Green Socialized Housing
Ms. Maria Benita Ochoa-RegalaDepartment Head, National Housing Authority
In using this presentation as reference, kindly include in your citation:Regala, MBO 2018, ‘Green Socialized Housing', presented to the Philippine Green Building Council – Building Green 2018 Conf
erence, SMX Convention Center, Pasay City, Philippines, 21 September 2018
![Page 3: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/3.jpg)
Building Green 2018 Conference
Ar./EnP. Maria Benita Ochoa-RegalaHousing Technology and Technical Research Department
National Housing Authority
PHILIPPINE GREEN BUILDING COUNCIL
![Page 4: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/4.jpg)
Greening the Socialized Housing Market
Actions and Challenges
![Page 5: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/5.jpg)
The Housing Sector Scenario and NHA’s Role
![Page 6: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/6.jpg)
![Page 7: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/7.jpg)
2040
2022
“PAGBABAGO”REDUCING INEQUALITY
“MALASAKIT”ENHANCING THE SOCIAL FABRIC
Accelerated and strategicdevelopment of infrastructure
Maintain ecological integrity, clean and healthy environment
Strategic trade and fiscal policy, macroeconomic stability, competition policy
FOUNDATION FOR INCLUSIVE GROWTH, A HIGH-TRUST SOCIETY AND A GLOBALLY COMPETITIVE KNOWLEDGE ECONOMY
MATATAG, MAGINHAWA AT PANATAG NA BUHAY
“KAUNLARAN”INCREASING POTENTIAL GROWTH
Ensure peace andsecurity
Promote awareness and value cultural diversity
Expand economic opportunities
Increase access to economic opportunities
Accelerate human capital development
Reduce vulnerability of the poor
Promote technology adoption
Maximize demographic dividend
Encourage innovation
Build up resiliency
Clean, efficient and citizen-centered governance
Swift and fair administration of justice
“MALASAKIT, PAGBABAGO para sa Patuloy na PAG-UNLAD”
STRATEGIC FRAMEWORK TO BUILD SAFE AND SECURE COMMUNITIES
![Page 8: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/8.jpg)
Major Component of Housing Total Housing Need2017-2022
PHILIPPINESTotal Housing Needs
6,571,387
A. Accumulated Needs 1,439,550
1. Total HHs in Unacceptable Housing UnitsRent-Freed without consent of ownerHomelessDilapidated/CondemnedMakeshift/Salvage Materials
865,408581,178
5,96999,377
178,884
2. Doubled-Up HHs in Acceptable Housing Units 574,142
B. Future / Recurrent Needs 5,129,021
1. Allowance for inventory losses 2,117,3032. Newly formed HHs (likely afford to own/rent HU) 3,011,718
Source: HUDCC
![Page 9: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/9.jpg)
NHMFC
OFFICE)OF)THE)PRESIDENT
HUDCC
REGULATING)BODY
FINANCING)BODY
PRODUCING)BODY
HLURB)
SHFC HGC
NHA
HDMFHousing(and(Land(Use(Regulatory(Board
Social(Housing(Finance(Corporation
National(Home(Mortgage(Finance(Corporation
Home(Development(Mutual(Fund
Home(Guaranty(Corporation
National(Housing(Authority
THE KEY SHELTER AGENCIES UNDER THE OFFICE OF THE PRESIDENT
![Page 10: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/10.jpg)
§ Housing need some 6 Million units, includingthose for about 1.5 Million ISFs
§ NG has been able to build an average of 192,000 units annually in the past 6-7 years
§ HUDCC targeting 30% increase: to build some 250,000 units annually, starting July thisyear
§ In 5 years, government to build 1.5 Million to 2.0 Million units
Eduardo Del RosarioHUDCC ChairBusiness Mirror
31 July 2017
HUDCC POLICY DIRECTIONS
![Page 11: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/11.jpg)
The NHA GM’s MESSAGE
“Heading one of the key agencies in the housing sector underthe Duterte administration is a challenge for me. But true to mycommitment as a public servant, I will, to myutmost ability, help steer this agency toward a more improved,effective and efficient public-service delivery. Laying down fundamental changes, developing more responsive housingprograms, building a culture of quality and initiatinginnovations in how we do things at the NHA is my pledge andcommitment.”
MARCELINO P. ESCALADA, JR.General Manager, NHA
![Page 12: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/12.jpg)
NHA MANDATES
PD 757 (31 July 1975)
q Develop and implement a comprehensive and integrated housing programEO 90 (17 December 1986)
q Sole national government agency to engage in shelter production focusing on the housing needs of thelowest 30% of urban income-earners
RA 7279 - UDHA (24 March 1992)
q Provide technical and other forms of assistance to LGUs in the implementation of their housing programs
q Undertake identification, acquisition, and disposition of lands for socialized housing
q Undertake relocation and resettlement of families living in danger areas with LGUs
RA 7835 - CISFA (08 December 1994)
q Implement the following vital components of the National Shelter Program: Resettlement Program, MediumRise Public and Private Housing Program, Cost Recoverable Programs, and Local Housing Program
q Engage in land banking activities to ensure availability of land to sustain the Resettlement Program
q Manage and administer a Trust Fund for the Medium Rise Public and Private Housing and Local HousingPrograms
![Page 13: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/13.jpg)
• 552,755 Housing Units/Assistance for ISFs and Low-income Sector• Housing Programs:
– Programs for ISFs Living along Danger Areas in Metro Manila (In-City and Near City)
– Programs for ISFs Affected by Infra Projects and those in Nearby Projects– Regional Resettlement Programs: LGUs and Indigenous Peoples– Vertical Development: LRBs and MRBs– AFP/PNP, Government Employees Housing– Permanent Housing for Calamity-affected Families– High-Impact Projects: Mixed Use Development
NHA PDP Target: Completions 2017-2022
![Page 14: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/14.jpg)
Some Policy Initiatives
![Page 15: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/15.jpg)
Green Guide for Socialized Housing ProjectsBuilding Green Program – Technical Working Group (February 27, 2013)
The development of a Green Guidefor Socialized Housing Projects in thePhilippines (Green Guide) is part of theGreen Jobs Promotion in theSocialized Housing Sector Project ofthe International Labour Organization(ILO) under the Green Jobs in AsiaProject funded by the Australian AID.
![Page 16: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/16.jpg)
OUTLINE
01 Guidelines for Site Selection, Site Suitability and Site Planning of NHA Housing Development Projects
02 Land Use and Circulation
03 Disaster Resilient Housing
04 Water Supply and Sanitation
05 Energy Conservation
06 Color Scheme
![Page 17: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/17.jpg)
Guidelines for Site Selection, Site Suitability and Site Planning of NHA
Housing Development ProjectsMC 2015-015 dated December 29, 2015
![Page 18: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/18.jpg)
The guidelines are set to have a unified approach, processes and minimum
requirements in selecting and planning sites for housing projects, and to establish these with a common
understanding among NHA planners.
Guidelines for Site Selection, Site Suitability and Site Planning of NHA Housing Development Projects (MC 2015-015)
![Page 19: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/19.jpg)
SITE SELECTION
• The site selection process covers the identification of locations that
are appropriate for housing development.
![Page 20: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/20.jpg)
SITE SELECTION
FEATURES:• Forward planning tool – with the use of the Housing Sites Map
• Participatory approach – through consultation with project-level units and other stakeholders
• Principle of integration – aligning of the plans with other plans of the government.
The objective is to undertake a purposive site selection, instead of being reactive to the escalating demand.
![Page 21: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/21.jpg)
SITE SELECTION
OUTPUT OF SITE SELECTION:HOUSING SITES MAP
•Or HSM, it is the mapped out locations ofhousing sites for at least the next 3 years.Sites are exact locations or indicative areas
.
•May be reference for land banking.
•To be updated every 3 years, coincided with the MTPDP and its midterm.
![Page 22: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/22.jpg)
SITE SELECTION
HOUSING SITES MAPREFERENCES & TOOLS:• NFPP, MTPDP, other national plans• CLUPs and ZOs• Hazard Maps• Government Infrastructure Projects
GUIDING CRITERIA:• Location• Conformity with Land Use• Accessibility
![Page 23: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/23.jpg)
Guidelines for Site Selection, Site Suitability and Site Planning of NHA Housing Development Projects (MC 2015-015)
ResponsibleUnits:
Regional Offices, Operating Units,
HTDO, CPO
Regional Offices;Project Offices;
HTDO (if assistance is requested);CIED (for appraisal of feasible sites
upon request)
Regional Offices;Project Offices
Deliverables:Housing Sites Map (HSM)
(at least 3-year term)
Site Inspection Report (SIR); Pre-Feasibility Study (PFS) with
Conceptual Plan
Site Development Plan, with detailed A&E drawings, costing, and technical
specifications
Timeline:At least 3 months before the
start of the MTPDP (2017-2022) and its midterm;
(Updated every 3 years)
a) SIR within 5 days from date of inspection
b) PFS with Conceptual plan within 1 month from date of
submission of SIR
Maximum of 6 months preparation;
Output completed by target pre-procurement schedule of
the project
Approval Requirement: HSM for approval of GM and for
notation of the NHA Board of Directors
Project Proposal to proceed with the detailed planning, design and budgetary estimates to concerned
Regional Office
GM approval prior to bidding and/or award
SITE SELECTION SITE SUITABILITYSITE PLANNING AND DETAILED A&E DESIGN
![Page 24: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/24.jpg)
SITE SUITABILITY ANALYSIS
This process looks at the intrinsic and specific technical qualities of the site and its capability to address the requirements for housing.
Involves determining the potentials, constraints, and development issues of a specific site
![Page 25: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/25.jpg)
SITE SUITABILITY ANALYSIS
• TopographyTopography must be relatively flat and slopes of proposed sites should not exceed the 15% maximum gradient considered as buildable slopes for housing development.
• SlopeDensity of above 300 to 600 units/ha: slope should be below 5%. Density of 300 units & below/ha: sloping area could be 5% to 15%.
• Drainage OutfallNatural waterways and outfalls shall be established on ground, with identified legal access. Natural waterways should be retained to preserve ecological balance. Drainage outfall should be extended directly into the main waterways.
![Page 26: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/26.jpg)
SITE SUITABILITY ANALYSIS
DELIVERABLES:
1) Site Inspection Report 2) Pre-Feasibility Study with Conceptual Plan
![Page 27: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/27.jpg)
SITE PLANNING AND DETAILED DESIGN
• Compliance to existing laws, rules and regulations on housing (local or national)
• Adoption of the green infrastructure and preservation of existing natural assets of the land (e.g. trees, ground cover, vegetation, and natural waterways)
• Promotion of “walkable communities”• Promotion of appropriate community facilities and infrastructure
-to provide for the socio-economic needs and cultural activities of the beneficiaries -to encourage the implementation of environmental management programs in the housing sites
![Page 28: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/28.jpg)
Land Use and Circulation
![Page 29: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/29.jpg)
LAND USE ALLOCATION PER SITE
60% Saleable-• Residential housing development • Areas for Store spaces
40% Non-Saleable• Circulation / Road Network• Parks and Playgrounds• Community Facilities
Saleable60%
Land Use Allocation40%
Non-Saleable
![Page 30: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/30.jpg)
Allowable Densities ( No. of Units/hectare)
MAXIMUM ALLOWABLE DENSITY PER HECTAREHorizontal Development
1-Storey Row house (Loftable) : 150 units / ha1-Storey Row house (with Loft) : 150 units / ha2-Storey Row house : 150 units / ha
Vertical Development (Low Rise Buildings)2-Storey LRB : 192 units / ha3-Storey LRB : 252 units / ha4-Storey LRB : 336 units / ha5-Storey LRB : 420 units / ha
![Page 31: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/31.jpg)
LOT/ HOUSING DESIGN GUIDELINES
BLOCK AND LOT ORIENTATION
• Maximum of 8 units per row of full block RHs• End lots of RH should face the wider RROW• RHs of 8 units must be segregated by at least
2.00mts linear park / pocket garden
![Page 32: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/32.jpg)
Disaster Resilient Housing
![Page 33: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/33.jpg)
![Page 34: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/34.jpg)
22.00 sqm Loftable Rowhouse
![Page 35: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/35.jpg)
33.00 sqm Rowhouse with Loft and Storespace Provision
![Page 36: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/36.jpg)
PARKING Standardizing the number of parking spaces only to the minimum requirement will (i)discourage the creation of hardscapes, (ii) help in reduction of associated emissions and (iii) encourage the use of alternative transport systems
![Page 37: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/37.jpg)
PROMOTING WALKABLE COMMUNITY
• Reduced transport costs• Additional planting strips• Improved air quality
![Page 38: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/38.jpg)
PROMOTING WALKABLE COMMUNITY
• Reduced transport costs• Additional planting strips• Improved air quality
![Page 39: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/39.jpg)
Water Supply and SanitationRainwater HarvestingAnaerobic Baffled ReactorMaterial Recovery FacilitiesDrainage Improvement
![Page 40: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/40.jpg)
Water Supply and Sanitation
Significant potable water consumption reduction
may be achieved with this.
Rainwater Harvesting
Storm drainage and sewerage system are
separately designed for better treatment of
sewage and efficiency.
Drainage Improvement
Standard design applicable for every 300 units.More economical and compliant to DENR and DOH parameters.
Anaerobic Baffled Reactor
Every project shall have an onsite MRF for better waste management
Material Recovery Facility
![Page 41: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/41.jpg)
RAINWATER HARVESTINGMARAWI TRANSITORY SHELTER
![Page 42: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/42.jpg)
RAINWATER HARVESTINGMARAWI TRANSITORY SHELTER
![Page 43: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/43.jpg)
RAINWATER HARVESTINGMARAWI TRANSITORY SHELTER
![Page 44: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/44.jpg)
MATERIAL RECOVERY FACILITYEXTERIOR PERSPECTIVE
![Page 45: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/45.jpg)
MATERIAL RECOVERY FACILITYSITE DEVELOPMENT PLAN
![Page 46: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/46.jpg)
MATERIAL RECOVERY FACILITY
![Page 47: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/47.jpg)
Energy ConservationSolar Street Lights
![Page 48: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/48.jpg)
Estimate = 26,712.00/unitSOLAR STREET LIGHTS
SPECIFICATION FOR INTEGRATED SOLAR STREET LIGHT
SOLAR PANEL:60W MONOBATTERY:LITHIUMCAPACITY:20AH / 11.1V
LED LAMP POWER:30 WATTSLUMEN:3000-3600 LMVIEWING ANGLE:120°
MOUNTING HEIGHT:6MWORKING TEMP. RANGE:-25°C TO 65°C
ARM/BRACKET: STAINLESS STEEL SCHEDULE 40
CONNECTING FLANGE:STAINLESS STEELSCHEDULE 40
![Page 49: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/49.jpg)
SOLAR STREET LIGHTS
![Page 50: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/50.jpg)
Color Selection GuideFor NHA Housing Projects : MC No. 2018-13
![Page 51: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/51.jpg)
COLOR SCHEME MANUAL
![Page 52: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/52.jpg)
COLOR SCHEME MANUAL
![Page 53: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/53.jpg)
![Page 54: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/54.jpg)
ACTIONS AND CHALLENGES
Aligning with the Philippine Development Plan of the Philippines, and with allthe directives pertaining to disaster preparedness and resiliency, climate changeand all the other laws affecting the housing sector, it is imperative to design andimplement innovative and responsive policies, programs and projects.
The greater challenge though is in the actual implementation of these initiativesin an environmentally sustainable manner. Given the mentioned projectionsand the already existing demand for the socialized and low-cost residentialhousing, there is a significant opportunity to promote energy efficiency (EE) andsustainable development measures through this sector, particularly at thehousehold level and on how to secure its scalability.
![Page 55: 21 SEPTEMBER 2018 - files.philgbc.org](https://reader035.vdocument.in/reader035/viewer/2022072104/62d8787d4f4af962c24a41f0/html5/thumbnails/55.jpg)
Thank youEnd of Presentation