Date: 05 Jan 2013 Day: Sat Project Name: 062 - 016 Location: Chemical Store - Fertil 2 Group No: Technician Names: 1 Nizamu Uddien 3 Manjur Alam 5 Supervisor: Alam 2 Mohammad Jony 4 6 7 OliAllah 8 9 Cutting of Thread Bars 6 Threading Machine Big pc= 1 Small pc= - Drilled Holes in slab/ceiling for Thread Bars 20 Grinder Big pc= - Small pc= - Fastening the Hangging clamp-clamp for Pipe support 20 Pipe Wrench Big pc= - Small pc= - Ladder Big pc= 1 Medium pc= - Small pc= Cutting of Main/Riser Service Pipes/pc Hilti Drill pc= 0 Chissel pc= 8" pc= - 6" pc= - 4" pc= - 3" pc= - Grooving Machine pc= 1 Tape Meter pc= Grooving of Main/Riser Service Pipe Welding Machine pc= 0 Allen Key Set pc= 8" pc= - 6" pc= - 4" pc= - 3" pc= - Spanner Size - pc= 2 Halk Saw Frame pc= Cutting of Sprinkler Service Pipes Black Spanner pc= 1 Halk Saw Blade pc= 2½" pc= - 1½" pc= 20 1¼" pc= - 1" pc= - Level Gauge pc= 0 Chipping Tool pc= Threading of Sprinkler Service Pipes Flat Screw Driver (-) pc= 0 Sprinkler Spanner pc= 2½" pc= - 1½" pc= 20 1¼" pc= - 1" pc= - Philip Screw Driver (+) pc= 0 Test Pen pc= Electric Fan pc= 0 Hammer pc= Installed Main/Riser Pipe per Branches w/ Fittings Risers pc= 2 pc= Location Undergrou 8" pc= - 6" pc= - 4" pc= 3 3" pc= - pc= pc= Location 8" pc= - 6" pc= - 4" pc= - 3" pc= - pc= pc= Main Line / Branches pc= pc= Location Undergrou 8" pc= 5 6" pc= - 4" pc= - 3" pc= - Location 8" pc= - 6" pc= - 4" pc= - 3" pc= - Installed Sprinkler Pipe Branches w/ Fittings Risers / Main Line / Branches Location High Level 6" pc= - 4" pc= - 3" pc= - 2" pc= - Location Low level 6" pc= - 4" pc= - 3" pc= - 2" pc= - Main Line / Branches Location High Level 2½" pc= - 1½" pc= 20 1¼" pc= - 1" pc= - Location Low Level 2½" pc= - 1½" pc= - 1¼" pc= - 1" pc= - Installation of Fire Hose Cabinet & Breaching Inlet Mounting of Fire Hose Cabinet pc= - Installation of Fire Hose Reels pc= - with nozzle? pc= - Breaching Inlet pc= - Pressure Red Valve pc= - w/ lockshield pc= - w/ Landing V. pc= - D Powder Fire Ext. pc= - Co2 Fire Ext. pc= - Sprinkler Drops pc= - Upright Sprinkler pc= - Pendent Sprinkler pc= - Recessed Sprinkler pc= - Extended Coverage pc= - Zone Control Valve Station pc= - Drain Valve pc= - Prepared By: Non-Rising Stem Gate Valve pc= - Air release Valve pc= - Pressure Reducing Valve Station pc= - Non-Return Valve pc= - Name: Ahmed I. AbuRadi OS & Y Gate Valve pc= - w/ Supervisory Switch? pc= - Date: 05 Jan 2013 Covering openings by stop plugs before Pressure Test pc= - Preparation of (Manual) Pump and Pressure Gauge x Applied pressure x Taken Readings on time intervals x Approved By: Mounting Electrical Pump pc= - Diesel pc= - Jockey pc= - Name: Tested Fire Pump Set x Diesel x Jockey x Date: Interconnecting Pump Set to Sprinkler Network x Installation of FirePump Set Follow Ups for Materials etc: (Optional) Installation of Valves Pressure Test for Sprinkler Network Installation of Sprinkler Heads Cause of Delays/ Emergencies: (optional) R E M A R K S : (optional) Installation of Service Pipes for Sprinkler System 2- 22mm Spanner 6 3- 18 mm Spanner 7 4 8 Cutting, Threading Grooving of Pipes Installation of Service Pipes for Wet System others tools/equipments not mention above: (optional) 1- Hitachi Drill 5 DAILY ACTIVITY ACCOMPLISHMENTS and MATERIALS MONITORING SHEET FOR FIRE FIGHTING " CHECK the box with (√) if made; put Number of Material/Tools for (pc=) ; put Size e.g, 2½" x 1" for (size) ; leave blank if not applicable" Installation of Pipe Support and Thread Bars Tools & Equipments Used for the day:

Upload: abu-bidu

Post on 21-Jul-2016

218 views

Category:

Documents


0 download

DESCRIPTION

design of chemical store

TRANSCRIPT

Page 1: 20130105 - Chemical Store

Date: 05 Jan 2013 Day: Sat Project Name: 062 - 016 Location: Chemical Store - Fertil 2

Group No: Technician Names: 1 Nizamu Uddien 3 Manjur Alam 5

Supervisor: Alam 2 Mohammad Jony 4 6

7 OliAllah 8 9

Cutting of Thread Bars 6 Threading Machine Big pc= 1 Small pc= -

Drilled Holes in slab/ceiling for Thread Bars 20 Grinder Big pc= - Small pc= -

Fastening the Hangging clamp-clamp for Pipe support 20 Pipe Wrench Big pc= - Small pc= -

Ladder Big pc= 1 Medium pc= - Small pc=

Cutting of Main/Riser Service Pipes/pc Hilti Drill pc= 0 Chissel pc=

8" pc= - 6" pc= - 4" pc= - 3" pc= - Grooving Machine pc= 1 Tape Meter pc=

Grooving of Main/Riser Service Pipe Welding Machine pc= 0 Allen Key Set pc=

8" pc= - 6" pc= - 4" pc= - 3" pc= - Spanner Size - pc= 2 Halk Saw Frame pc=

Cutting of Sprinkler Service Pipes Black Spanner pc= 1 Halk Saw Blade pc=

2½" pc= - 1½" pc= 20 1¼" pc= - 1" pc= - Level Gauge pc= 0 Chipping Tool pc=

Threading of Sprinkler Service Pipes Flat Screw Driver (-) pc= 0 Sprinkler Spanner pc=

2½" pc= - 1½" pc= 20 1¼" pc= - 1" pc= - Philip Screw Driver (+) pc= 0 Test Pen pc=

Electric Fan pc= 0 Hammer pc=

Installed Main/Riser Pipe per Branches w/ Fittings

Risers pc= 2 pc=

Location Underground 8" pc= - 6" pc= - 4" pc= 3 3" pc= - pc= pc=

Location 8" pc= - 6" pc= - 4" pc= - 3" pc= - pc= pc=

Main Line / Branches pc= pc=

Location Underground 8" pc= 5 6" pc= - 4" pc= - 3" pc= -

Location 8" pc= - 6" pc= - 4" pc= - 3" pc= -

Installed Sprinkler Pipe Branches w/ Fittings

Risers / Main Line / Branches

Location High Level 6" pc= - 4" pc= - 3" pc= - 2" pc= -

Location Low level 6" pc= - 4" pc= - 3" pc= - 2" pc= -

Main Line / Branches

Location High Level 2½" pc= - 1½" pc= 20 1¼" pc= - 1" pc= -

Location Low Level 2½" pc= - 1½" pc= - 1¼" pc= - 1" pc= -

Installation of Fire Hose Cabinet & Breaching Inlet

Mounting of Fire Hose Cabinet pc= -

Installation of Fire Hose Reels pc= - with nozzle? pc= -

Breaching Inlet pc= -

Pressure Red Valve pc= - w/ lockshield pc= - w/ Landing V. pc= -

D Powder Fire Ext. pc= - Co2 Fire Ext. pc= -

Sprinkler Drops pc= -

Upright Sprinkler pc= - Pendent Sprinkler pc= -

Recessed Sprinkler pc= - Extended Coverage pc= -

Zone Control Valve Station pc= - Drain Valve pc= - Prepared By:

Non-Rising Stem Gate Valve pc= - Air release Valve pc= -

Pressure Reducing Valve Station pc= - Non-Return Valve pc= - Name: Ahmed I. AbuRadi

OS & Y Gate Valve pc= - w/ Supervisory Switch? pc= - Date: 05 Jan 2013

Covering openings by stop plugs before Pressure Test pc= -

Preparation of (Manual) Pump and Pressure Gauge √ x

Applied pressure √ x Taken Readings on time intervals √ x Approved By:

Mounting Electrical Pump pc= - Diesel pc= - Jockey pc= - Name:

Tested Fire Pump Set √ x Diesel √ x Jockey √ x Date:

Interconnecting Pump Set to Sprinkler Network √ x

Installation of FirePump Set

Follow Ups for Materials etc: (Optional)

Installation of Valves

Pressure Test for Sprinkler Network

Installation of Sprinkler Heads

Cause of Delays/ Emergencies: (optional)

R E M A R K S : (optional)

Installation of Service Pipes for Sprinkler System

2- 22mm Spanner 6

3- 18 mm Spanner 7

4 8

Cutting, Threading Grooving of Pipes

Installation of Service Pipes for Wet System

others tools/equipments not mention above: (optional)

1- Hitachi Drill 5

DAILY ACTIVITY ACCOMPLISHMENTS and MATERIALS MONITORING SHEET FOR FIRE FIGHTING

" CHECK the box with (√) if made; put Number of Material/Tools for (pc=) ; put Size e.g, 2½" x 1" for (size) ; leave blank if not applicable"

Installation of Pipe Support and Thread Bars Tools & Equipments Used for the day:

Page 2: 20130105 - Chemical Store

-

0

2

0

0

0

0

0

0

1

Follow Ups for Materials etc: (Optional)

Cause of Delays/ Emergencies: (optional)

R E M A R K S : (optional)

others tools/equipments not mention above: (optional)

DAILY ACTIVITY ACCOMPLISHMENTS and MATERIALS MONITORING SHEET FOR FIRE FIGHTING

" CHECK the box with (√) if made; put Number of Material/Tools for (pc=) ; put Size e.g, 2½" x 1" for (size) ; leave blank if not applicable"

Tools & Equipments Used for the day:

Page 3: 20130105 - Chemical Store

Date: 05 /JAN /2013 Day: Project Name: 62 - 12 Location: Chemical Store

Group No: Technician Names: 1 Nizamu Uddien 4 Manjur Alam

Supervisor: BADIUL ALAM 2 Mohammad Jony 5

3 OliAllah 6

Cutting of Thread Bars pc= 6 Threading Machine Big pc= 1 Small pc= 0

Drilled Holes in slab/ceiling for Thread Bars √ √ pc= 20 Grinder Big pc= 0 Small pc= 0

Fastening the Hangging-clamp for Pipe support pc= 20 Pipe Wrench Big pc= 0 Small pc= 0

Ladder Big pc= 1 Medium pc= 0 Small pc=

Cutting of Main/Riser Service Pipes/pc Hilti Drill pc= 0 Chissel pc=

8" pc= 0 6" pc= 0 4" pc= 0 3" pc= 0 Grooving Machine pc= 1 Tape Meter pc=

Grooving of Main/Riser Service Pipe Welding Machine pc= 0 Allen Key Set pc=

8" pc= 0 6" pc= 0 4" pc= 0 3" pc= 0 Spanner Size - pc= 2 Halk Saw Frame pc=

Cutting of Sprinkler Service Pipes Black Spanner pc= 1 Halk Saw Blade pc=

2½" pc= 0 1½" pc= 20 1¼" pc= 0 1" pc= 0 Level Gauge pc= 0 Chipping Tool pc=

Threading of Sprinkler Service Pipes Flat Screw Driver (-) pc= 0 Sprinkler Spanner pc=

2½" pc= 0 1½" pc= 20 1¼" pc= 0 1" pc= 0 Philip Screw Driver (+) pc= 0 Test Pen pc=

Electric Fan pc= 0 Hammer pc=

Installed Main/Riser Pipe per Branches w/ Fittings

Pipes 8" pc= 0 6" pc= 0 4" pc= 0 3" pc= 0 pc= 1 pc=

Elbows 8" pc= 0 6" pc= 0 4" pc= 0 3" pc= 0 pc= 2 pc=

Tee 8" pc= 0 6" pc= 0 4" pc= 0 3" pc= 0 pc= 2 pc=

Coupling 8" pc= 0 6" pc= 0 4" pc= 2 3" pc= 0 pc= pc=

Reducer Tee Size 0 X 0 pc= 0 ;Size 0 X 0 pc= 0

Reducer Coupling Size 0 X 0 pc= 0 ;Size 0 X 0 pc= 0

Mechanical Tee Size 0 X 0 pc= 0 ;Size 4" X 1½" pc= 8

Installed Sprinkler Pipe Branches w/ Fittings

Pipes 2½" pc= 0 1½" pc= 20 1¼" pc= 0 1" pc= 0

Elbows 2½" pc= 0 1½" pc= 5 1¼" pc= 0 1" pc= 0

Tee 2½" pc= 0 1½" pc= 0 1¼" pc= 0 1" pc= 0

Coupling 2½" 0 1½" pc= 0 1¼" pc= 0 1" pc= 0

Reducer Tee Size 1½" X 1" pc= 20 ;Size 0 X 0 pc= 0

Reducer Coupling Size 0 X 0 pc= 0 ;Size 0 X 0 pc= 0

Reducer Bush Size 1½" X 1" pc= 20 ;Size 0 X 0 pc= 0

Mounting of Fire Hose Cabinet pc= 0

Installation of Fire Hose Reels pc= 0 with nozzle? pc= 0

Breaching Inlet pc= 0

Pressure Red Valve pc= 0 w/ lockshield pc= 0 w/ Landing V. pc= 0

D Powder Fire Ext. pc= 0 Co2 Fire Ext. pc= 0

Upright Sprinkler pc= 0 Pendent Sprinkler pc= 0

Recessed Sprinkler pc= 0 Extended Coverage pc= 0

Zone Control Valve Station pc= 0 Drain Valve pc= 0 Prepared By:

Non-Rising Stem Gate Valve pc= 0 Air release Valve pc= 0

Pressure Reducing Valve Station pc= 0 Non-Return Valve pc= 0 Name: AHMED I. ABURADI

OS & Y Gate Valve pc= 0 w/ Supervisory Switch? pc= 0 Date: 05 /01 /2013

Covering openings by stop plugs before Pressure Test pc= 0

Preparation of (Manual) Pump and Pressure Gauge √ x

Applied pressure √ x Taken Readings on time intervals √ x Approved By:

Mounting Electrical Pump pc= 0 Diesel pc= 0 Jockey pc= 0 Name:

Tested Fire Pump Set √ x Diesel √ x Jockey √ x Date:

Interconnecting Pump Set to Sprinkler Network √ x

Installation of Fire Hose Cabinet & Breaching Inlet

Installation of Valves

Installation of Sprinkler Service Pipes

Pressure Test for Sprinkler Network

Installation of FirePump Set

Installation of Sprinkler Heads

Follow Ups for Materials etc: (Optional)

Cause of Delays/ Emergencies: (optional)

R E M A R K S : (optional)

others tools/equipments not mention above: (optional)

1- Hitachi Drill

2- 22mm Spanner

3- 18 mm Spanner 7

DAILY ACTIVITY ACCOMPLISHMENTS and MATERIALS MONITORING SHEET FOR FIRE FIGHTING

Installation of Pipe Support and Thread Bars Tools & Equipments Used for the day:

6

5

" CHECK the box with (√) if made; put Number of Material/Tools for (pc=) ; put Size e.g, 2½" x 1" for (size) ; leave blank if not applicable"

Installation of Main/Riser Service Pipes

Cutting, Threading Grooving of Pipes

4 8

Page 4: 20130105 - Chemical Store

0

0

2

0

0

0

0

0

0

1

Follow Ups for Materials etc: (Optional)

Cause of Delays/ Emergencies: (optional)

R E M A R K S : (optional)

others tools/equipments not mention above: (optional)

DAILY ACTIVITY ACCOMPLISHMENTS and MATERIALS MONITORING SHEET FOR FIRE FIGHTING

Tools & Equipments Used for the day:

" CHECK the box with (√) if made; put Number of Material/Tools for (pc=) ; put Size e.g, 2½" x 1" for (size) ; leave blank if not applicable"