21st CII National Award for Excellence in Energy Management 2020
Mr. Samrender Kumar Singh – Sr. Manager
Mr. Prakash Manmode – Technical Manager
Mr. Prejith Preman – Facility Manager
Kensington, Powai, Mumbai
Agenda Points
© 2020 Cognizant2
Cognizant Overview & Delivery Network
Facility Overview
Energy Performance Trend – 2017 to 2020
Glimpse of Energy Journey
Energy Conservation Projects
Best Practice Towards Energy Conservation
Measurement, Monitoring and Review
Way forward
Cognizant Overview
© 2020 Cognizant
3
1Cognizant a global leader in providing solution for IT, consulting, digital, technology and
business process outsourcing services, dedicated to helping the World's leading
companies build stronger businesses
2Cognizant is a multinational corporation that provides IT services, including digital,
technology, consulting, and operations services. It is headquartered in Teaneck, New
Jersey, United States.
3Cognizant is included in the NASDAQ-100 and the S&P 500 indices. Cognizant had
a period of fast growth during the 2000s, becoming a Fortune 194 company in 2020.
4 The company has more than 291,700 employees globally, of which over 100000 are
women employees.
5 US$ 16.80 billion in revenues for FY 2019.
© 2020 Cognizant
Cognizant's Delivery Network
© 2020 Cognizant4
159 delivery and operation centers globally and spread across 39 countries
Total global foot print of 24 million+ built up area in which 13.6 million Sqft. of own facilities
Majority of these operations are in hot and humid climate and significant percentage support 24X7 operations
More than 80% of the space is air-conditioned
Facility Overview
© 2020 Cognizant5
Maximum Demand- 1300 KVA
Transformer - 1650 KVA
DG capacity - 500 KVA X 3
UPS Capacity - 125 KVA X 2
No. of raising Mains- 01 No's (Tata Power)
VRV System- 754 HP
Capacitor Panel- 350 KVAR
Commissioned on April 2008
Nature of Property – Multi tenant
Total Built area- 123280 Sqft.
Seating capacity: 1472
Present Head Count: 918
Operational : 24/7 facility
operations
High rise building – Stilt + P1 + P2
+ 13 floors
© 2020 Cognizant6
Cognizant Approach
Code 001
KEN-Load Pattern study
EMP year-wise goal
setting
Prioritized focus Areas
Implementation
Plan & Tracking
Training + R&R
Monitoring and Review
Complaints relating to comfort - Zero
Downtime of Business -Zero
Efficiency - 1 unit per square foot per month
Energy Management Program
© 2020 Cognizant7
UPS retrofit-
Replaced
conventional UPS to
Modular UPS
AC retrofit Ph II -
394 HP VRV
system
LED Retrofit-
Replaced 2*36W
CFL fitting with
25W fitting
LED Retrofit-
Replaced 2*18W
PL Downlights with
14W Downlight
Retrofit of
damaged ceiling to
prevent heat loss
AC retrofit Ph I -
360 HP VRV
system
© 2020 Cognizant8
Energy Performance Trend- 2017 to 2020
EPI-YOY
2187788 2137764
1542496
2017-18 2018-19 2019-20
Total Power Consumption kWh - YoY
Year (kWh) Sq. M (kWh/Annum/ SqM) (kWh/Month/ SqM)Energy
Consumption Reduction (%)
Per Capita (kWh / Month / Associate)
2016-17 2275097 11453 198.65 16.55 Base 16.35
2017-18 2187788 11453 191.02 15.91 -4.05% 15.48
2018-19 2137764 11453 186.65 15.55 -2.28% 15.66
2019-20 1542496 11453 134.68 11.22 -29.49% 11.92
191.02 186.65
134.68
© 2020 Cognizant9
Energy Efficiency Progression – 2017 to 2020
May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
Actual 2017-18 217 212 200 199 213 212 180 147 157 149 182
Actual 2018-19 214 214 204 205 186 209 186 164 160 144 169
Actual 2019-20 186 178 168 171 144 134 138 121 108 102 91
0
50
100
150
200
250Per Capita(Kwh/Month/Person)
0.00
5.00
10.00
15.00
20.00
25.00
Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Dec-18 Feb-19 Apr-19 Jun-19 Aug-19 Oct-19 Dec-19 Feb-20
Achived EPI 17.30 15.49 16.13 13.94 13.91 17.42 18.49 16.96 16.96 12.93 11.38 14.23 13.62 12.31 10.87 9.70 8.10
Target EPI 19.10 16.10 14.60 14.40 13.30 15.60 16.60 14.90 15.50 13.30 12.90 16.30 17.20 15.80 15.80 12.10 10.50
EPI Target Vs Actuals
Our Journey …
10
AC retrofit Phase II
UPS Retrofit
Light Retrofit
AC retrofit Phase 1
Operational saving. 2017-18
2018-19
2019-202019-20
2018-19
2017-18
© 2020 Cognizant
© 2020 Cognizant11
Energy Saving Achieved
Energy
Saving
632881 KWH/Annum
AC retrofit376366 kWh
Light retrofit118322 kWh
UPS retrofit138193 kWh
59%
22%
19%
AC Retrofit UPS retrofit Light retrofit
Energy Conservation
Summary on ENCON Projects – Investments & ROI
© 2020 Cognizant12
Projects YearAnnual Energy
Saving (kWh)
Annual Cost
Saving
(INR in Million)
Investment
(INR in Million)
ROI
(Year)
AC Retrofit Ph I 2018 -19 183316 2.16 21.67 10.0
AC Retrofit Ph II 2019 -20 193050 2.28 23.04 10.1
UPS Retrofit 2019 -20 138193 1.63 5.00 3.1
LED Light Retrofit 2019 -20 118322 1.40 2.40 1.7
© 2020 Cognizant13
AC Retrofit
Before After Achieved
Energy Saving 31364 kWh/Month
Energy Efficient
Less Breakdown
Projects Year Monthly SavingAnnual Consumption
Saving (kWh)
AC Retrofit Phase 1 2018-19 15276 183316
AC Retrofit Phase 2 2019-20 16087 193050
Total 31364 376366
© 2020 Cognizant14
LED Retrofit : 2x36W CFL replaced with 25W LED
Before
Energy Saving
5916 kWh/Month Delight for Associates
Projects Year Monthly SavingAnnual Consumption Saving
(kWh)
LED Retrofit (25W) 2019-20 5916 70993
After
© 2020 Cognizant15
Energy
Saving 3944
kWh/Month
LED Retrofit : 18W PL replaced with 14W LED
Projects Year Monthly SavingAnnual Consumption
Saving (kWh)
LED Retrofit (14W) 2019-20 3944 47329
Before After
© 2020 Cognizant16
UPS Retrofit : Conventional UPS to Modular UPS
Projects Year Monthly SavingAnnual Consumption
Saving (kWh)
UPS Retrofit 2019-20 11516 138193
Before After
© 2020 Cognizant17
Automation – Smart Work
Asset Management
System
EY Compliance
Manager– Compliance Tracking
Introduction of Eco
Struxure IT mobile app for UPS
One Transport Portal
QR code for physical
validation of assetsGST : Scrap
Sale – Portal for disposal of
Waste
Resilio – Daily
Reporting System
OHI –
Occupational Health Information
portal
© 2020 Cognizant18
Best Practices – Power System
Maintain Power Factor Power Quality Audit
© 2020 Cognizant19
Measuring & Monitoring- Energy Consumption Tracking
Daily Tracking & Review
Monthly monitoring & review
(FMS)
Qtly evaluation with
management
Performance review &
assessment of significant
deviation
© 2020 Cognizant20
GHG Inventorisation : Emission reduction (MT of CO2)
Scope 1 - GHG Emission for DG based electricity generation
Scope 2 - GHG emission for EB based Electricity consumption
18 20
4
18358 17936
12952
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
20000
2017-18 2018-19 2019-20
0
5
10
15
20
25
Scope 1 Intensity Scope 2 Intensity
2017-18
2018-19
2019-20
2017-18 2018-19 2019-20
Total 18376 17956 12956
Total
© 2020 Cognizant21
Green Supply Chain Policy - Performance contracts for Retrofit Projects
• Uphold the cause of environment, health and safety management
system through compliance to standards and continual
improvement
• Strong environment friendly culture in terms of water, fuel,
electricity and paper consumption
• Green practices such as usage of ecofriendly, recycled and reused
products in every stages of operations with special emphasis on
packaging of material
Minimize generation of waste to a practical extent and handle
(storage, transportation, disposal and tracking end use) it in an
ecofriendly manner so that no harm is caused to the environment
and society at large
Cognizant is committed to excel its performance with respect to Sustainable Development.
The company shall strive to engage all its vendors in this endeavor through sustainable supply chain management initiatives.
To fulfill this commitment, the company shall promote the following practices at the vendors’ end:
© 2020 Cognizant22
Green Supply Chain-Performance contracts- LED retrofit
LED Retrofit Performance
Guarantee Contract
© 2020 Cognizant23
Best Practices
Workplace Temperature policy standardized
24 ° C to 26 ° C
23
UPS Air-conditioning Kitchen / Pantry
Increasing the UPS/Battery room
Temperature from 22 ° C to 25 ° C
Hub room temperature were increased
from 23 ° C to 25 ° C
Increased the data center temp from 18° C to 22°C +/-1 ° C
Mandatory use of BEE Star rated
equipment's
Scheduled Kitchen Operation
timing to optimize exhaust and Fresh Air loads.
Reuse of hot water in bain-marie for
washing purpose
Ensure healthiness of the
equipment's placed in pantry and cafeteria to minimize the power
consumption
Auto Push program automatically puts the
PC to hibernate mode when it is not in use.(Achieved 88% reduction)
Created awareness among employees to
conserve Energy by stitching off unwanted power load.
Optimizing the workstation UPS load by
switching off 2 No’s
© 2020 Cognizant24
Timer installation for AC’s at common area’s
Stand alone Exhaust Fan Retrofit
Occupancy base lighting and AC control
Sourcing of renewable energy
10-12% EPI reduction in next two years
Energy Efficiency
IOT & Digital
Green EnergyThree Way Approach
Way Forward
THANK YOU