2013 crea energy innovation summit 2 mw solar project 1

8
2013 CREA Energy Innovation Summit 2 MW Solar Project 1

Upload: janis-charles

Post on 17-Dec-2015

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2013 CREA Energy Innovation Summit 2 MW Solar Project 1

2013 CREAEnergy

Innovation Summit

2 MW Solar Project

1

Page 2: 2013 CREA Energy Innovation Summit 2 MW Solar Project 1

Location of Project

• Hwy 7 & Colo Blvd in Adams County

2

Page 3: 2013 CREA Energy Innovation Summit 2 MW Solar Project 1

Electricity ProductionHangar 160 Solar Field

• Commissioned Dec 2012• Maximum Output – 2 MW• Energy Output• 3,400 MWh /yr• 0.25% of United Powers

annual energy needs• Supply 300 -350 homes/yr

3

Page 4: 2013 CREA Energy Innovation Summit 2 MW Solar Project 1

Generation Overview

4

7,600 solar panels 300 watts (DC) / panel 25 yr warranty

Racking System Wind tested – 120 mph All Steel

RPS Station (2) Inverters – 1,000 V UL 1.85 MVA Transformer

Combiner Box 19 panel strings 400 panels / string

Monitoring Real-time @ Individual string level

Page 5: 2013 CREA Energy Innovation Summit 2 MW Solar Project 1

Solar Overview

Capacity Factors

• Solar 18 to 20 %• Wind 35 to 45 %• Baseload 85 to 95 %

5

12:00:00 AM

01:00:00 AM

02:00:00 AM

03:00:00 AM

04:00:00 AM

05:00:00 AM

06:00:00 AM

07:00:00 AM

08:00:00 AM

09:00:00 AM

10:00:00 AM

11:00:00 AM

12:00:00 PM

01:00:00 PM

02:00:00 PM

03:00:00 PM

04:00:00 PM

05:00:00 PM

06:00:00 PM

07:00:00 PM

08:00:00 PM

09:00:00 PM

10:00:00 PM

11:00:00 PM

12:00:00 AM

0

500

1000

1500

2000

2500

BaseloadSolarWind

Page 6: 2013 CREA Energy Innovation Summit 2 MW Solar Project 1

Business Case

6

Renewable Resource 3 to 1 multiplier 0.73 % of RPS

Local Contractors Samuel Engineering HT Solar - Mechanical E Light - Electric Atlas Landscaping

Construction

3 Months / Oct - Dec Primary Metered Realtime data –

connected to SCADA

Hangar 160 Solar Field

United Power

Tri-State Policy 115Bill Credit Option

kwh

$$

$$

kwh

Page 7: 2013 CREA Energy Innovation Summit 2 MW Solar Project 1

Community

7

• Good for the Environment• Reduces CO2 Emissions by 5,000 metric tons• Equivalent to planting 750 trees or taking 750 cars off the road

• Good for the Economy• Local generation creates local construction jobs

• Good for United Power• Cost of Energy is predictable and stable• Helps meet RPS requirements• Net benefit to all co-op members

Page 8: 2013 CREA Energy Innovation Summit 2 MW Solar Project 1

Renewable Generation & RPS

• Continue to develop projects that benefit overall membership

• Enhances community presence and co-op reputation

• Provides hedge against rising energy prices

• Needed to meet higher RPS requirements

• Working with Tri-State to develop these small DG projects

8