tof status m. bonesini sezione infn milano bicocca

14
M. Bonesini - VC 18-12-08 1 TOF status M. Bonesini Sezione INFN Milano Bicocca

Upload: emmly

Post on 18-Jan-2016

35 views

Category:

Documents


0 download

DESCRIPTION

TOF status M. Bonesini Sezione INFN Milano Bicocca. TOF0 INSTALLATION. Installation in final position inside DSA. Preliminary installation before Q7 (July 08). - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: TOF status M. Bonesini Sezione INFN Milano Bicocca

M. Bonesini - VC 18-12-08 1

TOF status

M. BonesiniSezione INFN Milano Bicocca

Page 2: TOF status M. Bonesini Sezione INFN Milano Bicocca

TOF0TOF0 INSTALLATIONINSTALLATION

M. Bonesini - VC 18-12-08 2

Preliminary installation before Q7 (July 08)

Installation in final position inside DSA

Page 3: TOF status M. Bonesini Sezione INFN Milano Bicocca

M. Bonesini - VC 18-12-08 3

During data taking: one broken PMT (channel # 28, it was one of 3 discharging ones as discovered from preliminary tests at RAL after transport in June). It will be changed next weekend

Page 4: TOF status M. Bonesini Sezione INFN Milano Bicocca

TOF1 installation TOF1 installation

M. Bonesini - VC 18-12-08 4

• installation 9-12/12 • some data taken in two short evening runs• more data needed • installation went smoothly also thanks to the help of many people (DL team, Andy, Willy, …)

Page 5: TOF status M. Bonesini Sezione INFN Milano Bicocca

Waiting for “GODOT” (alias the Waiting for “GODOT” (alias the beam)beam)

• clearly with an “electron”, “pion” beam only a limited limited detector debug may be done:

• rate effects on PMTs will not show up• …

but still useful if AT LEAST we may study as complete as possible detectors: it means all detector channels read-out by DAQ

5M. Bonesini - VC 18-12-08

Page 6: TOF status M. Bonesini Sezione INFN Milano Bicocca

Some DAQ numerology Some DAQ numerology

• aim aim readout TOF0,TOF1, KL + 2 taggers behind KL • it means 40 ch for TOF0, 28 for TOF1, 42 for KL, 4 for taggers • we have enough TDC channels (3 boards: 2 Rm3, 1 MIB) • we have 14 FADC boards delivered to MICE delivered to MICE from RM3 (of which at least 12 installed at RAL)• proposal:• 5 boards TOF0• 5 boards KL (we do not equip the 2 upper PMTs)• 4 boards TOF1 + taggers

All this will put clearly some stress on the All this will put clearly some stress on the DAQ teamDAQ team

6M. Bonesini - VC 18-12-08

Page 7: TOF status M. Bonesini Sezione INFN Milano Bicocca

TOF requirements for next run TOF requirements for next run

Instead of many runs, 2 high statistics run : one with pions and one with electrons

7M. Bonesini - VC 18-12-08

Page 8: TOF status M. Bonesini Sezione INFN Milano Bicocca

Analysis effort Analysis effort

Mark and Yordan are looking to last weekend runs, but some problems are hanging around (decoding, …). But some good news: we may read the data and have plots. Some very preliminary plots from Mark in the following.

8M. Bonesini - VC 18-12-08

Page 9: TOF status M. Bonesini Sezione INFN Milano Bicocca

Cable length calibration of TOF0Cable length calibration of TOF0//11(verbatim from Mark’s slides)

• Goal: 0th order calibration of the PMTs within a plane relative to each other• Method: determine a TDC for each PMT• Event selection:

– Single space point– Passes through reference slab

• Conditions for all the slabs in a plane:

– Make <TDC1 – TDC0> the same• Constrains TDC1 – TDC0

– Make <tslab being calibrated – treference slab> the same• Constrains TDC1 + TDC0

• Next:– Improve statistics, especially in the outer slabs– Consider an FADC cut– Use e+ to calibrate the 4 planes of TOF0 and TOF1 relative to each other– Add an initial time-walk correction (large signals pass the discriminator sooner)

• Incorporated in G4MICE application TofCalibration

Reference slab

B1 B0

t1

t0

M. Rayner VC 18/12/08

Page 10: TOF status M. Bonesini Sezione INFN Milano Bicocca

slab

M. Rayner VC 18/12/08

Before calibrationBefore calibration:Deducing the TDC

Data: 844.000, 844.001, 845.000, 845.001

Number of events, N

Number of events, N

Mean after N

<TDC>–<TDC>ref

TDC1–TDC0

slab

Mean after N

slab

Mean and error on the mean

Mean and error on the mean

Constraining TDC1–TDC0…

Constraining TDC1+TDC0…

Page 11: TOF status M. Bonesini Sezione INFN Milano Bicocca

M. Rayner VC 18/12/08

After calibration:After calibration:Checking the calibration works

Data: 845.002, 847.000, 847.001

Number of events, N

Number of events, N

Mean after N

<TDC>–<TDC>ref

TDC1–TDC0

slab

Mean after N

slab

Mean and error on the mean

Mean and error on the mean

Constraining TDC1–TDC0…

Constraining TDC1+TDC0…

Page 12: TOF status M. Bonesini Sezione INFN Milano Bicocca

TOF2 statusTOF2 status

M. Bonesini - VC 18-12-08 12

1. TOF2 counters assembled, but not still wrapped out

2. TOF2 PMTs under repair at Hamamatsu: delivery expected by mid January 09

3. ARMCO steel for local PMTs shielding procured at CERN and now in house

4. final design of KL+TOF2 trolley under way5. final design of TOF2 mechanics + local shielding

done

Page 13: TOF status M. Bonesini Sezione INFN Milano Bicocca

M. Bonesini - VC 18-12-08 13

CAD drawing of TOF2 mechanics + CAD drawing of TOF2 mechanics + shielding shielding

Page 14: TOF status M. Bonesini Sezione INFN Milano Bicocca

M. Bonesini - VC 18-12-08 14

ConclusionsConclusions

TOF0 installed since June 2008 TOF1 installed since December 2008 performances seem compatible with what obtained at BTF (no time walk correction possible) TOF2 will follow soon