233-s pcf demolition project - srs233-s plutonium concentration facility d&d project 2 the 233-s...

33
1 1 233 233 - - S Plutonium Concentration Facility S Plutonium Concentration Facility D&D Project D&D Project 233 233 - - S PCF Demolition S PCF Demolition Project Project RadCon practices and techniques RadCon practices and techniques Stephen L. Bump, CHP Daniel S. Mantooth, CHP William J. Knight, HP

Upload: others

Post on 14-Jul-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 233-S PCF Demolition Project - SRS233-S Plutonium Concentration Facility D&D Project 2 The 233-S Facility • Located North of the 202-S “Redox” Facility. • The process area

11233233--S Plutonium Concentration Facility S Plutonium Concentration Facility

D&D ProjectD&D Project

233233--S PCF Demolition S PCF Demolition ProjectProject

RadCon practices and techniquesRadCon practices and techniques

Stephen L. Bump, CHP

Daniel S. Mantooth, CHP

William J. Knight, HP

Page 2: 233-S PCF Demolition Project - SRS233-S Plutonium Concentration Facility D&D Project 2 The 233-S Facility • Located North of the 202-S “Redox” Facility. • The process area

233233--S Plutonium Concentration Facility S Plutonium Concentration Facility D&D ProjectD&D Project 22

The 233The 233--S FacilityS Facility• Located North of the 202-S

“Redox” Facility.• The process area was a

reinforced concrete structure 37 feet high, 86 feet long and 43 feet wide with twelve-inch walls and six-inch thick floors.

• The non-process areas were a single story structure with eight-inch walls and six-inch thick floors.

Page 3: 233-S PCF Demolition Project - SRS233-S Plutonium Concentration Facility D&D Project 2 The 233-S Facility • Located North of the 202-S “Redox” Facility. • The process area

233233--S Plutonium Concentration Facility S Plutonium Concentration Facility D&D ProjectD&D Project 33

Existing ConditionsExisting Conditions• In 1956 a spill of approximately 32

grams of plutonium solution caused extensive contamination of the facility, including outside areas.

• In 1963 a fire spread gross alpha contamination to all areas of the facility, including the outside roof area.

• Major Decon activities occurred from 1978 to 1981. Stabilization of the facility was completed in 1987.

• Dismantlement and removal of process equipment began in 1996. Contamination levels range from 2,000 d/m/100 cm² to greater than 20,000,000 d/m/100 cm².

Page 4: 233-S PCF Demolition Project - SRS233-S Plutonium Concentration Facility D&D Project 2 The 233-S Facility • Located North of the 202-S “Redox” Facility. • The process area

233233--S Plutonium Concentration Facility S Plutonium Concentration Facility D&D ProjectD&D Project 44

D&D Radiological Control D&D Radiological Control --The ChallengeThe Challenge

• Different Than Nuclear Operations– Contamination control and monitoring is much

more difficult when demolishing facilities• Removing walls creates a lack of containment• Weather conditions affect the ability

to monitor contamination (e.g., detecting alpha contamination in the rain)

• Temporary facilities and dressing rooms are used

Page 5: 233-S PCF Demolition Project - SRS233-S Plutonium Concentration Facility D&D Project 2 The 233-S Facility • Located North of the 202-S “Redox” Facility. • The process area

233233--S Plutonium Concentration Facility S Plutonium Concentration Facility D&D ProjectD&D Project 55

D&D Radiological Control D&D Radiological Control ––The SolutionThe Solution

• Apply Innovative Techniques To Maintain Radiological Control While Still Meeting Requirements

Page 6: 233-S PCF Demolition Project - SRS233-S Plutonium Concentration Facility D&D Project 2 The 233-S Facility • Located North of the 202-S “Redox” Facility. • The process area

233233--S Plutonium Concentration Facility S Plutonium Concentration Facility D&D ProjectD&D Project 66

Innovation With 233Innovation With 233--S Demolition S Demolition Contamination ControlContamination Control

Shear w/Controlled Demolition

•Cont. Area manageable 40 M (131 ft.)•Existing equipment available•Acceptable cost/schedule

Shear w/Containment Tent•Expensive•Personnel risks•Did not demonstrate open air

Shear Only•Cont. Area >300 M (386 ft.)•Least cost

Grout/Section/Remove•Requires massive equipment•Impractical for location•Unacceptable cost/schedule

Page 7: 233-S PCF Demolition Project - SRS233-S Plutonium Concentration Facility D&D Project 2 The 233-S Facility • Located North of the 202-S “Redox” Facility. • The process area

233233--S Plutonium Concentration Facility S Plutonium Concentration Facility D&D ProjectD&D Project 77

Radiological PlanningRadiological Planning• Extensive interfacing with

D&D Operations, Waste Management, and demolition vendors is needed in order to establish an effective contamination control program while allowing efficient personnel and vehicle access.

• Planning and execution of an effective decontamination program is a vital part of the process.

Page 8: 233-S PCF Demolition Project - SRS233-S Plutonium Concentration Facility D&D Project 2 The 233-S Facility • Located North of the 202-S “Redox” Facility. • The process area

233233--S Plutonium Concentration Facility S Plutonium Concentration Facility D&D ProjectD&D Project 88

Radiological PlanningRadiological Planning

• Establishment of routine sample points at the CA/RBA boundary allows the detection of low level contamination in time to effect remediation efforts without impacting demolition activities.

Page 9: 233-S PCF Demolition Project - SRS233-S Plutonium Concentration Facility D&D Project 2 The 233-S Facility • Located North of the 202-S “Redox” Facility. • The process area

233233--S Plutonium Concentration Facility S Plutonium Concentration Facility D&D ProjectD&D Project 99

Radiological PlanningRadiological Planning

• Four Canberra “Alpha Sentry” Continuous Air Monitors provided real time remote monitoring.

• A portable Eberline Alpha-5 monitor provided spot monitoring.

Continuous monitoring of Airborne contamination levels is a necessity.

Page 10: 233-S PCF Demolition Project - SRS233-S Plutonium Concentration Facility D&D Project 2 The 233-S Facility • Located North of the 202-S “Redox” Facility. • The process area

233233--S Plutonium Concentration Facility S Plutonium Concentration Facility D&D ProjectD&D Project 1010

Radiological PlanningRadiological Planning

• Atmospheric dispersion modeling can provide a pre-demolition estimate of releases of radioactive material and assist in site boundary planning.

• No indication of spread beyond boundary

Page 11: 233-S PCF Demolition Project - SRS233-S Plutonium Concentration Facility D&D Project 2 The 233-S Facility • Located North of the 202-S “Redox” Facility. • The process area

233233--S Plutonium Concentration Facility S Plutonium Concentration Facility D&D ProjectD&D Project 1111

Administrative ControlsAdministrative Controls

• A control point desk at the demolition area access point allows on the spot decisions to expedite job flow.

Page 12: 233-S PCF Demolition Project - SRS233-S Plutonium Concentration Facility D&D Project 2 The 233-S Facility • Located North of the 202-S “Redox” Facility. • The process area

233233--S Plutonium Concentration Facility S Plutonium Concentration Facility D&D ProjectD&D Project 1212

Administrative ControlsAdministrative Controls

• All personnel were issued radios to allow rapid and effective communication.

Page 13: 233-S PCF Demolition Project - SRS233-S Plutonium Concentration Facility D&D Project 2 The 233-S Facility • Located North of the 202-S “Redox” Facility. • The process area

233233--S Plutonium Concentration Facility S Plutonium Concentration Facility D&D ProjectD&D Project 1313

Administrative ControlsAdministrative Controls

• Keeping non-essential personnel outside of the work area prevents over tasking both radiological and operational resources.

Page 14: 233-S PCF Demolition Project - SRS233-S Plutonium Concentration Facility D&D Project 2 The 233-S Facility • Located North of the 202-S “Redox” Facility. • The process area

233233--S Plutonium Concentration Facility S Plutonium Concentration Facility D&D ProjectD&D Project 1414

Engineering ControlsEngineering Controls

• Whenever active demolition was paused, the application of fixatives to the demolition site mitigated the windborne spread of radioactive material.

Page 15: 233-S PCF Demolition Project - SRS233-S Plutonium Concentration Facility D&D Project 2 The 233-S Facility • Located North of the 202-S “Redox” Facility. • The process area

233233--S Plutonium Concentration Facility S Plutonium Concentration Facility D&D ProjectD&D Project 1515

Engineering ControlsEngineering Controls

• Misting Nozzles were installed on the Shear and bucket to mitigate the spread of airborne contamination at the source.

Page 16: 233-S PCF Demolition Project - SRS233-S Plutonium Concentration Facility D&D Project 2 The 233-S Facility • Located North of the 202-S “Redox” Facility. • The process area

233233--S Plutonium Concentration Facility S Plutonium Concentration Facility D&D ProjectD&D Project 1616

Engineering ControlsEngineering Controls

• Fog Canons provide an effective way to further limit the spread of airborne contamination during active demolition.

Page 17: 233-S PCF Demolition Project - SRS233-S Plutonium Concentration Facility D&D Project 2 The 233-S Facility • Located North of the 202-S “Redox” Facility. • The process area

233233--S Plutonium Concentration Facility S Plutonium Concentration Facility D&D ProjectD&D Project 1717

Engineering ControlsEngineering Controls

• In order to expedite the release of transport vehicles, a clean pathway to the ERDF Box was created using disposable plastic sheeting.

Page 18: 233-S PCF Demolition Project - SRS233-S Plutonium Concentration Facility D&D Project 2 The 233-S Facility • Located North of the 202-S “Redox” Facility. • The process area

233233--S Plutonium Concentration Facility S Plutonium Concentration Facility D&D ProjectD&D Project 1818

Engineering ControlsEngineering Controls

• The application of plastic wrap allowed highly contaminated areas of contamination exposed during cutting to be rapidly fixed prior to packaging.

Page 19: 233-S PCF Demolition Project - SRS233-S Plutonium Concentration Facility D&D Project 2 The 233-S Facility • Located North of the 202-S “Redox” Facility. • The process area

233233--S Plutonium Concentration Facility S Plutonium Concentration Facility D&D ProjectD&D Project 1919

Mockups Mockups –– A vital tool.A vital tool.

• Utilizing Mockups and walk downs allowed workers to solve problems and refine procedures in a safe environment, saving time and exposure in the demolition zone.

Page 20: 233-S PCF Demolition Project - SRS233-S Plutonium Concentration Facility D&D Project 2 The 233-S Facility • Located North of the 202-S “Redox” Facility. • The process area

233233--S Plutonium Concentration Facility S Plutonium Concentration Facility D&D ProjectD&D Project 2020

Mockups Mockups –– A vital tool.A vital tool.

• Utilizing Mockups and walk downs allowed workers to solve problems and refine procedures in a safe environment, saving time and exposure in the demolition zone.

Page 21: 233-S PCF Demolition Project - SRS233-S Plutonium Concentration Facility D&D Project 2 The 233-S Facility • Located North of the 202-S “Redox” Facility. • The process area

233233--S Plutonium Concentration Facility S Plutonium Concentration Facility D&D ProjectD&D Project 2121

Mockups Mockups –– A vital tool.A vital tool.

• Utilizing Mockups and walk downs allowed workers to solve problems and refine procedures in a safe environment, saving time and exposure in the demolition zone.

Page 22: 233-S PCF Demolition Project - SRS233-S Plutonium Concentration Facility D&D Project 2 The 233-S Facility • Located North of the 202-S “Redox” Facility. • The process area

233233--S Plutonium Concentration Facility S Plutonium Concentration Facility D&D ProjectD&D Project 2222

Mockups Mockups –– A vital tool.A vital tool.

• Utilizing Mockups and walk downs allowed workers to solve problems and refine procedures in a safe environment, saving time and exposure in the demolition zone.

Page 23: 233-S PCF Demolition Project - SRS233-S Plutonium Concentration Facility D&D Project 2 The 233-S Facility • Located North of the 202-S “Redox” Facility. • The process area

233233--S Plutonium Concentration Facility S Plutonium Concentration Facility D&D ProjectD&D Project 2323

Problems and SolutionsProblems and Solutions

• Wind speeds in excess of 65 mph were recorded at the demolition site. Although the application of fixatives prevented the spread of contamination, equipment tents did not fair so well.

• “Hardening” of the tents to survive higher winds speeds was necessary.

Excessive Wind SpeedsExcessive Wind Speeds

Page 24: 233-S PCF Demolition Project - SRS233-S Plutonium Concentration Facility D&D Project 2 The 233-S Facility • Located North of the 202-S “Redox” Facility. • The process area

233233--S Plutonium Concentration Facility S Plutonium Concentration Facility D&D ProjectD&D Project 2424

Problems and SolutionsProblems and Solutions

• Temperatures, both Hot and Cold, became a limiting factor for work activities.

Temperature ExtremesTemperature Extremes

Page 25: 233-S PCF Demolition Project - SRS233-S Plutonium Concentration Facility D&D Project 2 The 233-S Facility • Located North of the 202-S “Redox” Facility. • The process area

233233--S Plutonium Concentration Facility S Plutonium Concentration Facility D&D ProjectD&D Project 2525

Problems and SolutionsProblems and Solutions

• A work/rest regimen based on WBGT index was used.

• Evaporative coolers were located in worker cool down areas.

High Temperatures reached 112°High Temperatures reached 112°

Page 26: 233-S PCF Demolition Project - SRS233-S Plutonium Concentration Facility D&D Project 2 The 233-S Facility • Located North of the 202-S “Redox” Facility. • The process area

233233--S Plutonium Concentration Facility S Plutonium Concentration Facility D&D ProjectD&D Project 2626

Problems and SolutionsProblems and Solutions• Cold weather gear was

issued to all outside workers.

• Modifications were made to existing RWPs to allow workers to wear cold weather gear under their protective clothing.

• A heated staging area was built to allow workers to remain warm without leaving the area.

Low Temperatures reached Low Temperatures reached --14°14°

Page 27: 233-S PCF Demolition Project - SRS233-S Plutonium Concentration Facility D&D Project 2 The 233-S Facility • Located North of the 202-S “Redox” Facility. • The process area

233233--S Plutonium Concentration Facility S Plutonium Concentration Facility D&D ProjectD&D Project 2727

Problems and SolutionsProblems and Solutions• The size of the change trailer

was inadequate for the number of personnel entering and exiting the area.

• The level of PPE required for entry into the demolition area required the presence of additional personnel to assist workers.

• A new trailer was procured and configured based on feedback from the workers in the field.

Change Trailer SizeChange Trailer Size

Page 28: 233-S PCF Demolition Project - SRS233-S Plutonium Concentration Facility D&D Project 2 The 233-S Facility • Located North of the 202-S “Redox” Facility. • The process area

233233--S Plutonium Concentration Facility S Plutonium Concentration Facility D&D ProjectD&D Project 2828

Expect The UnexpectedExpect The Unexpected

Contaminated Paint Flaking Off Pipes

Pipe With Legacy Nitric Acid…Found When Cut

Page 29: 233-S PCF Demolition Project - SRS233-S Plutonium Concentration Facility D&D Project 2 The 233-S Facility • Located North of the 202-S “Redox” Facility. • The process area

233233--S Plutonium Concentration Facility S Plutonium Concentration Facility D&D ProjectD&D Project 2929

Beginning to EndBeginning to End

• Demolition commenced October 22nd, 2003.

• Slab on Grade was achieved April 30th, 2004

Page 30: 233-S PCF Demolition Project - SRS233-S Plutonium Concentration Facility D&D Project 2 The 233-S Facility • Located North of the 202-S “Redox” Facility. • The process area

233233--S Plutonium Concentration Facility S Plutonium Concentration Facility D&D ProjectD&D Project 3030

The Final Steps.The Final Steps.• June 3rd, 2004 - A

worker levels the clean gravel fill in preparation for pouring the final grout cap.

• June 8th, 2004 - The final concrete cap is poured.

Page 31: 233-S PCF Demolition Project - SRS233-S Plutonium Concentration Facility D&D Project 2 The 233-S Facility • Located North of the 202-S “Redox” Facility. • The process area

233233--S Plutonium Concentration Facility S Plutonium Concentration Facility D&D ProjectD&D Project 3131

Lessons LearnedLessons Learned• D&D Experience May Be Hard To Find• Use All Available Resources

– DOE Complex– Vendors– ALARA Center– HAMMER

• ALARA Is An Ongoing Process• Don’t Underestimate The Impact Of Environmental

Condition• Have The Right Equipment At The Beginning• Tailor Radiological Monitoring To The Project• Look For Innovative Contamination Control Techniques

Page 32: 233-S PCF Demolition Project - SRS233-S Plutonium Concentration Facility D&D Project 2 The 233-S Facility • Located North of the 202-S “Redox” Facility. • The process area

233233--S Plutonium Concentration Facility S Plutonium Concentration Facility D&D ProjectD&D Project 3232

SummarySummary

• Plan Carefully• No Two Projects Are The Same• Listen To Co-Workers• Use Responsible Innovation• Keep An Open Mind and...Always Expect

The Unexpected

Page 33: 233-S PCF Demolition Project - SRS233-S Plutonium Concentration Facility D&D Project 2 The 233-S Facility • Located North of the 202-S “Redox” Facility. • The process area

233233--S Plutonium Concentration Facility S Plutonium Concentration Facility D&D ProjectD&D Project 3333

The EndThe End