14 National
Associations
UIP – International Union of Wagon Keepers
UIP communication tools
Twitter Linkedin
� Vehicle Authorisation (VA)
� ERTMS Approval
� New European Vehicle Register
Interop Directive
(IOD) - 2016/797
� Single Safety Certificate (SSC)
� Actors and their roles (long list similar to CIM/RID)
� Occurrence Reporting (COR)
Safety Directive
(RSD) - 2016/798
� One stop shop (OSS)
� Board of Appeal
� Fees and Charges
ERA Regulation
2016/796
4th Railway Package – Technical pillar
Overview
Transposition of Safety and Interop directive at national level until June 2019
� EC transposition tables for MS (RISC78) – 80 pages each handed over to NAs
� UIP compendium (105 pages each) for review of impact – main aspects to be highlighted
� Delegated act on revision of all TSI – 3rd draft available – final expected Q2 2017
Challenges: transitional provisions and deadlines for transposition
4th Railway Package – Technical pillar
Level of works and legal acts to be voted
NSA network subgroup cooperation agreement
NSA network subgroup cooperation agreement
Programme/ ERA Internal steering group
Programme/ ERA Internal steering group
EC RISC 4th RP Implementation Expert Group
EC RISC 4th RP Implementation Expert Group
ERA Management Board
ERA Management Board
Proposals for cooperation
agreements
Proposals to ERA
management Board
Recommendations/Proposals
on legal acts to be voted
Representatives of
� Mgt Board
� NSA network
� Sector
� EC & ERA mgt team
� Workshops
� adopt main elements to be included in the
cooperation agreements by December 2017
� adopt technical and functional specifications
and a plan for OSS by June 2017
� adopt a framework model for fees and
charges by December 2017
� adopt rules for the prevention and
management of conflicts of interest by
September 2017
� appoint and remove the members of the
Boards of Appeal by September 2018
� Delegated act for the CSM on CA revision by
December 2017
� Implementing act for the practical
arrangement for SSC by May 2017
� Implementing act for the practical
arrangement for VA by May 2017
� Implementing act for the EC model and
template for the EC declaration of conformity
for VA by May 2017
� Implementing act on the fees and charges by
September 2017
� Implementing act for the rules and procedures
by May 2017
Single Safety Certificate
Vehicle (type) authorization
Harmonisedimplementation of ERTMS trackside
Communication protocol /
Cooperation agreements
ICS IT development for OSS
Fees and charges Board of appeal Liability
Responsibilities
TSI revisionCSM on Conformity
AssessmentCSM on supervision
Practical arrangements for
SSC
EVR specificationsEC declaration of
verificationECM Regulation scope extension
Common OccurrenceReporting
4th Railway Package – Technical pillar
Main elements
Cluster Issue Item Status
Interoperability
Vehicle (type) authorizationPractical Arrangements for vehicle
authorisation
About to end – final discussions 05.07.2017, RISC80 for
info, RISC 81 for vote
-/-Application guide 1st Workshop on 28/29.03, next WS: End of June, new
draft available in May
-/-Interpretation of Article 23 “The use
of vehicles”
Kicked off by GRB, compendium handed over to ERA
(common position), waiting for ERA response
Harmonised implementation of
ERTMS trackside
EUAR new as system authority for
ERTMS approval
High level statements agreed among GRB, waiting for
ERA reply
TSI revisionAll TSI to be revised - new IOD 3rd draft DA (delegated act) presented on 12th of April,
review till 03.05.2017
EVR specificationsExpectations from MS and Sector ? ERA WP started – requirements, next meeting:
25/04/2017
EC declaration of verification new IOD, new format Ongoing – update of existing certificates
Safety Practical arrangements for SSC EUAR OSS for SSC About to end – final discussions 12.04.2017
CSM on Conformity Assessment About to end – vote in RISC in July (RISC80)
CSM on Supervision About to end – vote in RISC in July (RISC80)
ECM Regulation scope extensionNew Safety Directive About to start – JW and RK as UIP representatives + new
NA support group
Common Occurrence ReportingSAIT Tool released - bilateral discussions CER/ERA to start,
GRB joint statement (no agreement yet)
-/-Safety Data Management Consultation on roles, use of data and governance till 8th
of May 2017
ERA Cooperation agreements EUAR vs NSAs Ongoing – no information
IT development (OSS)Central IT system for VA and SSC Ongoing - OSS User Group 4th meeting in April
Fees and chargesIA on fees and charges to be levied by
EUAR for VA and SSC
GRB preparing common position, next meeting 5th of
July 2017
Board of appealNew body for complaints against
EUAR decisions
Discussions more or less closed
Article 93 (2) still problematic for GRB
EC Expert Group: next meeting: 05/07/2017
4th Railway Package – Technical pillar
Main elements – State of play
Implementing act (58 articles)� how the requirements for the vehicle authorisation for
placing on the market and for vehicle type authorisation
shall be fulfilled by the applicant and listing of the
documents required;
� the details of the authorisation process, such as
procedural stages and timeframes for each stage of the
process;
IMPLEMENTING
ACT
Practical arrangements
Application Guide
ERA and NSA internal procedures
Application guide� Guidance text
� Serve as a basis for One-Stop-Shop requirements
� Serve as a basis for ERA and NSA internal procedures
4th Railway Package
New approach to Vehicle Authorisation (VA)
ERA and NSA internal procedures� To be taken into account for the drafting of the
cooperation agreements
4th Railway Package
Legal texts relating to Vehicle Authorisation (VA)
� VA workshops 26-27 June and 27-28 September to discuss application guide
� Implementing act to be finalised at next EC Expert Group meeting on 05/07/2017
� Commission draft IA VA (for information) at RISC79 (on 6 & 7/07/2017)
� Commission draft IA VA (for opinion) at RISC80 (on 16 & 17/11/2017)
* EC declaration of verification
Working paper on
Vehicle Authorisation
Implementing Act (IA)
on VA & ECDofV*
Application Guide (AG)
Accompanying report
• Flowcharts
• Key concepts
• Issues
OSS
ERA Internal procedures
4th Railway Package
Implementing Act on Vehicle Authorisation (VA)
Key requests from the Sector (GRB)
� Comprehensive transitional provisions, which would allow a smooth and effective
transition without creating extra costs and burdens to the sector
� Adoption of Use of common language for VA
� Reasonable and predictable Fees and Charges
� Remove all uncertainty for the appealing party in the Board of Appeal process
Main differences in the legal framework for vehicle authorisation (Directive (EU)
2016/797 - Directive 2008/57/EU) were identified:
� New concept of Authorisation for Placing on the Market for vehicles (APM)
� Single APM covering an area of use for several Member States
� The authorisation case ”additional authorisation” was removed and ”extended area of
use” was introduced.
� The TSIs shall specify when a new authorisation is required after an upgrade/renewal.
� The IT tool One Stop Shop was introduced.
� The possibility for NSAs to issue a temporary authorisation to use a vehicle for tests on
the network was introduced.
� Arbitration and the Board of Appeal was introduced.
� Possibility to suspend/revoke/amend an issued authorisation.
STEP 1: EC delegated act
� One act for all TSIs
� Sets out specific objectives (taking into account Art. 4 & 5 new IOD)
� No "timeline", valid as long as objectives relevant, can be revised or repealed if changes in
objectives
STEP 2: EC requests the Agency to draft individual TSIs
� Same drafting process as before
� Agency issues recommendation
STEP 3: New TSIs
� Adopted through the so-called "examination procedure" (incl. RISC vote, as before)
� Published as Implementing acts in OJ
4th Railway Package
Revision of TSIs
Foreseen timelines for STEP 1
Consultation with MS & Sector, publication of final draft for comments
Adoption by EC with a right of scrutiny of Council and EP
Publication in EU Official Journal (OJ) – Target: Q2 2017
Article 5
Specific objectives applicable to WAG TSI
1. Without prejudice to Article 21(16) of Directive (EU) 2016/797, Commission Regulation (EU) No 321/2013
('WAG TSI') shall include the vehicles to be authorised and operated on rail networks within the Union with a
track gauge of 1520 mm.
2. The provisions of the WAG TSI on automatic variable gauge systems, including in terms of technical
specifications and conformity assessment procedures, shall be reviewed.
3. The WAG TSI shall include provisions to increase flexibility and efficiency in train composition and the
development of intermodal transport. Provisions on automatic coupling shall be included where appropriate.
4. The WAG TSI shall ensure consistency and avoid any overlap with the Regulations concerning the
International Carriage of Dangerous Goods by Rail ('RID') as regards technical requirements applicable to
vehicles. The inclusion of the derailment detection function shall be considered in terms of technical
requirements, operational aspects and conformity assessment procedures.
5. The WAG TSI shall include requirements improving the identification of freight wagons. The use of contactless
technologies and related standards shall be included where appropriate.
6. The WAG TSI shall take into account changes in the procedure for placing mobile subsystems on the market, as
provided for in Articles 20 to 26 of Directive (EU) 2016/797, including the checks before the first use of
authorised vehicles mentioned in Articles 4(3)(i) and 23 of that Directive.
4th Railway Package
Revision of TSIs – Delegated act TSI WAG
Slide2
Tuesday 16/05 : all events at Sofitel Grand Legend
15:30 – 17:30 Board (only for Board members)
19:00 – 22:00 Dinner
Wednesday 17/05: all events at Tobacco Theater
09:00 – 10:00 General Assembly
10:30 – 16:00 Lunch & conference
Schiphol Airport – Amsterdam
Central:
15 min by train
Amsterdam Central – Sofitel:
15 min by foot or 8 min by cab
UIP GA location and planning
Merci de votre attention!
GILLES PETERHANS
Generalsekretär
Austria Belgium Czech
RepublicFrance Germany UK Hungary
NVPG
Italy Netherlands Poland Slovak
Republic
Spain Sweden Switzerland