28.01.2013 projektinfo ferrari hannover en - bohle-gruppe€¦ · heinz mänz ausbau gmbh, a bohle...

4
Project Information Ferrari Store, Hannover Expo Grounds Heinz Mänz Ausbau GmbH also competed for the Rigips Trophy with this project in 2011. Heinz Mänz Ausbau GmbH, a Bohle Group company, achieved second place in the Rigips Trophy 2011 with the Pavilion Hafenspitze project in Düsseldorf. This plasterboard construction project is flooded with natural light and demanded the highest standards of workmanship. A combination of curved, yet exactly straight lines demarcate the supporting elements, which are arranged like a sculpture as supports for showcases, transparent coverings and specially fabricated fittings, such as lighting components, etc. This delivered high-ceilinged rooms replete with glass and stainless steel, in combination with various types and sizes of plasterboard cladding. A sophisticated setting was formed – full of minimalist details, it is ideal for presenting the premium Ferrari brand. One of the many highlights is the plasterboard-based staircase design; this consists of rounded, freely terminating balustrade elements that accompany the steps as they rise into clear heights. Walls and wall coverings contain rounded, linear niches that flow around corners or terminate freely.

Upload: others

Post on 22-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 28.01.2013 Projektinfo Ferrari Hannover EN - Bohle-Gruppe€¦ · Heinz Mänz Ausbau GmbH, a Bohle Group company, achieved second place in the Rigips Trophy 2011 with the Pavilion

Project Information

Ferrari Store, Hannover Expo Grounds

Heinz Mänz Ausbau GmbH also competed for the Rigips Trophy with

this project in 2011. Heinz Mänz Ausbau GmbH, a Bohle Group company, achieved second place in

the Rigips Trophy 2011 with the Pavilion Hafenspitze project in Düsseldorf.

This plasterboard construction project is flooded with natural light and demanded the

highest standards of workmanship.

A combination of curved, yet exactly straight lines demarcate the supporting elements,

which are arranged like a sculpture as supports for showcases, transparent coverings

and specially fabricated fittings, such as lighting components, etc.

This delivered high-ceilinged rooms replete with glass and stainless steel, in combination

with various types and sizes of plasterboard cladding. A sophisticated setting was formed

– full of minimalist details, it is ideal for presenting the premium Ferrari brand.

One of the many highlights is the plasterboard-based staircase design; this consists of

rounded, freely terminating balustrade elements that accompany the steps as they rise

into clear heights. Walls and wall coverings contain rounded, linear niches that flow

around corners or terminate freely.

Page 2: 28.01.2013 Projektinfo Ferrari Hannover EN - Bohle-Gruppe€¦ · Heinz Mänz Ausbau GmbH, a Bohle Group company, achieved second place in the Rigips Trophy 2011 with the Pavilion

All of this comes together to form an attractive construction project in which the

necessary restraint was exercised in all details and aspects in order to

showcase the “Ferrari” product.

Page 3: 28.01.2013 Projektinfo Ferrari Hannover EN - Bohle-Gruppe€¦ · Heinz Mänz Ausbau GmbH, a Bohle Group company, achieved second place in the Rigips Trophy 2011 with the Pavilion
Page 4: 28.01.2013 Projektinfo Ferrari Hannover EN - Bohle-Gruppe€¦ · Heinz Mänz Ausbau GmbH, a Bohle Group company, achieved second place in the Rigips Trophy 2011 with the Pavilion