2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 Recommended by the Transportation Advisory Committee February 27, 2018 Approved by the Board of Supervisors May 30, 2018

Upload: others

Post on 12-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

2018 FIVE-YEAR TRANSPORTATION

IMPROVEMENT & MAINTENANCE

PROGRAM 2017-2018 THROUGH 2021-2022

Recommended by the

Transportation Advisory Committee

February 27, 2018

Approved by the Board of Supervisors May 30, 2018

Page 2: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM

2017-2018 THROUGH 2021-2022

The Pinal County Board of Supervisors (Board) proudly presents the 2018 Five-Year Transportation Improvement and

Maintenance Program (TIMP) for Budget Years 2017-2018 through 2021-2022. The TIMP is Pinal County’s near-term transportation

plan that identifies potential funding and establishes a tentative schedule for planning, construction, and maintenance projects. It is

fiscally constrained and updated annually with new projects added to the fifth year.

The Transportation Advisory Committee (TAC) is the Board appointed, ten member panel representing each of Pinal County’s

five supervisor districts. The TAC is charged with prioritizing transportation projects for the TIMP and recommending the draft TIMP

to the Board. On February 27, 2018, the TAC met in an open public meeting and recommended approval of the 2018 TIMP for Budget

Years 2017-2018 through 2021-2022.

In recognition of their significant contributions, we would like to thank the TAC officers and members for their service to Pinal County.

First Row (L-R): Gordon Brown, District 2; Ted Hawkins, District 4; Chair Maxine Brown, District 5;

Anna Flores, District 1; Vice-Chair Kevin Louis, District 3

Second Row (L-R): Ron Vogler, District 4; William Beebe, District 5, Jim Fabris, District 2; David Garcia, District 1

Page 3: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM

2017-2018 THROUGH 2021-2022

The TAC conducts three public meetings during the months of September, November, and February in Florence and considers

public comments in developing recommendations to the Board. We encourage you to attend the meetings and offer comments on

the TIMP and future transportation projects.

Meetings are held on Tuesdays in the Ironwood Room (Northeast Multipurpose Room 101) of the Pinal County Administrative

Complex (1891 Historic Courthouse) and begin at 2:30 p.m. as follows:

Agendas and minutes are posted in compliance with Arizona’s Open Meeting Law and can be found on Pinal County’s website:

http://www.pinalcountyaz.gov/PublicWorks/TransportationPlanning/Pages/TACSchedule.aspx.

Funding for the TIMP is provided by revenues from the Pinal County Transportation Excise Tax, the half-cent sales tax, approved

by voters in 2005. The sole purpose of the tax is to fund construction, maintenance, and roadside development projects throughout

the county. Shopping and buying your gasoline locally ensure that quality transportation projects are planned and implemented

countywide. With your support, we can continue building and improving the county’s transportation system.

Pinal County Board of Supervisors

September 25, 2018 November 27, 2018 February 26, 2019

Vice-Chairman Pete Rios, District 1; Mike Goodman, District 2; Stephen Miller, District 3; Anthony Smith, District 4; Chairman Todd

House, District 5

Page 4: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three
Page 5: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM

2017-2018 THROUGH 2021-2022

GLOSSARY

Activity – Project work such as: pre-construction/construction/new construction/reconstruction, drainage, dust palliative,

pavement preservation or safety.

Construction – The building of roadway and/or related infrastructure improvements.

Drainage – The management of storm water to protect private and/or public infrastructure.

Dust Palliative – A surface treatment applied to unimproved roadways to control dust.

New Construction – The establishment of a roadway and/or related infrastructure improvements.

Pavement Preservation – A topical treatment that extends the service life of existing pavement surfaces.

Pre-Construction – The project work conducted prior to construction of roadway and/or related infrastructure

improvements such as: planning, environmental, design, and right-of-way acquisition.

Reconstruction – The rebuilding of roadway and/or related infrastructure improvements. Elements of new construction may

be incorporated into the project.

Safety – The project work that eliminates or reduces the severity of roadway hazards. Examples include intersection

realignment, guardrails, improved signage and/or pavement markings, traffic signals or related studies.

Status – The current state of the project such as: cancelled, closed, completed, pending, programmed, and underway

Cancelled – The project was terminated due to financial or other constraints such as unresolved right-of-way issues or

changing priority.

Closed – The project was combined with another project (including allocated funding) to streamline activities or allocated

funding for project was not used.

Page 6: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM

2017-2018 THROUGH 2021-2022

GLOSSARY (continued)

Completed – The project was successfully finished/constructed and closed out.

Pending – The project is about to start or awaiting the completion of another activity.

Programmed – The project was approved/authorized and scheduled for a future budget year.

Underway – The project is in progress.

Unfunded – Funding has not been identified/allocated.

Page 7: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Budget Year 2017-2018Transportation Improvement and Maintenance ProgramIMPROVEMENT

Project Location Activity PageDistrictStatus

PROJECT TYPE

Total CostProject Manager

Battaglia Drive Overfield Rd Intersection Construction/Reconstructi $350,000 14CompletedAngeline To a

Curry Road State Route 287-Storey Rd Construction $110,000 13CompletedLindsey Randall b

Germann Road Meridian Rd-Ironwood Dr Pre-Construction $244,124 22UnderwayCeleste Garza a

Henness Road Val Vista Rd-Waverly Dr New Construction $350,000 23CompletedLindsey Randall b

McCartney Road Interstate 10-Evans Rd Reconstruction $3,500,000 31, 3UnderwayLindsey Randall a

Mitchell Trail Heritage Rd-Arizona Farms Rd Pre-Construction $0 32CancelledLindsey Randall b

Safety Program Countywide Safety $500,000 47ProgrammedJohn Kraft a

Sunland Gin Road Battaglia Dr Intersection Safety $350,000 44UnderwayAngeline To b

Tweedy Road State Route 287-Storey Rd Construction $110,000 53CompletedLindsey Randall a

$5,514,124SUBTOTAL IMPROVEMENT

MAINTENANCEProject Location Activity PageDistrictStatus

PROJECT TYPE

Total CostProject Manager

Bronco Lane Valley View Dr south .1 mile Dust Palliative $30,000 55CompletedLindsey Randall b

Cactus Road Kaniksu St (north)-Frontier St Dust Palliative $20,000 65CompletedLindsey Randall a

Cattle Tank Road Davis Ranch Rd-Park Link Dr Pre-Construction $90,000 61, 4CompletedAngeline To b

Cattle Tank Road Davis Ranch Rd-Park Link Dr Dust Palliative $1,300,000 71, 4UnderwayAngeline To a

Dust Abatement Program Apache Junction area Dust Palliative $500,000 75PendingLindsey Randall b

Estancia Drive Davis Ranch Rd-Hedgehog Tr Dust Palliative $100,000 84CompletedAngeline To a

Harmon Road Toltec Hwy-Tweedy Rd Dust Palliative $360,000 81CompletedAngeline To b

Huisatch Road Garnet Rd-Amarillo Valley Rd Dust Palliative $175,000 94CompletedLindsey Randall a

La Palma Road State Route 287-.25 north of Kleck Rd Dust Palliative $150,000 91CompletedLindsey Randall b

Maverick Circle Mohican Rd west .1 mile Dust Palliative $30,000 105CompletedLindsey Randall a

McDavid Road Warren Rd-Hidden Valley Rd Dust Palliative $110,000 104CompletedLindsey Randall b

Muleshoe Road Roundup St-Shiprock St Dust Palliative $20,000 115CompletedLindsey Randall a

Pavement Preservation Program Countywide Pavement Preservation $500,000 117ProgrammedJoe Ortiz b

Redington Road Veterans Memorial Blvd-Pima County Line Dust Palliative $665,000 121CompletedAngeline To a

Sixshooter Road Jacob Waltz St north .1 mile Dust Palliative $30,000 125CompletedLindsey Randall b

Warren Road Farrell Rd-McDavid Rd Dust Palliative $220,000 134CompletedLindsey Randall a

$4,300,000SUBTOTAL MAINTENANCE

$9,814,124GRAND TOTAL 2017-2018

District 7 = Multiple districts or countywide

Page 8: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Budget Year 2018-2019Transportation Improvement and Maintenance ProgramIMPROVEMENT

Project Location Activity PageDistrictStatus

PROJECT TYPE

Total CostProject Manager

Arizona City Safety Study Multiple Intersections Pre-Construction $100,000 134ProgrammedAngeline To b

Baseline Avenue Mohican Rd-East 980 feet Construction $55,417 145PendingLindsey Randall a

Cactus Wren Street Mountain View Rd-Val Vista Rd New Construction $61,700 145PendingLindsey Randall b

Florence-Kelvin Highway Donnelly Wash-East 2 miles Construction $800,000 151PendingAngeline To a

Gantzel Road Chandler Heights Rd Construction $325,000 152, 5CompletedCeleste Garza b

Germann Road Meridian Rd-Ironwood Dr New Construction $1,728,756 162PendingCeleste Garza a

Hohokam Road Paisano Dr-Quartzite Dr Construction $286,300 161PendingLindsey Randall b

Lost Dutchman Road Sun Rd-Prospectors Rd Construction $156,000 175PendingLindsey Randall a

Safety Program Countywide Safety $500,000 177ProgrammedJohn Kraft b

$4,013,173SUBTOTAL IMPROVEMENT

MAINTENANCEProject Location Activity PageDistrictStatus

PROJECT TYPE

Total CostProject Manager

Arica Road Isom Rd-Trekell Rd Dust Palliative $120,000 184CompletedJohn Kraft a

Battaglia Drive Chuichu Rd-Del Rio Rd Pavement Preservation $200,000 183, 4ProgrammedAngeline To b

Carefree Place State Route 347-Pepper Pl Dust Palliative $500,000 194PendingJohn Kraft a

Chuichu Road Battaglia Dr-Interstate 8 Pavement Preservation $2,000,000 193PendingJohn Kraft b

Dust Abatement Program Countywide Dust Palliative $1,000,000 207ProgrammedJoe Ortiz a

Fulcar Road Hidden Valley Rd-Table Top Rd Dust Palliative $240,000 204CompletedJohn Kraft b

Mount Lemmon Road Campo Benito Rd-.5 miles south of AZ Zipline Dust Palliative $250,000 211PendingAngeline To a

Peters Road Santa Cruz Wash-Corrales Rd Dust Palliative $252,083 213PendingJohn Kraft b

Sage Street Barnes Rd-Miller Rd Dust Palliative $120,000 224CompletedJohn Kraft a

Sotol Road Warren Rd-Hidden Valley Rd Dust Palliative $150,000 224CompletedJohn Kraft b

Stagecoach Pass Avenue Schnepf Rd-Ghost Rider St Pre-Construction $0 235ClosedLindsey Randall a

$4,832,083SUBTOTAL MAINTENANCE

$8,845,256GRAND TOTAL 2018-2019

District 7 = Multiple districts or countywide

Page 9: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Budget Year 2019-2020Transportation Improvement and Maintenance ProgramIMPROVEMENT

Project Location Activity PageDistrictStatus

PROJECT TYPE

Total CostProject Manager

Florence-Kelvin Highway Gardenshire Rd-Apache Kid Rd Construction $700,000 231ProgrammedAngeline To b

Gantzel Road Queen Creek (Wash) Pre-Construction $50,000 242, 5ProgrammedLindsey Randall a

Hash Knife Draw Road Schnepf Rd-Sierra Vista Dr Construction $110,000 245PendingLindsey Randall b

Jackpot Street Skyline Dr-Rolling Ridge Rd Construction $82,500 255ProgrammedLindsey Randall a

Roberts Road Felix Rd-Joel Rd Construction $38,542 255ProgrammedLindsey Randall b

Rolling Ridge Road Schnepf Rd-Sierra Vista Dr Construction $110,000 265ProgrammedLindsey Randall a

Safety Program Countywide Safety $500,000 267ProgrammedJohn Kraft b

Sage Brush Avenue Schnepf Rd-Sierra Vista Dr Construction $110,000 275ProgrammedLindsey Randall a

Stagecoach Pass Avenue Ghost Rider St-Sierra Vista Dr Construction $0 275ClosedLindsey Randall b

Tombstone Street Skyline Dr-Rolling Ridge Rd Construction $82,500 285ProgrammedLindsey Randall a

Val Vista Road Warren Rd-Hidden Valley Rd Construction $520,000 284CompletedJohn Kraft b

$2,303,542SUBTOTAL IMPROVEMENT

MAINTENANCEProject Location Activity PageDistrictStatus

PROJECT TYPE

Total CostProject Manager

Ashmore Street Passmore Rd-Baldwin Av Dust Palliative $59,000 293, 4ProgrammedJohn Kraft a

Boyd Road Roosevelt St-End of road (Scenic St) Dust Palliative $11,000 295ProgrammedLindsey Randall b

Dolores Place-Shirley Road Olberg Rd-Avram Rd Dust Palliative $78,100 302PendingLindsey Randall a

Donnaloy Road Wilma Rd-Brenner Pass Rd Dust Palliative $84,700 302ProgrammedLindsey Randall b

Dust Abatement Program Countywide Dust Palliative $2,000,000 317ProgrammedJoe Ortiz a

Marlow Road Jacob Waltz St-End of road Dust Palliative $15,958 315ProgrammedLindsey Randall b

Olberg Road Arizona Farms Rd-Brenner Pass Rd Dust Palliative $102,083 322PendingLindsey Randall a

Pavement Preservation Program Countywide Pavement Preservation $700,000 327ProgrammedJoe Ortiz b

Plaza Drive Moon Vista St-Goldpoppy St Dust Palliative $6,667 335ProgrammedLindsey Randall a

Reed Road Bartlett Rd-At wash before Cactus Forest Rd Dust Palliative $91,667 331ProgrammedLindsey Randall b

Stagecoach Pass Avenue Schnepf Rd-Sierra Vista Dr Dust Palliative $250,000 345ProgrammedLindsey Randall a

Whirly Bird Road Amarillo Valley Rd-Ralston Rd Dust Palliative $300,000 344ProgrammedJohn Kraft b

$3,699,175SUBTOTAL MAINTENANCE

$6,002,717GRAND TOTAL 2019-2020

District 7 = Multiple districts or countywide

Page 10: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Budget Year 2020-2021Transportation Improvement and Maintenance ProgramIMPROVEMENT

Project Location Activity PageDistrictStatus

PROJECT TYPE

Total CostProject Manager

Bunkhouse Road Veteran's Memorial Blvd-San Manuel Lodge Reconstruction $50,000 351ProgrammedAngeline To a

Cordones Road Catalina Hills Rd-Biosphere Rd Pre-Construction $0 354CancelledAngeline To b

Hunt Highway (Old) Pioneer Path-Wildhorse Dr Construction $125,000 362ProgrammedLindsey Randall a

Judd Road-Tourmaline Drive Gantzel Rd-Copper Basin Development Construction $1,250,000 362ProgrammedCeleste Garza b

Kenworthy Road Germann Rd-Pima Rd Reconstruction $550,000 372ProgrammedLindsey Randall a

Magma Road Hunt Hwy-Gary Rd (Edwards Rd) Construction $1,250,000 372ProgrammedCeleste Garza b

Mountain View Road Broadway Av Intersection Construction $250,000 385ProgrammedLindsey Randall a

Ocotillo Road Meridian Rd-Ironwood Dr Construction $2,500,000 382ProgrammedLindsey Randall b

Red Rock Access Road Red Rock to Pinal Airpark Rd Pre-Construction $250,000 394ProgrammedAngeline To a

Safety Program Countywide Safety $500,000 397ProgrammedJohn Kraft b

$6,725,000SUBTOTAL IMPROVEMENT

MAINTENANCEProject Location Activity PageDistrictStatus

PROJECT TYPE

Total CostProject Manager

Bowlin Road Hidden Valley Rd-Stonebluff Rd Dust Palliative $100,000 404ProgrammedLindsey Randall a

Logan Boulevard Diffin Rd-Reed Rd Dust Palliative $125,000 401ProgrammedLindsey Randall b

Louis Johnson Drive Amarillo Valley Rd-State Route 347 Dust Palliative $250,000 414ProgrammedLindsey Randall a

Midway Road Beggs Rd-Marsh Rd Dust Palliative $230,000 413, 4ProgrammedLindsey Randall b

Rhea Road Brennar Pass Rd-Donnaloy Road Dust Palliative $30,000 422ProgrammedLindsey Randall a

River Road Redington Rd-Copper Creek Rd Dust Palliative $200,000 421ProgrammedAngeline To b

Rockcliffe Boulevard Oracle Ranch Rd (West)-Alice St Dust Palliative $30,000 431ProgrammedAngeline To a

Stonebluff Road Farrell Rd-Bowlin Rd Dust Palliative $100,000 434ProgrammedLindsey Randall b

Tweedy Road Storey Rd-Randolph Rd Dust Palliative $250,000 443ProgrammedLindsey Randall a

$1,315,000SUBTOTAL MAINTENANCE

$8,040,000GRAND TOTAL 2020-2021

District 7 = Multiple districts or countywide

Page 11: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Budget Year 2021-2022Transportation Improvement and Maintenance ProgramIMPROVEMENT

Project Location Activity PageDistrictStatus

PROJECT TYPE

Total CostProject Manager

Florence-Kelvin Highway Apache Kid Rd-Zellweger Rd Construction $250,000 441ProgrammedAngeline To b

Heather Drive Kashmir Rd-Lamb Rd Construction $125,000 454ProgrammedAngeline To a

Judd Road-Tourmaline Drive Gantzel Rd-Copper Basin Development Construction $1,250,000 452ProgrammedCeleste Garza b

Kenworthy Road Combs Rd-Chandler Heights Rd Construction $1,500,000 462, 5ProgrammedLindsey Randall a

Peart Road Interstate 8-Early Rd Reconstruction $2,520,000 463ProgrammedJohn Kraft b

Pinal Airpark Road Interstate 10-Trico Rd Construction $650,000 474ProgrammedAngeline To a

Safety Program Countywide Safety $500,000 477ProgrammedJohn Kraft b

Trekell Road S. Hanna Rd-Interstate 8 Reconstruction $540,000 483ProgrammedJohn Kraft a

$7,335,000SUBTOTAL IMPROVEMENT

MAINTENANCEProject Location Activity PageDistrictStatus

PROJECT TYPE

Total CostProject Manager

Camino Viejo Road Camino Viejo W-Enrada del Oro Dr Dust Palliative $940,000 485ProgrammedLindsey Randall b

Encanto Lane Cactus Forest Rd-840' North Dust Palliative $100,000 491ProgrammedLindsey Randall a

Orville Drive Diffin Rd-Quail Run Rd Dust Palliative $130,000 491ProgrammedLindsey Randall b

River Road Redington Rd-Copper Creek Rd Dust Palliative $200,000 501ProgrammedAngeline To a

Thunderbird Road Teel Rd-Mayer Rd Reconstruction $450,000 504ProgrammedJohn Kraft b

$1,820,000SUBTOTAL MAINTENANCE

$9,155,000GRAND TOTAL 2021-2022

District 7 = Multiple districts or countywide

Page 12: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Battaglia Drive Overfield Rd Intersection

Construction/Reconstruction

$350,000

$0

$350,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 4Project Manager Angeline To E-mail [email protected]

Comments Activity: Culvert for intersection and pavement replacementBudget Year: From 2016-2017 to 2017-2018Status: From Programmed to Completed. Construction completed February 2018.

Status Completed

Maintenance Area Arizona City

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0

1a

Length in Miles

Curry Road State Route 287-Storey Rd

Construction

$110,000

$0

$110,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 3Project Manager Lindsey Randall E-mail [email protected]

Comments Status: From Programmed to Completed. Construction completed October 2017.

Status Completed

Maintenance Area Casa Grande

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

1

1b

Budget Year 2017-2018 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 13: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Germann Road Meridian Rd-Ironwood Dr

Pre-Construction

$13,866

$230,258

$244,124

Activity

County Cost

Non County Cost

IMPROVEMENT

District 2Project Manager Celeste Garza E-mail [email protected]

Comments Activity: Right-of-way acquisition, environmental, design for construction of two-lane road, and plan review by the Arizona Department of TransportationCounty Cost: $13,866 reflects Pinal County's cost share matchBudget Year: 2016-2017 to 2017-2018Status: Design underway and is approximately 60% complete (Stage 3) with review/management by Arizona Department of Transportation. Project was awarded Surface Transportation Program (federal) funds through Maricopa Association of Governments. Construction scheduled Winter 2018.

Status Underway

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 6621139

1

2a

Length in Miles

Henness Road Val Vista Rd-Waverly Dr

New Construction

$350,000

$0

$350,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 3Project Manager Lindsey Randall E-mail [email protected]

Comments Budget Year: Carryover from 2016-2017 to 2017-2018Status: From Underway to Completed. Construction completed February 2018 with work on earth stabilization underway to complete Storm Water Quality General Permit.

Status Completed

Maintenance Area Casa Grande

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

1

2b

Budget Year 2017-2018 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 14: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

McCartney Road Interstate 10-Evans Rd

Reconstruction

$3,500,000

$0

$3,500,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 1, 3Project Manager Lindsey Randall E-mail [email protected]

Comments Activity: Installation of culverts at dip crossings. Status: Construction Notice to Proceed issued 2/19/18 with completion expected August 2018.

Status Underway

Maintenance Area Casa Grande

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

3.1

3a

Length in Miles

Mitchell Trail Heritage Rd-Arizona Farms Rd

Pre-Construction

$0

$0

$0

Activity

County Cost

Non County Cost

IMPROVEMENT

District 2Project Manager Lindsey Randall E-mail [email protected]

Comments Activity: Right-of-way/design for new roadwayBudget Year: Carryover of $0 from 2016-2017 to 2017-2018Status: From Underway to Cancelled. Project cancelled due to stalled right-of-way acquisitions.

Status Cancelled

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

1

3b

Budget Year 2017-2018 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 15: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Safety Program Countywide

Safety

$500,000

$0

$500,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 7Project Manager John Kraft E-mail [email protected]

Comments Activity: Direct funding to the Safety Program (Target Funding: 10%)

Status Programmed

Maintenance Area Multiple

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0

4a

Length in Miles

Sunland Gin Road Battaglia Dr Intersection

Safety

$350,000

$0

$350,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 4Project Manager Angeline To E-mail [email protected]

Comments Activity: Westbound Turn laneStatus: From Programmed to Underway. Design underway and construction scheduled Summer 2018.

Status Underway

Maintenance Area Arizona City

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 19118

0

4b

Budget Year 2017-2018 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 16: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Tweedy Road State Route 287-Storey Rd

Construction

$110,000

$0

$110,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 3Project Manager Lindsey Randall E-mail [email protected]

Comments Status: From Programmed to Completed. Construction completed October 2017.

Status Completed

Maintenance Area Casa Grande

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

1

5a

Length in Miles

Bronco Lane Valley View Dr south .1 mile

Dust Palliative

$30,000

$0

$30,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Activity: Asphalt Rock Dust PalliativeStatus: From Pending to Completed. Asphalt rock dust palliative completed October 2017.Budget Year: From 2016-2017 to 2017-2018

Status Completed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0.1

5b

Budget Year 2017-2018 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 17: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Cactus Road Kaniksu St (north)-Frontier St

Dust Palliative

$20,000

$0

$20,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Status: From Pending to Completed. Asphalt rock dust palliative completed 2015/2016.

Status Completed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0.1

6a

Length in Miles

Cattle Tank Road Davis Ranch Rd-Park Link Dr

Pre-Construction

$90,000

$0

$90,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 1, 4Project Manager Angeline To E-mail [email protected]

Comments Activity: Environmental and right-of-way for Asphalt Rock Dust PalliativeBudget Year: From 2016-2018 to 2017-2018Status: From Underway to Completed. Pre-Construction completed September 2017. Construction underway and dust palliative expected Fall 2018Project Numbers: 6511213 (environmental clearance), 6511214 (right-of-way acquisition)

Status Completed

Maintenance Area Arizona City

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 6511213

5.5

6b

Budget Year 2017-2018 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 18: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Cattle Tank Road Davis Ranch Rd-Park Link Dr

Dust Palliative

$1,300,000

$0

$1,300,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 1, 4Project Manager Angeline To E-mail [email protected]

Comments Activity: Asphalt rock dust palliativeCounty Cost: From $750,000 to $1,300,000 due to Bureau of Land Management requirementsBudget Year: From 2016-2017 to 2017-2018 Status: From Pending to Underway. Phased construction (Phase 2-Clearing and Grubbing) underway with chip seal expected Fall 2018.

Status Underway

Maintenance Area Arizona City

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

5.5

7a

Length in Miles

Dust Abatement Program Apache Junction area

Dust Palliative

$500,000

$0

$500,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Activity: Area Engineer's discretionary project(s) to address fugitive dust (Particulate Matter 10) in Pinal County's Non-Attainment area (T1N, R8E)Status: 3.22 miles of Asphalt rock dust palliatives in the southeast Apache Junction area scheduled Summer 2018

Status Pending

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0

7b

Budget Year 2017-2018 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 19: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Estancia Drive Davis Ranch Rd-Hedgehog Tr

Dust Palliative

$100,000

$0

$100,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager Angeline To E-mail [email protected]

Comments Budget Year: From 2016-2017 to 2017-2018Status: From Pending to Completed. Asphalt rock dust palliative completed May 2017.

Status Completed

Maintenance Area Arizona City

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

1.1

8a

Length in Miles

Harmon Road Toltec Hwy-Tweedy Rd

Dust Palliative

$235,000

$125,000

$360,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 1Project Manager Angeline To E-mail [email protected]

Comments Budget Year: From 2016-2017 to 2017-2018Status: From Pending to Completed. Construction completed September 2017.

Status Completed

Maintenance Area Arizona City

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

2

8b

Budget Year 2017-2018 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 20: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Huisatch Road Garnet Rd-Amarillo Valley Rd

Dust Palliative

$175,000

$0

$175,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager Lindsey Randall E-mail [email protected]

Comments Budget Year: From 2016-2017 to 2017-2018Status: From Pending to Completed. Asphalt rock dust palliative completed August 2017.

Status Completed

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

1

9a

Length in Miles

La Palma Road State Route 287-.25 north of Kleck Rd

Dust Palliative

$150,000

$0

$150,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 1Project Manager Lindsey Randall E-mail [email protected]

Comments Status: From Pending to Completed. Asphalt rock dust palliative completed November 2017.Budget Year: From 2016-2017 to 2017-2018

Status Completed

Maintenance Area Casa Grande

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

2.25

9b

Budget Year 2017-2018 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 21: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Maverick Circle Mohican Rd west .1 mile

Dust Palliative

$30,000

$0

$30,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Budget Year: From 2016-2017 to 2017-2018Status: From Pending to Completed. Asphalt rock dust palliative scheduled October 2017.

Status Completed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0.1

10a

Length in Miles

McDavid Road Warren Rd-Hidden Valley Rd

Dust Palliative

$110,000

$0

$110,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager Lindsey Randall E-mail [email protected]

Comments Status: From Underway to Completed. Dust Palliative completed September 2017.

Status Completed

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

1

10b

Budget Year 2017-2018 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 22: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Muleshoe Road Roundup St-Shiprock St

Dust Palliative

$20,000

$0

$20,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Status: From Pending to Completed. Asphalt rock dust palliative completed October 2017.

Status Completed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0.1

11a

Length in Miles

Pavement Preservation Program Countywide

Pavement Preservation

$500,000

$0

$500,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 7Project Manager Joe Ortiz E-mail [email protected]

Comments Activity: Direct funding to the Pavement Preservation Program (Target Funding: 10%)

Status Programmed

Maintenance Area Multiple

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0

11b

Budget Year 2017-2018 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 23: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Redington Road Veterans Memorial Blvd-Pima County Line

Dust Palliative

$665,000

$0

$665,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 1Project Manager Angeline To E-mail [email protected]

Comments Budget Year: From 2016-2017 to 2017-2018Status: From Underway to Completed. Dust palliative on Redington Road from Veterans Memorial Blvd to River Rd completed September 2015. Environmental study completed on Redington Road from River Rd to Pinal-Pima County boundary September 2016 with asphalt rock dust palliative completed March 2017. Wash crossing repairs completed March 2018.

Status Completed

Maintenance Area Oracle

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

8

12a

Length in Miles

Sixshooter Road Jacob Waltz St north .1 mile

Dust Palliative

$30,000

$0

$30,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Budget Year: From 2016-2017 to 2017-2018Status: From Pending to Completed. Asphalt rock dust palliative completed October 2017.

Status Completed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0.1

12b

Budget Year 2017-2018 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 24: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Warren Road Farrell Rd-McDavid Rd

Dust Palliative

$220,000

$0

$220,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager Lindsey Randall E-mail [email protected]

Comments Status: From Pending to Completed. Dust palliative completed September 2017.

Status Completed

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

2

13a

Length in Miles

Arizona City Safety Study Multiple Intersections

Pre-Construction

$100,000

$0

$100,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 4Project Manager Angeline To E-mail [email protected]

Comments Location: Battaglia Drive from Sunland Gin Road to Overfield Road, Battaglia Drive from Chuichu Road to Del Rio Road, Lamb Road from Battaglia Drive to Milligan Road, Milligan Road from Sunland Gin Road Overfield Road, Overfield Road from Battaglia Drive to Milligan Road, and Sunland Gin Road from Battaglia Drive to Milligan Road

Status Programmed

Maintenance Area Arizona City

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0

13b

Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Budget Year 2017-2018

Page 25: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Baseline Avenue Mohican Rd-East 980 feet

Construction

$55,417

$0

$55,417

Activity

County Cost

Non County Cost

IMPROVEMENT

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Status: From Programmed to Pending. Construction expected after July 2018.Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Pending

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0.19

14a

Length in Miles

Cactus Wren Street Mountain View Rd-Val Vista Rd

New Construction

$61,700

$0

$61,700

Activity

County Cost

Non County Cost

IMPROVEMENT

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Status: From Programmed to Pending. Construction expected after July 2018.

Status Pending

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0.22

14b

Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 26: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Florence-Kelvin Highway Donnelly Wash-East 2 miles

Construction

$800,000

$0

$800,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 1Project Manager Angeline To E-mail [email protected]

Comments Status: From Programmed to Pending. Design expected July 2018 and construction expected Summer 2019.

Status Pending

Maintenance Area Riverside

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

2

15a

Length in Miles

Gantzel Road Chandler Heights Rd

Construction

$325,000

$0

$325,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 2, 5Project Manager Celeste Garza E-mail [email protected]

Comments Activity: Traffic SignalStatus: From Programmed to Completed. Traffic signal activitated July 2017.

Status Completed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0

15b

Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 27: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Germann Road Meridian Rd-Ironwood Dr

New Construction

$98,696

$1,630,060

$1,728,756

Activity

County Cost

Non County Cost

IMPROVEMENT

District 2Project Manager Celeste Garza E-mail [email protected]

Comments Activity: Construction of two-lane roadBudget Year: Carryover from 2014-2015 to 2018-2019County Cost: $98,696 reflects Pinal County's cost share matchStatus: From Programmed to Pending. Design underway and construction expected Winter 2018. Project was awarded Surface Transportation Program (federal) funds through Maricopa Association of Governments.

Status Pending

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 6621139

1

16a

Length in Miles

Hohokam Road Paisano Dr-Quartzite Dr

Construction

$286,300

$0

$286,300

Activity

County Cost

Non County Cost

IMPROVEMENT

District 1Project Manager Lindsey Randall E-mail [email protected]

Comments Status: From Programmed to Pending. Construction expected Summer 2018.Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Pending

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0.33

16b

Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 28: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Lost Dutchman Road Sun Rd-Prospectors Rd

Construction

$156,000

$0

$156,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Status: From Programmed to Pending. Construction scheduled Summer 2018.Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Pending

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0.6

17a

Length in Miles

Safety Program Countywide

Safety

$500,000

$0

$500,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 7Project Manager John Kraft E-mail [email protected]

Comments Activity: Direct funding to the Roadway Safety ProgramCounty Cost: Reduce from $1,000,000 to $500,000 and carryover $500,000 to Budget Year 2020-2021 to rebalance Safety Program funding.

Status Programmed

Maintenance Area Multiple

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0

17b

Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 29: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Arica Road Isom Rd-Trekell Rd

Dust Palliative

$120,000

$0

$120,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager John Kraft E-mail [email protected]

Comments Status: From Programmed to Completed.

Status Completed

Maintenance Area Casa Grande

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

1

18a

Length in Miles

Battaglia Drive Chuichu Rd-Del Rio Rd

Pavement Preservation

$200,000

$0

$200,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 3, 4Project Manager Angeline To E-mail [email protected]

Comments

Status Programmed

Maintenance Area Arizona City

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

4.5

18b

Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 30: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Carefree Place State Route 347-Pepper Pl

Dust Palliative

$500,000

$0

$500,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager John Kraft E-mail [email protected]

Comments Activity: Dust palliative includes 4.1 miles of the following roadways: Carefree Place, Reitz Ranch Road, Padilla Road, Clayton Road, and Lopez Road.Budget Year: Advance from 2019-2020 to 2018-2019 to combine with projects programmed under the State Implemention Plan for completion after July 2018.Status: From Programmed to Pending

Status Pending

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 27124

4.1

19a

Length in Miles

Chuichu Road Battaglia Dr-Interstate 8

Pavement Preservation

$2,000,000

$0

$2,000,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 3Project Manager John Kraft E-mail [email protected]

Comments Status: From Programmed to Pending. Planning to contract Pavement Preservation after July 2018.

Status Pending

Maintenance Area Arizona City

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

4.3

19b

Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 31: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Dust Abatement Program Countywide

Dust Palliative

$1,000,000

$0

$1,000,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 7Project Manager Joe Ortiz E-mail [email protected]

Comments Activity: Area Engineers' discretionary project(s) to address fugitive dust (Particulate Matter 2.5 and 10) in Pinal County's Non-Attainment areas

Status Programmed

Maintenance Area Multiple

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0

20a

Length in Miles

Fulcar Road Hidden Valley Rd-Table Top Rd

Dust Palliative

$240,000

$0

$240,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager John Kraft E-mail [email protected]

Comments Status: From Programmed to Completed. Completed in 2016 as part of the State Implementation Plan.

Status Completed

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

2

20b

Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 32: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Mount Lemmon Road Campo Benito Rd-.5 miles south of AZ Zipline

Dust Palliative

$250,000

$0

$250,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 1Project Manager Angeline To E-mail [email protected]

Comments Activity: Continuation of asphalt rock dust palliative and cutoff walls at wash crossingBudget Year: From 2020-2021 to 2018-2019Status: From Programmed to Pending. Asphalt rock dust palliative is expected Summer 2018.

Status Pending

Maintenance Area Oracle

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 141

2

21a

Length in Miles

Peters Road Santa Cruz Wash-Corrales Rd

Dust Palliative

$252,083

$0

$252,083

Activity

County Cost

Non County Cost

MAINTENANCE

District 3Project Manager John Kraft E-mail [email protected]

Comments Budget Year: From 2017-2018 to 2018-2019Status: From Programmed to Pending. Construction scheduled after July 2018.Project Manager: From Lindsey Randall to John KraftE-mail: From [email protected] to [email protected]

Status Pending

Maintenance Area Casa Grande

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

1.6

21b

Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 33: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Sage Street Barnes Rd-Miller Rd

Dust Palliative

$120,000

$0

$120,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager John Kraft E-mail [email protected]

Comments Status: From Programmed to Completed. Construction completed August 2017.

Status Completed

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

22a

Length in Miles

Sotol Road Warren Rd-Hidden Valley Rd

Dust Palliative

$150,000

$0

$150,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager John Kraft E-mail [email protected]

Comments Status: From Programmed to Completed. Completed April 2017.

Status Completed

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

1

22b

Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 34: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Stagecoach Pass Avenue Schnepf Rd-Ghost Rider St

Pre-Construction

$0

$0

$0

Activity

County Cost

Non County Cost

MAINTENANCE

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Status: From Underway to Closed. Funding and project is combined with Stagecoach Pass Avenue project programmed in Budget Year 2019-2020.County Cost: From $50,000 to $0.Activity: In-house design and right-of-way design. Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Closed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0.8

23a

Length in Miles

Florence-Kelvin Highway Gardenshire Rd-Apache Kid Rd

Construction

$700,000

$0

$700,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 1Project Manager Angeline To E-mail [email protected]

Comments

Status Programmed

Maintenance Area Riverside

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 3030

3

23b

Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Budget Year 2018-2019

Page 35: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Gantzel Road Queen Creek (Wash)

Pre-Construction

$50,000

$0

$50,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 2, 5Project Manager Lindsey Randall E-mail [email protected]

Comments Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Programmed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 4010

0.07

24a

Length in Miles

Hash Knife Draw Road Schnepf Rd-Sierra Vista Dr

Construction

$110,000

$0

$110,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Status: From Programmed to Pending. Construction expected Summer 2018 as part of the State Implementation Plan.Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Pending

Maintenance Area Multiple

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 8125

1

24b

Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 36: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Jackpot Street Skyline Dr-Rolling Ridge Rd

Construction

$82,500

$0

$82,500

Activity

County Cost

Non County Cost

IMPROVEMENT

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Programmed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 10116

0.75

25a

Length in Miles

Roberts Road Felix Rd-Joel Rd

Construction

$38,542

$0

$38,542

Activity

County Cost

Non County Cost

IMPROVEMENT

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Programmed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 15035

0.35

25b

Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 37: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Rolling Ridge Road Schnepf Rd-Sierra Vista Dr

Construction

$110,000

$0

$110,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Programmed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 16114

1

26a

Length in Miles

Safety Program Countywide

Safety

$500,000

$0

$500,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 7Project Manager John Kraft E-mail [email protected]

Comments Activity: Direct funding to the Roadway Safety ProgramCounty Cost: Reduce from $1,000,000 to $500,000 and carryover $500,000 to Budget Year 2021-2022 to rebalance Safety Program funding.

Status Programmed

Maintenance Area Multiple

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0

26b

Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 38: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Sage Brush Avenue Schnepf Rd-Sierra Vista Dr

Construction

$110,000

$0

$110,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Programmed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 17126

1

27a

Length in Miles

Stagecoach Pass Avenue Ghost Rider St-Sierra Vista Dr

Construction

$0

$0

$0

Activity

County Cost

Non County Cost

IMPROVEMENT

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Status: From Programmed to Closed. Funding and project is combined with Stagecoach Pass Avenue project programmed in Budget Year 2019-2020.County Cost: $28,333.00 to $0.Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Closed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 18127

1

27b

Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 39: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Tombstone Street Skyline Dr-Rolling Ridge Rd

Construction

$82,500

$0

$82,500

Activity

County Cost

Non County Cost

IMPROVEMENT

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Programmed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 20115

0.75

28a

Length in Miles

Val Vista Road Warren Rd-Hidden Valley Rd

Construction

$520,000

$0

$520,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 4Project Manager John Kraft E-mail [email protected]

Comments Status: From Programmed to Completed. Completed August 2017 as part of the State Implementation Plan.

Status Completed

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 22036

1

28b

Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 40: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Ashmore Street Passmore Rd-Baldwin Av

Dust Palliative

$59,000

$0

$59,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 3, 4Project Manager John Kraft E-mail [email protected]

Comments

Status Programmed

Maintenance Area Casa Grande

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 23022

0.5

29a

Length in Miles

Boyd Road Roosevelt St-End of road (Scenic St)

Dust Palliative

$11,000

$0

$11,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Programmed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 25015

0.1

29b

Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 41: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Dolores Place-Shirley Road Olberg Rd-Avram Rd

Dust Palliative

$78,100

$0

$78,100

Activity

County Cost

Non County Cost

MAINTENANCE

District 2Project Manager Lindsey Randall E-mail [email protected]

Comments Status: From Programmed to Pending. Construction expected Summer 2018 as part of the State Implementation Plan.Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Pending

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 28121

0.71

30a

Length in Miles

Donnaloy Road Wilma Rd-Brenner Pass Rd

Dust Palliative

$84,700

$0

$84,700

Activity

County Cost

Non County Cost

MAINTENANCE

District 2Project Manager Lindsey Randall E-mail [email protected]

Comments Status: From Programmed to Pending. Construction expected Summer 2018 as part of the State Implementation Plan.Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Programmed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 29120

0.77

30b

Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 42: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Dust Abatement Program Countywide

Dust Palliative

$2,000,000

$0

$2,000,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 7Project Manager Joe Ortiz E-mail [email protected]

Comments Activity: Area Engineers' discretionary project(s) to address fugitive dust (Particulate Matter 2.5 and 10) in Pinal County's Non-Attainment areas

Status Programmed

Maintenance Area Multiple

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

31a

Length in Miles

Marlow Road Jacob Waltz St-End of road

Dust Palliative

$15,958

$0

$15,958

Activity

County Cost

Non County Cost

MAINTENANCE

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Programmed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 30012

0.15

31b

Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 43: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Olberg Road Arizona Farms Rd-Brenner Pass Rd

Dust Palliative

$102,083

$0

$102,083

Activity

County Cost

Non County Cost

MAINTENANCE

District 2Project Manager Lindsey Randall E-mail [email protected]

Comments Status: From Programmed to Pending. Construction expected Summer 2018 as part of the State Implementation Plan.Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Pending

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 31119

0.93

32a

Length in Miles

Pavement Preservation Program Countywide

Pavement Preservation

$700,000

$0

$700,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 7Project Manager Joe Ortiz E-mail [email protected]

Comments Activity: Direct funding to the Pavement Preservation Program

Status Programmed

Maintenance Area Multiple

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0

32b

Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 44: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Plaza Drive Moon Vista St-Goldpoppy St

Dust Palliative

$6,667

$0

$6,667

Activity

County Cost

Non County Cost

MAINTENANCE

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Programmed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 32016

0.06

33a

Length in Miles

Reed Road Bartlett Rd-At wash before Cactus Forest Rd

Dust Palliative

$91,667

$0

$91,667

Activity

County Cost

Non County Cost

MAINTENANCE

District 1Project Manager Lindsey Randall E-mail [email protected]

Comments Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Programmed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 35029

0.74

33b

Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 45: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Stagecoach Pass Avenue Schnepf Rd-Sierra Vista Dr

Dust Palliative

$250,000

$0

$250,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Location: From Schnepf Rd-Sierra Ghost Rider St to Schnepf Rd-Sierra Vista DrStatus: Funding and projects 2 Stagecoach Pass Avenue projects from Budget Year 2018-2019 and 2019-2020 into one Stagecoach Pass Avenue project from Schnepf Rd-Sierra Vista Dr. Development north of area will improve roadway and county will chip seal roadway once improvements are made.County Cost: from $250,000 to $328,333.Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Programmed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0.75

34a

Length in Miles

Whirly Bird Road Amarillo Valley Rd-Ralston Rd

Dust Palliative

$300,000

$0

$300,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager John Kraft E-mail [email protected]

Comments Activity: Dust palliative includes Whirly Bird Road from Amarillo Valley Rd to Ralston Rd and Garnet Road from Whirly Bird Rd to Century Rd

Status Programmed

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 36008

3

34b

Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 46: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Bunkhouse Road Veteran's Memorial Blvd-San Manuel Lodge

Reconstruction

$50,000

$0

$50,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 1Project Manager Angeline To E-mail [email protected]

Comments Activity: Resize culvert to driveway and reconstruct roadway for proper drainage

Status Programmed

Maintenance Area Oracle

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 134

0.2

35a

Length in Miles

Cordones Road Catalina Hills Rd-Biosphere Rd

Pre-Construction

$0

$0

$0

Activity

County Cost

Non County Cost

IMPROVEMENT

District 4Project Manager Angeline To E-mail [email protected]

Comments Activity: Design Concept Report for new roadwayCounty Cost: From $250,000 to $0.00Status: From Programmed to Cancelled. Project is now funded by the Pinal Regional Transportation Authority.

Status Cancelled

Maintenance Area Oracle

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 156

3.5

35b

Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 47: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Hunt Highway (Old) Pioneer Path-Wildhorse Dr

Construction

$125,000

$0

$125,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 2Project Manager Lindsey Randall E-mail [email protected]

Comments Activity: Concrete ford crossingProject Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Programmed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 181

0

36a

Length in Miles

Judd Road-Tourmaline Drive Gantzel Rd-Copper Basin Development

Construction

$1,250,000

$0

$1,250,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 2Project Manager Celeste Garza E-mail [email protected]

Comments Activity: Construction of new road on Judd Road alignmentCounty Cost: $1,250,000 will be programmed annually for 4 years (Year 1).

Status Programmed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 176

1.5

36b

Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 48: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Kenworthy Road Germann Rd-Pima Rd

Reconstruction

$550,000

$0

$550,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 2Project Manager Lindsey Randall E-mail [email protected]

Comments Activity: RehabilitationProject Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Programmed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 178

1

37a

Length in Miles

Magma Road Hunt Hwy-Gary Rd (Edwards Rd)

Construction

$1,250,000

$0

$1,250,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 2Project Manager Celeste Garza E-mail [email protected]

Comments Activity: Continuation of improvements on alignmentStatus: Project is a high priority for Transportation Advisory Committee and Staff. Staff is exploring other funding opportunities to advance the project schedule.

Status Programmed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 1420144

1

37b

Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 49: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Mountain View Road Broadway Av Intersection

Construction

$250,000

$0

$250,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Activity: Intersection reconstruction and culvert installationProject Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Programmed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 179

0

38a

Length in Miles

Ocotillo Road Meridian Rd-Ironwood Dr

Construction

$2,500,000

$0

$2,500,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 2Project Manager Lindsey Randall E-mail [email protected]

Comments Activity: Roadway widening

Status Programmed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 177

1

38b

Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 50: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Red Rock Access Road Red Rock to Pinal Airpark Rd

$250,000

$0

$250,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 4Project Manager Angeline To E-mail [email protected]

Comments Activity: Environmental Clearnace/Right-of-Way Acquisition. Replacement project for Cordones Road. Red Rock Access Road was programmed on the Transportation Improvement and Maintenance Program but was cancelled in 2015. Pre-Construction funding is necessary to evaluate a secondary access to Pinal Airpark.

Status

3

Pre-Construction Programmed

Maintenance Area Arizona City

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

39a

Length in Miles

Safety Program Countywide

Safety

$500,000

$0

$500,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 7Project Manager John Kraft E-mail [email protected]

Comments Activity: Direct funding to the Roadway Safety ProgramCounty Cost: Add $500,000 to Budget Year 2020-2021 to rebalance Safety Program funding.

Status Programmed

Maintenance Area Multiple

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0

39b

Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 51: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Bowlin Road Hidden Valley Rd-Stonebluff Rd

Dust Palliative

$100,000

$0

$100,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager Lindsey Randall E-mail [email protected]

Comments

Status Programmed

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0.6

40a

Length in Miles

Logan Boulevard Diffin Rd-Reed Rd

Dust Palliative

$125,000

$0

$125,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 1Project Manager Lindsey Randall E-mail [email protected]

Comments Activity: Dust palliative is contingent on receiving right-of-way donationsProject Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Programmed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 147

1

40b

Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 52: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Louis Johnson Drive Amarillo Valley Rd-State Route 347

Dust Palliative

$250,000

$0

$250,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager Lindsey Randall E-mail [email protected]

Comments

Status Programmed

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 137

2

41a

Length in Miles

Midway Road Beggs Rd-Marsh Rd

Dust Palliative

$230,000

$0

$230,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 3, 4Project Manager Lindsey Randall E-mail [email protected]

Comments

Status Programmed

Maintenance Area Casa Grande

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 130

2

41b

Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 53: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Rhea Road Brennar Pass Rd-Donnaloy Road

Dust Palliative

$30,000

$0

$30,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 2Project Manager Lindsey Randall E-mail [email protected]

Comments Status: Dust palliative may be completed in conjunction with the Donnaloy Road project that is programmed in Budget Year 2019-2020.Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Programmed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0.3

42a

Length in Miles

River Road Redington Rd-Copper Creek Rd

Dust Palliative

$200,000

$0

$200,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 1Project Manager Angeline To E-mail [email protected]

Comments Status: Dust palliative is contigent on receiving right-of-way donations.Length: Dust palliative will extend to existing 5 miles of paved roadway.County Cost: $200,000 will be programmed annually for 4 years (Year 1).

Status Programmed

Maintenance Area Oracle

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 191

8

42b

Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 54: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Rockcliffe Boulevard Oracle Ranch Rd (West)-Alice St

Dust Palliative

$30,000

$0

$30,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 1Project Manager Angeline To E-mail [email protected]

Comments Comments: Dust palliative is contigent on receiving right-of-way donations

Status Programmed

Maintenance Area Oracle

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 132

0.25

43a

Length in Miles

Stonebluff Road Farrell Rd-Bowlin Rd

Dust Palliative

$100,000

$0

$100,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager Lindsey Randall E-mail [email protected]

Comments

Status Programmed

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 149

1

43b

Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 55: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Tweedy Road Storey Rd-Randolph Rd

Dust Palliative

$250,000

$0

$250,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 3Project Manager Lindsey Randall E-mail [email protected]

Comments Comments: Carmichael Road to Randolph Road is located within the City of Coolidge

Status Programmed

Maintenance Area Casa Grande

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 1400188

2

44a

Length in Miles

Florence-Kelvin Highway Apache Kid Rd-Zellweger Rd

Construction

$250,000

$0

$250,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 1Project Manager Angeline To E-mail [email protected]

Comments Activity: L-2 Standard - 6 inch Aggregate Base over Double Chip Seal

Status Programmed

Maintenance Area Riverside

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 253

0.75

44b

Budget Year 2021-2022 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Budget Year 2020-2021

Page 56: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Heather Drive Kashmir Rd-Lamb Rd

Construction

$125,000

$0

$125,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 4Project Manager Angeline To E-mail [email protected]

Comments Activity: Roadway construction with Aggregate Base and Aphalt ConcreteLength: 900'

Status Programmed

Maintenance Area Arizona City

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 249

900

45a

Length in Miles

Judd Road-Tourmaline Drive Gantzel Rd-Copper Basin Development

Construction

$1,250,000

$0

$1,250,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 2Project Manager Celeste Garza E-mail [email protected]

Comments Activity: Construction on new road on Judd alignmentCounty Cost: $1,250,000 will be programmed annually for 4 years (Year 2)

Status Programmed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 176

1.5

45b

Budget Year 2021-2022 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 57: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Kenworthy Road Combs Rd-Chandler Heights Rd

Construction

$1,500,000

$0

$1,500,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 2, 5Project Manager Lindsey Randall E-mail [email protected]

Comments Activity: Construction of an L-2 Standard roadway. This project in contingent on funding availability (project is partially funded at this time).

Status Programmed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 207

1.15

46a

Length in Miles

Peart Road Interstate 8-Early Rd

$2,520,000

$0

$2,520,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 3Project Manager John Kraft E-mail [email protected]

Comments Activity: Remove existing pavement and replace with L-2 Modified Standard.

Status

Reconstruction Programmed

Maintenance Area Casa Grande

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 269

2

46b

Budget Year 2021-2022 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 58: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Pinal Airpark Road Interstate 10-Trico Rd

Construction

$650,000

$0

$650,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 4Project Manager Angeline To E-mail [email protected]

Comments Activity: Driveways, possible left turn acceleration/merge lane, and possible roadway mill and replace.

Status Programmed

Maintenance Area Arizona City

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 251252

2

47a

Length in Miles

Safety Program Countywide

Safety

$500,000

$0

$500,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 7Project Manager John Kraft E-mail [email protected]

Comments Activity: Direct funding to the Roadway Safety ProgramCounty Cost: Add $500,000 to Budget Year 2021-2022 to rebalance Safety Program funding.

Status Programmed

Maintenance Area Multiple

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0

47b

Budget Year 2021-2022 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 59: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Trekell Road S. Hanna Rd-Interstate 8

$540,000

$0

$540,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 3Project Manager John Kraft E-mail [email protected]

Comments Activity: Remove existing pavement and replace with L-2 Modified Standard.

Status

Reconstruction Programmed

Maintenance Area Casa Grande

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 271

0.4

48a

Length in Miles

Camino Viejo Road Camino Viejo W-Enrada del Oro Dr

Dust Palliative

$940,000

$0

$940,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Activity: State Land right-of-way is needed to complete the dust palliative

Status Programmed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 212

2.4

48b

Budget Year 2021-2022 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 60: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

Encanto Lane Cactus Forest Rd-840' North

Dust Palliative

$100,000

$0

$100,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 1Project Manager Lindsey Randall E-mail [email protected]

Comments Activity: Dust Palliative will include Indigo Road, the unpaved segment of Leisure Lane, and Page Road for a total of 1 mile.

Status Programmed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 193

1

49a

Length in Miles

Orville Drive Diffin Rd-Quail Run Rd

Dust Palliative

$130,000

$0

$130,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 1Project Manager Lindsey Randall E-mail [email protected]

Comments

Status Programmed

Maintenance Area San Tan

Transporation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 217

1.13

49b

Budget Year 2021-2022 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 61: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

Length in Miles

River Road Redington Rd-Copper Creek Rd

Dust Palliative

$200,000

$0

$200,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 1Project Manager Angeline To E-mail [email protected]

Comments Status: Dust palliative is contigent on receiving right-of-way donations.Length: Dust palliative will extend to existing 5 miles of paved roadway.County Cost: $200,000 will be programmed annually for 4 years (Year 2).

Status Programmed

Maintenance Area Oracle

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 191

8

50a

Length in Miles

Thunderbird Road Teel Rd-Mayer Rd

$450,000

$0

$450,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager John Kraft E-mail [email protected]

Comments Activity: Roadway Widening

Status

Reconstruction Programmed

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 216

1.5

50b

Budget Year 2021-2022 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Page 62: 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & … · 2019-04-30 · 2018 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2017-2018 THROUGH 2021-2022 The TAC conducts three

45b

2a & 16a

5b10a

12b6a

11a

12a6b & 7a

1a

8a

8b

21b

15b

14b

14a

16b

17a

23a &34a

9b

2b3a

9a

10b13a

1b44a

15a

23b

4b

MesaTempe

Chandler

Gilbert

Queen Creek27b

Tonto National Forest

San Carlos Apache Tribe

33a 31b

29b

37a38b

24a 27a24b26a

25a 28a36a

37b

25b

30b

32a

30a

42a

33b

40b

13b & 18b 13b 50a

43a

21a35b

35a

20b

28b22a

22b

41b19b

29a

18a

41a

34b

19a

43b

40a

5a

3b

38a

44b

45a

47a

48a

50b

46a

36b

46b

48b

49a

49b

39a

District 3;

District 4;

;District 2

;District 5

District 1;

WINKELMANHAYDEN

SUPERIOR

KEARNY

APACHE JUNCTION

MAMMOTH

COOLIDGEMARICOPA

FLORENCE

CASA GRANDE

ELOY

HUNT HWY

§̈¦10rx187

£¤60

rx287

rx88

rx587

rx387

rx238

rx287rx84

rx347

rx87

rx177

rx79

rx77§̈¦8

§̈¦10

MARICOPA-CASA GRANDE HWY

PARK LINK DR

Ak-Chin Indian Res.

Gila River Indian Res.

Tohono Indian Res.

FLOREN CE-KELV

INHW

Y

rx347

rx87

£¤60

rx79

PINAL COUNTYPIMA COUNTY

PINAL

COUN

TYGR

AHAM

COUN

TY

GILA COUNTY

PINAL COUNTY

MARICOPA COUNTYPINAL COUNTY

PINAL COUNTYMARICOPA COUNTY

PINAL

COUN

TYMA

RICO

PA CO

UNTY

Coconino

Pima

Mohave

Gila

Pinal

Yavapai

Maricopa

Yuma

Cochise

La Paz

Graham

ApacheNavajo

Greenlee

Santa Cruz

LegendArea 1 Projects

Area 2 Projects

Area 3 Projects

µ

Project Time Frame : 2017-2022Pinal County Public Works Incorporated Cities Tribal Communities Tonto National Forest Supervisor DistrictsFive Year Transportation Improvement & Maintenance Project Map