27/6/05 frascati1 m. bonesini infn milano mice tof stations updates
TRANSCRIPT
27/6/05 Frascati 1
M. Bonesini INFN Milano
MICE TOF stationsupdates
27/6/05 Frascati 2
Preliminary considerationsBackground: MICE for INFN is on track
approval, this means that we have got funds for TOF0 prototypes, EMCAL prototypes now only for 2006 (~310 KE on a 415 KE request)
In practice: funds are for specific items, they are not an experiment budget: ie I cannot easily move from one item to the other (eg from PMTs to trigger modules)
Funds cover all TOF0 items up to cable: eg no electronics& calibration system, but counters, mechanics, pmts
A serious final planning cannot be done now
27/6/05 Frascati 3
Aim of TOF stations
• TOF0 experiment trigger
•TOF0/TOF1 PID on incoming muons
•TOF1/TOF2 PID on particle traversing the cooling channel
•Requirements:
oSingle detector resolution ~60 ps
oHigh rate capability
oSustain nearby B fringe fields
This has been questioned by INFN referees, so simulation work
is needed on this corner
27/6/05 Frascati 4
Short term planning
The idea is to freeze the design of TOF0 by November (PMTS+ scint counters): some money has to be spent by end 2005, if not it will evaporateTests are under way for PMTs (choice of partition chain) and Scintillator type (cosmics)BUT I need urgently some inputs, if NOT I have to assume OLD numbers maybe wrong
27/6/05 Frascati 5
TOF0 simulation in my hand
With 4 cm width slabs max counter rate seems < 400-500 KHz. R4998 maybe OK with booster
or active divider circuit (studies under way)
27/6/05 Frascati 6
What is needed
If NEW beam (Aug 05) I need 1. X,Y beam profiles at TOF0 as rates/cm2
(Hz/cm2) 2. A table with rates/cm2 x,y with step of 1
cm2
To decide the geometrical size of TOF0
( present dimensions 48 x 4 x 2.5 cm3
for 12 counters/plane)
27/6/05 Frascati 7
B field
current assumption for TOF0, validated recently by a mail by Kevin, B is well below 50 gauss I need the B field components along the PMT axis and orthogonal to the PMT axis
27/6/05 Frascati 8
For TOF1/TOF2 more relaxed schedule
presently we are testing fine-mesh PMTs at LASA what is needed is: B field components along/
perpendicular to PMT axis at TOF1/TOF2
X,Y beam profile (rate/cm2) at TOF1/TOF2