2015-2020 transportation improvement program

117
2015-2020 Transportation Improvement Program June 16, 2014

Upload: others

Post on 16-Apr-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2015-2020 Transportation Improvement Program

2015-2020 Transportation Improvement Program

June 16, 2014

Page 2: 2015-2020 Transportation Improvement Program

TABLE OF CONTENTS

Table of Contents………………………………………………... 1

Adopting Resolution…………………………………………….. 2

Program Overview………………………………………………. 5

Letter from the Director……………………………………….… 6

Policies…………………………………………………………....8

Title VI Policy Statement………………………………………..10

Financial Analysis……………………………………………… 11

TIP Changes Last Year to This Year…………………………... 21

Business License Surcharge Projects Update………………...... 23

Six Year Project Lists………………………………………….. 24

Project Detail Sheets………………………………………….... 28

Arterial Map Updates..……………………………………..…..103

Glossary……………………………………………………..….106

1

Page 3: 2015-2020 Transportation Improvement Program

2

Page 4: 2015-2020 Transportation Improvement Program

3

Page 5: 2015-2020 Transportation Improvement Program

4

porterb
Text Box
Signature on File
porterb
Text Box
Signature on File
porterb
Text Box
Signature on File
Page 6: 2015-2020 Transportation Improvement Program

TRANSPORTATION IMPROVEMENT PROGRAM OVERVIEW The City of Vancouver 2015 – 2020 Transportation Improvement Program (TIP) is an

update of the City’s 2014 - 2019 TIP. The TIP is the programming document for transportation improvements over a six-year period. The State of Washington law (RCW 35.77.010) requires the City to prepare a TIP annually that is consistent with and implements the city’s adopted comprehensive growth management plan. The TIP identifies capital transportation system improvement projects and includes a policy to work with affected property owners to preserve railroad right-of-way in the event a railroad ceases to operate.

A City of Vancouver Arterial Street System and Classification Map which designates

roadways functionally classified as Arterials pursuant to VMC 11.70.010 and VMC 9.02.040 is adopted and attached hereto.

For information about the City’s Comprehensive Plan, contact Vancouver Planning at 360-

487-7950. For questions or more information about specific transportation projects, please contact Vancouver Public Works at 360-487-7130, or visit the City’s website:

www.cityofvancouver.us

5

Page 7: 2015-2020 Transportation Improvement Program

P.O. Box 1995 • Vancouver, WA 98668-1995 • www.cityofvancouver.us

_____________________________________________________________________________

2015-2020 Transportation Improvement Program (TIP) Letter from the Public Works Director

Vancouver’s 2015-2020 Six-Year Transportation Improvement Program (TIP) continues the City’s focus on core services and systems vital to our community’s quality of life and economic well-being. State law requires that the City annually adopt a TIP that includes transportation capital improvement projects. This year’s TIP again provides a comprehensive view of the successes of the past year and the challenges ahead by listing projects identified as important to keeping residents and businesses moving efficiently and effectively throughout our community, even those projects where funding has not yet been identified.

The City is currently working on several key transportation projects. These projects include Northeast 18th Street between Four Seasons Lane and 138th Avenue (right-of-way only); East Mill Plain Boulevard from 104th Avenue to Chkalov Drive; Northeast First Street between 164th and 192nd avenues (design and right-of-way only); Northeast 137th Avenue between 49th Street and Fourth Plain Boulevard (design only); and various sidewalk, traffic and pedestrian signal improvements. The City recently completed Northeast 137th/138th Avenue improvements between 28th and 49th streets, as well as the Waterfront Access Project Phase II. In addition, the City continues to expand on its collaborative partnership with the independent, citizen-led Neighborhood Traffic Safety Alliance through the ongoing Neighborhood Traffic Management Program, which utilizes the limited funding available on solutions championed by neighborhoods.

Vancouver’s citizens have made a significant investment in our community’s street system infrastructure, with an estimated replacement value of more than $1 billion. Council’s commitment to providing resources for Vancouver’s most costly street asset – pavement – reflects our determination to preserve this investment as our top priority. Current resources are prioritized to our arterial network first, as they receive the most traffic, followed by our neighborhood streets. In addition, some county roads annexed in the 1980s and 1990s are inadequate for today’s more urban population and require costly urban upgrades and/or pavement reconstruction. The City’s program to reconstruct streets that either failed or were not built to sustain current traffic loads has minimal funding. Unfortunately, resources have been insufficient to maintain our network pavement condition index (PCI), and we have seen a consistent decline in our PCI values over time. Upcoming discussions will continue to deal with pavement needs in our community.

-continued-

6

Page 8: 2015-2020 Transportation Improvement Program

We continue to refine how we operate and maintain what we have. Through our multi-year asset management initiative, we are taking a close look at our current transportation system assets; assessing current conditions; determining future maintenance, rehabilitation or replacement needs; estimating future costs; and managing those costs. The planned technology upgrade from Hansen 7 to Hansen 8, anticipated to be complete by the end of 2014, will be an important step in this process.

Looking forward, there is uncertainty as to the one-time or ongoing resources that might be available for future work. This uncertainty is reflected in the small number of capital projects programmed beyond 2015. The City recently completed a comprehensive street program review, which will support Council’s goal to develop a transportation funding policy and long-term strategy. Recommendations for the strategy are anticipated later this year, and the strategy will provide a pathway for developing projects beyond 2015.

Our future, in part, depends upon our ability to invest in public infrastructure in a way that both facilitates new private development and preserves our neighborhoods. We will continue to seek out innovations and opportunities to ensure the strong foundation our community needs to thrive.

Brian K. Carlson, P.E. Director of Vancouver Public Works

7

Page 9: 2015-2020 Transportation Improvement Program

TRANSPORTATION POLICIES (Vancouver Comprehensive Plan 2011)

1. TRANSPORTATION SYSTEM: Develop and maintain an interconnected and overlapping transportation system grid of pedestrian

walkways, bicycle facilities, roadways for automobiles and freight, transit service, and high capacity transit service. Include support programs such as traffic operations, transportation demand management, neighborhood traffic management, and the regional trails program. Work towards completing and sustaining individual components and programs to ensure success of the entire system.

2. SYSTEM BALANCE: Allocate resources to balance transportation choices. Promote development of a broader range of transportation

options including pedestrian, bike, and transit systems, rather than focusing all resources on satisfying peak commuting demand with roadway capacity alone.

3. TRANSPORTATION SAFETY: Ensure high safety standards for motorists, pedestrians, and bicyclists through the development and

capital improvement processes. Allocate city capital resources to high risk and collision location for motorists, bicyclists, and pedestrians.

4. TRANSPORATION FINANCE: Develop recurring and dedicated funding for a complete transportation program, including system

operation and maintenance. Leverage local funding with innovative and aggressive finance strategies including partnerships, grant development, efficient debt, and fee-based funding sources.

5. TRANSPORATION CIRCULATION AND SYSTEM CONNECTIVITY: Develop a transportation grid that provides good

connections to surrounding land uses and activity centers and allows for multiple circulation routes to/from each location. Close gaps and complete system connections through the development and capital improvement processes.

6. LAND USE AND TRANSPORTATION INTEGRATION: Develop and implement innovative transportation investment, design, and

program incentives to achieve the urban environment envisioned in the Comprehensive Plan. 7. LIVABLE STREETS: Design streets and sidewalks and manage vehicular traffic to encourage livability, interaction, and sense of

neighborhood or district ownership in linkage with adjacent land uses. Encourage multi-modal travel, and provide accessible, human scale opportunities for transferring between travel modes.

8. TRANSPORTATION ACCESSIBILITY: Build an accessible transportation system focused on inter-model connectivity and removing

barriers to personal physical mobility. 9. TRANSPORTATION SYSTEM EFFICIENCY: Invest in and improve efficiency of the transportation system with multi-modal design,

advanced traffic management and operations technology, demand management strategies and high-frequency transit service. 10. NEIGHBORHOOD TRAFFIC: Protect and enhance neighborhoods with an active program that focuses on safety, safe routes to

school, traffic calming, education, and enforcement. 11. TRANSPORATION REGIONAL AND METROPOLITAN COORDINATION: Coordinate Vancouver’s transportation plans, policies,

and programs with those of other jurisdictions serving the greater Metropolitan area to ensure a seamless transportation system. Focus particularly on cooperation with the Southwest Washington Regional Transportation Council, Washington State Department of Transportation, Clark County and C-TRAN.

12. ECONOMIC DEVELOPMENT: In order to support the continued economic vitality of Vancouver, major transportation system

investments should facilitate freight mobility, job creation, regional competitive position, and revenue growth. 13. VEHICILE MILES TRAVELED: Use transportation and land use measures to maintain or reduce single occupant motor vehicle miles

traveled per capita to increase system efficiency and lower overall environmental impacts. 14. STREET DESIGN: Design city streets to achieve safety and accessibility for all modes. Arterial streets shall provide facilities for

automobile, bike, pedestrian and transit mobility, and shall include landscaping and adequate lighting. 15. PARKING STANDARDS: Adopt coordinated parking standards which maintain neighborhood integrity, promote the use of a multi-

modal transportation system, encourage desired economic development and growth throughout the entire urban area, and which economize the use of urban land by reducing the need for any excess provision of surface parking.

8

Page 10: 2015-2020 Transportation Improvement Program

CAPITAL PLANNING AND ASSET MANAGEMENT FINANCIAL POLICIES (Adopted 5-7-2012) 31. Asset management best practice involves managing the performance, risk and expenditures on infrastructure assets in an optimal

and sustainable manner throughout their lifecycle covering planning, design, construction, operation, maintenance, and disposal. The City shall integrate the principles and best practices of Asset Management such as those embodied in the International Infrastructure Management Manual in the management of its assets.

32. Asset Inventory will be maintained with maintenance, repair and deferred maintenance costs identified and updated on an annual

basis. 33. Maintenance of city assets shall be addressed on a current need, rather than deferred into the future. 36. Funding for capital projects, including major facilities maintenance projects, will be allocated in a manner that balances

community needs with City priorities, the potential for attracting matching funds, and the ability to reduce or limit expenses in future years.

37. The City’s objective is to incorporate a “Pay-As-You-Go” approach (using available cash and current resources) in the Capital

Improvement program. 38. The Capital Budget will be adopted at the same time the City Operating Budget is adopted. The Capital budget will only include

fully funded projects. The Capital Budget will only contain projects identified in the Capital Improvement Program. 39. A capital repair appropriation will be maintained for unanticipated major repairs of general operating facilities and for

emergency replacement of general fund equipment. Additions to the capital repair contingency reserve will be made based on Council directions.

40. Impacts on net annual operating and maintenance costs will be identified as part of the funding considerations for new capital

projects such as buildings, parks and street enhancements. This includes identifying potential reductions in maintenance costs if improvements are funded. The necessary funds to operate the capital facility will be identified at the time the capital budget is adopted.

ASSET MANAGEMENT COMPREHENSIVE PLAN POLICY (Adopted 12-16-2013)

1. City public facility assets shall be systematically managed to balance full life cycle costs, performance, risk, and service levels, using

best management practices and data.

9

Page 11: 2015-2020 Transportation Improvement Program

10

Page 12: 2015-2020 Transportation Improvement Program

2015-2020 Transportation Improvement Program

Financial Analysis

11

Page 13: 2015-2020 Transportation Improvement Program

The funding sources listed below are those typically used for transportation capital investments and pavement maintenance within the City of Vancouver. Revenue varies from year to year. The current City budget calls for most transportation capital revenue after 2011 to be used to retire bond debt incurred to build transportation infrastructure over the last decade or so, including such projects as 18th Street, 137th Avenue, 164th Avenue, 28th Street/Burton Road, Fruit Valley Road, 192nd Avenue, and others. As a result, the City’s transportation capital program will enter a period of significant slowdown for several years as the City pays off debt for previously completed capital projects. As local funding goes to retire debt, external revenue sources like grants and traffic impact fees are less available to the City for improvements. Local Funding: State Gas Tax: About $3.2 million per year. REET: Real estate excise tax, $1 million/year, depending on real estate transactions. Bonds (debt): Periodically the City sells bonds for transportation construction projects. Revenues to pay those debts come from several sources including gas tax, general fund, REET, and business license surcharge. Other Local Transportation Funds: Business License Fee = $50/employee generates around $2.2 million annually to pay bond debt. Developer Contribution: Direct Construction: Private developers are required to build or improve on-site roadways and may also be required to make off-site improvements to comply with concurrency or SEPA impacts. Traffic Impact Fees (TIF): The City maintains a TIF program (fees paid by a developer per new trip) which historically covers about 10% of the annual construction program. Proportionate Share Contributions: Developer contributions toward an improvement project to meet concurrency or safety requirements. Federal Grant Programs: STP-TMA: Surface Transportation Program Transportation Management Area funds are allocated by the SW Washington Regional Transportation Council and then, through a competitive grant process, to urban jurisdictions in Clark County. CMAQ: Congestion Mitigation and Air Quality Program funds are administered like STP-TMA funds. CDBG: Community Development Block Grant—periodically available for small neighborhood improvements. State Grant Programs: Transportation Improvement Board (TIB): Funded with a small portion of the state gas tax, TIB is the main source for state grant funds to urban areas. Vancouver competes with other jurisdictions in western Washington for funds from several TIB grant programs. The state has several other smaller grant programs run by various agencies that fund smaller, targeted safety, pedestrian, and bicycle projects. The graphs on the next few pages show the historical and forecasted revenues and expenses for streets in the City of Vancouver. Work is currently underway to refine revenue forecasts consistent with work being performed to review long-term transportation funding options.

12

Page 14: 2015-2020 Transportation Improvement Program

Transportation Financial Data

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

STREET MAINTENANCE

ExpensesStreet Maintenance Fund 102

Pavement Management 3,689,283        2,516,952      3,535,182      4,716,758      3,805,029      4,349,882        3,650,173      2,935,568      5,521,405      5,631,248      5,942,740     

Signs and Striping 861,143           858,811         999,003         958,721         935,199         1,051,468        876,281         880,863         974,625         1,219,456      1,257,580     

Signals 896,221           980,889         1,031,767      1,040,078      919,313         1,349,708        909,444         821,940         1,125,277      917,800          1,145,852     

Street Lights 1,206,445        1,155,316      1,169,164      1,311,566      1,361,565      1,242,909        1,476,108      1,569,659      1,594,820      1,695,242      1,775,652     

Street Maintenance 441,884           442,443         439,151         461,416         356,965         659,886           775,861         734,933         610,040         714,832          559,316        

Administration 3,698,214        3,743,218      4,029,496      4,363,813      4,932,282      4,573,342        3,594,185      3,433,860      2,510,676      2,419,916      2,693,072     

Street Sweeping 196,777           179,587         221,637         230,314         183,503         346,118           707,249         546,345        

Traffic Engineering     447,719         488,101          522,239        

Total Street Maintenance Fund 102 Expenses 10,989,967      9,877,216      11,425,400    13,082,666    12,493,856    13,573,313      11,989,301    10,923,168    12,784,562    13,086,595    13,896,451   

Transportation Debt Service paid by Fund 102 119,277         226,457         226,457         226,457           652,580         635,535         279,722         639,102          634,303        

Transfers to Fund 330 Transportation Capital   720,000         191,409         125,535           1,424,009      952,440         1,304,270      2,449,167      2,507              

Fund 102 Street Maintenance Cash Outflows 10,989,967      9,877,216      11,544,677    14,029,123    12,911,722    13,925,305      14,065,890    12,511,143    14,368,554    16,174,864    14,533,261   

RevenuesStreet Maintenance Fund 102

Property Taxes 145,361         444,218         46,242              18,462            21,025            103,416        

REET 2 2,182,426        2,788,342      3,494,130      3,660,703      3,296,097      1,771,348        1,482,032      1,259,689      1,373,945      1,310,417      2,177,228     

Motor Vehicle Fuel Tax 1,953,422        2,119,003      2,185,119      3,661,169      3,861,972      3,595,593        3,589,027      3,547,722      3,371,269      3,316,528      3,380,195     

Transfer from the General Fund 6,286,998        5,643,500      6,150,342      2,700,104      5,532,106      5,874,552        8,073,813      8,317,368      8,837,796      9,364,098      9,822,342     

Transfer from the 2006 Bond Fund 1,000,000      300,000          

Transfer from the Surface Water 300,000         176,151           204,753         823,526        

Miscellaneous 406,438           843,402         735,620         563,011         1,436,093      1,137,354        668,520         678,482         1,059,314      1,003,895      670,513        

Total Street Maintenance Fund 102 Revenues 10,829,284      11,394,247    12,565,211    11,730,348    14,870,486    12,901,240      14,036,607    14,647,812    14,642,324    14,994,938    16,153,694   

TRANSPORTATION DEBT

ExpensesYearly Debt Service 2,901,098        2,886,765        2,733,765        2,587,080        3,197,494        3,602,767        4,085,020        4,044,493        4,221,205        5,142,388        5,144,299       

RevenuesDebt Service Revenues

General Fund 2,229,331        2,225,951      2,074,968      1,928,588      1,987,838      1,998,755        1,993,677      1,460,343      1,721,103      2,053,276      2,062,167     

Employee Surcharge ‐                    ‐                  ‐                  ‐                  828,244         943,250           1,438,762      1,948,615      1,942,513      1,945,481      1,944,661     

Motor Vehicle Fuel Tax 671,767           660,814         658,797         658,492         381,413         660,762           652,580         635,535         279,722         639,102          634,303        

REET 277,867         504,530          503,168        

Total Debt Service Revenues 2,901,098        2,886,765      2,733,765      2,587,080      3,197,494      3,602,767        4,085,020      4,044,493      4,221,205      5,142,388      5,144,299     

TRANSPORTATION ENGINEERING

ExpensesTransportation Engineering

Administration 943,652           927,808         923,346         1,106,711      1,181,262      1,168,008        1,144,366      1,037,542      366,917         53,371            38,932            

Commuter trip Reduction 42,508            145,949         228,350         260,804           370,148         248,486        

Street Design 257,581           245,153         273,265         306,280         545,602         389,804           367,365         502,755         616,271         417,185          365,461        

Traffic Engineering 361,400           322,137         287,832         374,258         564,263         485,347           466,805         481,603        

Neighborhood Traffic Management 184,138           189,033         205,755         199,680         129,116         161,674          

Transportation Planning 253,168           265,935         337,670         400,610         413,980         436,402           787,451         419,304         41,842            15,327            26,845            

Concurrency 235,408           204,653         249,899         253,268         185,002         236,240           194,844         113,161        

Development Review 231,987           317,109         468,050         485,926         442,219         394,481           251,850         135,884         215,077         202,836          228,112        

Transfers to Fund 330   35,000              75,415           

Totals Transportation Engineering 2,467,334        2,471,828      2,788,325      3,272,682      3,689,794      3,567,760        3,582,829      3,014,150      1,240,107      688,719          659,350        

RevenuesTransportation Engineering

General Fund 2,467,334        2,471,828      2,788,325      3,272,682      3,689,794      3,567,760        3,582,829      3,014,150      1,240,107      688,719          659,350        

TRANSPORTATION CAPITAL

ExpensesFund 330 Transportation Capital

Capital Expenses 13,549,816      23,966,415    27,011,556    19,290,317    24,508,291    15,868,620      8,784,884      14,736,472    17,782,275    16,259,786    18,241,260   

RevenuesFund 330

REET 500,000         513,000         526,338         465,182           88,922            75,581            82,437            78,916            130,429        

Grants 6,567,300        12,256,842    14,822,248    9,828,815      10,255,076    7,633,141        5,934,236      6,313,201      9,298,306      4,451,602      5,559,068     

Developer Participation 557,344           2,465,104      450,331         1,797,218      2,056,326      2,860,197        73,513            300,188         353,724         24,302            ‐                  

Intergovernmental Loan Proceeds 990,000         1,100,000      110,000         3,840,000      77,000            6,000              1,496,000     

Transfer from Fund 001 General Fund 5,021                24,020            118,163         1,270,187      553,767         588,696           411,833         582,261         300,000         67,963            265,934        Transfer from Fund 102 Street Maintenance 720,000         191,409         125,535           1,424,009      952,440         1,304,270      2,449,167      22,730            

Transfer from Fund 130 Arterial Street Fund 1,977,211      1,153,809      210,317        

Transfer from Fund 131 Transportation Special Revenue 1,563,735      2,171,472      1,626,251        1,006,929      387,654         839,140         126,639          74,251            

Transfer from Fund TIF Funds 2,229,014        3,726,842      3,082,703      920,641         1,365,547      700,752           622,642         1,254,091      394,929         1,532,710      1,736,997     

Transfer from Bond Capital Fund ‐                    ‐                  ‐                  ‐                  7,425,444      3,052,680        1,322,697      1,008,956      3,573,771      6,749,195      7,052,756     

Miscellaneous Revenue 968,032           379,942         1,020,509      1,177,844      962,769         1,174,153        212,870         1,701,624      314,485         380,502          815,752        

Total Fund 330 Revenue 10,326,711      20,829,961    21,147,763    18,991,757    26,608,148    18,226,587      11,207,651    16,415,996    16,538,062    15,866,996    17,153,917   

1 of 1 2015‐2020 Transportation Improvement Program13

Page 15: 2015-2020 Transportation Improvement Program

Operationsand Maintenance

21%

PavementManagement

16%

Capital Expenses

50%

Debt Service13%

2013 Streets Expenses$37.9 Million

OperatingExpenses

50%

14

Page 16: 2015-2020 Transportation Improvement Program

General Fund33%

REET7%

Motor Vehicle Fuel Tax

9%

Grants15%

Special Revenue5%

TIF Funds5%

Bond Capital Fund22%

Miscellaneous Revenue4%

2013 Streets Revenue$39.1 Million

15

Page 17: 2015-2020 Transportation Improvement Program

Operations and Maintenance

Pavement Preservation

Debt Service

Capital Expenses

 ‐

 5

 10

 15

 20

 25

 30

 35

 40

 452002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

Dollars

(Millions)

Year

Streets Expenses

ProgrammedActual

16

Page 18: 2015-2020 Transportation Improvement Program

TIF/Developer ContributionBonds

Grants 

Miscellaneous Revenue*

 ‐

 5

 10

 15

 20

 25

 30

 35

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

Dollars (Millions)

Year

Streets Capital Revenues

Actual Forecasted

???

Note: The comprehensive street funding work recently completed will help guide discussions in 2014 for future revenue forecasts.

17

Page 19: 2015-2020 Transportation Improvement Program

REET

Motor Vehicle Fuel Tax

General Fund

Miscellaneous

 ‐

 5

 10

 15

 20

 252002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

Dollars (Millions)

Year

Street Operations, Pavement Preservation, and Debt Service Revenues

Actual Forecasted

18

Page 20: 2015-2020 Transportation Improvement Program

REET

Employee Surcharge

Gas Tax

General Fund

Total Debt Service

0.0

1.0

2.0

3.0

4.0

5.0

6.0

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

Dollars(M

illions)

Year

Streets Debt Service Revenues

Actual Forecasted

?

19

Page 21: 2015-2020 Transportation Improvement Program

2015-2020 Transportation Improvement Program

Six Year Project List

20

Page 22: 2015-2020 Transportation Improvement Program

City of Vancouver 6‐Year Transportation Improvement Program (2015‐2020)  Hearing date June 16, 2014 

 

This page provides an overview of the changes from the previous 6 year project list (2014‐2019) to this year's 6 year project list (2015‐2020). The changes are segmented by: projects removed; projects added; and other changes. 

Projects Removed:  TIP ID:  Project Type:  Comments: 

Main St CDBG – 6th to Evergreen  TRANS‐831  Multimodal  Project did not receive grant. 

 

Projects Added:  TIP ID:  Project Type:  Comments: 

Funded Project List       

E Mill Plain @ Garrison Signal Improvement Project 

TRANS‐837  Traffic  Project moved from unfunded list to funded list. Locally funded. 

Columbia Way – Columbia St to Grant St 

TRANS‐715  Capacity  Project moved from unfunded list to funded list. New TIB grant received. 

SE McGillivray Blvd. @ SE 166th Ave  TRANS‐746  Traffic  Carry forward into 2014 & 2015. 

Partially Funded Project List       

SE 136th Ave @ SE 7th St  TRANS‐363  Traffic  Project already designed. Actively seeking funding for construction phase. 

Evergreen Hwy Trail – Image to Chelsea 

TRANS‐740  Multimodal  Project moved from unfunded list to partially funded list. New grant received for design only. 

Jefferson St – W Evergreen to W Mill Plain Blvd 

TRANS‐531  Capacity  Project moved from unfunded list to partially funded list.  

Unfunded Project List       

East Evergreen Highway Reconstruction Project 

TRANS‐838  Other  Needed improvement along Evergreen Hwy from Chelsea to 164th. 

Columbia Shores Blvd @ Columbia Way 

TRANS‐680  Capacity  Added to unfunded list. Needed freight mobility improvement 

Hearthwood @ SE 1st St  TRANS‐724  Traffic  Added to unfunded list. Future intersection improvement. 

 

Other Changes:  TIP ID:  Project Type:  Comments: 

Funded Project List       

NE 162nd Ave – Poplar to Fourth Plain Blvd – Fiber Communications 

TRANS‐737  Traffic  Carry forward money into 2014. 

E Mill Plain Blvd. @ SE 157th Ave and Mill Plain west of Andresen 

TRANS‐739  Traffic  Carry forward money into 2014. 

Flashing Yellow Arrow Upgrade Project 

TRANS‐A‐828 

Traffic  Carry forward money into 2014. 

East Mill Plain Signal Optimization    Traffic  Carry forward money into 2014. 

Endeavour Elementary Pathway and Safety Improvement Program 

TRANS‐824  Multimodal  Carry forward money into 2014. 

Columbia St/97th St/St Helens/Mcloughlin Sharrows 

TRANS‐734  Multimodal  Carry forward money into 2014. 

18th St – Four Seasons Ln to NE 138th Ave 

TRANS‐703  Capacity  Carry forward money into 2015. 

NE Vancouver Mall Dr. – NE Andresen Rd. to NE 66th Ave 

TRANS‐555  Capacity  Carry forward money into 2015. 100% TIF funded (Orchards TIF district). 

E Mill Plain Blvd. – 104th Ave to  TRANS‐678  Capacity  Carry d forward money into 2015. 

21

Page 23: 2015-2020 Transportation Improvement Program

City of Vancouver 6‐Year Transportation Improvement Program (2015‐2020)  Hearing date June 16, 2014 

Chkalov 

Fourth Plain Infill Sidewalk  TRANS‐832  Multimodal  Carry forward money into 2015. 

Columbia St/Main St VAST 6th to 45th  TRANS‐721  Traffic  Carry forward money into 2015. 

Destination Downtown TDM  TRANS‐DT‐451 

Multimodal  Carry forward money into 2015. 

Partially Funded Project List       

Evergreen Hwy Trail – Ellsworth Rd to Weber Arboretum 

TRANS‐337  Multimodal  Carry forward money into 2015. 

NE 18th St – Four Seasons Lane to NE 138th Ave 

TRANS‐703  Capacity  Carry forward money into 2015. 

SE 137th Ave. – NE 49th St to NE Fourth Plain Blvd 

TRANS‐275  Capacity  Carry forward money into 2015. 

SE 1st St. – SE 164th Ave to SE 192nd Ave 

TRANS‐268  Capacity  Carry forward money into 2015. 

Unfunded Project List       

None       

Other:  Project Type:  Comments: 

Non‐City Projects Added     

None     

Non‐City Projects Removed     

NE 20th Street Extension  Capacity  Completed by City of Camas 

Columbia River Crossing  Capacity  Funding removed by State 

 

22

Page 24: 2015-2020 Transportation Improvement Program

Project StatusE Mill Plain Blvd. & 104th Ave. Intersection CompletedEsther & 4th Street Lowering & Realignment Completed

NE 49th Street – 112th Ave. to 122nd Ave. CompletedNE Fourth Plain Blvd. at 65th/66th Ave. Completed

NE Thurston Rd. at Parkway & Van Mall Dr. CompletedMill Plain Blvd. & 136th Ave. Intersection Completed

Main Street Reconstruction Design Only Completed design

NE 138th Avenue – 28th St. to 49th St. Completed

NE 18th Street – I-205 to Four Seasons CompletedSE 164th Intersection Improvements Completed

NE 18th Street – Four Seasons to 136th Ave Right-of-way partially completed

Council Approved Business License Surcharge Capital Projects - Status

2015‐2020 City of Vancouver Transportation Improvement Program23

Page 25: 2015-2020 Transportation Improvement Program

Note: All costs are in 2014 dollars. 2014 shown for reference only (6-year plan is for 2015-2020).

2014 2015 2016 2017 2018 2019 2020

R

A

N

K

Project ID Project Name Project Type PhaseSpent to Date    

(3‐31‐14)Grant

TIF/Dev. 

DollarsBonds Other Local Grant

TIF/Dev. 

DollarsBonds Other Local Grant

TIF/Dev. 

DollarsBonds Other Local Grant

TIF/Dev. 

DollarsBonds Other Local Grant

TIF/Dev. 

DollarsBonds Other Local Grant

TIF/Dev. 

DollarsBonds Other Local Grant

TIF/Dev. 

DollarsBonds Other Local

Cost to 

CompleteProject Total TIF Area/Eligibility

FUNDED PROJECTSCapacity

TRANS‐555 NE Vancouver Mall Dr. ‐ NE Andresen Rd. to NE 66th Ave Capacity PSE $112,763 $100,000 $100,000 $212,763 Orchards

ROW $229,605 $400,000 $400,000 $629,605CN $0 $1,317,632 $1,317,632 $1,317,632

Total $342,368 Project Total By Year => $500,000 Project Total By Year => $1,317,632 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $1,817,632 $2,160,000

TRANS‐678 E Mill Plain Blvd. ‐ 104th Ave to Chkalov Capacity PSE $113,593 $400,000 $25,000 $425,000 $538,593 East City

ROW $0 $900,000 $25,000 $200,000 $75,000 $1,200,000 $1,200,000CN $0 $2,700,000 $75,000 $2,775,000 $2,775,000

Total $113,593 Project Total By Year => $1,350,000 Project Total By Year => $3,050,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $4,400,000 $4,513,593

TRANS‐726 NE 45th St ‐ NE 72nd Ave to NE 77th Ave Capacity PSE $107,578 $50,000 $50,000 $157,578 South Orchards

ROW $136,511 $0 $136,511CN $0 $1,050,000 $1,050,000 $1,050,000

Total $244,088 Project Total By Year => $1,100,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $1,100,000 $1,344,088

TRANS‐727 NE 82nd Ave ‐ NE 51st St to NE 54th St Capacity PSE $77,669 $50,000 $50,000 $127,669 South Orchards

ROW $1,954 $0 $1,954CN $0 $550,000 $550,000 $550,000

Total $79,623 Project Total By Year => $600,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $600,000 $679,623

TRANS‐748 Downtown Waterfront Access Project Capacity PSE $0 $0 $0 Vancouver

(approximately $13 million will be spent in 2012 ROW $0 $0 $0not shown here) CN $36,468,250 $164,150 $199,000 $134,000 $497,150 $36,965,400

Total $36,468,250 Project Total By Year => $497,150 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $497,150 $36,965,400

TRANS‐715 Columbia Way ‐ Columbia St to Grant St Capacity PSE $7,338 $50,000 $50,000 $57,338 Vancouver

(funded by developer and grants) ROW $190 $0 $190CN $0 $2,283,500 $519,800 $2,283,500 $519,800 $5,606,600 $5,606,600

Total $7,528 Project Total By Year => $2,853,300 Project Total By Year => $2,803,300 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $5,656,600 $5,664,128

Traffic

TRANS‐830 Fourth Plain Crosswalk Upgrades to Hybrid Beacons Traffic PSE $13,484 $0 $13,484 South Orchards

ROW $0 $0 $0CN $109,410 $250,000 $250,000 $359,410

Total $122,895 Project Total By Year => $250,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $250,000 $372,895

TRANS‐ 721 Columbia St./Main St. VAST 6th to 45th Traffic PSE $1,022 $0 $1,022 South Orchards

ROW $0 $0 $0CN $0 $75,000 $25,000 $350,000 $50,000 $500,000 $500,000

Total $1,022 Project Total By Year => $100,000 Project Total By Year => $400,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $500,000 $501,022

TRANS‐837 E Mill Plain @ Garrison Signal Improvement Project Traffic PSE $0 $50,000 $50,000 $50,000 South Orchards

ROW $0 $0 $0CN $0 $325,000 $325,000 $325,000

Total $0 Project Total By Year => $375,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $375,000 $375,000

TRANS‐746 SE McGillivray Blvd. @ SE 166th Ave Traffic PSE $0 $25,000 $25,000 $25,000 South Orchards

ROW $0 $0 $0CN $0 $275,000 $275,000 $275,000

Total $0 Project Total By Year => $300,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $300,000 $300,000

TRANS‐737

NE 162nd Ave ‐ Poplar to Fourth Plain Blvd ‐ Fiber 

Communications Traffic PSE $18,210 $10,000 $10,000 $28,210 South Orchards

ROW $0 $0 $0CN $0 $300,000 $40,000 $340,000 $340,000

Total $18,210 Project Total By Year => $350,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $350,000 $368,210

TRANS‐739 E Mill Plain Blvd. @ SE 157th Ave and Mill Plain west of Andresen Traffic PSE $29,978 $0 $29,978 South Orchards

(Hawk signals) ROW $3,514 $0 $3,514CN $9,391 $425,000 $25,000 $450,000 $459,391

Total $42,883 Project Total By Year => $450,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $450,000 $492,883

TRANS‐A‐828 Flashing Yellow Arrow Upgrade Project Traffic PSE $22,041 $0 $22,041 South Orchards

ROW $0 $0 $0CN $0 $400,000 $25,000 $425,000 $425,000

Total $22,041 Project Total By Year => $425,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $425,000 $447,041

East Mill Plain Signal Optimization Traffic PSE $38,750 $0 $38,750 South Orchards

ROW $0 $0 $0CN $0 $20,000 $40,000 $60,000 $60,000

Total $38,750 Project Total By Year => $60,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $60,000 $98,750

Multimodal

TRANS‐ 829 Columbia St. CDBG ‐ 33rd to 39th CDBG PSE $22,356 $0 $22,356 East City

ROW $0 $0 $0CN $0 $300,000 $300,000 $300,000

Total $22,356 Project Total By Year => $300,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $300,000 $322,356

TRANS‐832 Fourth Plain Subarea Sidewalk Infill Enhancement PSE $25,039 $50,000 $50,000 $75,039 East City

ROW $0 $300,000 $50,000 $350,000 $350,000CN $0 $550,000 $50,000 $600,000 $600,000

Total $25,039 Project Total By Year => $400,000 Project Total By Year => $600,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $1,000,000 $1,025,039

TRANS‐DT‐451 Downtown Vancouver TMA Multimodal PSE $0 $0 $0 East City

ROW $0 $0 $0CN $0 $150,000 $21,214 $50,000 $10,000 $231,214 $231,214

Total $0 Project Total By Year => $171,214 Project Total By Year => $60,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $231,214 $231,214

Ongoing

TRANS‐A‐237 Traffic Signal Sustainability Ongoing PSE $0 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $175,000 $175,000

ROW $0 $0 $0CN $0 $125,000 $125,000 $125,000 $125,000 $125,000 $125,000 $125,000 $875,000 $875,000

Total $0 Project Total By Year => $150,000 Project Total By Year => $150,000 Project Total By Year => $150,000 Project Total By Year => $150,000 Project Total By Year => $150,000 Project Total By Year => $150,000 Project Total By Year => $150,000 $1,050,000 $1,050,000

TRANS‐A‐241 Pavement Preservation Program Ongoing PSE $0 $308,100 $316,419 $324,962 $333,736 $342,747 $352,001 $352,001 $2,329,966 $2,329,966

ROW $0 $0 $0CN $0 $6,162,000 $6,328,374 $6,499,240 $6,674,720 $6,854,937 $7,040,020 $7,040,020 $46,599,311 $46,599,311

Total $0 Project Total By Year => $6,470,100 Project Total By Year => $6,644,793 Project Total By Year => $6,824,202 Project Total By Year => $7,008,456 Project Total By Year => $7,197,684 Project Total By Year => $7,392,021 Project Total By Year => $7,392,021 $48,929,277 $48,929,277

TRANS‐A‐245 Bridge Management Program Ongoing PSE $0 $0 $0

ROW $0 $0 $0CN $0 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $70,000 $70,000

Total $0 Project Total By Year => $10,000 Project Total By Year => $10,000 Project Total By Year => $10,000 Project Total By Year => $10,000 Project Total By Year => $10,000 Project Total By Year => $10,000 Project Total By Year => $10,000 $70,000 $70,000

TRANS‐A‐738 Traffic Safety & Livability ‐ Citywide Ongoing PSE $0 $10,000 $10,000 $10,000

ROW $0 $0 $0CN $0 $55,000 $55,000 $55,000

Total $0 Project Total By Year => $65,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $65,000 $65,000

TRANS‐A‐240 Neighborhood Traffic Management Program Ongoing PSE $0 $0 $0

ROW $0 $0 $0CN $0 $120,000 $120,000 $120,000 $360,000 $360,000

Total $0 Project Total By Year => $120,000 Project Total By Year => $120,000 Project Total By Year => $120,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $360,000 $360,000

2014 2015 2016 2017 2018 2019 2020 TIP 2015‐2020 Totals

Annual Totals GrantTIF/Dev. 

DollarsBonds Other Local Grant

TIF/Dev. 

DollarsBonds Other Local Grant

TIF/Dev. 

DollarsBonds Other Local Grant

TIF/Dev. 

DollarsBonds Other Local Grant

TIF/Dev. 

DollarsBonds Other Local Grant

TIF/Dev. 

DollarsBonds Other Local Grant

TIF/Dev. 

DollarsBonds Other Local Grants TIF/Dev. Dollars Bonds

by Funding Source $6,027,650 $2,794,800 $199,000 $7,875,314 $6,133,500 $1,837,432 $0 $7,184,793 $0 $0 $0 $7,104,202 $0 $0 $0 $7,168,456 $0 $0 $0 $7,357,684 $0 $0 $0 $7,552,021 $0 $0 $0 $7,552,021 $12,161,150 $4,632,232 $199,000

Annual Totals  PSE ROW CN PSE ROW CN PSE ROW CN PSE ROW CN PSE ROW CN PSE ROW CN PSE ROW CN Other Local

by Phase $1,153,100 $1,675,000 $14,068,664 $341,419 $275,000 $14,539,306 $349,962 $0 $6,754,240 $358,736 $0 $6,809,720 $367,747 $0 $6,989,937 $377,001 $0 $7,175,020 $377,001 $0 $7,175,020       Project Costs Grand Total $51,794,491

Annual Totals $16,896,764 $15,155,725 $7,104,202 $7,168,456 $7,357,684 $7,552,021 $7,552,021 $106,335,519

Non‐City

18th Street @ I‐205 Interchange (2014 construction) WSDOT

Fourth Plain BRT (funding uncertain) C‐Tran

West Vancouver Freight Access (under construction) Port of Vancouver

6 YEAR TRANSPORTATION IMPROVEMENT PROGRAM(2015-2020)

PSE=Plans, Specifications, and Estimate, ROW=Right‐of‐way, CN=Construction, TIF=Transportation Impact Fees Page 1 City of Vancouver Transportation Improvement Program 2015‐2020

24

Page 26: 2015-2020 Transportation Improvement Program

Note: All costs are in 2014 dollars. 2014 shown for reference only (6-year plan is for 2015-2020).

2014 2015 2016 2017 2018 2019 2020

R

A

N

K

Project ID Project Name Project Type PhaseSpent to Date    

(3‐31‐14)Grant

TIF/Dev. 

DollarsBonds Other Local Grant

TIF/Dev. 

DollarsBonds Other Local Grant

TIF/Dev. 

DollarsBonds Other Local Grant

TIF/Dev. 

DollarsBonds Other Local Grant

TIF/Dev. 

DollarsBonds Other Local Grant

TIF/Dev. 

DollarsBonds Other Local Grant

TIF/Dev. 

DollarsBonds Other Local

Cost to 

CompleteProject Total TIF Area/Eligibility

PARTIALLY FUNDED PROJECTSCapacity

TRANS‐268 SE 1st St ‐ SE 164th Ave to SE 192nd Ave Capacity PSE $280,770 $650,000 $50,000 $700,000 $980,770 East City

(PSE & ROW only partially funded, no CN funding ROW $1,743 $1,000,000 $50,000 $1,050,000 $1,051,743see project detail sheet for more information) CN $0 $0 $0

Total $282,514 Project Total By Year => $700,000 Project Total By Year => $1,050,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $1,750,000 $2,032,514

TRANS‐275 NE 137th Ave ‐ NE 49th St to NE Fourth Plain Blvd Capacity PSE $99,236 $700,000 $50,000 $700,000 $50,000 $1,500,000 $1,599,236 Evergreen

(PSE funded, no ROW or CN funding ROW $0 $0 $0see project detail sheet for more information) CN $0 $0 $0

Total $99,236 Project Total By Year => $750,000 Project Total By Year => $750,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $1,500,000 $1,599,236

TRANS‐703 NE 18th St ‐ Four Seasons Lane to NE 138th Ave Capacity PSE $0 $0 $0 Evergreen &

(ROW phase funded, construction partially funded) ROW $231,523 $2,000,000 $250,000 $700,000 $50,000 $3,000,000 $3,231,523 East CityCN $0 $3,000,000 $2,720,000 $2,280,000 $8,000,000 $8,000,000

Total $231,523 Project Total By Year => $2,250,000 Project Total By Year => $750,000 Project Total By Year => $8,000,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $11,000,000 $11,231,523

TRANS‐531 Jefferson St ‐ W Evergreen to W Mill Plain Blvd Capacity PSE $0 $100,000 $100,000 $100,000 Evergreen &

(Design partially funded) ROW $0 $0 $0 East CityCN $0 $0 $0

Total $0 Project Total By Year => $100,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $100,000 $100,000

Traffic

TRANS‐363 SE 136th Ave @ SE 7th St Traffic PSE $38,628 $0 $38,628 Vancouver

(Design funded only) ROW $0 $0 $0CN $0 $0 $0

Total $38,628 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $0 $38,628

Multimodal

TRANS‐337 Evergreen Hwy Trail ‐ Multimodal PSE $184,073 $0 $184,073 Vancouver

 Ellsworth Rd to Weber Arboretum ROW $7,016 $100,000 $25,000 $125,000 $132,016(See detail sheet for more information) CN $0 $650,000 $25,000 $675,000 $675,000

Total $191,089 Project Total By Year => $125,000 Project Total By Year => $675,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $800,000 $991,089

TRANS‐740 Evergreen Hwy Trail ‐ Multimodal PSE $0 $100,000 $100,000 $100,000 Vancouver

 Image to Chelsea ROW $0 $0 $0(Design funded only) CN $0 $0 $0

Total $0 Project Total By Year => $100,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $100,000 $100,000

TRANS‐833 Vancouver Waterfront Trail Multimodal PSE $0 $0 $0 Vancouver

(see detail sheet for more information) ROW $0 $0 $0CN $0 $750,000 $750,000 $750,000

Total $0 Project Total By Year => $750,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $750,000 $750,000

Other

TRANS‐DT‐822 Downtown Quiet Zone Other PSE $15,307 $0 $15,307 Vancouver

(See detail sheet for more information) ROW $0 $0 $0CN $0 $85,000 $85,000 $85,000

Total $15,307 Project Total By Year => $85,000 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 Project Total By Year => $0 $85,000 $100,307

2014 2015 2016 2017 2018 2019 2020 TIP 2015‐2020 Totals

Annual Totals GrantTIF/Dev. 

DollarsBonds Other Local Grant

TIF/Dev. 

DollarsBonds Other Local Grant

TIF/Dev. 

DollarsBonds Other Local Grant

TIF/Dev. 

DollarsBonds Other Local Grant

TIF/Dev. 

DollarsBonds Other Local Grant

TIF/Dev. 

DollarsBonds Other Local Grant

TIF/Dev. 

DollarsBonds Other Local Grants TIF/Dev. Dollars Bonds

by Funding Source $4,300,000 $350,000 $0 $210,000 $3,050,000 $100,000 $0 $75,000 $3,000,000 $2,720,000 $2,280,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $10,350,000 $3,170,000 $2,280,000

Annual Totals  PSE ROW CN PSE ROW CN PSE ROW CN PSE ROW CN PSE ROW CN PSE ROW CN PSE ROW CN Other Local

by Phase $1,650,000 $2,375,000 $835,000 $750,000 $1,800,000 $675,000 $0 $0 $8,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0       Project Costs Grand Total $285,000

Annual Totals $4,860,000 $3,225,000 $8,000,000 $0 $0 $0 $0 $16,943,296

6 YEAR TRANSPORTATION IMPROVEMENT PROGRAM(2015-2020)

PSE=Plans, Specifications, and Estimate, ROW=Right‐of‐way, CN=Construction, TIF=Transportation Impact Fees Page 1 City of Vancouver Transportation Improvement Program 2015‐202025

Page 27: 2015-2020 Transportation Improvement Program

2015 2016 2017 2018 2019 2020

R

A

N

K

Project ID Project Name Project Type PhaseSpent to Date    

(3‐30‐14)

See Detail Sheets for 

Project CostsTIF Area/Eligibility

UNFUNDED PROJECTSCapacity

TRANS‐274 NE 28th St ‐ NE 142nd Ave to NE 162nd Ave. Capacity PSE $0 Evergreen

ROW $0CN $0

Total $0 No FundingTRANS‐279 NE 49th St ‐ NE 122nd Ave to NE 137th Ave Capacity PSE $0 Evergreen

ROW $0CN $0

Total $0 No FundingTRANS‐281 NE 18th St ‐ NE 87th Ave to NE 97th Ave Capacity PSE $0 Evergreen

ROW $0CN $0

Total $0 No FundingTRANS‐349 NE 18th St ‐ NE 164th Ave to NE 192nd Ave Capacity PSE $0 East City

ROW $0CN $0

Total $0 No FundingTRANS‐444 NE 18th St ‐ NE 142nd Ave to NE 162nd Ave Capacity PSE $0 East City

ROW $0CN $0

Total $0 No FundingTRANS‐527 NE 18th St ‐ NE 97th Ave to NE 107th Avenue Capacity PSE $0 East City

ROW $0CN $0

Total $0 No FundingTRANS‐536 Fruit Valley Rd ‐ 61st St to NW 78th St Capacity PSE $0 Vancouver

ROW $0CN $0

Total $0 No FundingTRANS‐583 NE 87th Ave / Lieser Rd. Realignment Capacity PSE $0 Vancouver

ROW $0CN $0

Total $0 No FundingTRANS‐607 NE 192nd Ave ‐ SE 1st St. to NE 18th St. Capacity PSE $0 East City

ROW $0CN $0

Total $0 No FundingTRANS‐712 NE 59th St ‐ NE 147th Ave to NE 162nd Ave Capacity PSE $0 Evergreen

ROW $0CN $0

Total $0 No FundingTRANS‐713 NE 147th Ave ‐ NE 59th St to NE Fourth Plain Blvd Capacity PSE $0 Evergreen

ROW $0CN $0

Total $0 No FundingTRANS‐716 NE 9th St ‐ NE 172nd Ave to NE 192nd Ave Capacity PSE $0 East City

ROW $0CN $0

Total $0 No FundingTRANS‐717 NE 182nd Ave ‐ SE 1st St to NE 18th St Capacity PSE $0 East City

ROW $0CN $0

Total $0 No FundingTRANS‐718 NE 162nd Ave ‐ SE 1st St to NE 9th St Capacity PSE $0 East City

ROW $0CN $0

Total $0 No FundingTRANS‐719 NE 112th Ave ‐ E Mill Plain Blvd. to NE 15th St Pedestrian PSE $0 East City

ROW $0CN $0

Total $0 No FundingTRANS‐729 E Mill Plain Blvd ‐ SE 172nd Ave to SE 192nd Ave Capacity PSE $0 East City

(see detail sheet for more information) ROW $0CN $0

Total $0 No FundingTRANS‐816 NW 32nd Ave ‐ SR501 to Whitney Capacity PSE $0 Vancouver

ROW $0CN $0

Total $0 No FundingTRANS‐825 NE 54th St ‐ 15th Avenue to St. James Street Capacity PSE $0 Hazel Dell

ROW $0CN $0

Total $0 No FundingTRANS‐826 NE 104th Avenue ‐ Mill Plain Blvd. to 14th Street Capacity PSE $0 East City

ROW $0CN $0

Total $0 No FundingTRANS‐827 NE 104th Avenue ‐ 14th Street to 18th Street Capacity PSE $0 East City

ROW $0CN $0

Total $0 No FundingTRANS‐834 NE 9th St. ‐ Broadway to "C" Capacity PSE $0 Vancouver

ROW $0CN $0

Total $0 No FundingTRANS‐680 Columbia Shores Blvd @ Columbia Way Capacity PSE $0 Vancouver

ROW $0CN $0

Total $0 No FundingTraffic

TRANS‐603 Leiser Rd @ MacArthur St. Intersection Traffic PSE $0 Vancouver

ROW $0CN $0

Total $0 No FundingTRANS‐720 136th/137th Ave ‐ E Mill Plain Blvd to E 28th st Traffic PSE $0 Evergreen

ROW $0CN $0

Total $0 No FundingTRANS‐722 St Johns Blvd. @ NE 68th St Traffic PSE $0 Hazel Dell

ROW $0

6 YEAR TRANSPORTATION IMPROVEMENT PROGRAM(2015-2020)

PSE=Plans, Specifications, and Estimate, ROW=Right‐of‐way, CN=Construction, TIF=Transportation Impact Fees Page 1 City of Vancouver Transportation Improvement Program 2015‐2020

26

Page 28: 2015-2020 Transportation Improvement Program

2015 2016 2017 2018 2019 2020

R

A

N

K

Project ID Project Name Project Type PhaseSpent to Date    

(3‐30‐14)

See Detail Sheets for 

Project CostsTIF Area/Eligibility

UNFUNDED PROJECTS

6 YEAR TRANSPORTATION IMPROVEMENT PROGRAM(2015-2020)

CN $0

Total $0 No FundingTRANS‐723 SE 20th St @ SE 176th Ave Traffic PSE $0 East City

ROW $0CN $0

Total $0 No FundingTRANS‐725 St Johns Blvd. @ Ft Vancouver Way Traffic PSE $0 Vancouver

ROW $0CN $0

Total $0 No FundingTRANS‐724 Hearthwood @ SE 1st St Traffic PSE $0 East City

ROW $0CN $0

Total $0 No FundingTRANS‐818 NE Burton/28th Street ‐ NE Andresen Rd to NE 138th Ave Traffic PSE $0 Evergreen

ROW $0CN $0

Total $0 No FundingTRANS‐819 NW Fruit Valley Rd @ La Frambois Traffic PSE $0 Vancouver

ROW $0CN $0

Total $0 No FundingMultimodal

TRANS‐258 E. Fourth Plain Blvd. ‐ Ft Vancouver Way to NE Andresen Rd. Enhancement PSE $0 Vancouver

ROW $0CN $0

Total $0 No FundingTRANS‐495 Main St Reconstruction ‐ 5th St to 15th Street Enhancement PSE $0 Vancouver

ROW $0CN $0

Total $0 No FundingTRANS‐740 Evergreen Hwy Trail ‐ Image Rd. to Chelsea Ave Enhancement PSE $0 Vancouver

ROW $0CN $0

Total $0 No FundingTRANS‐741 Evergreen Hwy Trail ‐ Silver Springs to Se 164th Ave Enhancement PSE $0 Vancouver

ROW $0CN $0

Total $0 No FundingTRANS‐742 Evergreen Hwy Trail ‐ SE 164th Ave to E. city limits Enhancement PSE $0 Vancouver

ROW $0CN $0

Total $0 No Funding

TRANS‐835

Fort Vancouver Way Subarea Improvements ‐ Mcloughlin to 4th 

Plain Multimodal PSE $0 Vancouver

ROW $0CN $0

Total $0 No FundingOther

TRANS‐836 Evergreen Blvd. Bridge over Blandford Safety PSE $0 Vancouver

ROW $0CN $0

Total $0 No Funding

TRANS‐837 Fruit Valley Rd. Bridge over railroad tracks near Whitney Rd. Safety PSE $0 Vancouver

ROW $0CN $0

Total $0 No FundingTRANS‐838 East Evergreen Highway Reconstruction Project Reconstruction PSE $0 East City

ROW $0CN $0

Total $0 No FundingOngoing

TRANS‐A‐238 Disabled Access (ADA) Ongoing PSE $0

ROW $0CN $0

Total $0 No FundingTRANS‐A‐239 School Crossing Protection Ongoing PSE $0

ROW $0CN $0

Total $0 No FundingTRANS‐A‐242 Bikeways Ongoing PSE $0

ROW $0CN $0

Total $0 No FundingTRANS‐A‐244 Safe Walkways Ongoing PSE $0

ROW $0CN $0

Total $0 No FundingTRANS‐A‐421 Pavement Reconstruction Program Ongoing PSE $0

ROW $0CN $0

Total $0 No Funding

PSE=Plans, Specifications, and Estimate, ROW=Right‐of‐way, CN=Construction, TIF=Transportation Impact Fees Page 2 City of Vancouver Transportation Improvement Program 2015‐2020

27

Page 29: 2015-2020 Transportation Improvement Program

2015-2020

Transportation Improvement Program

Project Detail Sheets

28

Page 30: 2015-2020 Transportation Improvement Program

 

PROJECT DETAIL SHEETS OVERVIEW 

 

The following pages consist of project detail sheets, which provide additional 

information for each project listed within the City’s 6‐year Transportation 

Improvement Program (TIP). A project identification number is located in the upper 

right hand corner of each detail sheet. Each detail sheet includes a vicinity map for the 

project, project description, project justification, estimated costs, estimated schedule, 

and other pertinent information. 

 

29

Page 31: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-258

SR-500 EB

SR-500 WB

I-5

18TH

86TH

33RD

EVERGREEN

87TH

FALK

15TH

ROSS

39TH

44TH

MCLOUGHLIN

MACARTHUR

STAP

LETO

N

FORT VANCOUVER

BLAN

DFOR

D

BURTON

VANCOUVER MALL

20TH

COLUMBIA HOUSE

MILL PLAIN

FOURTH PLAIN

GRAN

D

ANDR

ESEN

SAIN

T JOH

NS

25TH

33RD

Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:EnhancementProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

E. FOURTH PLAIN BLVD. - FT VANCOUVER WAY TO NE ANDRESEN RD.

Upgrade sidewalks and St lights to be consistent with the vision established in the Fourth PlainSub-Area Plan. Improvement include wider sidewalks, upgraded ornamental Street lights, andstreet trees. Total scope of project is undefined.

Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

History of collisions associated with driveways and pedestrians and bicyclists. Project identifiedas a priority improvement in the Fourth Plain Blvd Sub-Area Plan (2007). Project identified inthe Vancouver Comprehensive Plan (2011-2030).Based on 2012 safety report this project haspotentially high safety benefits.

TRANS-258PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: FT VANCOUVER WAY TO: NE ANDRESEN RD

Total Proj. Cost:

Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

30

Page 32: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-268

15TH

172N

D13TH

FRIB

ERG-

STRU

NK

BYBEE

1ST19

2ND

164T

H

MILL PLAIN

162N

D

Ê

In Design

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:CapacityProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

SE 1ST ST - SE 164TH AVE TO SE 192ND AVE

Urban upgrade of existing 2 lane Roadway to a 3 and 5 lane principal arterial standard (oneor two lanes each direction plus turn lane). Roadway cross section varies per segment. Streetupgrades include sidewalks, bike lanes, Street lights and sound walls at required locations. PSEand ROW only partially funded. No funding for CN.

71612

Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

Upgrade of substandard urban arterial with safety and level of service deficiencies. Projectidentified as a priority improvement in the Section 30 Subarea Plan (2009). Project identifiedin the Vancouver Comprehensive Plan (2011-2030).

TRANS-268PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: SE 164TH AVE TO: SE 192ND AVE

$16,270,000.00Total Proj. Cost:

$10,500,000.00Const. Cost:$1,470,000.00Design Cost:

Pre-Design Cost:$4,300,000.00ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

31

Page 33: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

**SCIP-100

**SCIP-94

**SCIP-16

**SCIP-93

**SS-19

TRANS-444

TRANS-720

**SCIP-17**SCIP-230

**SCIP-84

**SCIP-99

**SCIP-90

TRANS-273

**SS-21

**WTR-1

**WTR-22

**WTR-61

**WTR-70**WTR-51**SCIP-19

TRANS-349**SS-22

TRANS-818

TRANS-703

**SCIP-207

**SCIP-89

**

**SCIP-77

**SCIP-92

**SCIP-76**SCIP-219

**SCIP-218

**SW-28

**SCIP-DR10

**SCIP-209

TRANS-274

39TH

18TH

28TH

162N

D

138T

H13

7TH

136TH Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:CapacityProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

NE 28TH ST - NE 142ND AVE TO NE 162ND AVE.

Urban upgrade of existing 2 lane Rdway to 3 lane minor arterial roadway standards (one laneeach direction plus center turn lane) including sidewalks, bike lanes, Stlights and sound walls atrequired locations.

Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

Upgrade of substandard urban arterial with level of service, poor pavement and safetydeficiencies. Project identified in Vancouver Comprehensive Plan (2011-2030).Based on 2012safety report this project has potentially high safety benefits.

TRANS-274PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: NE 142ND AVE TO: NE 162ND AVE

$9,750,000.00Total Proj. Cost:

$7,250,000.00Const. Cost:$1,250,000.00Design Cost:

Pre-Design Cost:$500,000.00ROW Cost:

$750,000.00Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

32

Page 34: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-275

117T

HSR

-500 E

B

162N

D

76TH

137T

H

162N

D

FOURTH PLAIN

49TH 48TH

WARD

POPLAR

Ê

In Design

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:CapacityProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

NE 137TH AVE - NE 49TH ST TO NE FOURTH PLAIN BLVD

Urban upgrade of existing 2 lane Rdway to 3 lane minor arterial roadway standard (one laneeach direction with turn lane or median divider) including a new intersection at NE 59th St,sidewalks, bike lanes, St lights and sound walls where required. PSE funded. No funding forROW or CN.

71237

Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

Upgrade of substandard urban arterial with level of service and safety deficiencies. Projectidentified in Vancouver Comprehensive Plan (2011-2030).

TRANS-275PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: NE 49TH ST TO: NE FOURTH PLAIN BLVD

$16,000,000.00Total Proj. Cost:

$10,900,000.00Const. Cost:$1,600,000.00Design Cost:

Pre-Design Cost:$3,500,000.00ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

33

Page 35: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

**SCIP-19**SCIP-17**SCIP-207

**SS-20TRANS-275

TRANS-273

**SCIP-206

**WTR-22

**SCIP-105

**

**SCIP-183 **SCIP-184

**SCIP-103

TRANS-279

44TH

39TH

41ST

130TH

122ND

52ND129TH

136TH

121ST

45TH

51ST

47TH

140TH

131ST

126TH

139TH

123RD

56TH

128TH

141ST

53RD

50TH

46TH

127TH

54TH

55TH

138TH

40TH

42ND

49TH

125TH

133RD

119TH

43RD

118TH

142ND

135TH

132ND

124TH

134TH

57TH

120TH

48TH

125TH

40TH

142ND

47TH

42ND

46TH

42ND

49TH135

TH

52ND

141ST

138TH

45TH

56TH

51ST

47TH

124TH

135TH

128TH

53RD

139TH

50TH

42ND

45TH

118TH

131ST

141ST

132ND 47TH

50TH

52ND

138TH

43RD

50TH

126TH

129TH

40TH

43RD

127TH

138TH

135TH

123RD

123RD

51ST

46TH

40TH

138TH

43RD

128TH

141ST

40TH

141ST

46TH

133RD

131ST

135TH

39TH

49TH

137T

H

Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:CapacityProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

NE 49TH ST - NE 122ND AVE TO NE 137TH AVE

Urban upgrade of existing 2 lane Rdway to 3 lane minor arterial roadway standard (one laneeach direction and turn lane) including sidewalks, bike lanes, and Stlights.Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

Upgrade of substandard urban arterial with level of service and safety deficiencies. Projectidentified in Vancouver Comprehensive Plan (2011-2030).

TRANS-279PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: NE 122ND AVE TO: NE 137TH AVE

$8,700,000.00Total Proj. Cost:

$5,250,000.00Const. Cost:$950,000.00Design Cost:

Pre-Design Cost:$2,000,000.00ROW Cost:

$500,000.00Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

34

Page 36: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

**SCIP-68

**SCIP-11

**SW-1

**SCIP-66

TRANS-818

**SW-3

**SCIP-172

**

**SCIP-67

**SW-4

TRANS-527

**SCIP-63

TRANS-733

TRANS-826

**SCIP-9

**WTR-6

TRANS-258**SCIP-109

**SS-24 **SCIP-14

**SCIP-108

**SCIP-162

TRANS-827**SS-67**SS-29

**SS-26**SS-93

**SCIP-173

**SCIP-69

**WTR-46**WTR-63

**SCIP-15

**SCIP-167

**SCIP-170

**WTR-65

**SCIP-DR21

**SCIP-DR15

TRANS-817

**SCIP-168

TRANS-739

**SCIP-DR19

TRANS-281

86TH

97TH

87TH

18TH 98TH

BURTON

BURTON

ANDR

ESEN

MILL PLAIN

25TH

ANDR

ESEN

AUTO

MAL

L

FOURTH PLAIN

Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:CapacityProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

NE 18TH ST - NE 87TH AVE TO NE 97TH AVE

New St construction to a minor arterial standard (one lane each direction plus turn lane) withbike lanes, St lights, sound walls, sidewalk on north side of street and shared use pathway onsouth side of street.*Environmental Assessment and alignment study completed and approved in 2004*

Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

New Rdway segment which provide planned east / west circulation. Project identified inVancouver Comprehensive Plan (2011-2030).

TRANS-281PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: NE 87TH AVE TO: NE 97TH AVE

$14,200,000.00Total Proj. Cost:

$9,500,000.00Const. Cost:$1,600,000.00Design Cost:

Pre-Design Cost:$2,100,000.00ROW Cost:

$1,000,000.00Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

35

Page 37: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

**WTR-32**WTR-64**WTR-70

**WTR-52**WTR-16

**SCIP-179

**SCIP-50

TRANS-838

**SCIP-178

TRANS-740

**SW-16 **SCIP-42

**SCIP-176

**SCIP-18**SCIP-187

TRANS-735

**SCIP-180

**SCIP-43

**SCIP-177

**SCIP-175

**SCIP-188

TRANS-337

SR-14 EBSR-14 WB

12TH

FRENCH

19TH

23RD

104TH

95TH 14TH

97TH

101ST

13TH

18TH

MT HOOD

113TH

IMAGE

PORTER

NANCY

106TH

MAXON

88TH

96TH

16TH

MT RAINIER

HILLCREST

98TH

99TH

15TH

102ND

103RD

17TH

105TH

MT ADAMS

114TH

112TH

MT W

HITNE

Y

15TH

113TH

14TH

105TH16TH

98TH

106TH

13TH

113TH

106TH

97TH

18TH

15THEVERGREEN

ELLS

WORT

H

88TH

Ê

In Design

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:EnhancementProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

EVERGREEN HWY TRAIL - ELLSWORTH RD TO WEBER ARBORETUM

Upgrade St for 8 foot pedestrian pathway on south side of Rdway. Design will be completed forentire length, but construction is only funded from Ellsworth to approximately 100th Court.Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

2013*Start of Construction (Year):

Substandard Rdway and shoulder conditions, priority east/west pedestrian and bicycle corridor.Project listed in Vancouver Comprehensive Plan (2011-2030). Project identified in adjacentNeighborhood Action Plans.

TRANS-337PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: ELLSWORTH RD TO: IMAGE RD (APPROXIMATE)

$1,000,000.00Total Proj. Cost:

$690,000.00Const. Cost:$170,000.00Design Cost:

Pre-Design Cost:$140,000.00ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

36

Page 38: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-349

172N

D

13TH

FRIB

ERG-

STRU

NK

18TH

162N

D

192N

D

28TH

164TH

Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:CapacityProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

NE 18TH ST - NE 164TH AVE TO NE 192ND AVE

Urban upgrade of 2 lane Rdway to 5 lane urban principal arterial standard (two lanes eachdirection plus turn lane) with bike lanes, St lights, sound walls, sidewalk on north side of St andshared use pathway on south side of street. *Environmental Assessment alignment studycompleted and approved in 2004*

Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

Substandard urban arterial with level of service and safety deficiencies. Project identified inthe Vancouver Comprehensive Plan (2011-2030).

TRANS-349PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: NE 164TH AVE TO: NE 192ND AVE

$18,250,000.00Total Proj. Cost:

$11,500,000.00Const. Cost:$1,750,000.00Design Cost:

Pre-Design Cost:$4,000,000.00ROW Cost:

$1,000,000.00Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

37

Page 39: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-363SE 7TH ST

SE

13

5T

H C

T

SE

13

6T

H A

VE

Ê

In Design

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:TrafficProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

SE 136TH AVE @ SE 7TH ST

Installation of new traffic signal. Improvement includes upgrades to ADA ramps and Stlights. TIFProject ID SC30Street Improvement

071230

Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

Substandard intersection with level of service and safety deficiencies. Project identified in theVancouver Comprehensive Plan (2011-2030). Based on 2012 safety report this project haspotentially high safety benefits.

TRANS-363PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: TO:

Total Proj. Cost:

Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

38

Page 40: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

**SCIP-94

TRANS-720

**SCIP-93

**SS-19TRANS-274

**SCIP-84

**SCIP-77

**SCIP-90

TRANS-349

**

**SS-22

**SCIP-83

TRANS-818

TRANS-703

**SCIP-89

**SCIP-92

TRANS-718

TRANS-273**WTR-22

**SCIP-219

**SCIP-218

**SW-28

**SCIP-209

TRANS-44418TH

28TH

162N

D

138T

H

136T

H

164TH Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:CapacityProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

NE 18TH ST - NE 142ND AVE TO NE 162ND AVE

Urban upgrade of 2 lane Rdway to 5 lane urban principal arterial standard (two lanes eachdirection plus turn lane) with bike lanes, St lights, sound walls, sidewalk on north side of St andshared use pathway on south side of street. *Environmental Assessment alignment studycompleted and approved in 2004*

Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

Substandard urban arterial with level of service and safety deficiencies. Project identified inthe Vancouver Comprehensive Plan (2011-2030).

TRANS-444PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: NE 142ND AVE TO: NE 162ND AVE

$19,600,000.00Total Proj. Cost:

$9,600,000.00Const. Cost:$1,500,000.00Design Cost:

Pre-Design Cost:$7,500,000.00ROW Cost:

$1,000,000.00Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

39

Page 41: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

**WTR-48

TRANS-452

TRANS-748

TRANS-676

**SS-5

TRANS-833

** **SS-7

TRANS-531

TRANS-734

**WTR-14

TRANS-721**WTR-5

TRANS-831

**WTR-3

TRANS-715

**WTR-88TRANS-496

**SS-17

TRANS-821

**SCIP-123

**WTR-35

TRANS-834

**WTR-91

**SCIP-122

TRANS-835

TRANS-495

15TH

MILL PLAINI-5

F

13TH

11TH

D

5TH

G

12TH

17TH

16TH

9TH

19TH

ESTH

ER

C

7TH

E

BROA

DWAY

LINCO

LN

HARN

EY

MCLOUGHLIN

KAUF

FMAN

6TH

OFFICERS

JEFFE

RSON

DANIE

LS

15TH

KING

14TH

8TH

EVERGREENFO

RT VA

NCOU

VER

4TH

3RD

FRAN

KLIN

GRAN

T

HILL

DANIE

LS12THD

E

HARN

EY

MCLOUGHLINMCLOUGHLIN

7TH

17TH

ESTH

ER

KING

ESTH

ER

19TH

6TH

LINCO

LN

5TH

16TH

14TH

COLU

MBIA 6TH

8TH

FRAN

KLIN

MCLOUGHLIN

FORT VANCOUVER

EVERGREEN

EVERGREEN

8TH

C

WASH

INGT

ON

MILL PLAIN

MAIN

MAIN

FORT VANCOUVER

BROA

DWAY

MCLOUGHLIN

Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:EnhancementProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

MAIN ST RECONSTRUCTION - 5TH ST TO 15TH STREET

Complete reconstruction of pavement and sidewalks. Project includes upgraded Street lighting,and pedestrian amenities.Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

Priority project identified in the Vancouver City Center Vision plan (2007). Project identified inthe Vancouver Comprehensive Plan (2011-2030).Based on 2012 safety report this project haspotentially high safety benefits.

TRANS-495PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: 5TH ST TO: 15TH ST

$11,150,000.00Total Proj. Cost:

$8,750,000.00Const. Cost:$1,400,000.00Design Cost:

Pre-Design Cost:ROW Cost:

$1,000,000.00Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

40

Page 42: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-348

**SCIP-172

TRANS-818

TRANS-281

**SCIP-168

**

TRANS-827

**SCIP-170

**SCIP-173 TRANS-826**SCIP-DR15 **SCIP-172A

**SCIP-73

**WTR-6

TRANS-52718TH

94TH

I-205

14TH

21ST

16TH

20TH

107TH

22ND

23RD

102ND

96TH

109TH

18TH

15TH

103RD

105TH

19TH

95TH

98TH

110TH

101ST

CRANBROOK

104TH

PINE CREEK

FERNGROVE

24TH

100TH

HERON

17TH

KNOL

LCRE

ST

108TH

94TH

WOODRIDGE

99TH

106TH

HOLLY

100TH

19TH

102ND

110TH

94TH

22ND

14TH

21ST

22ND

22ND

14TH

21ST

15TH

95TH

18TH

16TH

105TH

95TH

20TH

101ST

107TH

19TH

109TH

15TH

98TH

20TH

110TH

24TH

97TH

98TH

BURTON

Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:CapacityProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

NE 18TH ST - NE 97TH AVE TO NE 107TH AVENUE

New street construction and upgrade of existing segments to a minor arterial standard (two laneeach direction plus turn lane) with bike lanes, St lights, sound walls, sidewalk on north side ofstreet and shared use pathway on south side of street.*Environmental Assessment and alignment study completed and approved in 2004*

Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

New Interchange will be constructed at NE 18th St. EA study completed and approved in aFONSI by FHWA in 2004. Project identified in the Vancouver Comprehensive Plan (2011-2030).

TRANS-527PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: NE 97TH AVE TO: NE 107TH AVE

$12,750,000.00Total Proj. Cost:

$8,500,000.00Const. Cost:$1,350,000.00Design Cost:

Pre-Design Cost:$1,900,000.00ROW Cost:

$1,000,000.00Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

41

Page 43: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-748

**SS-7

TRANS-676

**WTR-14TRANS-833

**SCIP-123**

TRANS-734

TRANS-531

8TH

GRAN

T

7TH

6TH

HARBORSIDEJE

FFER

SON

14TH

6TH

MILL PLAIN15TH

11TH

13TH

ESTH

ER

12TH

9TH

7TH

6TH

HARN

EY

DANIE

LS

JEFFE

RSON

HILL

KING

14TH

8TH

EVERGREEN

LINCO

LN

MARK

LE KAUF

FMAN

FRAN

KLIN

GRAN

T

INGAL

LS

DANIE

LS

LINCO

LN

ESTH

ER

14TH

12TH

6TH

KING

ESTHER

8TH

PORT

FRAN

KLIN

EVERGREEN

8TH

Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:CapacityProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

JEFFERSON ST - W EVERGREEN TO W MILL PLAIN BLVD

Upgrade Rdway to 3 lane minor arterial standard (one lane each direction and turn lane)including upgrades to ADA ramps, sidewalk repair, bike lanes and St lights. Project includes therealignment of Jefferson/Kauffman @ 13th St.

Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

Priority west side circulation route identified in the Vancouver City Center Vision plan (2007).Project identified in the Vancouver Comprehensive Plan (2011-2030).Based on 2012 safetyreport this project has potentially high safety benefits.

TRANS-531PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: 8TH ST TO: 13TH ST

$10,000,000.00Total Proj. Cost:

Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

42

Page 44: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

**SCIP-26

**SCIP-117

TRANS-816

**SCIP-22

**

**SCIP-24

**SCIP-25

**WTR-55

TRANS-536

78TH

FRUIT VALLEY

LAKESHORE

Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:CapacityProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

FRUIT VALLEY RD - 61ST ST TO NW 78TH ST

Urban upgrade of 2 lane Rdway to full urban principal arterial standard (one lane eachdirection plus center turn lane) including sidewalks, bike lanes, Stlights, and rehabilitation ofexisting bridge. Project includes replacement of bridge over railroad tracks. *EnvironmentalAssessment alignment study completed in approved in 200x*

Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

Substandard Rdway conditions and reported safety concerns. Project identified in theVancouver Comprehensive Plan (2011-2030).

TRANS-536PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: WHITNEY RD TO: NW 78TH ST

$34,100,000.00Total Proj. Cost:

$25,000,000.00Const. Cost:$6,000,000.00Design Cost:

Pre-Design Cost:$100,000.00ROW Cost:

$3,000,000.00Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

43

Page 45: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

**SCIP-158

**WTR-79TRANS-555

66T

H

48TH

AN

DR

ES

EN

VANCOUVER MALL

51ST

68T

H

Ê

In Design

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:CapacityProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

NE VANCOUVER MALL DR. - NE ANDRESEN RD. TO NE 66TH AVE

New St construction to an 3 lane urban arterial standard (one lane each direction and turn lane)including sidewalks, bike lanes and Stlights.

71241

Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

2015*Start of Construction (Year):

New Rdway segment to create east / west circulation. Project identified in the VancouverComprehensive Plan (2011-2030).

TRANS-555PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: NE ANDRESEN RD. TO: NE 66TH AVE

$2,220,000.00Total Proj. Cost:

$1,100,000.00Const. Cost:$170,000.00Design Cost:

Pre-Design Cost:$950,000.00ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

44

Page 46: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

**SCIP-61

**SCIP-63

**

TRANS-583

LIESER (P)

5TH

88T

H

89T

H

BA

LTIM

OR

E

LIESER

5TH

MILL PLAIN

87T

H

LIE

SE

R

DE

LAW

AR

E

CH

AR

LOT

TE

Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:CapacityProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

NE 87TH AVE / LIESER RD. REALIGNMENT

Intersection modifications along E. Mill Plain Blvd. at NE 87th Ave. and Lieser Rd to improvecapacity and safety at these offset intersections. Scope of project is undefined.Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

Offset intersections create significant traffic delay and safety concerns. Project identified in theVancouver Comprehensive Plan (2011-2030).

TRANS-583PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: LIESER RD. TO: EAST 5TH ST.

Total Proj. Cost:

Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

45

Page 47: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

**SW-18**SCIP-40

**

TRANS-603

LORRY

MIA

MI

MT OLYMPUS

SH

ER

LE

Y

MIA

MI

LIE

SE

R

MACARTHUR

SAINT HELENS

Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:TrafficProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

LEISER RD @ MACARTHUR ST. INTERSECTION

Intersection modification to construct new traffic signal. Improvements will include upgradedsidewalks, ADA ramps and St lights.Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

This is four-way-stop controlled intersection is operating near maximum capacity with the currentconfiguration during PM peak hour. Improvement listed in Vancouver Comprehensive Plan(2011-2030).

TRANS-603PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: MACARTHUR ST. INTERSECTION TO:

$1,075,000.00Total Proj. Cost:

$750,000.00Const. Cost:$225,000.00Design Cost:

Pre-Design Cost:ROW Cost:

$100,000.00Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

46

Page 48: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-607

172N

D

13TH

GOODWIN

FRIB

ERG-

STRU

NK

1ST

18TH19

2ND

LAKE

MILL PLAIN Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:CapacityProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

NE 192ND AVE - SE 1ST ST. TO NE 18TH ST.

Urban upgrade of existing 2 lane Rdway to 5 lane principal arterial standard with bike lanes,sidewalks and Stlights.Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

Improvement listed in Vancouver Comprehensive Plan (2011-2030). Substandard 2-laneRdway.

TRANS-607PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: SE 1ST ST TO: NE 18TH ST

$4,215,763.00Total Proj. Cost:

$2,715,763.00Const. Cost:$1,000,000.00Design Cost:

Pre-Design Cost:$500,000.00ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

47

Page 49: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

**SW-8

**SCIP-52

**SCIP-70

TRANS-728

TRANS-732

**SCIP-7

**SCIP-54

**SCIP-172

**SCIP-6

**SCIP-55

**

TRANS-719

TRANS-826

**SCIP-50 **SCIP-56

**SCIP-174 TRANS-678

115T

H

2ND

4TH

I-205

NB

EXIT

29 117T

H

3RD

102N

D

5TH

SAINT HELENS

4TH

I-205

5TH117

TH

7TH

101ST

102ND

103RD

104TH

4TH

105TH

118TH

107TH

110TH

3RD

6TH

116TH

2ND

SAINT HELENS

106TH

MAJOR

108TH

115TH

TANGL

EWOO

D

1ST

CRESTWOOD104TH

5TH

5TH

102ND 103

RD

6TH

2ND

118TH

5TH

110TH

101ST

5TH

4TH

3RD

4TH

4TH

5TH5TH

6TH

116TH

CHKA

LOV

2ND

ELLS

WORT

H

MILL PLAIN

112T

H

107T

H

CHKALOV

Ê

In Design

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:CapacityProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

E MILL PLAIN BLVD. - 104TH AVE TO CHKALOV

Intersection modification to eliminate offset intersections. Improvements include extension of SE104th Ave to SE 2nd St and modification of access to SE 105th Ave and NE 107th Ave. Otherproject improvements include upgrades to ADA ramps, sidewalk improvements, Street lights,striping, overlay, and improved transit stops.

071223

Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

2016*Start of Construction (Year):

The offset intersections of 104th / 105th create traffic level of service delays and safetydeficiency. Additionally, striping, lighting, and pedestrian access needs to be improved along thecorridor. Improvement listed in Vancouver Comprehensive Plan (2011-2030).

TRANS-678PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: NE 104TH AVE TO: CHKALOV

$4,500,000.00Total Proj. Cost:

Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

48

Page 50: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-680

CUTTER (P)

SPINAKER (P)

COLUMBIA

V

COLUMBIA

COLUMBIA HOUSE

CO

LU

MB

IA S

HO

RE

S

WIN

DW

AR

D (

P)

HALYA

RD

(P) C

OL

UM

BIA

SH

OR

ES

Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:CapacityProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

COLUMBIA SHORES BLVD @ COLUMBIA WAY - BNSF UNDERCROSSING WIDENING

This project will widen the existing RR undercrossing portal and improve the intersection atColumbia Shores and Columbia Way. Total scope of project is undefined.Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

Level of service deficiency and sub-standard pedestrian and bicycle access conditions.Improvement listed in Vancouver Comprehensive Plan (2011-2030).

TRANS-680PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: RR UNDERCROSSING PORTAL TO:

$25,000,000.00Total Proj. Cost:

Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

49

Page 51: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

**SCIP-85

**SCIP-75

**SCIP-76

TRANS-348

**SCIP-233

**SW-14

**SCIP-88

**SCIP-74

**SW-8

**SCIP-73

**SW-9

TRANS-818

TRANS-720

**SS-22 **SCIP-232

**WTR-6

**SCIP-84

**SCIP-90

**SCIP-172

**SCIP-70

**SCIP-186

TRANS-719

**SCIP-77

**WTR-30

**SCIP-71**WTR-21

**SCIP-86**WTR-13

TRANS-274

**SCIP-89

**SS-19

TRANS-444

TRANS-273**WTR-22

** **SS-8

**SS-112

**WTR-23**WTR-56

**SS-10

**WTR-72

**SCIP-DR17

TRANS-824

**SCIP-DR21

**SCIP-234

**SCIP-173

**SCIP-DR10

**SCIP-185

**SCIP-172A

**SCIP-209

TRANS-703

I-205

18TH

28TH

112T

H

138T

H

136T

H

BURTON

Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:CapacityProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

NE 18TH ST - FOUR SEASONS LANE TO NE 138TH AVE

Urban upgrade of 2 lane Rdway to 5 lane urban principal arterial standard (two lanes eachdirection plus turn lane) with bike lanes, St lights, sound walls, sidewalk on north side of St andshared use pathway on south side of street. ROW funded via an STP grant ($3.237mill).Construction partially funded.*Environmental Assessment and alignment study completed and approved in 2004*

71614

Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

Upgrade substandard urban arterial to resolve level of service and safety deficiencies.Improvement listed in Vancouver Comprehensive Plan (2011-2030).

TRANS-703PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: FOUR SEASONS LANE TO: 138TH AVE

$14,000,000.00Total Proj. Cost:

$9,500,000.00Const. Cost:$500,000.00Design Cost:

Pre-Design Cost:$3,000,000.00ROW Cost:

$1,000,000.00Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

50

Page 52: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

**SCIP-4

**SCIP-17

**SS-1

TRANS-737

**SS-20TRANS-275

**SS-21

**

TRANS-713

**SCIP-107**SCIP-202

**SCIP-203

**WTR-4

**SCIP-19

**SCIP-206

TRANS-279

**SCIP-204

TRANS-273**SCIP-207

**WTR-22

**SCIP-200

**SCIP-205

**SCIP-184

**SCIP-201

**SCIP-199

TRANS-712

162N

D

FOURTH PLAIN

137T

H

162N

D

49TH

FOURTH PLAIN

48TH

WARD

POPLAR

76TH

Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:CapacityProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

NE 59TH ST - NE 147TH AVE TO NE 162ND AVE

New St construction to urban minor arterial standard (one lane each direction plus turn lane)including sidewalks, bike lanes, Stlights and surface water treatment.Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

New Rdway segment needed to address circulation needs within sub district. Improvement listedin Vancouver Comprehensive Plan (2011-2030).

TRANS-712PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: NE 147TH AVE TO: NE 162ND AVE

$7,450,000.00Total Proj. Cost:

$4,500,000.00Const. Cost:$1,200,000.00Design Cost:

$750,000.00Pre-Design Cost:$1,000,000.00ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

51

Page 53: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

**SS-1 TRANS-712

**SS-20TRANS-275

**SCIP-203

**WTR-4

**SCIP-204

**SCIP-107

**

**SCIP-200

**SCIP-205

**SCIP-201

TRANS-713

152ND

157TH

143RD

140TH

65TH

70TH

147TH

63RD

71ST144

TH

159TH

59TH

64TH

69TH

135TH

61ST

72ND

148TH

68TH

62ND

149TH

KERR

67TH

141ST

57TH

139TH

138TH

151ST

150TH

146TH

142ND

157TH

70TH147TH

141ST 71ST

71ST

143RD

65TH

143RD

69TH

70TH

65TH

159TH

63RD

157TH

140TH

69TH

149TH

137T

H

FOURTH PLAINWA

RD

Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:CapacityProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

NE 147TH AVE - NE 59TH ST TO NE FOURTH PLAIN BLVD

Construct new 3 lane minor arterial Rdway as extension of Ward Road from E Fourth Plain Blvdsouth to new NE 59th St, east/west minor arterial roadway.Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

New Rdway segment needed to address circulation needs within sub district. Improvement listedin Vancouver Comprehensive Plan (2011-2030).

TRANS-713PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: E FOURTH PLAIN BLVD TO: NE 59TH ST

$5,000,000.00Total Proj. Cost:

$3,250,000.00Const. Cost:$1,000,000.00Design Cost:

$250,000.00Pre-Design Cost:$500,000.00ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

52

Page 54: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

**WTR-48

TRANS-748

TRANS-833

**SS-17

**WTR-14**SS-7

TRANS-715

ES

TH

ER

6TH

5TH

4TH

ES

TH

ER

3RD

PHIL ARNOLD

WA

SH

ING

TO

N

6TH

CO

LU

MB

IA

6TH

6TH6TH

GR

AN

T

GR

AN

T

6TH

ES

TH

ER

WA

SH

ING

TO

N

Ê

In Design

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:CapacityProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

COLUMBIA WAY - COLUMBIA ST TO GRANT ST

New St construction to urban minor arterial standards (one lane each direction with on Stparking) including enhanced downtown sidewalks, ornamental street lights, and bike lanes.Street will be built to accommodate streetcar transit if required in future. Any right-of-wayrequired to construct the project is anticipated to be dedicated by the land owner at no charge.

Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

2014*Start of Construction (Year):

Priority circulation route for waterfront redevelopment area identified in Vancouver City CenterVision plan (2007). Improvement listed in Vancouver Comprehensive Plan (2011-2030).

TRANS-715PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: COLUMBIA ST TO: GRANT ST

$3,650,000.00Total Proj. Cost:

$2,500,000.00Const. Cost:$850,000.00Design Cost:

Pre-Design Cost:ROW Cost:

$300,000.00Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

53

Page 55: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

**SS-23 **SCIP-226

**SCIP-228

**WTR-15

**SCIP-96

**SS-15

TRANS-349

TRANS-268

TRANS-607

TRANS-717

** **SCIP-83

**SCIP-225

**SCIP-95 **SCIP-224

TRANS-716

172N

D

13TH

1ST

18TH

192N

D

Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:CapacityProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

NE 9TH ST - NE 172ND AVE TO NE 192ND AVE

New St construction to urban collector standards (one lane each direction plus turn lane) includingsidewalks, bike lanes, and Stlights. Rdway planned in conjunction with Section 30 Sub Area Planconcept.

Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

Priority east / west circulation route identified in Section 30 Subarea Plan (2009). Improvementlisted in Vancouver Comprehensive Plan (2011-2030).

TRANS-716PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: NE 172ND AVE TO: NE 192ND AVE

Total Proj. Cost:

Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

54

Page 56: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

**SS-23**SCIP-226

**SCIP-228

**SCIP-96

**WTR-15

**SCIP-95

**SS-15

TRANS-349

TRANS-268

TRANS-607TRANS-716

**SCIP-224

TRANS-718

**

**SCIP-83

TRANS-444

TRANS-729

**SCIP-93

**SCIP-225

**SCIP-219

**SCIP-78

**SW-28

**SCIP-82

TRANS-739

TRANS-717

172N

D

13TH

FRIB

ERG-

STRU

NK

1ST

18TH

192N

D

162N

D16

4TH

MILL PLAIN

GOODWIN

MILL PLAINMILL PLAIN Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:CapacityProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

NE 182ND AVE - SE 1ST ST TO NE 18TH ST

New St construction to urban collector standards (one lane each direction plus turn lane) includingsidewalks, bike lanes, and Stlights. Rdway weaves north / south through site and planned inconjunction with Section 30 Sub Area Plan concept.

Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

Priority north / south circulation route identified in Section 30 Subarea Plan (2009).Improvement listed in Vancouver Comprehensive Plan (2011-2030).

TRANS-717PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: SE 1ST ST TO: NE 18TH ST

Total Proj. Cost:

Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

55

Page 57: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

**SS-23

**SCIP-226

TRANS-268

**SCIP-83

TRANS-716

**SS-15

**SCIP-78

**

**SCIP-DR30

TRANS-718

1ST

6TH

175TH

12TH

8TH

7TH

160TH

167TH

2ND

5TH

9TH

10TH

152ND

11TH162

ND

4TH

3RD

155TH

151ST

169TH

156TH

163RD

157TH

171ST

164TH

176TH

COUNTRYSIDE154TH

159TH

158TH

BLUE GRASS

161ST

153RD

166TH

166TH

168TH

170TH

173RD

3RD

164TH

2ND

4TH

9TH

158TH

168TH

157TH

8TH

9TH

160TH

12TH

2ND

12TH

158TH

156TH

5TH

176TH

153RD

158TH

1ST

12TH

3RD

12TH

6TH

161ST

169TH

151ST

154TH

4TH

10TH

3RD

5TH

7TH

166TH

171ST

4TH

173RD

157TH

11TH

10TH

152ND

3RD

5TH

3RD

154TH

155TH

6TH5TH

8TH

2ND

4TH

6TH

151ST

12TH

160TH

151ST

170TH

153RD

157TH

3RD

3RD

1ST

167TH6TH

156TH

159TH

10TH

9TH

161ST

158TH

5TH

2ND

6TH

152ND

169TH

2ND

2ND

152ND

162ND

1ST

10TH

11TH

159TH

7TH 7TH

5TH

9TH

4TH

4TH

171ST

2ND2ND

3RD

5TH169

TH

8TH

157TH

161ST

172N

D

1ST

164T

H

162N

D

Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:CapacityProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

NE 162ND AVE - SE 1ST ST TO NE 9TH ST

Urban upgrade of 5 lane Rdway to 7 lane principal arterial standard (3 lanes each directionplus turn lane) including sidewalks, bike lanes and StlightsProject Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

Roadway constriction at this location. Improvement listed in Vancouver Comprehensive Plan(2011-2030).

TRANS-718PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: SE 1ST ST TO: NE 9TH ST

$11,250,000.00Total Proj. Cost:

$7,000,000.00Const. Cost:$1,000,000.00Design Cost:

Pre-Design Cost:$2,500,000.00ROW Cost:

$750,000.00Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

56

Page 58: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

**SW-9

**SCIP-85

**SCIP-71

**WTR-21

**SW-8

**SCIP-172

**SCIP-70

**SCIP-75

**SCIP-76

TRANS-348

**SCIP-52

**SCIP-233

**SW-14

TRANS-728

**SCIP-68

**SCIP-232**SS-22

**SCIP-2

TRANS-703

**SCIP-74

**

**SCIP-6

TRANS-720

**SCIP-64

TRANS-826

TRANS-732

**SCIP-73

**SCIP-55**SCIP-7**SCIP-47

**SCIP-54

TRANS-527 **WTR-30

**SCIP-45 **SCIP-50

TRANS-678

**SCIP-84

**SCIP-174

TRANS-281

TRANS-827

**SCIP-173

**SCIP-56

**SCIP-69

**SCIP-DR1

**SCIP-DR21

**SS-8

**SS-112

**WTR-23

**WTR-56

**SS-10

**SCIP-86

**SCIP-170

**SCIP-DR15

**SCIP-234

**SCIP-DR27

**SCIP-168

**SCIP-185

**SCIP-172A

**SW-10

**SCIP-21

TRANS-719

I-205

97TH

98TH

CHKA

LOV

98TH

18TH

MILL PLAIN

112T

H

136T

H2ND

ELLS

WORT

H

SAINT HELENS

107T

H

CHKALOV

Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:CapacityProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

NE 112TH AVE - E MILL PLAIN BLVD. TO NE 15TH ST

Corridor improvement project to bring NE 112th Avenue up to urban arterial standards.Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

Priority sidewalk improvement identified in 112th Ave Subarea Plan (2011). Improvement listedin Vancouver Comprehensive Plan (2011-2030).

TRANS-719PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: E MILL PLAIN BLVD TO: NE 15TH ST

$1,650,000.00Total Proj. Cost:

$1,100,000.00Const. Cost:$400,000.00Design Cost:

Pre-Design Cost:ROW Cost:

$150,000.00Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

57

Page 59: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-720

I-205

172N

D

39TH

97TH

10TH

15TH

136T

H

98TH

MCGILLIVRAY

CHKA

LOV2ND

98TH

18TH

28TH

MILL PLAIN

112T

H

162N

D138T

H

164T

H

1ST136T

H

BURTON

Ê

Completed

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:TrafficProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

NE 136TH / 137TH AVE - E MILL PLAIN BLVD TO NE 28TH ST

Install new switches and signal hardware at each traffic signal. Project will improvecommunications and operations of signal network.Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

Improvement listed in Vancouver Comprehensive Plan (2011-2030). Project identified asregional priority in the Transportation System Management and Operations Plan (RTC2011).Based on 2012 safety report this project has potentially high safety benefits.

TRANS-720PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: E MILL PLAIN BLVD TO: NE 28TH ST

Total Proj. Cost:

Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

58

Page 60: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-721

MILL PLAIN

SR-500 EB

SR-500 WB

15TH

LOWER RIVER

I-5

39TH

33RD

COLU

MBIA

54TH

15TH

MAIN

EVERGREEN

ROSS

MCLOUGHLIN

8TH

18TH

FRAN

KLIN

26TH

PORT FORT VANCOUVER

44TH

HAZEL DELL

20TH

8TH

C

FOURTH PLAIN

GRAN

D

SAINT JOHNS

MILL PLAIN

FRUI

T VAL

LEY

SAINT JAMESÊ

In Design

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:TrafficProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

COLUMBIA ST./MAIN ST. VAST 6TH TO 45TH

Install new fiber optic communications fiber and signal hardware at each traffic signal. Projectwill improve communications and operations of signal network.

71327

Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

2015*Start of Construction (Year):

Improvement listed in Vancouver Comprehensive Plan (2011-2030). Project identified asregional priority in the Transportation System Management and Operations Plan (RTC2011).Based on 2012 safety report this project has potentially high safety benefits.

TRANS-721PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: 6TH ST TO: NE 45TH ST

$1,059,900.00Total Proj. Cost:

$859,900.00Const. Cost:$200,000.00Design Cost:

Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

59

Page 61: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-722

NE 68TH ST

NE SAIN

T JOHNS R

D

Ê

In Design

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:TrafficProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

ST JOHNS BLVD. @ NE 68TH ST

Modify existing intersection for traffic safety and operations.

71310

Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

Level of service deficiency. Improvement listed in Vancouver Comprehensive Plan (2011-2030).

TRANS-722PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: TO:

Total Proj. Cost:

Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

60

Page 62: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-723

176

TH

22ND

21ST

19TH

20TH

175TH

177

TH

19TH

176T

H

21ST

176

TH17

5T

H

20TH

18TH

174

TH Ê

In Design

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:TrafficProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

SE 20TH ST @ SE 176TH AVE

Modify existing intersection for traffic safety and operations.

71227

Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

Level of service deficiency. Improvement listed in Vancouver Comprehensive Plan (2011-2030).

TRANS-723PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: TO:

Total Proj. Cost:

Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

61

Page 63: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

**SCIP-210

TRANS-7241ST

148

TH

HE

AR

TH

WO

OD

COAST PINE

JUN

IPER

2ND

Ê

In Design

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:TrafficProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

HEARTHWOOD @ SE 1ST ST

Modify existing intersection for traffic safety and operations. Scope of work undefined.

71231

Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

Level of service deficiency. Improvement listed in Vancouver Comprehensive Plan (2011-2030).

TRANS-724PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: TO:

Total Proj. Cost:

Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

62

Page 64: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-725

V S

T

E 29TH ST

E 28TH STSAINT JOHNS BLVD

FO

RT

VA

NC

OU

VE

R W

AY

Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:TrafficProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

ST JOHNS BLVD. @ FT VANCOUVER WAY

Modify existing intersection to construct intersection improvements to address traffic safety andoperational issues. Per Clark College DA, City is only responsible for ROW acquisition.Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

Level of Service deficiency. Improvement listed in Vancouver Comprehensive Plan (2011-2030).

TRANS-725PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: TO:

$2,000,000.00Total Proj. Cost:

$1,400,000.00Const. Cost:$175,000.00Design Cost:

Pre-Design Cost:$250,000.00ROW Cost:

$175,000.00Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

63

Page 65: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

** **WTR-80TRANS-726

45TH (P)

43RD (P)

44TH (P)

72N

D (

P)

LOO

WIT

(P

)43RD (P)

72N

D

77T

H

41ST

PARKWAY

41ST

44TH (P)

75T

H

(P)

45TH (P)

GR

EE

NW

OO

D

VANCOUVER PLAZA

Ê

In Design

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:CapacityProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

NE 45TH ST - NE 72ND AVE TO NE 77TH AVE

New St construction to urban collection standard (one lane each direction plus turn lane) includingsidewalks, bike lanes and Stlights.

71242

Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

2013*Start of Construction (Year):

Missing St in arterial network. Improvement listed in Vancouver Comprehensive Plan (2011-2030).

TRANS-726PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: NE 72ND AVE TO: NE 77TH AVE

$1,162,000.00Total Proj. Cost:

$767,000.00Const. Cost:$125,000.00Design Cost:

Pre-Design Cost:$270,000.00ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

64

Page 66: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

**

**SCIP-164 TRANS-72785

TH

(P

)

86T

H

(P)

84T

H

(P)

51ST

82N

D

78T

H

54TH

81S

T

84T

H

VANCOUVER MALL

55TH

56TH

85T

H

79T

H

77T

H 54TH

55TH

54TH

VANCOUVER MALL

TH

UR

ST

ONLO

OW

IT (P

)

LOO

WIT

(P)

56TH (P)

55TH (P)

83R

D

53RD

56TH

85T

H

Ê

In Design

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:CapacityProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

NE 82ND AVE - NE 51ST ST TO NE 54TH ST

Urban upgrade of 2 lane Rdway to minor arterial standard (2 lanes each way and turn lane)including sidewalks, bike lanes and Stlights.

71243

Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

2013*Start of Construction (Year):

Substandard Rdway conditions. Improvement listed in Vancouver Comprehensive Plan (2011-2030).

TRANS-727PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: NE 51ST ST TO: NE 54TH ST

$619,300.00Total Proj. Cost:

$467,000.00Const. Cost:$70,000.00Design Cost:

Pre-Design Cost:$82,300.00ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

65

Page 67: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

**SS-23**SCIP-226

**SCIP-81

**WTR-15

**SCIP-79

**SCIP-228

**SS-15TRANS-268

**SCIP-80

TRANS-607

** TRANS-717

TRANS-723

TRANS-729

15TH

172N

D

BYBEE

1ST

192N

DMILL PLAIN

Ê

Completed

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:CapacityProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

E MILL PLAIN BLVD - SE 172ND AVE TO SE 192ND AVE

Urban upgrade of to urban principal arterial standard. *This project funding to be reallocatedto NE 18th St corridor improvements upon Congressional approval*Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

New Rdway constructed. Improvement listed in Vancouver Comprehensive Plan (2011-2030).

TRANS-729PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: SE 172ND AVE TO: SE 192ND AVE

Total Proj. Cost:

Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

66

Page 68: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-734

MILL PLAIN 15TH

SR-500 EB SR-500 WBLOWER RIVER

I-5

39TH

33RD

COLU

MBIA

15TH

MCLOUGHLIN

8TH

EVERGREEN

FRAN

KLIN

26TH

PORT FORT VANCOUVER

6TH

16TH

EVERGREEN

CMA

IN

FOURTH PLAIN

MILL PLAIN

FRUI

T VAL

LEY

SAINT JOHNS

Ê

Construction

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:BicycleProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

COLUMBIA ST/97TH ST/ST HELENS/MCLOUGHLIN SHARROWS

Install bike sharrow markings for increased safety and transportation mobility. This project ispart of Bike Vancouver Phase II grant. Also includes sharrows on 97th Mcloughlin, and St. Helens.Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

2014*Start of Construction (Year):

Priority north/south bicycle corridor west of I-5. Improvement listed in Vancouver ComprehensivePlan (2011-2030).

TRANS-734PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: TO:

$200,000.00Total Proj. Cost:

$170,000.00Const. Cost:$30,000.00Design Cost:

Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

67

Page 69: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-737

FOURTH PLAIN16

2ND

39TH

76TH

182N

D

137T

H

162N

D

49TH

FOURTH PLAIN

48TH

WARD

POPLAR

138TH Ê

Construction

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:TrafficProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

NE 162ND AVE - POPLAR TO FOURTH PLAIN BLVD FIBER COMMUNICATIONS

Install traffic signal fiber optic cable for increased signal communications.Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

2014*Start of Construction (Year):

Project listed in Vancouver Comprehensive Plan (2011-2030). Identified as a regional priority inthe Transportation System Management and Operations plan (RTC 2011).

TRANS-737PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: NE 39TH ST TO: E FOURTH PLAIN BLVD

$372,000.00Total Proj. Cost:

$282,000.00Const. Cost:$90,000.00Design Cost:

Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

68

Page 70: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-739

TRANS-739

SR-14 EB

SR-14 WB

SR-500 EB SR-500 WB

I-205

18TH 172N

D

39TH

15TH20TH

86TH

97TH

MCGILLIVRAY10TH

EVERGREEN

87TH

FALK

MACARTHUR

98TH

44THVANCOUVER MALL

2ND

EVERGREEN

98TH 18TH

MILL PLAIN

192N

D

28TH

112T

H

162N

D16

4TH

1ST

FOURTH PLAIN

34TH

49TH

ANDRESEN

GRAND

136T

H13

7TH

48TH

Ê

Construction

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:TrafficProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

E MILL PLAIN BLVD. @ SE 157TH AVE & MILL PLAIN BLVD. WEST OF ANDRESEN

Install two pedestrian hawk signals for enhanced traffic safety. One at Mill Plain/157th and onewest of Mill Plain/Andresen.Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

2014*Start of Construction (Year):

Pedestrian collision history. Program listed in Vancouver Comprehensive Plan (2011-2030).

TRANS-739PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: SE 157TH AVE TO:

$500,000.00Total Proj. Cost:

$375,000.00Const. Cost:$125,000.00Design Cost:

Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

69

Page 71: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

**SW-15**SCIP-41

**SCIP-38**SW-18

**SW-16

**SCIP-21

**SCIP-2

**SW-17

TRANS-838

**SCIP-40**SCIP-47

**SCIP-48

**SCIP-42

**WTR-32

**SCIP-18

**WTR-16

**WTR-70

**WTR-52

**

TRANS-337

**SCIP-43

**SCIP-45

**WTR-95

**SCIP-52**SCIP-DR1

**SCIP-6

**SCIP-44TRANS-603**WTR-31

**SCIP-180

**WTR-93

**SCIP-DR6

TRANS-740SR-14 EB

SR-14 WBLIE

SER

98TH

MACARTHUR

RIVERSIDE

ANDR

ESEN

SAINT HELENSEVERGREEN

EVERGREEN

10TH

88TH

CHELSEA

Ê

In Design

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:EnhancementProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

EVERGREEN HWY TRAIL - IMAGE RD. TO CHELSEA AVE

Upgrade street with 10 foot pedestrian pathway on south side of Rdway. Only partially funded(Design only).Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

Substandard Rdway and shoulder conditions, priority east/west pedestrian and bicycle corridor.Project listed in Vancouver Comprehensive Plan (2011-2030). Project identified in adjacentNeighborhood Action Plans.

TRANS-740PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: IMAGE RD TO: CHELSEA AVE

$2,900,000.00Total Proj. Cost:

$1,500,000.00Const. Cost:$450,000.00Design Cost:

Pre-Design Cost:$750,000.00ROW Cost:

$200,000.00Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

70

Page 72: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-741SR-14 EB SR-14 WB

I-205

EVERGREEN

MCGILLIVRAY

15TH

20TH

136T

H

VILLAGE

164T

H

34TH

Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:EnhancementProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

EVERGREEN HWY TRAIL - SILVER SPRINGS TO SE 164TH AVE

Upgrade street with 10 foot pedestrian pathway on south side of Rdway.Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

Substandard Rdway and shoulder conditions, priority east/west pedestrian and bicycle corridor.Project listed in Vancouver Comprehensive Plan (2011-2030). Project identified in adjacentNeighborhood Action Plans.

TRANS-741PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: SE SILVER SPRINGS DR TO: SE 164TH AVE

$5,100,000.00Total Proj. Cost:

$3,000,000.00Const. Cost:$550,000.00Design Cost:

Pre-Design Cost:$1,250,000.00ROW Cost:

$300,000.00Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

71

Page 73: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-742

SR-14 EBSR-14 WB

LEWIS AND CLARK

EVERGREEN

BRADY

34TH PACIFIC RIM34TH

192N

D

164T

H

Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:EnhancementProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

EVERGREEN HWY TRAIL - SE 164TH AVE TO E. CITY LIMITS

Upgrade street with 10 foot pedestrian pathway on south side of Rdway.Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

Substandard Rdway and shoulder conditions, priority east/west pedestrian and bicycle corridor.Project listed in Vancouver Comprehensive Plan (2011-2030). Project identified in adjacentNeighborhood Action Plans.

TRANS-742PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: SE 164TH AVE TO: EAST CITY LIMITS

$4,750,000.00Total Proj. Cost:

$2,500,000.00Const. Cost:$500,000.00Design Cost:

Pre-Design Cost:$1,000,000.00ROW Cost:

$250,000.00Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

72

Page 74: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-471

**SW-13

TRANS-746

SE

16

6T

H A

VE

SE MCGILLIVRAY BLVD

Ê

In Design

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:TrafficProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

SE MCGILLIVRAY BLVD. @ SE 166TH AVE

Intersection improvement to install an urban roundabout, including upgrades and ADA ramps andStlights. This project was combined with 071611 (164th Ave. intersection improvements project).

071608

Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

2015*Start of Construction (Year):

Level of service deficiency. Project listed in Vancouver Comprehensive Plan (2011-2030).

TRANS-746PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: SE 164TH AVE TO: SE 166TH AVE

$350,000.00Total Proj. Cost:

$350,000.00Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

73

Page 75: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

**WTR-48

TRANS-833

**SS-5**

**SS-7

**WTR-14

TRANS-531

TRANS-831

TRANS-715

TRANS-676

**SS-17

TRANS-821

**WTR-3

TRANS-452

TRANS-748

I-5

11TH

9TH

12TH

ESTH

ER

7TH

5TH

HARN

EY

6TH

JEFFE

RSON

HILL

DANIE

LS

KING

8TH

EVERGREEN

4TH

3RD

FRAN

KLIN

LINCO

LN

WASH

INGTO

N

GRAN

T

BROA

DWAY

12TH

6TH

6TH

ESTH

ER

KING

8TH

MAIN

COLU

MBIA

PORT

6TH

EVERGREEN

8TH

FRAN

KLIN

WASH

INGT

ON

Ê

Construction

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:CapacityProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

DOWNTOWN WATERFRONT ACCESS PROJECT

Install new urban streets and undercrossings of BNSF railway at Esther St and Grant Street, toinclude enhanced downtown sidewalks, ornamental street lights, and bike lanes (at Grant St).Project costs shown include rail portion of the project as well as the road portion of the project.Rail portion completed in early 2013. Roadway portion to be completed in early 2014.

71233

Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

2011*Start of Construction (Year):

This project will provide for additional north/south circulation in lower downtown through theBNSF railroad berm. Improvement listed in Vancouver Comprehensive Plan (2011-2030).Project listed as a priority improvement in the Vancouver City Center Vision plan (2007).

TRANS-748PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: TO:

$44,000,000.00Total Proj. Cost:

$34,000,000.00Const. Cost:$4,000,000.00Design Cost:

Pre-Design Cost:$6,000,000.00ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

74

Page 76: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-816

LOWER RIVER SR-500 WB

I-5

39THHA

ZEL D

ELL

15TH

33RD

COLU

MBIA

ROSS

26TH

78TH

MAIN

FRUIT VALLEY

FOURTH PLAIN

HIGH

WAY 9

9

LAKESHORE

Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:CapacityProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

NW 32ND AVE - SR501 TO WHITNEY

Install new arterial roadway from SR501 to Fruit Valley Road.Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

TRANS-816PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: LOWER RIVER RD TO: FRUIT VALLEY RD

Total Proj. Cost:

Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

75

Page 77: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-818

SR-500 EB

SR-500 WB

SR-14 EB

SR-14 WB

117T

H

I-205

63RD

18TH

39TH

86TH

97TH

10TH

87TH

MACARTHUR

LIESE

R

EVERGREEN

136T

H

98TH

STAP

LETO

N

MCGILLIVRAY

107T

H

THURSTON

CHKA

LOV2ND

AUTO

MAL

L

98TH

MILL PLAIN

18TH

28TH

162N

D

112T

HFOURTH PLAIN

ANDR

ESEN

49TH

138T

H

164T

H

137T

H13

6TH

63RD

48TH

MINNEHAHA

Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:TrafficProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

NE BURTON/28TH STREET - NE ANDRESEN RD TO NE 138TH AVE

Install switches at multiple signals along corridor to improve signal operations.Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

TRANS-818PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: NE ANDRESEN RD TO: NE 138TH AVE

Total Proj. Cost:

Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

76

Page 78: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

**WTR-24TRANS-819

36TH

34TH

WE

IGE

L

UNANDER

LAFRAMBOIS

TH

OM

PS

ON

VAN ALLMAN

THO

MP

SO

N

FR

UIT

VA

LL

EY

Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:TrafficProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

NW FRUIT VALLEY RD @ LA FRAMBOIS

Replace existing signal with Hawk pedestrian signal.Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

TRANS-819PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: TO:

Total Proj. Cost:

Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

77

Page 79: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-741

**SCIP-223

TRANS-838

**SS-4**WTR-2

**SCIP-222

TRANS-742

**SW-13**WTR-20

**

**SCIP-213**SCIP-212

**SCIP-211

TRANS-594

**SCIP-221

**SS-18

TRANS-730

**SCIP-214

TRANS-746

**SCIP-189

TRANS-823

TRANS-823

TRANS-823

SR-14 EB

SR-14 WBEVERGREEN

164T

H

34TH

Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:EnhancementProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

EASTSIDE QUIET ZONE LID

Proposed Local Improvement District (LID) to install crossing protection at several rail crossings oneast side of Vancouver so trains will not blow horns near private residences.Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

2014*Start of Construction (Year):

Implement a quiet zone in East Vancouver in the vicinity of Evergreen Highway as requested bycitizens in the area.

TRANS-823PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: TO:

$850,000.00Total Proj. Cost:

$700,000.00Const. Cost:$150,000.00Design Cost:

Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

78

Page 80: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

**SCIP-186

**SCIP-86**WTR-13

**SCIP-DR17

**SCIP-DR24

**SCIP-DR14

TRANS-82412

4T

H

26TH

24TH

123

RD

23RD

26TH

23RD

27TH

FO

UR

SE

AS

ON

S

121

ST Ê

Planned

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:EnhancementProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

ENDEAVOUR ELEMENTARY PATHWAY AND SAFETY IMPROVEMENT PROGRAM

Construct an HMA pathway behind Endeavour Elementary that will connect to NE 26th Street andNE 24th Street.Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

2014*Start of Construction (Year):

New pathway will allow students to safely walk and bicycle to school without having to travelalong NE 28th Street.

TRANS-824PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: TO:

$170,000.00Total Proj. Cost:

$140,000.00Const. Cost:$30,000.00Design Cost:

$0.00Pre-Design Cost:$0.00ROW Cost:

$0.00Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

79

Page 81: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

**SCIP-128

**

**WTR-36

**SCIP-32

**SCIP-33

**SCIP-34

**WTR-98

**SCIP-30

**SCIP-20

**SCIP-23

**SCIP-110

**WTR-9

**SCIP-31

**WTR-84

**SCIP-129

TRANS-825

I-5

54TH

15TH

ROSS

44TH

MINNEHAHA

SAIN

T JOH

NS

SAIN

T JAM

ES

63RD

HIGH

WAY 9

9

Ê

Planned

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:CapacityProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

NE 54TH STREET - NE 15TH AVE TO NE SAINT JAMES RD

Urban upgrade of existing 2 lane Roadway to a 3 arterial standard (one lane each directionplus turn lane). Street upgrades include city standard sidewalks, bike lanes, Street lights, andADA ramps.

Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

Upgrade of substandard urban arterial with level of service and safety deficiencies (especiallyat the intersection of 54th and Drexel). Project identified in Vancouver Comprehensive Plan(2011-2030).

TRANS-825PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: NE 15TH AVE TO: NE SAINT JAMES RD

Total Proj. Cost:

Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

80

Page 82: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

**SCIP-68

**SW-8

**SCIP-172

**SW-9**SCIP-70 **SCIP-71

**SCIP-52

TRANS-348

**SW-14

**SCIP-2

**SCIP-74

TRANS-728

**SCIP-6

**SCIP-21

**SW-1

**SCIP-64

TRANS-732

**SCIP-73

**WTR-21

TRANS-719**

**SW-3 TRANS-281

**SCIP-54

TRANS-527

**SCIP-55

**WTR-30 **SS-22

**SCIP-75

TRANS-678

**SCIP-7

**SCIP-61

**SCIP-47**SCIP-45

**SCIP-174

**SCIP-50

TRANS-827

TRANS-583

**SCIP-173

**SCIP-69

**SCIP-DR1

**SCIP-DR21

**WTR-56**WTR-23

**SCIP-56

**WTR-72

**SCIP-170

**SCIP-63

**SCIP-DR15

**SCIP-234**SCIP-66

**SCIP-DR27

**SCIP-185

**SS-8

**SCIP-172A

**SCIP-DR19

**SCIP-DR16

TRANS-826

I-205

97TH87

TH

98TH

CHKA

LOV

2NDMILL PLAIN

112T

H

18TH

CHKALOV

ELLS

WORT

H

SAINT HELENS

107T

H

98TH

Ê

Planned

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:CapacityProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

NE 104TH AVENUE - SE MILL PLAIN BLVD TO NE 14TH STREET

Urban upgrade of existing 2 lane Roadway to a 3 arterial standard (one lane each directionplus turn lane). Street upgrades include city standard sidewalks, bike lanes, Street lights, andADA ramps.

Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

Upgrade of substandard urban arterial with level of service and safety deficiencies. Projectidentified in Vancouver Comprehensive Plan (2011-2030).

TRANS-826PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: SE MILL PLAIN BLVD TO: NE 14TH ST

Total Proj. Cost:

Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

81

Page 83: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-348

**SCIP-172

TRANS-527

**SCIP-173

**SCIP-170

**

TRANS-826

**SCIP-73

**SCIP-DR15

**SCIP-172A

**SCIP-168

TRANS-827

18TH

I-205 NB EXIT 29

102N

D

I-205

14TH

18TH

16TH

20TH

107TH

102ND

19TH

109TH

15TH

103RD

104TH 12TH

108TH

98TH

101ST

100TH

17TH

99TH

105TH

100TH

107TH

15TH

102ND

98TH

18TH

14TH

20TH

15TH

19TH

15TH

14TH

16TH

104TH

101ST

98TH

Ê

Planned

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:CapacityProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

NE 104TH AVENUE - NE 14TH STREET TO NE 18TH STREET

Install new 3 arterial standard (one lane each direction plus turn lane). Street improvementsinclude city standard sidewalks, bike lanes, Street lights, and ADA ramps.Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

New urban arterial will address level of service and accessibility issues. Project identified inVancouver Comprehensive Plan (2011-2030).

TRANS-827PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: NE 14TH ST TO: NE 18TH ST

Total Proj. Cost:

Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

82

Page 84: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

**

TRANS-721**WTR-5

TRANS-734

TRANS-751

**WTR-53

TRANS-829

32ND

36TH

41ST

33RD

35TH

40TH

GRAN

T

31ST

38TH

F

DANIE

LS

34TH

HARN

EY

KAUF

FMAN

DIVISI

ON

WASH

INGTO

N

CRES

TON

FRAN

KLIN

37TH

COLU

MBIA

PINE

38TH

36TH

37TH

38TH

34TH

35TH

40TH

F36TH

35TH

DIVISI

ON

FRAN

KLIN

39THCO

LUMB

IA

33RD

MAIN

Ê

In Design

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:CDBGProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

COLUMBIA STREET - 33RD STREET TO 39TH STREET

ADA, Alley approach, and sidewalk repair improvements along Columbia Street between 33rdStreet and 39th StreetProject Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

2014*Start of Construction (Year):

Improve pedestrian access and mobility along Columbia Street

TRANS-829PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: W 33RD ST TO: W 39TH ST

$330,000.00Total Proj. Cost:

$300,000.00Const. Cost:$30,000.00Design Cost:

$0.00Pre-Design Cost:$0.00ROW Cost:

$0.00Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

83

Page 85: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

**WTR-78

**SS-13

**WTR-25

TRANS-258

**

**WTR-58**WTR-57

**WTR-42**WTR-37

**WTR-39

**WTR-11

TRANS-835**WTR-41

**WTR-81

**SCIP-8

TRANS-832

**SCIP-36

TRANS-731

**WTR-9

**WTR-18

TRANS-725

**SCIP-125**SCIP-126

TRANS-733

**WTR-29

TRANS-830

P

R

S

Q

O

V

U

29TH

Z

X

26TH

T

30TH

27TH

25TH

13TH

28TH

W

14TH

Y

NORR

IS

FAIRMOUNT

BRANDT

17TH

WATS

ON

NEAL

S

15TH

RESE

RVE

16TH

31ST

NICHOLSON

24TH

19TH

TODD20TH

MCLOUGHLIN

33RD

21ST

18TH

ASH

GRAN

D

ROSS

ITER

DATE

JUNE

ALGONA

12TH

DRUM

MOND

32ND

BRYA

NTMURT

ON

CELL

ARS

BRIDG

E

TERRACE

GIBBONS

HARNEY HEIGHTS

PLOMONDON

43RD

HOWA

RDLA

UREL

LARS

EN

WILS

ON

MANO

R WINC

HELL

41ST

SAINT JOHNS

22ND

Z

V

ALGO

NA

32ND

U

30TH 30TH

25TH

14TH

Z

27TH

BRIDG

E

Y

16TH

Z

NORR

IS

Y

15TH

17TH

27TH

T

W

14TH

YX

17TH

Z

28TH

NEALS

Y

16TH

X

19TH

32ND

18TH

33RD

FALK

MCLOUGHLIN

20TH

GRAN

D

SAINT JOHNS

FORT VANCOUVER

FOURTH PLAIN

33RD

Ê

In Design

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:TrafficProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

FOURTH PLAIN CROSSWALK UPGRADES TO HYBRID BEACONS

Install pedestrian hybrid beacons along Fourth Plain at the following locations: T St., Z St.,Fairmont St., Neals Ln., and Todd/Rossiter Ln.

71326

Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

2014*Start of Construction (Year):

Improve pedestrian safety along Fourth Plain by installing pedestrian hybrid beacons at severalintersections.

TRANS-830PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: T ST TO: ROSSITER LN

$375,000.00Total Proj. Cost:

$360,000.00Const. Cost:$15,000.00Design Cost:

$0.00Pre-Design Cost:$0.00ROW Cost:

$0.00Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

84

Page 86: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

**WTR-25

TRANS-258TRANS-830

**

TRANS-832TRANS-832

LINDA

GIBBONS

PLOMONDON

NEAL

S

NORR

IS

NEAL

S

26TH

WATS

ON

21ST

28TH

27TH

25TH

ROSS

ITER

TODD

24TH

ALGONABR

ANDT

TERRACE

HOWA

RD

LAUR

EL

HAZELWOOD

WILS

ON

CEDA

R

24TH

25TH

24TH

27TH

ALGO

NA

FALK

FOURTH PLAIN

Ê

In Design

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:EnhancementProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

FOURTH PLAIN INFILL SIDEWALK

Sidewalk and ADA improvements along Neals Ln and Rossiter Ln from Fourth Plain to NE 26th St.

71450

Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

2015*Start of Construction (Year):

Improve pedestrian access and safety along Neals Ln and Rossiter Ln. Will provide pedestrianaccess to Fourth Plain Boulevard which is a high transit use corridor.

TRANS-832PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: TO:

$1,042,000.00Total Proj. Cost:

$439,000.00Const. Cost:$140,000.00Design Cost:

$0.00Pre-Design Cost:$463,000.00ROW Cost:

$0.00Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

85

Page 87: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

**WTR-48

TRANS-748

**SS-7

TRANS-821

TRANS-452**SS-5

**WTR-14 TRANS-495

** TRANS-831

TRANS-715

TRANS-531

**SS-17

TRANS-834

TRANS-833

8TH

GRAN

T7TH

6TH

ESTH

ER

6TH

I-5

9TH

7TH

5TH

6TH

ESTH

ER

KING

HILL

BROA

DWAY

8TH

4TH

3RD

JEFFE

RSON

HARN

EY

FRAN

KLIN

PHIL ARNOLD WASH

INGTO

N

DANIE

LS

6TH

ESTH

ER

8TH

COLU

MBIA

6TH

PORT

8TH

C

MAINWA

SHIN

GTON

Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:EnhancementProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

VANCOUVER WATERFRONT TRAIL

Major trail and aesthetic improvements along the Vancouver Waterfront from approximatelyLincoln St to Columbia StProject Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

2015*Start of Construction (Year):

Improve pedestrian access and safety along the Vancouver Waterfront. Improve aesthetics andpromote livability along the Vancouver Waterfront

TRANS-833PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: LINCOLN ST TO: COLUMBIA ST

$15,000,000.00Total Proj. Cost:

$0.00Const. Cost:$0.00Design Cost:$0.00Pre-Design Cost:$0.00ROW Cost:

$0.00Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

86

Page 88: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

**WTR-48

TRANS-452

TRANS-834

BR

OA

DW

AY

ST

E 8TH ST

E 9TH ST

C S

T

Ê

Planned

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:CapacityProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

NE 9TH ST - BROADWAY TO C ST

Extend 9th street from Broadway to C Street. Improvements will include travel lanes, sidewalk,ADA ramps, street lights, and other amenities similar to the existing 9th Street to the west.Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

Project will improve circulation, access, and connectivity in downtown Vancouver.

TRANS-834PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: BROADWAY ST TO: C ST

$0.00Total Proj. Cost:

$0.00Const. Cost:$0.00Design Cost:$0.00Pre-Design Cost:$0.00ROW Cost:

$0.00Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

87

Page 89: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

**

**WTR-78**WTR-57

**WTR-58

**WTR-42

**WTR-39

TRANS-258

**WTR-37

**WTR-11

**WTR-41

TRANS-830

**SCIP-8**WTR-9

**SCIP-125

**WTR-44

**WTR-48

**WTR-29TRANS-835

I-5

Z

X

T

P

Y

W

16TH

27TH

Q

25TH

26TH

O R

RESE

RVE

K S

18TH17TH

20TH

14TH

MANO

R

SAINT JOHNS

Z

27TH

RESE

RVE

Z

T

18THMCLOUGHLIN

FORT VANCOUVER

FOURTH PLAIN

SAINT JOHNS

Ê

Planned

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:EnhancementProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

FORT VANCOUVER WAY SUBAREA IMPROVEMENTS - MCLOUGHLIN TO 4TH PLAIN

Sidewalk, bicycle, and aesthetic improvements along Fort Vancouver Way from Mcloughlin to 4thPlainProject Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

Project will improve pedestrian and bicycle access and safety as well as provide aestheticimprovements in conformance with the adopted subarea plan for the area.

TRANS-835PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: E MCLOUGHLIN BLVD TO: E FOURTH PLAIN BLVD

$0.00Total Proj. Cost:

$0.00Const. Cost:$0.00Design Cost:$0.00Pre-Design Cost:$0.00ROW Cost:

$0.00Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

88

Page 90: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-817 TRANS-837

N G

AR

RIS

ON

RD

MILL PLAIN CT

E MILL PLAIN BLVD

Ê

In Design

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:TrafficProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

E MILL PLAIN @ GARRISON SIGNAL IMPROVEMENT

Upgrade existing span wire signal. Upgrade all components of the signal to current standardsincluding cabinet, poles, conduit, junction boxes, detection, ADA ramsp, mast arms, and lights.Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

2015*Start of Construction (Year):

Existing span wire signal has wood poles that are in jeopardy of failing. Most components of thesignal are old and are in need of upgrading to current standards.

TRANS-837PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: MILL PLAIN TO: GARRISON

$387,000.00Total Proj. Cost:

$350,000.00Const. Cost:$37,000.00Design Cost:

Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

89

Page 91: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPVancouver City Limits

Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-A-237SR-14 EB

SR-14 WB

117T

H58TH

10TH

PADDEN

EVER

ETT

MILL PLAIN 242N

D

I-5

I-205

29TH

C

76TH

50TH

212T

H

99TH

11TH

BLAIR

119TH

RISTO

6TH

39TH

159TH

EATON

78TH

41ST

83RD

20TH 38TH

139TH

292ND

33RD

117TH

COLUMBIA

53RD

INGLE

164TH25

TH

10TH

142N

D

15TH

199TH

19TH

72ND

119TH

18TH

78TH11

2TH

3RD

41ST

36TH

Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:OngoingProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

TRAFFIC SIGNAL SUSTAINABILITY

Ongoing updating of traffic signals at various locations and may include but not be limited toadding a left turn phase, adding a signal head, adding a push-button, removing an operation,adding detectors, changing the detector setup, or other similar improvements. (Budgeted$150,000 annually.)

Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

ONGOING*Start of Construction (Year):

Projects identified in the Vancouver Comprehensive Plan (2011-2030).

TRANS-A-237PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: TO:

Total Proj. Cost:

Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

90

Page 92: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPVancouver City Limits

Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-A-238SR-14 EB

SR-14 WB

117T

H58TH

10TH

PADDEN

EVER

ETT

MILL PLAIN 242N

D

I-5

I-205

29TH

C

76TH

50TH

212T

H

99TH

11TH

BLAIR

119TH

RISTO

6TH

39TH

159TH

EATON

78TH

41ST

83RD

20TH 38TH

139TH

292ND

33RD

117TH

COLUMBIA

53RD

INGLE

164TH25

TH

10TH

142N

D

15TH

199TH

19TH

72ND

119TH

18TH

78TH11

2TH

3RD

41ST

36TH

Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:OngoingProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

DISABLED ACCESS (ADA)

Miscellaneous ADA ramp upgrades at various locations citywide. Ramp locations prioritized inthe City ADA Transition Plan. (No annual budget.)Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

ONGOING*Start of Construction (Year):

Projects identified in the Vancouver ADA Transition Plan.

TRANS-A-238PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: TO:

$0.00Total Proj. Cost:

Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

91

Page 93: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPVancouver City Limits

Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-A-239SR-14 EB

SR-14 WB

117T

H58TH

10TH

PADDEN

EVER

ETT

MILL PLAIN 242N

D

I-5

I-205

29TH

C

76TH

50TH

212T

H

99TH

11TH

BLAIR

119TH

RISTO

6TH

39TH

159TH

EATON

78TH

41ST

83RD

20TH 38TH

139TH

292ND

33RD

117TH

COLUMBIA

53RD

INGLE

164TH25

TH

10TH

142N

D

15TH

199TH

19TH

72ND

119TH

18TH

78TH11

2TH

3RD

41ST

36TH

Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:OngoingProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

SCHOOL CROSSING PROTECTION

New and replacement pedestrian school zone beacons including enhancements to signs andmarking at various locations citywide. (No annual budget.)Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

ONGOING*Start of Construction (Year):

Program listed in the Vancouver Comprehensive Plan (2011-2030).

TRANS-A-239PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: TO:

$0.00Total Proj. Cost:

Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

92

Page 94: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPVancouver City Limits

Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-A-240SR-14 EB

SR-14 WB

117T

H58TH

10TH

PADDEN

EVER

ETT

MILL PLAIN 242N

D

I-5

I-205

29TH

C

76TH

50TH

212T

H

99TH

11TH

BLAIR

119TH

RISTO

6TH

39TH

159TH

EATON

78TH

41ST

83RD

20TH 38TH

139TH

292ND

33RD

117TH

COLUMBIA

53RD

INGLE

164TH25

TH

10TH

142N

D

15TH

199TH

19TH

72ND

119TH

18TH

78TH11

2TH

3RD

41ST

36TH

Ê

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:OngoingProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

NEIGHBORHOOD TRAFFIC MANAGEMENT

This ongoing project (Neighborhood Traffic Management Program) funds installation of trafficcalming (speed controls) and traffic management measures (traffic volume controls). It includeseducational approaches that address the same issues by heightened awareness of the impacts ofspeeding traffic (for example Neighborhood Speed Watch). The project also address othertraffic safety issues such as pedestrian/bicycle safety, sight restrictions and parking problems.($120k annual budget.)

Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

ONGOING*Start of Construction (Year):

The Neighborhood Traffic Control Program is important to reaching our Community Vision of “...Safe neighborhoods with a distinct quality and proud identities linked by parks and greenspaceas well as a transportation system that provides mobility options for all.” The project is consistentwith the City’s Strategic Commitments of Creating Identity as One City and Quality Growth andDevelopment through projects in support of neighborhoods.Speeding on residential Sts is one of the most frequent complaint from citizens and neighborhood

TRANS-A-240PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: TO:

$0.00Total Proj. Cost:

Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

93

Page 95: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPVancouver City Limits

Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-A-241SR-14 EB

SR-14 WB

117T

H58TH

10TH

PADDEN

EVER

ETT

MILL PLAIN 242N

D

I-5

I-205

29TH

C

76TH

50TH

212T

H

99TH

11TH

BLAIR

119TH

RISTO

6TH

39TH

159TH

EATON

78TH

41ST

83RD

20TH 38TH

139TH

292ND

33RD

117TH

COLUMBIA

53RD

INGLE

164TH25

TH

10TH

142N

D

15TH

199TH

19TH

72ND

119TH

18TH

78TH11

2TH

3RD

41ST

36TH

Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:OngoingProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

PAVEMENT PRESERVATION PROGRAM

Upgrade pavement surfaces by surface overlay and slurry treatments at multiple locationscitywide. Upgrades may include updating ADA ramps, traffic striping and markings. (Budgeted$6.1 Million in 2014 and inflationary increases after.)

Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

ONGOING*Start of Construction (Year):

Program identified in the Vancouver Comprehensive Plan (2011-2030).

TRANS-A-241PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: TO:

Total Proj. Cost:

Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

94

Page 96: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPVancouver City Limits

Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-A-242SR-14 EB

SR-14 WB

117T

H58TH

10TH

PADDEN

EVER

ETT

MILL PLAIN 242N

D

I-5

I-205

29TH

C

76TH

50TH

212T

H

99TH

11TH

BLAIR

119TH

RISTO

6TH

39TH

159TH

EATON

78TH

41ST

83RD

20TH 38TH

139TH

292ND

33RD

117TH

COLUMBIA

53RD

INGLE

164TH25

TH

10TH

142N

D

15TH

199TH

19TH

72ND

119TH

18TH

78TH11

2TH

3RD

41ST

36TH

Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:OngoingProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

BIKEWAYS

Installation of bike lane and bike Blvd projects on existing St at various locations citywide. (Noannual budget.)Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

ONGOING*Start of Construction (Year):

Program identified in the Vancouver Comprehensive Plan (2011-2030).

TRANS-A-242PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: TO:

$0.00Total Proj. Cost:

Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

95

Page 97: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPVancouver City Limits

Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-A-244SR-14 EB

SR-14 WB

117T

H58TH

10TH

PADDEN

EVER

ETT

MILL PLAIN 242N

D

I-5

I-205

29TH

C

76TH

50TH

212T

H

99TH

11TH

BLAIR

119TH

RISTO

6TH

39TH

159TH

EATON

78TH

41ST

83RD

20TH 38TH

139TH

292ND

33RD

117TH

COLUMBIA

53RD

INGLE

164TH25

TH

10TH

142N

D

15TH

199TH

19TH

72ND

119TH

18TH

78TH11

2TH

3RD

41ST

36TH

Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:OngoingProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

SAFE WALKWAYS

Installation of new sidewalks on existing Sts at various locations citywide. (No annual budget.)Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

ONGOING*Start of Construction (Year):

Program identified in the Vancouver Comprehensive Plan (2011-2030).

TRANS-A-244PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: TO:

$0.00Total Proj. Cost:

Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

96

Page 98: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPVancouver City Limits

Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-A-245SR-14 EB

SR-14 WB

117T

H58TH

10TH

PADDEN

EVER

ETT

MILL PLAIN 242N

D

I-5

I-205

29TH

C

76TH

50TH

212T

H

99TH

11TH

BLAIR

119TH

RISTO

6TH

39TH

159TH

EATON

78TH

41ST

83RD

20TH 38TH

139TH

292ND

33RD

117TH

COLUMBIA

53RD

INGLE

164TH25

TH

10TH

142N

D

15TH

199TH

19TH

72ND

119TH

18TH

78TH11

2TH

3RD

41ST

36TH

Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:OngoingProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

BRIDGE MANAGEMENT PROGRAM

Ongoing citywide inspection and maintenance of the city's bridges. (Budgeted $10,000annually.)Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

ONGOING*Start of Construction (Year):

Maintain safe bridges in compliance with state and federal regulations. Program identified inthe Vancouver Comprehensive Plan (2011-2030).

TRANS-A-245PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: TO:

Total Proj. Cost:

Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

97

Page 99: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPVancouver City Limits

Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-A-421SR-14 EB

SR-14 WB

117T

H58TH

10TH

PADDEN

EVER

ETT

MILL PLAIN 242N

D

I-5

I-205

29TH

C

76TH

50TH

212T

H

99TH

11TH

BLAIR

119TH

RISTO

6TH

39TH

159TH

EATON

78TH

41ST

83RD

20TH 38TH

139TH

292ND

33RD

117TH

COLUMBIA

53RD

INGLE

164TH25

TH

10TH

142N

D

15TH

199TH

19TH

72ND

119TH

18TH

78TH11

2TH

3RD

41ST

36TH

Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:OngoingProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

PAVEMENT RECONSTRUCTION PROGRAM

Major pavement and Rdway reconstruction of failed pavement surfaces on existing Sts at variouslocations citywide. (No annual budget.)Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

ONGOING*Start of Construction (Year):

Program identified in the Vancouver Comprehensive Plan (2011-2030).

TRANS-A-421PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: TO:

$0.00Total Proj. Cost:

Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

98

Page 100: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPVancouver City Limits

Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-A-738SR-14 EB

SR-14 WB

117T

H58TH

10TH

PADDEN

EVER

ETT

MILL PLAIN 242N

D

I-5

I-205

29TH

C

76TH

50TH

212T

H

99TH

11TH

BLAIR

119TH

RISTO

6TH

39TH

159TH

EATON

78TH

41ST

83RD

20TH 38TH

139TH

292ND

33RD

117TH

COLUMBIA

53RD

INGLE

164TH25

TH

10TH

142N

D

15TH

199TH

19TH

72ND

119TH

18TH

78TH11

2TH

3RD

41ST

36TH

Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:OngoingProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

TRAFFIC SAFETY & LIVABILITY - CITYWIDE

Install upgrades to traffic signal hardware, markings and signs to enhance traffic safety andmultiple locations citywide. ($125,000 annual budget for 2013/2014 includes $60k each yearfor Neighborhood Traffic Management Program).

Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

ONGOING*Start of Construction (Year):

Program listed in Vancouver Comprehensive Plan (2011-2030).

TRANS-A-738PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: TO:

Total Proj. Cost:

Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

99

Page 101: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPVancouver City Limits

Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-A-828SR-14 EB

SR-14 WB

117T

H58TH

10TH

PADDEN

EVER

ETT

MILL PLAIN 242N

D

I-5

I-205

29TH

C

76TH

50TH

212T

H

99TH

11TH

BLAIR

119TH

RISTO

6TH

39TH

159TH

EATON

78TH

41ST

83RD

20TH 38TH

139TH

292ND

33RD

117TH

COLUMBIA

53RD

INGLE

164TH25

TH

10TH

142N

D

15TH

199TH

19TH

72ND

119TH

18TH

78TH11

2TH

3RD

41ST

36TH

Ê

In Design

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:TrafficProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

FLASHING YELLOW ARROW UPGRADE PROJECT

Upgrade 35 signalized intersections across the City from permitted/protected left-turn operationto flashing yellow arrow left turn operation.Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

2014*Start of Construction (Year):

The City of Vancouver currently has 35 intersections with PPLT phasing which has long beenconsidered confusing to motorists attempting to make left turns resulting in serious collisions withthrough traffic in the opposite direction. The NCHRP report Evaluation of the Flashing YellowArrow Permissive-Only Left-Turn Indication Field Implementation cites a significant reduction incollisions associated with conversion of PPLT to FYA.

TRANS-A-828PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: TO:

$450,000.00Total Proj. Cost:

$375,000.00Const. Cost:$75,000.00Design Cost:

$0.00Pre-Design Cost:$0.00ROW Cost:

$0.00Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

100

Page 102: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-DT-451

SR-14 EBSR-14 WB

15TH

LOWER RIVER I-5

COLU

MBIA 33RD

MAIN8TH

MCLOUGHLIN

FRAN

KLIN

26TH

PORT

EVERGREEN

FORT VANCOUVER

6TH

16TH

8TH

CMA

IN

FOURTH PLAIN

MILL PLAIN

FRUI

T VAL

LEY

SAINT JOHNS

Ê

Planned

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:TDMProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

DESTINATION DOWNTOWN TDM

Downtown focused transportation demand management program. Investments include: employeroutreach, commuter training, bike sidewalk and ADA system investments, incentive programsProject Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

2014*Start of Construction (Year):

Program identified as priority implementation strategy for Vancouver City Center Vision plan(2007). Program adopted into the City of Vancouver Commute Trip Reduction Plan and Growthand Transportation Efficiency Center Plan (2008).

TRANS-DT-451PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: TO:

$230,000.00Total Proj. Cost:

$200,000.00Const. Cost:$30,000.00Design Cost:

Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

101

Page 103: 2015-2020 Transportation Improvement Program

Project BoundaryTransportationSanitary SewerSurface WaterWaterSCIPTaxlots

Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal

TRANS-DT-822

SR-14 EBSR-14 WB

15TH

LOWER RIVER I-5

COLU

MBIA 33RD

MAIN8TH

MCLOUGHLIN

FRAN

KLIN

26TH

PORT

EVERGREEN

FORT VANCOUVER

6TH

16TH

8TH

CMA

IN

FOURTH PLAIN

MILL PLAIN

FRUI

T VAL

LEY

SAINT JOHNS

Ê

Pending Funding

Date: 5/20/2014

PROJECT AREA MAP

PROJECT:

PROJECT SUMMARY

Project Status:

TransportationUtility Type:EnhancementProject Type:

PROJECT DESCRIPTIONProject Justification / Priority

ESTIMATED PROJECT COSTS FUNDING STRATEGY

SR-14 EB

SR-14 WB

117T

H

SR-500 EBSR-500 WB

LOW

ER R

IVER

58TH

PADDEN

MILL PLAIN

162N

D

I-5

I-205

76TH

EVERGREEN

99TH 212T

H50TH

18TH

119TH

39TH

63RD

78TH

15TH

83RD

6TH

20TH 38TH

HAZE

L DEL

L

139TH

33RD

117TH

COLUMBIA

86TH

INGLE

97TH

25TH

MCGILLIVRAY

87TH

182N

D

88TH

54TH

134TH

13TH

172N

D

ANDR

ESEN

34TH

26TH

139TH

39TH

172N

D

119TH

18TH

99TH 72ND

1ST112T

H

WARD

137T

H

LAKE

63RD

VICINITY MAPLEGEND

DOWNTOWN QUIET ZONE

Remove at-grade rail crossings or install crossing protection at several downtown intersections sotrains will not blow horns in downtown Vancouver. Work at 8th & Jefferson Complete. Work atHill & 11th on hold. Recently added work at the Chelsea RR crossing (to be completed in 2014)

Project Description / Comments

Budget / Proj. #:

Budget / Proj. Task #:

*Start of Construction (Year):

TRANS-DT-822PROJECT ID:

2015 - 2020 TRANSPORTATION IMPROVEMENT PROGRAM

PROJECT EXTENT: TO:

$200,000.00Total Proj. Cost:

Const. Cost:Design Cost:Pre-Design Cost:ROW Cost:

Const. Admin. Cost:

*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Utility CIP projects (WTR-XXX, SS-XXX, SW-XXX & SCIP-XXX) can be found in the 6 Year Public Works Capital Improvement Program (CIP) document.

102

Page 104: 2015-2020 Transportation Improvement Program

2015-2020 Transportation Improvement Program

Arterial Map Update

103

Page 105: 2015-2020 Transportation Improvement Program

New Designation: RecommendationSoutheast Evergreen Highway (176th to East City Limits) Add as collector arterialNortheast 94th Avenue (54th to 58th Street)

Add as collector arterialRedesignation:

STREETS - ARTERIAL CLASSIFICATION CHANGES

6 YEAR TRANSPORTATION IMPROVEMENT PROGRAMArterial Map Update

(2015-2020)

104

Page 106: 2015-2020 Transportation Improvement Program

105

Page 107: 2015-2020 Transportation Improvement Program

2015-2020 Transportation Improvement Program

Glossary

106

Page 108: 2015-2020 Transportation Improvement Program

Transportation Improvement Program 2015-2020 Glossary Page 1

GGLLOOSSSSAARRYY OOFF FFRREEQQUUEENNTTLLYY UUSSEEDD TTEERRMMSS AANNDD AACCRROONNYYMMSS

ACP

Annual Construction Program.

ADA

Americans with Disabilities Act.

ADT

Average Daily Traffic.

AIP

Arterial Improvement Program (TIB funding Program).

Access Access is a means of approach to provide vehicular or pedestrian entrance or exit to a property. This may not necessarily include all movements.

Access Management

Access management is the process of providing and managing access to land development while preserving the regional flow of traffic in terms of safety, capacity, and speed.

A.M. Peak Hour

A.M. peak hour is identified by a one hour period in the morning when traffic flow increases. The a.m. peak hour typically occurs between 6:30 a.m. and 9:00 a.m. Traffic volumes occurring during the a.m. peak hour are used to calculate the overall operation of a roadway or intersection.

ARRA

American Recovery and Reinvestment Act. Also call “economic stimulus package,” ARRA was enacted by the 111th Congress in February 2009. The act provides $28.35 billion for improving and maintaining transportation infrastructure throughout the United States.

Arterial

An arterial is a major street carrying the traffic of local and collector streets to and from freeways and other major streets. Arterials generally have traffic signals at intersections and may have limits on driveway spacing and street intersection spacing.

107

Page 109: 2015-2020 Transportation Improvement Program

2015-2020 Transportation Improvement Program Page 2 Glossary

Biological Assessment A biological assessment is an environmental document required for compliance with the Endangered Species Act for projects with federal funding or permits.

CAT

Citizen Advisory Team.

CCRP Corridor Congestion Relief Program (State funded).

CDBG Community Development Block Grant. Block grants are targeted for low and moderate-income areas. Improvements usually consist of sidewalk and capital improvement programs.

CMAQ

Congestion Mitigation and Air Quality Improvement (Federal funding source). This funding is for projects that create a direct air quality benefit, leading toward attainment or maintenance of a National Ambient Air Quality Standard (NAAQS).

CN

Construction.

CTL

Center Turn Lane.

C-TRAN

Clark County Public Transportation Benefit Area Authority, the transit agency for Clark County, Washington.

CWP

Clean Water Program

Capacity

The maximum rate of flow at which vehicles can be reasonably expected to traverse a point or uniform segment of a lane or roadway during a specified time period under prevailing roadway, traffic, and control conditions; usually expressed as vehicles per hour.

In the project list spreadsheets Capacity is a term used to describe a subset of projects that upgrade existing substandard streets to urban arterial standards. This subset of projects typically improves more than just vehicle capacity. They also improve the pavement section, street lighting, bicycle, pedestrian, and ADA facilities.

108

Page 110: 2015-2020 Transportation Improvement Program

Transportation Improvement Program 2015-2020 Glossary Page 3

Collector Streets – Urban Collector

Collectors – Urban Collector. “Urban collector” provides for land access and traffic circulation within and between residential neighborhoods, and commercial and industrial areas. Direct access to adjacent land uses, however, is still subordinate to traffic movement. Access to abutting properties is controlled through the use of raised channelization, driveway spacing and pavement markings. Typically, collectors are not continuous for any great length, nor do they form a connected network by themselves.

Comprehensive Plan

A long-range plan, typically looking 20 to 50 years into the future, which is intended to guide growth and development of a community. Comprehensive Plans are required by the Growth Management Act for specific counties and cities in Washington State. The Plans establish goals and policies for managing population growth and land development while ensuring that the growth is adequately served by public facilities.

Concurrency

The Concurrency ordinance (VMC 11.95) was adopted in response to the Washington State Growth Management Act, which required local jurisdictions to adopt level-of-service (LOS) standards for the arterial road system and to ensure maintaining those standards when considering new development. This process is called Concurrency. Concurrency applies to any development, land division, site plan, and conditional use permit approvals.

EA

Environmental Assessment.

Environmental Review

The consideration of environmental factors as required by the Washington State Environmental Policy Act (SEPA). The environmental review process is the procedure used by agencies and others under SEPA for giving appropriate consideration to the environment in agency decision-making. (WAC 197-11-746).

Enhancement

In the project list spreadsheets Capacity is a term used to describe a subset of projects that upgrade pedestrian or bicycle facilities, or otherwise enhance the livability of the community through upgrades to the street system.

ESA

The Endangered Species Act was established in 1973 to preserve ecosystems of endangered and threatened species. The Act was recently amended to include various species of fish, wildlife, and plants throughout the United States.

109

Page 111: 2015-2020 Transportation Improvement Program

2015-2020 Transportation Improvement Program Page 4 Glossary

Growth Management

A group of strategies used by a government to direct the timing, location and type of development in a community.

Growth Management Act (GMA)

The State of Washington's Growth Management Act was adopted in 1990 to address the negative consequences of unprecedented population growth and suburban sprawl in the State. The GMA requires all cities and counties in the State to do some planning and has more extensive requirements for the largest and fastest-growing counties and cities in the State. Its requirements include guaranteeing the consistency of transportation and capital facilities plans with land use plans.

HES

Hazard Elimination System/Safety (Federal Funding Source). The objective of this fund is to improve specific locations which constituted a danger to vehicles or pedestrians as shown by frequency of accidents.

HIS-HRRP

In 2008, a portion of the funding provided through Federal Transportation Act SAFETEA-LU was made available for safety grants. Funds were provided through the Highway Safety Improvement Program (HSIP) and the High Risk Rural Roads Program (HRRRP).

HOV

High Occupancy Vehicle.

Impacts

‘Impacts’ are the effects or consequences of actions. Environmental impacts are effects upon the elements of the environment.

Interchange

A system of interconnecting roadways in conjunction with one or more grade separations, providing for the movement of traffic between two or more roadways on different levels.

Intersection

The general area where two or more roadways join or cross, within which are included the roadway and roadside facilities for traffic movements in that area.

ITS

Intelligent Transportation System.

Land Use

110

Page 112: 2015-2020 Transportation Improvement Program

Transportation Improvement Program 2015-2020 Glossary Page 5

The type of activity associated with a specific geographic area. Land use categories can be broad (e.g., residential, retail, office, industrial, and recreational), or they can be very specific (e.g., single-family residential, convenience market, or elementary school). In order to estimate trip generation characteristics for a specific geographic area, it is necessary to know both the type and intensity of land use (e.g., single-family residential land use at a development intensity of eight units per acre).

Level of Service (LOS)

The Level of Service is a grading system developed by the transportation profession to quantify the degree of comfort (including such elements as speed, travel time, number of stops, total amount of stopped delay, and impediments caused by other vehicles) afforded to drivers as they travel through an intersection or roadway segment. LOS is expressed as a letter grade that ranges from “A”, indicating that drivers will experience little, if any delay, to “F”, indicating significant traffic congestion and driver delay will occur.

MVFT Motor Vehicle Fuel Tax.

Mitigation

(1) Avoiding impacts altogether by not taking a certain action or parts of an action; (2) minimizing impacts by limiting the degree or magnitude of the action and its implementation by using appropriate technology, or by taking affirmative steps to avoid or reduce impacts; (3) rectifying impacts by repairing, rehabilitating, or restoring the affected environment; (4) reducing or eliminating impacts over time by preservation and maintenance operations during the life of the action; (5) compensating for impacts by replacing, enhancing or providing substitute resources or environments; and/or, (6) monitoring impacts and taking appropriate corrective measures (WAC 197-11-768).

Mode The means by which travel is accomplished. Alternative modes of travel include walking, bicycling, auto, bus, light rail, airplane, ferry, etc.

NAAQS

The National Ambient Air Quality Standards were set up by the Environmental Protection Agency (EPA) to help mitigate the health impacts of air pollution. EPA established NAAQS measure for six pollutants that include carbon monoxide, ozone, particulate matter, lead, sulfur dioxide, and nitrous oxide.

Non-attainment Area

Geographic area in which air pollution levels exceed the NAAQS.

Peak Hour

A period of 60 consecutive minutes during which an intersection or roadway system experiences the greatest amount of traffic volume.

111

Page 113: 2015-2020 Transportation Improvement Program

2015-2020 Transportation Improvement Program Page 6 Glossary

P.M. Peak Hour

A one hour period in the afternoon or evening when traffic flow increases. The p.m. peak hour typically occurs between 4 and 6 p.m. Traffic volumes occurring during the p.m. peak hour are used to calculate the overall operation of a roadway or intersection.

PE

Preliminary Engineering.

PSE

Plans, Specifications, and Estimates.

PSMP

Pedestrian Safety and Mobility Program.

PWB

Public Works Board. The Public Works Board was created by the 1985 Legislature. The Board is comprised of local government officials, special purpose district representatives, and private sector members. The mission of the Washington State Public Works Board is “to assist Washington’s local governments and private water systems in meeting their public works needs to sustain livable communities.” The Board is authorized to loan money to counties, cities, and special purpose districts to repair, replace, or create domestic water systems, sanitary sewer systems, storm water systems, roads, streets, solid waste and recycling facilities, and bridges.

PWTF

Public Works Trust Fund. This trust fund is administered by the Public Works Board. The PWTF Construction and Pre-construction Loan Programs provide funds to design, repair, replace, or create a facility. These loans have a 5 to 20-year term with an interest rate of only one-half percent. The maximum for any agency is ten million dollars per biennium.

RCW

The Revised Code of Washington contains all the laws of the state of a general and permanent nature.

REET

Real-estate Excise Tax.

RTC

Southwest Washington Regional Transportation Council. RTC is the regional transportation planning agency for Clark, Klickitat, and Skamania counties.

112

Page 114: 2015-2020 Transportation Improvement Program

Transportation Improvement Program 2015-2020 Glossary Page 7

WW&RP Washington Wildlife and Recreation Program.

Right-of-Way/ROW

Right-of-way is property held by the City for existing or future public roads or other public improvements.

Roadway Conditions

The geometric characteristics of the street or highway, including the type of facility and its development environment, the number of lanes (by direction), lane and shoulder widths, lateral clearances, design speed, and horizontal and vertical alignments.

Roadway

A roadway is the improved portion of an easement or right-of-way, excluding curbs, sidewalks and ditches. Road, roadway and street will be considered interchangeable terms.

Roadway Section

A roadway section is a cross-section of a roadway which displays, travel lanes, turning lanes, bike lanes, sidewalks, and medians with their respective dimensions. Each classification of roadway has a corresponding roadway section.

SAFETEA-LU

On August 10, 2005, the President signed into law the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU). With guaranteed funding for highways, highway safety, and public transportation totaling $244.1 billion, SAFETEA-LU represents the largest surface transportation investment in our Nation’s history. The two landmark bills that brought surface transportation into the 21st century—the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA) and the Transportation Equity Act for the 21st Century (TEA-21)—shaped the highway program to meet the Nation’s changing transportation needs. SAFETEA-LU builds on this firm foundation, supplying the funds and refining the programmatic framework for investments needed to maintain and grow our vital transportation infrastructure.

SEPA

State Environmental Policy Act. SEPA is a state law requiring agencies to consider the environmental consequences of their decisions. (WAC 197-11-790).

STP

Surface Transportation Program (Federal funding source). The objective of the STP is to fund construction, reconstruction, resurfacing, restoration and rehabilitation of roads functionally classified as arterials.

113

Page 115: 2015-2020 Transportation Improvement Program

2015-2020 Transportation Improvement Program Page 8 Glossary

STP-C

Surface Transportation Program – Competitive Grant.

STP-E

Surface Transportation Program – Enhancement Grant.

STP-TMA

Surface Transportation Program – Transportation Management Area Grant.

Signal Warrant

A criterion that must be met before the installation of a traffic signal can be considered.

Significant/Significance

1) ‘Significant’ as used in SEPA means a reasonable likelihood of more than a moderate adverse impact on environment quality.

2) Significance involves context and intensity and does not lend itself to a formula or quantifiable test. The context may vary with the physical setting. Intensity depends on the magnitude and duration of an impact. The severity of an impact should be weighed along with the likelihood of its occurrence. An impact may be significant if its chance of occurrence is not great, but the resulting environmental impact would be severe if it occurred. (WAC 197-11-794).

SWCAA

Southwest Washington Clean Air Agency, is a government agency responsible for air pollution control and planning in Clark, Cowlitz, Lewis, Skamania, and Wahkiakum Counties.

SYS

Traffic Signal System Improvement.

TBD

To Be Determined.

TDM

Transportation Demand Management is a demand-based technique for reducing traffic congestion, such as ride-sharing programs and flexible work schedules enabling employees to commute to and from work outside of peak hours.

TEA-21

114

Page 116: 2015-2020 Transportation Improvement Program

Transportation Improvement Program 2015-2020 Glossary Page 9

The Transportation Equity Act for the 21st Century was signed on June 9, 1998, superseding the Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991. This bill provides Federal Transportation dollars for Federal, State and Local agencies. The majority of benefits associated with ISTEA are continued or expanded upon through TEA-21. Also, see SAFETEA-LU.

TIB

The Transportation Improvement Board is a state funding agency and administers several state funding programs. The mission of the TIB is to assist local agencies to preserve and improve transportation systems by providing financial assistance, supporting economic development, promoting multi-jurisdictional and multi-modal coordination and to promote public/private cooperation.

TIF

Transportation Impact Fee. TIF is the traffic impact component of a development impact fee. An impact fee is a fee levied on a developer by the county as compensation for expected effects of the development.

TIMACS

Transportation Information Management and Control System.

TIP

Six-Year Transportation Improvement Program.

TPP

Transportation Partnership Program (TIB Funding Program).

TS

Traffic Signal Project.

TSNS

Traffic Safety Near Schools.

TSO Traffic Signal Optimization.

UAP Urban Arterial Program (State funding source) formally known as the Arterial Improvement Program. This program was established by the State in 1967 as the Urban Arterial Trust Account (UATA) and was designated as the AIP in July 1999. The purpose of this program is to fund city and urban county arterial road and street projects to reduce congestion and improve safety, geometrics, and structural concerns.

115

Page 117: 2015-2020 Transportation Improvement Program

2015-2020 Transportation Improvement Program Page 10 Glossary

UCP

Urban Corridor Program (State funding source) formally known as the Transportation Partnership Program. This program was established by the State in 1988 as the Transportation Improvement Account (TIA) and was designated as the TPP in July 1999. The purpose of the program is to fund projects on the regional transportation plan that are necessitated by existing or future congestion due to economic growth.

UR-SP

Urban Sidewalk Program (State funding source) formally known as the Pedestrian Safety and Mobility Program. This program was established by the TIB in 1994 as the Pedestrian Facilities Program (TIA-PFP) and was designated as the PSMP in July 1999. The program goal is to enhance and promote pedestrian mobility by providing funding for pedestrian projects that provide access and connectivity of pedestrian facilities.

V/C Ratio

The ratio of volume to capacity for a traffic facility.

Volume

The number of vehicles passing a point on a lane or roadway during some time interval, often taken to be one hour, but may also be expressed in terms such as sub-hourly, daily, or annually.

WAC

Washington Administrative Code. The WAC is laws adopted by state agencies to implement state legislation.

WSDOT

Washington State Department of Transportation. WSDOT is a department of the State of Washington responsible for transportation related planning, management, and coordination.

Zoning

A map and ordinance text which divides a city or county into land use “zones” and specifies the types of land uses, setbacks, lot size, and size restrictions for buildings within each zone.

116