29.00 vaults, general 29.01 vault access, ladder, sump
TRANSCRIPT
FIXED LADDER FOR VAULTS ALL ALUMINUM
10' X 15' AND 10' X 21' TRAFFIC RATED PRECAST VAULTS (STEEL DETAILS)10' X 15' AND 10' X 21' TRAFFIC RATED PRECAST VAULTS (CONCRETE DETAILS)
TRANSFORMER TRANSCLOSURE CABINETSTYPICAL TRANSCLOSURE INSTALLATIONFERRORESONANCE PREVENTIONFLOATING WYE - DELTA CUSTOMER SUPPLIED OUTDOOR ABOVE GROUND VAULTFLOATING WYE - DELTA VAULT LAYOUT (1500 KVA MAX)GROUNDING FOR GROUNDED WYE - GROUNDED WYE BANK WITH DEAD TOP
LARGE TWO TRANSFORMER VAULT 5000 KVA MAXVAULT SECONDARY BUS
FUSE CABINET, WALL MOUNTED TYPE, 200 AMPERE - THREE-PHASE (FMO)
VACUUM SWITCH GROUNDING - FAULT INDICATORS AND REMOTE OPERATORSKEARNEY VACUUM SWITCHES SUBMERSIBLE, VAULT TYPE
AUTOMATIC TRANSFER SCHEMESVAULT AUTO TRANSFER SCHEME
TRANSFORMERS (VAULT OR TRANSCLOSURE INSTALLATION)
29.05-0129.05-03
29.06-0129.06-03
29.01-05
29.03-1129.03-1329.03-15
29.04-09
29.02-0329.02-05
29.03-0129.03-0329.03-0529.03-0729.03-09
SECTION 29 - NETWORK, VAULTSAND TRANSCLOSURESTABLE OF CONTENTSELKINS11/17/10 CECCONI GUINN
LOADBREAK THREE-WAY JUNCTION - WALL MOUNTED 29.08-01
0
3
2
1
APPR.REVISED BY CK'D
THREE-PHASE VAULT TRANSFORMERS DIMENSIONS 29.09-03VAULT TRANSFORMER SECONDARY BUSHING SUPPORT 29.09-05
COOPER - CURRENT LIMITING SUBMERSIBLE FUSE DIMENSIONS (REPLACEMENT)COOPER - CURRENT LIMITING SUBMERSIBLE FUSE DIMENSIONS (REPLACEMENT)
29.04-12B29.04-12A
THREE-PHASE VAULT TRANSFORMERS 29.09-01
G&W - CURRENT LIMITING SUBMERSIBLE FUSE - APPLICATIONS (FMO)G&W - CURRENT LIMITING SUBMERSIBLE FUSE DIMENSIONS (FMO)
29.04-12D29.04-12C
GENERAL REQUIRMENTS FOR VAULT ROOMSGENERAL REQUIRMENTS FOR VAULT ROOMS
29.00-01A29.00-01B
GENERAL REQUIRMENTS FOR VAULT ROOMS 29.00-01C
ELKINS2/22/11 CECCONI BURLISON
FOR MAINTENANCE ONLY DRAWINGS
THE FOR MAINTENANCE ONLY DRAWINGS LISTED BELOW ARE NOT CONTAINED
IN THE PRINTED SPEC BOOK, BUT ARE AVAILABLE ONLINE
29.09 VAULT TRANSFORMERS
29.08 VAULT AND ENCLOSURE PRIMARY JUNCTIONS
29.06 SOURCE TRANSFER SCHEMES
29.05 VAULT SWITCHES
29.04 VAULT AND ENCLOSURE FUSING
29.03 TRANSCLOSURES AND VAULT LAYOUTS
29.01 VAULT ACCESS, LADDER, SUMP PUMP AND CONTROL
29.00 VAULTS, GENERAL
29.02 MANUFACTURED VAULTS
ADCOCK10/25/12 KATIGBAK GUINN
VAULT LIGHTING KITS (FMO) 29.01-01
ELECTRICAL SCHEMATIC FOR VAULT 29.01-09OIL MINDER SYSTEM 29.01-11STANCOR OIL MINDER SYSTEM CONTROLLER 29.01-13
ADCOCK9/4/14 KATIGBAK GUINN
29.00-00A
DEFDEP
X
DEMDEC
A TRANSFORMER VAULT IS AN ENCLOSED COMPARTMENT WITHIN A BUILDING OR BELOW GROUND LEVEL ESPECIALLY DESIGNED FOR THE TYPE TRANSFORMERS SPECIFIED BY THE COMPANY.
A TRANSFORMER ENCLOSURE IS A SPECIAL COMPARTMENT SUITABLE FOR INSTALLING COMPANY'S STANDARDTRANSFORMERS. SUCH ENCLOSURE MAY UTILIZE THE CUSTOMER'S BUILDING WALL(S) AS ONE OR MORE SIDESOF THE ENCLOSURE.
ALL ENCLOSURES MUST HAVE A REMOVABLE COVER APPROVED BY THE ENGINEER EXCEPT THOSE LOCATED INISOLATED OR PROTECTED AREAS WHERE, IN THE WRITTEN OPINION OF THE ENGINEER, THERE IS NO REASONABLY FORESEEABLE DANGER OF ACCESS BY MINORS, WORKMEN AND OTHER MEMBERS OF THE PUBLIC.
ONLY AUTHORIZED COMPANY PERSONNEL SHALL HAVE ACCESS TO TRANSFORMER VAULTS OR ENCLOSURESAND ALL ENTRY DOORS SHALL BE KEPT LOCKED UNLESS ATTENDED.
DWG.
29.00-01A11/9/10 GUINN GUINN ELKINS
GENERAL REQUIREMENTS FOR VAULT ROOMS R
0
3
2
1
APPR.REVISED BY CK'D
FERRORESONANCE
FERRORESONANCE IS POSSIBLE WITH UNDERGROUND CABLES AND SINGLE-PHASE SWITCHES FEEDING A DELTAPRIMARY TRANSFORMER BANK OR A FLOATING-WYE TO DELTA TRANSFORMER BANK. THE PREFERRED METHODTO PREVENT THE POSSIBILITY OF FERRORESONANCE IN VAULTS IS TO USE A GANGED SWITCH TO ENERGIZE ORDE-ENERGIZE THE TRANSFORMER BANK. IF THE BANK IS A FLOATING-WYE TO DELTA TRANSFORMER BANK AND ONLY SINGLE-PHASE SWITCHING IS AVAILABLE, FERRORESONANCE CAN BE PREVENTED BY TEMPORARILY
FERRORESONANCE PREVENTION.GROUNDING THE NEUTRAL BEFORE ENERGIZING THE BANK. SEE DWG. 29.03-05 FOR MORE INFORMATION ON
GENERAL
TRANSFORMERS
IT IS THE CUSTOMER'S RESPONSIBILITY TO PROVIDE A TRANSFORMER LOCATION OUTSIDE OF THE BUILDING THAT ALLOWS US TO USE OUR STANDARD MINERAL OIL FILLED TRANSFORMERS AND STANDARD FUSING METHODS. IF THIS IS NOT POSSIBLE, PROGRESS ENERGY WILL INSTALL TRANSFORMERS, SWITCHES ANDFUSES INSIDE A BUILDING IN A CUSTOMER SUPPLIED VAULT THAT IS IN COMPLIANCE WITH NEC ARTICLE 450.THIS ARTICLE STATES THAT UNDER CERTAIN CONDITIONS, MINERAL OIL TRANSFORMERS CAN BE INSTALLEDINSIDE BUILDINGS. HOWEVER, TO AVOID CONFUSION AND TO KEEP PROGRESS ENERGY FROM HAVING TO MONITOR CONTINUED COMPLIANCE WITH THESE CONDITIONS, ALL VAULTS WITHIN A BUILDING WILL BE EQUIPPED WITH TRANSFORMERS USING A LESS FLAMMABLE DIELECTRIC. IN ADDITION THE TRANSFORMER(S) WILL BE FUSED WITH CURRENT LIMITING FUSES. AS MENTIONED IN THE FUSE SECTION ABOVE. THIS CURRENTLIMITING FUSE (CL) REDUCES THE FAULT CURRENT AVAILABLE WITHIN THE TRANSFORMER TANK. THE LESSFLAMMABLE DIELECTRIC, COOPER "FR3", RAISES THE FIRE POINT OF THE TRANSFORMER DIELECTRIC TO ABOVE300° C. THIS COMBINATION GREATLY REDUCES THE CHANCE OF CATASTROPHIC FAILURE DURING A PRIMARY
FAULT IN THE TRANSFORMER.
SPECIAL THREE-PHASE VAULT TRANSFORMERS ARE AVAILABLE. THESE TRANSFORMERS ARE STAINLESS STEEL UNITS AND ARE FILLED WITH LESS-FLAMMABLE FLUID. THEY ARE ALSO FULLY RATED FOR OPERATION IN A 50°C
FOR VAULT TRANSFORMER BANKS CONSISTING OF BANKED SINGLE-PHASE UNITS, STANDARD SINGLE-PHASEDOUBLE BUSHING TRANSFORMERS CAN BE USED PROVIDING THEY ARE MODIFIED. USE A STANDARD STAINLESS STEEL UNIT WHEN AVAILABLE. THESE UNITS SHOULD BE DRAINED AND FLUSHED OF THE EXISTING MINERAL OILAND FILLED WITH A LESS-FLAMMABLE FLUID SUCH AS FR3. ARRANGEMENTS SHOULD BE MADE WITH THETRANSFORMER SHOP TO HAVE THIS DONE. THE TRANSFORMERS SHOULD ALSO BE CONVERTED FROM LIVEBUSHINGS TO BUSHING WELLS IN THE TRANSFORMER SHOP. THE TRANSFORMERS SHOULD BE DERATED FOROPERATION IN THE HIGHER AMBIENT TEMPERATURE CONDITIONS BY 1.5% FOR EACH 1°C ABOVE A 30°C
AMBIENT.
FUSES
FOR AVAILABLE FUSES. FULL RANGE CURRENT LIMITING FUSES ARE ALSO AVAILABLE FOR FUSING
AMBIENT ENVIRONMENT.
TRANSFORMERS IN VAULTS WHEN THE FUSE IS OUTSIDE THE VAULT. CONTACT DISTRIBUTION STANDARDS FORADDITIONAL INFORMATION.
TRANSFORMER LOCATION
FULL RANGE CURRENT LIMITING SUBMERSIBLE FUSES ARE AVAILABLE FOR USE IN VAULTS. SEE SECTION 29.04
DWG.
29.00-01B
GENERAL REQUIREMENTS FOR VAULT ROOMS R
0
3
2
1
APPR.REVISED BY CK'D
11/9/10 GUINN GUINN ELKINS
DESIGN
VAULT SPECIFICATIONS AND REQUIREMENTS SHALL BE PROVIDED TO THE CUSTOMER BY PROGRESS ENERGYENGINEERING REPRESENTATIVE. CUSTOMER MUST FURNISH DETAILED DRAWINGS FOR REVIEW AND APPROVAL
THE ROOM'S INSIDE DIMENSIONS ARE TO BE A MINIMUM OF 20' LENGTH X 14' WIDTH X 10' HEIGHT. THELENGTH WILL BE REQUIRED TO BE MORE THAN 20' IF MORE THAN ONE TRANSFORMER IS REQUIRED.
ONLY EQUIPMENT OWNED BY PROGRESS ENERGY WILL BE ALLOWED INSIDE THE VAULT ROOM.
VAULT ROOM MUST MEET ALL THE REQUIREMENTS OF NEC 450 SECTION III, TRANSFORMER VAULTS, INCLUDINGTHE CONSTRUCTION OF WALLS, ROOFS AND FLOORS, DOORWAYS, VENTILATION, DRAINAGE, ETC.
THE VAULT ROOM MUST REMAIN READILY ACCESSIBLE TO PROGRESS ENERGY OR PROGRESS ENERGYCONTRACTOR LINE AND SERVICE VEHICLES AT ALL TIMES.
THE AREA IN FRONT OF THE ENTRANCE FOR A GROUND LEVEL VAULT MUST BE LEVEL PAVEMENT OR CONCRETEIN ORDER TO ALLOW EQUIPMENT TO BE EASILY ROLLED UP TO THE DOOR. THERE SHALL NO OBSTRUCTIONS TO
ROOM SHALL BE ILLUMINATED WITH LIGHT FIXTURES APPROVED BY PROGRESS ENERGY AND AT LOCATIONSSPECIFIED BY PROGRESS ENERGY. THE LIGHT SWITCH LOCATION SHALL BE AS SPECIFIED BY PROGRESSENERGY. THE LIGHTING SHALL BE INSTALLED PER NEC REQUIREMENTS AND SERVED BY CUSTOMER'S
ACCEPTANCE PRIOR TO PROGRESS ENERGY INSTALLING FACILITIES
PROGRESS ENERGY ENGINEERING AND LINE AND SERVICE ARE TO HAVE A FINAL INSPECTION FOR COMPLIANCEPRIOR TO FINAL ACCEPTANCE.
PROGRESS ENERGY LINE AND SERVICE WILL REQUIRE A MINIMUM OF THREE WEEKS TO COMPLETE THEEQUIPMENT INSTALLATION AFTER FINAL ACCEPTANCE BY PROGRESS ENERGY.
VAULT IS TO BE CLEANED OF DIRT, MUD, AND DEBRIS PRIOR TO PROGRESS ENERGY ACCEPTANCE.
METERING
CUSTOMER TO PROVIDE A METERING ROOM FOR ALL ELECTRICAL METERS. CUSTOMER IS TO PROVIDE ACCESS TO THE METER ROOM FOR PROGRESS ENERGY OR PROGRESS ENERGY CONTRACTOR PERSONNEL FORMAINTENANCE OR METER READING. ALL METERS ARE TO BE INSTALLED PER PROGRESS ENERGY AND NECSPECIFICATIONS AND MUST BE CLEAR OF OBSTRUCTIONS WITH SAFE ACCESS FOR MAINTENANCE OR METERREADING. SITE SPECIFIC METERING ISSUES TO BE DETERMINED BY PROGRESS ENERGY ENGINEER ANDCUSTOMER ENGINEER.
WALLS
WALLS TO BE CONSTRUCTED OF SOLID MASONRY AND IN SUCH A WAY THAT CLIMBING IS NOT POSSIBLE. ALLWALLS MUST MEET APPLICABLE BUILDING AND FIRE CODES.
WALLS SHALL BE CAPABLE OF WITHSTANDING A RADIAL FORCE EQUAL OR GREATER THAN THE STRENGTH OF THE PULLING EYES.
THE HEIGHT OF THE INTERIOR SHALL BE A MINIMUM OF 12 FEET FROM THE FLOOR TO THE BOTTOM OF THECEILING SUPPORT BEAMS.
CUSTOMER IS TO PROVIDE CONDUIT KNOCKOUT-TYPE OPENINGS OR PVC SLEEVES IN THE ROOM'S FLOOR TOPROVIDE ACCESS FOR PROGRESS ENERGY CABLES ENTRANCES. ALL CABLE ENTRANCES SHALL BE COORDINATEDWITH THE PROGRESS ENERGY ENGINEER.
PULLING EYES
THERE ARE TO BE A MINIMUM OF THREE PULLING EYES IN THE BACK WALLS EQUALLY SPACED ALONG THE WALLS.THERE ARE TO BE A MINIMUM OF TWO PULLING EYES IN THE END WALLS EQUALLY SPACED ALONG THE WALLS.THE PULLING EYES ARE TO BE INSTALLED APPROXIMATELY 6" - 18" ABOVE THE FLOOR. THE PULLING EYES SHALLHAVE A MINIMUM TENSILE STRENGTH OF 15,000 POUNDS. THE CUSTOMER WILL SUPPLY THE WALL MOUNTING HARDWARE TO SECURE THE PULLING EYES IN PLACE.
PRIOR TO CONSTRUCTION.
THE ENTRANCE OF A GROUND LEVEL VAULT AND NO OVERHANGS ABOVE A BELOW GROUND VAULT.
ELECTRICAL PANEL. IF AN EMERGENCY GENERATOR PANEL EXISTS, THE LIGHTS SHALL BE SERVED BY THEEMERGENCY PANEL.
DWG.
29.00-01C
GENERAL REQUIREMENTS FOR VAULT ROOMS R
0
3
2
1
APPR.REVISED BY CK'D
11/9/10 GUINN GUINN ELKINS
CONDUIT FOR PRIMARY SECONDARY AND METERING CONDUCTORS
THE NUMBER AND SIZE OF PRIMARY, SECONDARY AND METERING CONDUITS INTO THE VAULT AND THEIR EXACTLOCATION SHALL BE NEGOTIATED WITH CUSTOMER AND AGREED UPON WITH COMPANY ENGINEER.
FLOORS
FLOOR TO BE CONCRETE WITH SUFFICIENT STRUCTURAL STRENGTH TO SUPPORT A MINIMUM EQUIPMENTWEIGHT OF 16000 POUNDS DISTRIBUTED OVER A FOOTPRINT OF 69" X 40".
THE FLOORS MUST HAVE A 4" PVC CONDUIT SLEEVE IN EACH CORNER OF THE VAULT TO ALLOW PROGRESSENERGY TO INSTALL GROUND RODS. THE SLEEVES MUST EXTEND THROUGH THE FLOOR TO THE GROUND BELOW.THE SLEEVES ARE TO BE LOCATED APPROXIMATELY 12" FROM THE WALLS.
THE FLOOR, AT ANY ENTRANCE, MUST HAVE A SILL THAT IS A MINIMUM HEIGHT OF 4 INCHES TO ENSURE ANYOIL SPILL IS CONTAINED WITHIN VAULT ROOM.
DOOR
THE DOOR, WHEN INSTALLED, MUST HAVE A MINIMUM HORIZONTAL OPENING OF 8 FOOT AND MEET ANYAPPLICABLE NEC, BUILDING, OR FIRE CODES.
THE DOOR MUST BE ACCESSIBLE BY PROGRESS ENERGY PERSONNEL ONLY.
THE DOOR MUST NOT OPEN INTO THE VAULT ROOM.
THE DOOR'S HEIGHT ABOVE THE SILL SHALL BE A MINIMUM OF 8'.
CUSTOMER'S ELECTRICAL CONDUCTORS
CUSTOMER IS TO PROVIDE ELECTRICAL CABLES IN THE VAULT. ENTRANCE LOCATIONS ARE TO BE APPROVED BYTHE PROGRESS ENERGY ENGINEERING REPRESENTATIVE PRIOR TO CONSTRUCTION. RIGID BUS DUCT IS
ALL CIRCUITS, PHASE CABLES, AND NEUTRAL CABLES SHALL BE CLEARLY MARKED TO MEET THE REQUIREMENTSOF THE NEC.
POINT OF DELIVERY
THE POINT OF DELIVERY WILL BE WHERE THE CUSTOMER'S CONDUCTORS OR BUS CONNECT TO THE PROGRESSENERGY SECONDARY CONDUCTORS.
GROUNDING
CUSTOMER SHALL PROVIDE SUFFICIENT GROUNDING CONNECTION AVAILABLE TO COMPANY FOR GROUNDINGCOMPANY EQUIPMENT. THIS SHALL BE CONDUIT SLEEVE(S) FOR INSTALLING GROUND RODS TO EARTH BELOW,OR A COPPER CONNECTION TO BUILDING STEEL. COPPER CONNECTION PROVIDED BY CUSTOMER TO BUILDINGSTEEL SHALL BE A MINIMUM #3/0 COPPER. IF BUILDING STEEL IS USED, THE AUTHORITY HAVING JURISDICTION (ELECTRICAL INSPECTOR) SHALL INSPECT AND APPROVE THE METHOD OF CONNECTION.
SECONDARY CONDUCTORS
THE MAXIMUM ALLOWED NUMBER OF CONDUCTORS SHALL BE 14, SIZE 750 KCMIL CU OR AL MAXIMUM. SMALLERSIZES ARE ACCEPTABLE AS LONG AS THE NUMBER IS 14 OR LESS.
ACCEPTABLE AND IF PROVIDED, PROGRESS ENERGY WILL MAKE SECONDARY CONNECTION FROM THE SUPPLYTRANSFORMER TO THE RIGID BUS DUCT AND THE POINT OF CONNECTION SHALL BE THE POINT OF DELIVERY.
ENTRY DOORS SHALL HAVE A STURDY HASP SUITABLE FOR COMPANY'S STANDARD LOCK OR LOCK TUMBLERS
LOCK TUMBLERS SHALL BE READILY OPENED FROM THE INSIDE WITHOUT A KEY.
COMPANY'S STANDARD "DANGER HIGH VOLTAGE" SIGN SHALL BE AFFIXED TO THE OUTSIDE OF ALL ENTRYDOORS OF TRANSFORMER VAULTS INSIDE OF BUILDINGS AND OF TRANSFORMER ENCLOSURES. THIS SIGN
WITHIN THE DOOR TO ACCOMMODATE COMPANY'S STANDARD KEY. SELF-LOCKING DOORS AND DOORS WITH
SHOULD BE SECURELY AFFIXED AND MAINTAINED AT A PLACE EASILY SEEN.
DWG.
29.01-0510/21/10 DANNA GUINN ELKINS
FIXED LADDER FOR VAULTS
ALL ALUMINUMRR
0
3
2
1
APPR.REVISED BY CK'D
MOUNTING HEIGHTTHE LADDER TO ADJUST THE
LEADANCHORS
1/2" DIA. SSBOLT, WASHERAND NUT
24" X 30" MINIMUM ACCESS DOOROPENING WITH LADDER TOP IN PLACE
ACCESS DOOR CLOSED WITHTOP SECTION OF LADDER STORED
MOUNT LADDER AFTER THE ACCESSDOOR PANEL HAS BEEN SET
NOTES:
1. THIS IS A NON-STOCK STANDARD ITEM FOR NEW OR EXISTING VAULTS.
2. ALLOW 8 WEEKS FOR DELIVERY.
THE LADDER IS SHOWN IN A TYPICAL PRECAST VAULT.SPECIFY THE EXACT LENGTH NEEDED WHEN ORDERING.
3. GROUND LADDER TO VAULT GROUNDING GRID.
CN 54051800
VAULTPRECAST
APPROX 12'
10" TYP.
24-1/8"
17"
(BY OTHERS)(BY OTHERS)
17"
24-1/8"
10" TYP.
APPROX 12'PRECASTVAULT
CU LDRVLTCCN 54051800
SPECIFY THE EXACT LENGTH NEEDED WHEN ORDERING.THE LADDER IS SHOWN IN A TYPICAL PRECAST VAULT.
2. ALLOW 8 WEEKS FOR DELIVERY.
1. THIS IS A NON-STOCK STANDARD ITEM FOR NEW OR EXISTING VAULTS.
NOTES:
DOOR PANEL HAS BEEN SETMOUNT LADDER AFTER THE ACCESS
TOP SECTION OF LADDER STOREDACCESS DOOR CLOSED WITH
OPENING WITH LADDER TOP IN PLACE24" X 30" MINIMUM ACCESS DOOR
AND NUTBOLT, WASHER1/2" DIA. SS
ANCHORSLEAD
SIDE VIEW
FRONT VIEW
TOPSECTION
SECTIONBOTTOM
MOUNT THE FIXED SECTION OF THE LADDER 13" BELOW THE TOP OF THE ACCESS PANEL
CUT FROM THE BOTTOM OF
BRACKETSWALL MOUNT
OPENINGCLEARS THE DOORSO THE TOP SECTIONMOUNT BRACKETS ADJUST THE WALL
13"
STREET LEVELSIDEWALK OR
15/16"
10"
4. ENGINEER MUST SPECIFY HATCH TYPE ON ACCESS DOOR WITH RECESS LOCK BOX.
SENSOR
NOTES:
1. GROUND ALL METAL PARTS (SUMP, LIGHTS, AND PANEL).
SUMP
CONTROLLER; SEE
ELECTRICAL SCHEMATIC FOR VAULT0
3
2
1
APPR.REVISED BY CK'D
FOR DETAILDWG. 29.01-13
CONNECT TO 120 VOLT
WHITE WIRE TO SYSTEM NEUTRAL
TO FUSE HOLDERBLACK WIRE
VAULT GROUNDGREEN WIRE TO
SOURCE ONLY
LOAD SIDE
CN 11130101, FUSE HOLDER
CN 21143102 30 AMP FUSE
29.01-09
DEF
X
DEPDEMDEC
7/14/14 GUINN GUINN ADCOCK
7/14/14 GUINN GUINN ADCOCK
OIL MINDER SYSTEM0
3
2
1
APPR.REVISED BY CK'D
1/2 HP PUMP
CN 54052006
NOTES:
1. USE PUMP WITH STANCOR OIL MINDER CONTROLLER. SEE
FLOAT OFF LEVEL4 1/4" FROM BASEPLATE
PROBE TIP 2 1/2"FROM BASEPLATE
2. OIL-MINDER PROBE TIP MUST BE BELOW FLOAT OFF LEVEL. ADJUST FLOAT ACCORDINGLY.
TO OIL MINDER CONTROLLER
CU SUMPPUMPC
29.01-11
DEFDEP
X
DEMDEC
3. INSTALL PUMP CONTROL AS HIGH ON THE VAULT WALL AS THE LIQUID LEVEL CABLES WILL ALLOW.
4. USE CAROLINAS STOCK 2" SCH 40 PVC FOR DISCHARGE PIPE. IF THE SUMP IS SMALL ENOUGH THAT HEADWATER DRAINING BACK INTO SUMP AFTER THE PUMP CUTS OFF CAUSES THE PUMP TO CYCLE, INSTALL A 2" TO3" ADAPTER AND A 3" ONE WAY FLUSH VALVE IN THE DISCHARGE PIPE. THIS SHOULD BE PURCHASED FROM A
5. IF HEAD IS GREATER THAN 20 FEET, A LARGER PUMP WILL BE NECESSARY. CONTACT DISTRIBUTIONS STANDARDS.
8. PUMP CONTROL IS WATER TIGHT BUT NOT SUBMERSIBLE.
LOCAL PLUMBING SUPPLY OUTLET.
6. CABLES FOR OIL SENSOR AND PUMP SWITCH COME WITH THE CONTROL. 20 FEET OF CABLE COMES WITH PUMP.3 WIRE SOURCE VOLTAGE CABLE MUST BE SUPPLIED. 3#10 IS ADEQUATE.
7. MINIMUM BASIN DIAMETER IS 24 INCHES.
CAPACITY TABLE FOR STANDARD 1/2 H.P. PUMP
HEAD IN FEET
GALLONS PER MINUTE (GPM)
10'
122
15'
90
20'
50
SHUT-OFF
26'
STANCOR OIL MINDER SYSTEM CONTROLLER7/14/14 GUINN GUINN ADCOCK0
3
2
1
APPR.REVISED BY CK'D
OIL MINDER CONTROL BOXCU CNTRLSPUMPC
POWER
OIL FAULT
HIGH LEVEL
OVERLOAD
PUMP RUN
115 VAC
L1 N P1(N) P2(L)
RMS RELAY10 AMPS @ 240 VAC
F4F3F2F1OIL
PROBE
ONFLOAT
HIGH ALARMFLOAT
SETTINGS
OVERLOADAMPS
SENSOR
1 10
75
3
5 15
1310
7
STANCOR515 FAN HILL RD.
MONROE, CT 06468www.stancorpumps.comOIL MINDER II CONTROL
PATENTS: 2,752,188; 4,715,785; 6,203,281MADE IN USA
BLK
WHT GR
POWERSUPPLY
GR
WHT BLK
BLK
WHT
WHT
POWER POWER PROBE FLOATTO
PUMP
10 FT. PIGTAILINCLUDED
RESET
SILENCE
CN 54041404
29.01-13
DEFDEP
X
DEMDEC
HIGH HEELGRATINGAPPROX.
PER PANELCLEAR OPENING
OPENINGCLEAR PER PANEL
APPROX.GRATINGSTANDARD
1800 IN.2SOLID CONCRETEPANEL WEIGHT 2380 LBS.
BRICK PAVER PANELMUST BE FILLED AT JOBSITETO MATCHSIDEWALK
THE CROSS BRACES ARE ONLYUSED IF THE VAULT IS LOCATEDIN THE STREET OR IS SUBJECTEDTO CONTINUOUS TRAFFIC.
THE VAULTS ARE HS20-44TRAFFIC RATED (THIS IS STREET RATED)
IF THE VAULT TOP NEEDS TO BE RAISED FOR PAVING
2. REMOVE THE TOP PANELS AND THE SUPPORT STEEL AND PUT SHIMS IN THE BEAM POCKETS THE SAME THICKNESS AS THE COLLAR IN STEP 1.
3. WELD SHIMS TO THE END ANGLETHE SAME THICKNESS AS THECOLLAR IN STEP 1.
4. REPLACE THE SUPPORT STEEL AND THE PANELS.
THE CROSS BRACES CAN BE LEFTOFF IF THE VAULT IS ONLY SUBJECTEDTO INCIDENTAL TRAFFIC (SIDEWALK INSTALLATIONS)
BEAM POCKETSEE NOTE 2
SEE NOTE 1
SEE NOTE 2
15' VAULT SHOWN21' VAULT HAS 2 MORE PANELS
SEENOTE 5
SEE NOTE 6
SEENOTE 7
SEENOTE 8
SEENOTE 9
1. WELD A COLLAR SHIM AROUND THE TOP TO THE EDGE ANGLE.
THE VAULTS ARE NON-STOCKSTANDARD ALLOW 6 MONTHSDELIVERY TIME
ALL TOP PANELSARE INTERCHANGEABLEBETWEEN THE 15'AND THE 21' VAULTS.
1/2 GRATING PANEL (SPEC HIGHHEEL OR STANDARD GRATING HALFPANEL) 2 ACCESS PANELS CAN BEINSTALLED BACK TO BACK IF ONEDOOR IS NEEDED FOR REMOTEOPERATORS, SPECIFY ON THE ORDERDRAWING.
GRATING (LIFTING DEVICE FOR HIGH HEEL GRATE TO BE LEFT IN THE VAULT).
TO THE EDGE ANGLE.
DWG.
29.02-03
STAINLESS STEEL SLAM LOCK W/ REMOVABLE KEY
STAINLESS STEEL COMPRESSION SPRING ASSIST
STAINLESS STEEL HINGES AND ATTACHING HARDWARE
AUTO-LOCK STAINLESS STEEL HOLD OPEN ARMS WITH
ACCESS DOOR PANEL FEATURES:
DOUBLE LEAF CONSTRUCTION H-20 LOAD RATING .
1/4" THICK
RELEASE HANDLES
ACCESS DOOR DETAIL
PLAN VIEW STEEL DETAILS
RECESSED LOCKING BOX.
(SEE NOTES 1 THROUGH 4)
SEE ACCESSDOOR DETAIL
RECESSED
WORK THIS DRAWING WITH DWG. 29.02-05
10. FOR VAULT LADDER DETAILS SEE DWG. 29.01-05.
NOTES:
DIAMOND PAT. AL.COVER PLATE
PADLOCKBOX
2880 IN. 2
5. CN 54051305 ACCESS PANEL WITH
6. CN 54051206 SPECIFY HIGH HEEL
7. CN 54051206 SPECIFY STANDARD GRATING
8. CN 54052105 SOLID CONCRETE PANEL
9. CN 54052204 BRICK PAVER PANEL
54"
3" 24"
30"
3"
6/17/10 DANNA GUINN ELKINS
10' X 15' AND 10' X 21'
TRAFFIC RATED PRECAST VAULTS (STEEL DETAILS)
ALL VAULT ORDERS MUST BE ACCOMPANIEDBY AN ORDER DRAWING. TO SPECIFY TOPPANELS, CONDUIT PANELS, SUMP LOCATION,ETC. CONTACT DISTRIBUTION STANDARDSFOR ORDER ASSISTANCE.
R
0
3
2
1
APPR.REVISED BY CK'D
SLAM LOCK
LIFTING HANDLE
STAINLESS STEEL
MIN. FROM WALL
SEE NOTE 1
JOINT LINE
15' 1-1/2" (FOR 15' VAULT)
SEE NOTE 3
ID SUMP24"x24"x24"
6'-0"
8"
SUMP GRATE
12"
12" MIN.
NOTE 2
SEE NOTE 2
SEE
8"
8"
CN 54051602
CN 54051701
21'-2" (FOR 21' VAULT)
KNOCKOUTS
10" - 21' VAULT8" - 15' VAULT
SEE NOTE 4
DIMENSIONEDFROM THIS
LOCATIONPANEL
KNOCKOUT12-1/2"
3X6 MAX.2X2 MIN.ALL 6"
6"
1. ALL 4 CORNERS OF VAULT HAVE PIPE INSERTS FOR THE INSTALLATION OF GROUND RODS. ATTACH #2 BC GROUNDING RING AROUND THE VAULT ABOVE THE FLOOR. ATTACH THE GROUND RING TO THE 4 GROUND ROD LOCATIONS AND ATTACH THE #2 BC TO THE WALL WITH NEUTRAL SPOOLS AND TIE WIRE.
2. SPECIFY SUMP AND SUMP PUMP DISCHARGE PIPE LOCATION ON THE ORDER DRAWING.
4. CONDUIT PANEL LOCATIONS AND SIZE SHOULD BE SPECIFIED ON THE ORDER DRAWING. PANEL LOCATIONSWILL BE MEASURED AS SHOWN ABOVE. THE KNOCKOUT IS 30" FROM THE TOP OF THE VAULT WALL OR 30"BELOW THE JOINT LINE. MINIMUM 12" FROM ANY WALL TO THE START OF A CONDUIT PANEL. THE PANELSCAN ONLY BE 3 VERTICAL BY 6 HORIZONTAL (MAXIMUM). PANELS MAY BE AS SMALL AS 2 VERTICAL BY 2 HORIZONTAL.
5. VAULTS ARE SOMETIMES MANUFACTURED WITH SLOPE TO MATCH THE SLOPE OF FINISHED GRADE. THECONTRACTOR SHOULD MEASURE THE VAULT PRIOR TO INSTALLATION, AND PROPERLY LEVEL THE EXCAVATEDAREA. THIS WILL ELIMINATE THE NEED TO RE-EXCAVATE FOR THE PURPOSE OF LEVELING AFTER THE VAULTHAS BEEN SET.
WORK THIS DRAWING WITH DWG. 29.02-03.
3. SEE DWGS. 29.01-09, 29.01-11 AND 29.01-13 FOR SUMP PUMP.
NOTES:
10'-0"
NOTE 4SEE
(BOTH 15' AND21' VAULTS)VLT15X10CVEHC
VLT21X10CVEHC
APPROX. 10'-6"
30"
30"
6"
30"
9/1/10 DANNA GUINN ELKINS
10' X 15' AND 10' X 21'TRAFFIC RATED PRECAST VAULTS
(CONCRETE DETAILS)0
3
2
1
APPR.REVISED BY CK'D
SIDE VIEW END VIEW
6'-0"
9/4/14 GUINN GUINN ADCOCK
29.02-05
DEFDEP
X
DEMDEC
ISN'T AVAILABLE FROM THREE-PHASE, PAD-MOUNTED TRANSFORMERS.8. THESE ENCLOSURES WITH OVERHEAD TYPE TRANSFORMERS SHALL ONLY BE INSTALLED TO PROVIDE THREE-PHASE SERVICE THAT
7. FOR 2 OR 3 CABINETS, USE THE ABOVE TABLE DIMENSIONS, CATALOG AND ASSEMBLY NUMBERS.
L2
200" X 66" X 91" (L3 X D X H)
133" X 66" X 91" (L3 X D X H)
164" X 54" X 81" (L2 X D X H)
109" X 54" X 81" (L2 X D X H)
CONVENTIONAL TF. SIZES WITH BUSHING WELLS (kVA)ENCLOSURE SIZES
WIDE (IN.)BAY(S)
L3
3. USE OVERHEAD TYPE TRANSFORMERS WITH BUSHING WELLS. (TRANSFORMERS HAVE TO BE REQUESTED AND REWORKED FROM THE
1. THESE ENCLOSURES ARE APPROVED FOR PURCHASE, NON-STOCK AND SHOULD BE SPECIAL ORDERED.
NOTES:
H
D
SIDE VIEWFRONT VIEW
TOP VIEW - TOPS REMOVED
DWG.
29.03-01
TRANSFORMER SHOP).
9. USE DEEP DRIVEN GROUNDS. DWG. 29.03-03 SHOULD BE USED AS AN EXAMPLE ON GROUNDING.
6. SEE SECTION 34 FOR PRIMARY METERING ENCLOSURES. THE ABOVE CABINET SHOULD NOT BE USED FOR PRIMARY METERING.
5. REFER TO DWG. 27.06-05 FOR LOCATION OF OIL-FILLED PAD-MOUNTED TRANSFORMERS.
4. FOR TRANSFORMER ENCLOSURE PADS, SEE DWGS. 24.02-01A & 24.02-01B.
2. FOR OVERHEAD TRANSFORMER DIMENSIONS SEE DWG. 06.00-12.
CN 22277206 TR200X66X91SCCONCRETE PAD PADTRA208X74CC
CONCRETE PAD PADTRA141X74CCCN 22277107 TR133X66X91SC
CN 22277008 TR109X54X81SCCONCRETE PAD PADTRA117X62CC
CN 22277305 TR164X54X81SCCONCRETE PAD PADTRA172X62CC
3
2
66
54
54
66
250 333 50050 75 100 167
COMPATIBLE UNITS, CATALOG NUMBERS & DIMENSIONS
10/21/10 DANNA GUINN ELKINS
TRANSFORMER TRANSCLOSURE CABINETS0
3
2
1
APPR.REVISED BY CK'D
8/27/12 SIMMONS BURLISON ELKINS
6/13/13 SIMMONS GUINN ADCOCK
12/16/13 SIMMONS GUINN ADCOCK
X4
X2
X3
X1
H1
H2
H2
H1
14.4
KV
X1
X3
X2
H2
H1 X1
X3
X2
X4
X4
CØ
NBØ
AØ
METER
IF THE BANK IS ENERGIZED ONE PHASE AT A TIME THE FLOATING WYE MUST BE TEMPORARILY GROUNDED.
THE BANK SHOWN IS CONNECTED FLOATING WYE - DELTA.
THE FLOATING NEUTRAL IS BROUGHT TO A FEED THRUBUSHING.
TO GROUND THE NEUTRAL:
ATTACH THE YELLOW GROUNDING ELBOW TO THETRANSCLOSURE GROUND LOOP.
REMOVE THE DEAD-END RECEPTACLE FROM THE FEED THRU BUSHING.
INSTALL THE YELLOW GROUNDING ELBOW ON THE FEEDTHRU BUSHING.
THE BANK CAN NOW BE ENERGIZED ONE PHASE AT A TIMEWITHOUT PRODUCING DAMAGING FERRORESONANCE OVERVOLTAGES.
AFTER THE BANK IS ENERGIZED, THE TEMPORARY GROUNDMUST BE REMOVED BY REVERSING THE ABOVE PROCEDURE BEFORE LEAVING THE BANK IN SERVICE.
1. RUN THE SECONDARY THROUGH THE CT'S AND THEN CONNECT TO THE TRANSFORMER TERMINALS. THE CT'S CAN NOT BE
2. RUN A #4 COPPER GROUNDING LOOP AROUND THE BOTTOM OF THE TRANSCLOSURE AND GROUND THE CABINET AT EACH BAY.
3. THIS IS A "TYPICAL" INSTALLATION. SEE REFERENCE SPEC.
4. THE GROUNDING FEED THRU CAN BE MOUNTED ANYWHERE IN THE TRANSCLOSURE AS LONG AS IT IS OPERABLE WITHA HOT STICK AND GOOD CLEARANCE IS MAINTAINED BETWEEN THE MOUNTING HARDWARE AND ANY EXPOSED SECONDARY
NOTES:
YELLOW GROUNDING ELBOW
FEED THRU BUSHING PARKING STAND
5. SUPPORT PRIMARY AND SECONDARY CABLES WITH CABLE TIES AND CABLE PROTECTORS AS NECESSARY.
6. A TRANSCLOSURE SHOULD BE USED FOR THREE-PHASEFOUR-WIRE 240/120 VOLT OR THREE-PHASE THREE-WIRE240 VOLT SERVICE ONLY. SEE STANDARD PRACTICES
INSTALLED OVER THE SECONDARY BUSHINGS TO METERA DELTA SECONDARY.
DWG.
29.03-03
HOT PARTS. SEE DWG. 26.04-06.
DWG. 06.10-06 II.
6/17/10 DANNA GUINN ELKINS
TYPICAL TRANSCLOSURE INSTALLATION
SECTION 06.
SEE DWG. 29.03-11. ONE DEEP DRIVEN GROUND ROD CONSISTINGOF 4 -5' RODS ASSEMBLED ON TOP OF ONE ANOTHER SHALL BEINSTALLED AND CONNECTED TO THE #4 GROUNDING LOOP.
AVAILABLE FROM DISTRIBUTIONTOOLS AND TEST EQUIPMENT
0
3
2
1
APPR.REVISED BY CK'D
6/13/13 SIMMONS GUINN ADCOCK
DWG.
29.03-05
ENERGIZE
1. OPEN SWITCH2. CLOSE CUTOUTS3. CLOSE SWITCH
DE-ENERGIZE
1. OPEN SWITCH 2. OPEN CUTOUTS
PRIMARY
FLOATINGNEUTRAL
FEEDTHROUGH PARKING STAND
23 KV PRIMARY14.4 KV TRANSFORMERS
12 KV PRIMARY7.2 KV TRANSFORMERS
ENERGIZE
1. ALL 3 CUTOUTS OPEN
2. REMOVE DEAD END RECEPTACLE FROM THE FEED THROUGH PARKING STAND
3. INSTALL THE YELLOW GROUNDING ELBOW ON THE FEEDTHROUGH PARKING STAND
4. CLOSE IN ALL 3 CUTOUTS
5. CHECK SECONDARY VOLTAGE
6. REMOVE GROUNDING ELBOW
7. INSTALL DEAD END RECEPTACLE ON FEED THROUGH PARKING STAND
THE GROUNDING ELBOW MUSTBE REMOVED WHEN NOT WORKINGON THE BANK
PRIMARY SECONDARY
DE-ENERGIZE
1. REMOVE DEAD END RECEPTACLE FROM THE FEEDTHROUGH PARKING STAND
2. INSTALL THE YELLOW GROUNDING ELBOW ON THE FEEDTHROUGH PARKING STAND
3. OPEN THE CUTOUTS
YELLOW GROUNDINGELBOW
DEAD ENDRECEPTACLE
DELTA BANKS SOURCED BY AN UNDERGROUND CIRCUIT SHOULD HAVE A GANGED THREE-PHASE SWITCH TO ENERGIZE ANDDE-ENERGIZE THE BANK. THIS CAN BE DONE BY USING A GANG OPERATED PMH OR VAULT SWITCH. FUSING FOR THE BANK CAN BEON THE DIP POLE OR AT THE TRANSFORMER LOCATION.
FLOATING WYE-DELTA BANKS SOURCED BY AN UNDERGROUND CIRCUIT SHOULD BE ENERGIZED BY A GANG OPERATED SWITCH OR BYTEMPORARILY GROUNDING THE FLOATING NEUTRAL WHILE THE BANK IS ENERGIZED FROM A SINGLE-PHASE SOURCE SUCH AS FUSEDCUTOUTS OR SINGLE-PHASE DISCONNECTS. TEMPORARY GROUNDING SHOULD BE DONE BY BRINGING THE FLOATING NEUTRAL TO THEFRONT OF THE TRANSCLOSURE OR VAULT.
10/4/10 DANNA GUINN ELKINS
FERRORESONANCE PREVENTION R
0
3
2
1
APPR.REVISED BY CK'D
H1
H2
H2
H1X1
X3
X2
X4
X4
X2
X3
X1 H1
H2
X4
X2
X3
X1
FLOATINGNEUTRAL
TO ENERGIZE:
1. ALL 3 CUTOUTS OPEN2. REMOVE DEAD END RECEPTACLE
FROM THE FEED THRU PARKING STAND
3. INSTALL THE YELLOW GROUNDINGELBOW ON THE FEEDTHROUGH PARKING STAND
4. CLOSE IN ALL 3 CUTOUTS 5. CHECK SECONDARY VOLTAGE
6. REMOVE GROUNDING ELBOW7. INSTALL DEAD END RECEPTACLE
ON FEED THRU PARKING STAND
THE GROUNDING ELBOW MUST BE REMOVED WHEN NOT WORKING ON THE BANK
PRIMARY SECONDARY
TO DE-ENERGIZE:
1. REMOVE DEAD END RECEPTACLE FROM THE FEED THRU PARKING STAND
2. INSTALL THE YELLOW GROUNDING ELBOW ON THE FEED THRU PARKING STAND
3. OPEN THE CUTOUTS
TO PREVENT FERRORESONANCE WHILE ENERGIZING THIS BANK THROUGH UNDERGROUND
IN METER ENCLOSURE
GROUND RODS INEACH CORNER
#4 BARE COPPERGROUND LOOP AROUND THE PERIMETER OF THE VAULT
#4 BC EQUIPMENT GROUNDS
METER ENCLOSURE
THIS CONFIGURATION WILL ACCEPT UP TO 8 CUSTOMER CONDUCTORS PER PHASE.
PULLING EYE
FEED-THRU PARKING STAND
YELLOW GROUNDINGELBOW
ATTACH THE #4 GROUND LOOPWITH NEUTRAL SPOOLS
POSITION THE FEED THRU PARKING STAND TO ALLOW THE GROUNDING ELBOW TO BEBE INSTALLED AND REMOVED FROM OUTSIDE THE VAULT WITH A SHOTGUN STICK.
CN 21100508FLEXIBLE BRAIDEDCONNECTOR STRAPS
JUMPERS BY PROGRESS
PLASTIC COVERS FORCONNECTORSEXPOSED TORAIN
NEUTRAL
CUSTOMER'SCONDUCTORS
FOR TEMPORARILY GROUNDED NEUTRAL
PRIMARY - THE FLOATING NEUTRAL MUST BE TEMPORARILY GROUNDED AS SHOWN IN THIS DRAWING OR A THREE-PHASE GANG OPERATEDSWITCH MUST BE INSTALLED.
DWG.
29.03-07
ELBOW ARRESTERFEED-THRU &
2 TOTAL
CONSULT ENGINEERING MANUAL VAULT SECTION FOR DETAILS
9/9/10 DANNA GUINN ELKINS
FLOATING WYE - DELTA CUSTOMER SUPPLIED
OUTDOOR ABOVE GROUND VAULT
ENERGY
R
0
3
2
1
APPR.REVISED BY CK'D
DWG.
29.03-09
H1
H2
H2
H1
14.4
KV
X1
X3
X2
X4
X4
X2
X3
X1
14.4
KV
H1
H2
N
X4
X2
X3
X1
14.4
KV
FLOATINGNEUTRAL
PRIMARY SECONDARY
15' I.D.
GROUND RODS INEACH CORNER
#4 BARE COPPERGROUND LOOP AROUND THE PERIMETER OF THE VAULT
#4 BC EQUIPMENT GROUNDS
TOTAL 2CN 21100508FLEXIBLE BRAIDEDCONNECTOR STRAPS
JUMPERS BY PROGRESS
PLASTIC COVERS
STAINLESS STEEL TRANSFORMERS IF THE VAULT IS BELOW GROUND
PRIMARY LOOP
SUMP
REMOTE OPERATORCABLES
LADDER
REMOTE OPERATORHANDLES
SET TRANSFORMERS ON TIMBERS
GROUND LADDER AND OPERATORHANDLES TO THE VAULT GROUNDING GRID
TYPICAL
SWITCHVACUUM
20' I.D.
9/20/10 GUINN GUINN ELKINS
FLOATING WYE - DELTA
VAULT LAYOUT (1500 KVA MAX)
ENERGY
R
0
3
2
1
APPR.REVISED BY CK'D
MOUNT CL FUSES VERTICALLYWITH SOURCE SIDE ON TOP
29.04-12B.SEE DWGS. 29.04-12A AND
(SEE NOTE 1)
NOTES:
1. INSTALL 4-5' RODS IN ONE CORNER AND 1-5' RODIN THE OTHER THREE CORNERS.
#4 BC
APP
RO
X 1
2"
8"
SEM
I-CO
ND
UCTIN
G
INSU
LATIO
N S
HIE
LD
BARE 1
/0CO
ND
UCTO
R
2"
AQ
UA-S
EAL
#4 B
C
#4 B
C T
RAN
SFO
RM
ER
GRO
UN
DIN
G L
OO
P
2/0
BC V
AU
LT G
RO
UN
DIN
G L
OO
P
#4 B
C
#4 B
C
SQ
UEEZE C
NTO
#4 B
CTW
O T
IMES
ALU
MIN
UM
TO
BE O
VER T
HE
CO
PPER
#4 B
C
NO
TES:
1.
START W
ITH
A 2
6"
PIECE O
F 1/0
JACKETED
PRIM
ARY C
ABLE
.
2.
REM
OVE T
HE O
UTER I
NSU
LATIN
G J
ACKET A
ND
TH
E C
ON
CEN
TRIC
NEU
TRAL
FOR T
HE E
NTIR
E L
EN
GTH
OF
TH
E C
ABLE
.O
F TH
E C
ABLE
.
4.
INSTALL
TH
E C
ABLE
IN
TO
TH
E E
LBO
W A
ND
IN
STALL
TH
E M
ALE
CO
NTACT.
5.
CU
T B
ACK 8
" O
F SEM
I-CO
N A
ND
IN
SU
LATIO
N F
RO
M T
HE O
TH
ER E
ND
OF
TH
E C
ABLE
LEAVIN
G 8
" O
F EXPO
SED
1/0
SO
LID
ALU
MIN
UM
.
6.
AQ
UA-S
EAL
AN
D T
APE
BETW
EEN
TH
E S
EM
I-CO
N A
ND
BARE C
ON
DU
CTO
R
7.
INSTALL
TH
E S
TATIC
WIR
E T
O T
HE E
LBO
W A
ND
ARO
UN
D T
HE S
EM
I-CO
N T
O T
HE A
QU
A-S
EAL
AN
D T
HEN
TO
TH
E G
RO
UN
DLO
OP.
GRO
UN
DIN
G L
OO
P#
4 B
C T
RAN
SFO
RM
ER
H1
H2
X1
X
2
H1
H2
X1
X
2
H1
H2
X1
X
2SS
SS
SS
#4 B
C
AN
D T
APE
#4 B
CSEE
NO
TE 8
#4 B
C T
RAN
SCLO
SU
RE G
RO
UN
D
H2
DWG.
29.03-11
8.
SQ
UEEZE T
HE #
4 B
C T
O T
HE 1
/0 A
LUM
INU
M 2
TIM
ES.
IF T
HE A
LUM
INU
M 1
/0 C
ON
DU
CTO
R I
S S
UBJE
CTED
TO
SALT
CO
NTAM
INAN
TS,
AQ
UA S
EAL
AN
D T
APE
TH
E C
ON
NECTIO
NS.
9.
TH
E H
2 B
USH
ING
MAY B
E L
EFT
AS A
CERAM
IC B
USH
ING
AN
D N
OT C
ON
VERTED
TO
A B
USH
ING
WELL
. TH
IS S
HO
ULD
BE
CO
ORD
INATED
WIT
H T
HE T
RAN
SFO
RM
ER S
HO
P.
3.
CU
T B
ACK T
HE I
NSU
LATIO
N A
ND
TH
E S
EM
I-CO
N S
HIE
LD P
ER
DW
G.
26.0
4-0
2B
AN
D I
NSTALL
TH
E C
ON
DU
CTO
R C
ON
TACT.
6/17/10 DANNA GUINN ELKINS
GROUNDING FOR GROUNDED WYE - GROUNDED WYE BANK WITH DEAD TOP TRANSFORMERS(VAULT OR TRANSCLOSURE INSTALLATION)0
3
2
1
APPR.REVISED BY CK'D
10.
VAU
LTS R
EQ
UIR
E O
NE D
EEP
DRIV
EN
GRO
UN
D R
OD
CO
NSIS
TIN
G O
F 4 -
5' RO
DS I
N O
NE C
ORN
ER O
F TH
E V
AU
LT A
ND
1 -
5' RO
D I
N E
ACH
OF
TH
E O
TH
ER C
ORN
ERS.
TRAN
SCLO
SU
RES R
EQ
UIR
E O
NE D
EEP
DRIV
EN
GRO
UN
D R
OD
CO
NSIS
TIN
G O
F 4 -
5'
RO
DS A
SSEM
BLE
D O
N T
OP
OF
ON
E A
NO
TH
ER.
GRO
UN
D R
OD
(S)
SH
ALL
BE C
ON
NECTED
TO
TH
E G
RO
UN
D L
OO
P.
SEE N
OTE 1
0
6/13/13 SIMMONS GUINN ADCOCK
DWG.
29.03-13
2500
2500
4-WAYSWITCH
SUMP
REMOTE OPERATORHANDLES AT THE VAULT ENTRANCE
SET VAULT TYPETRANSFORMERS ON TIMBERS
CL FUSES
SEE VAULT DESIGN GUIDE TRANSFORMER SECTION FOR INFORMATION ONFUSING AND SPLIT BUS
#4 BC GROUND LOOP
SECTIONALGROUND RODS
SECONDARYBUSHING LAYOUT
FRONT VIEW OF THE SECONDARY LAYOUT ON 3Ø TRANSFORMERS
TOP VIEW OF THE SECONDARY TERMINALS
20'
N
AØ
BØ
CØ
CØ
AØ
CTCT
BACK TO BACK 8-HOLECONNECTORS WITHPLASTISOL COVERS
1. THE METER PT'S CANBE MOUNTED IN THE VAULT OR THE VOLTAGECIRCUIT CAN BE BROUGHTOUT OF THE VAULT. THEPT'S CAN BE INSTALLED IN A T1 CABINET MOUNTED NEXT TO THE METER ENCLOSURE.
2. THE INSTALLATION SHOWN IS A SPLIT BUSON THE COMPANY SIDE AND ON THE CUSTOMER'S
3. MOUNT CL FUSESVERTICALLY WITH SOURCESIDE ON TOP. SEE
4. RUN #4 COPPER VAULT GROUND AROUNDTHE VAULT AND ATTACHTO GROUND RODS IN EACH CORNER.
5. EACH PIECE OF EQUIPMENT IS TO BELOOP GROUNDED TO THEVAULT GROUND LOOPPER INDIVIDUAL EQUIPMENTSPEC DWG.
6. THE INSTALLATION SHOWN ASSUMES THE VAULT WILL NOT FLOODTO THE LEVEL OF THE SECONDARY BUSHINGSON THE TRANSFORMERS.IF THIS IS NOT TRUE,CONTACT DISTRIBUTION STANDARDS FOR SPECIALSUBMERSIBLE SECONDARYCONNECTORS.
7. THE TRANSFORMERS SHOWN HAVE INTERNAL EXPULSION FUSES TO PREVENT THE FAILED COILS FROM BEING RE-ENERGIZED. THETRANSFORMERS MUSTSTILL HAVE SOME TYPEOF PRIMARY FUSING ASSHOWN.
8. THE TRANSFORMERS HAVE TAPS AND A WYE-DELTA SWITCH.
9. IF THE TRANSFORMERSARE PARALLED, ON THEPRIMARY, INSTALL 3-WAY200 AMP JUNCTIONSTO FEED THE INDIVIDUALTRANSFORMERS FROMONE FUSED SOURCE.
NOTES:
5.5" WINDOW CT'S SHOWN
IF THE VAULT FLOORWILL BE WET
30'
6/17/10 DANNA GUINN ELKINS
LARGE TWO TRANSFORMER VAULT
5000 KVA MAX.
SIDE.
R
SIDE
0
3
2
1
APPR.REVISED BY CK'D
CL FUSESSEE NOTE 3
SEE NOTE 3
AND 29.04-12B.DWGS. 29.04-12A
DWG.
29.03-15
MAIN VAULT SERVICEENTRANCE CABLES
PROGRESS ENERGY SECONDARY TOUNLOAD THE
PROGRESS ENERGY SECONDARY ORSEPARATELY METERED BUILDINGSERVICE ENTRANCE CIRCUIT(S)
5000 AMP SUBSTATION CT ASSEMBLY ON CROSSARM RACK
PLASTICCOVERSTYPICAL TOP VIEW
1. SOMETIMES IT WILL BE NECESSARY TO SERVE SECONDARY OR ADDITIONAL SMALL METERED SERVICES FROM A TRANSFORMER FEEDING THE MAIN LARGE SERVICE IN A VAULT. IF THESE SMALL LOADS CANNOT BECONNECTED TO THE TRANSFORMER SECONDARY BUSHINGS WHILE LEAVING ROOM FOR THE CT, THETRANSFORMER CAN BE UNLOADED INTO A BUS THAT WILL ALLOW THE SMALL SERVICES TO BE TAPPED UPBEFORE THE MAIN LARGE SERVICE LOAD CURRENT PASSES THROUGH THE CT'S TO THE CUSTOMER'S SERVICE
VAULT SECONDARY BUS R
0
3
2
1
APPR.REVISED BY CK'D
6/17/10 GUINNDANNA ELKINS
NOTES:
ENTRANCE CABLES.
1 CTA65000C
BOLT, HX, 1/2-13X2", ALUMINUM
BILL OF MATERIALS
CATALOG
22110100
BOLT, HX, CAP, 1/2-13X3/4, GLV
BOLT, HX, 1/2-13X1-1/2", ALUMINUMBOLT, HX, 1/2-13X10", GLV, A307BOLT, HX, 3/8-16X1", GLV, A307
HX, 1/2-13X3-1/2, GLV, A307BOLT, HX, 1/2-13X1-1/2,GLV, A307BAR, 3/8X4"X9", AL, 4-HOLE3/8X4"X14", AL, 4-HOLE NEMA
ASSEMBLY, MTG, 5000A, 600V CURRENT XFMRINSULATOR, POST, STN, 7.5KV
DESCRIPTION
22011209308369023083680310031706100322093002030910030104100328031001640010016509
1
8
QTY
4
48
4
22
2221
PERCU
NUMBERMACRO UNIT
-
CUITEMNO.
COMPATIBLE UNIT
QTYREQ'D
1
TRANSFORMER
DWG.
29.04-12A11/9/10 HOFFMAN GUINN ELKINS
COOPER - CURRENT LIMITING
SUBMERSIBLE FUSE DIMENSIONS (REPLACEMENT)REVISED CK'DBY APPR.
1
0
3
2
30.97"
27.77"
19.77"
20.95"
34.63"
USE UNIVERSAL BRACKET
9220207259FUSEVLTEMF15C
MOUNTING OPTIONSOPTIONA MIN.A MAX.B MIN.B MAX.C MIN.C MAX.
LENGTH (IN)22.7725.9125.9729.6129.6733.10
A MIN.
A MAX.
B MIN.
B MAX.
C MIN.
C MAX.
20°
6.27"
3.18"
2.56"
PLAN VIEW
FRONT VIEW
PLAN VIEW
NOTES:
2. LABEL EACH FUSE AMP SIZE USING 1-5/8" LABELING STICKER KIT ON CENTER OF FUSE BODY.
3. USE STANDARD 9/16" GROUND LUG WITH BRACKET WITH #2 CU GROUND.
4. SEE DWG. 29.04-12B FOR FUSE SPECIFICATIONS AND COMPATIBLE UNITS.
5.409"
10.56"
6.83"
1. COOPER FUSES SHOULD BE USED FOR ALL NEW INSTALLS. REQUIRES NEW UNIVERSAL BRACKET LISTED ON
THIS DRAWING.
8/1/11 HOFFMAN BURLISON ELKINS
DWG.
29.04-12B7/13/10 HOFFMAN GUINN ELKINS
COOPER - CURRENT LIMITING
SUBMERSIBLE FUSE DIMENSIONS (REPLACEMENT)REVISED CK'DBY APPR.
1
0
3
2
NOTES:
SINGLE-PHASE 13.2 KVKVA HV LV FUSE (AMPS) CATALOG NUMBER COMPATIBLE UNIT100 14.4 240/120 10 9220207260 F10EMF15C167 14.4 240/120 20 9220207261 F20EMF15C
THREE-PHASE 22.86 KVKVA HV LV FUSE (AMPS) CATALOG NUMBER COMPATIBLE UNIT300 14/24Y/14 208Y/120 10500 14/24Y/14 208Y/120 20750 14/24Y/14 208Y/120 301000 14/24Y/14 208Y/120 40300 14/24Y/14 480Y/277 10500 14/24Y/14 480Y/277 20750 14/24Y/14 480Y/277 301000 14/24Y/14 480Y/277 401500 14/24Y/14 480Y/277 502500 14/24Y/14 480Y/277 803000 14/24Y/14 480Y/277 100
922020726292202072789220207260922020726192202072629220207278922020727992202072819220207282
F30EMF15CF40EMF15CF10EMF15CF20EMF15CF30EMF15CF40EMF15CF50EMF15CF80EMF15CF100EMF15C
THREE-PHASE 12.47 KVKVA HV LV FUSE (AMPS) CATALOG NUMBER COMPATIBLE UNIT300 14/24Y/14 208Y/120 20500 14/24Y/14 208Y/120 30750 14/24Y/14 208Y/120 501000 14/24Y/14 208Y/120 65300 14/24Y/14 480Y/277 20500 14/24Y/14 480Y/277 30750 14/24Y/14 480Y/277 501000 14/24Y/14 480Y/277 651500 14/24Y/14 480Y/277 1002500 14/24Y/14 480Y/277 125
9220207261922020726292202072799220207280922020726192202072629220207279922020728092202072829220207283
F20EMF15CF30EMF15CF50EMF15CF65EMF15CF20EMF15CF30EMF15CF50EMF15CF65EMF15CF100EMF15CF125EMF15C
1. SEE DWG. 29.04-12A FOR FUSE DIMENSIONS AND DETAILS.
9220207260 F10EMF15C9220207261 F20EMF15C
8/11/11 HOFFMAN BURLISON ELKINS
ATTACH THE #2 BCTO THE SWITCH GROUNDING TABSWITH BRONZE LUGS
3 REMOTE OPERATOR CABLES ON 3-WAY SWITCH
TOP VIEW OF A 3-WAY VACUUM SWITCH
2. 3-WAY SWITCH IS SHOWN. GROUND 2-WAY AND 4-WAY SWITCHES THE SAME.
3. SPECIAL BRACKETS TO MOUNT REMOTE OPERATORS ARE SHIPPED WITH THE 3-WAY SWITCH. THESE SHOULD BE USED IN PLACE OF THE
4. EACH SWITCH POSITION REQUIRES A SEPARATE REMOTE OPERATOR.
2 BC VAULT GROUNDING LOOP
.
SEE NOTE 5
SEE NOTE 5 SEE NOTE 4
BRACKETS SHIPPED WITH THE REMOTE OPERATORS ON THE 3-WAY SWITCH ONLY.
SEE NOTE 3
EACH CABLE LENGTH 20'OTHER LENGTHSARE SPECIAL ORDER 30', 40', 50'
CONCENTRIC NEUTRAL ATTACHED TO THEGROUNDING RING
7" MIN
FIXED HANDLE REMOTE OPERATOR
CU OPERFIXVACC
CN 11241106
WARNING: REMOTE
OPERATORS ARE
NOT INSULATED
FROM THE
VACUUM SWITCH
REMOTE CABLE TO THESWITCH
2" X 3" WALLMOUNT ANGLE
8-1/2"
OPEN POSITION
PUSH TOCLOSE
IF THE VACUUM SWITCH CANNOT BE POSITIONED TOOPERATE FROM OUTSIDE THEVAULT OR MANHOLE WITH ASTICK, REMOTE OPERATORS SHOULD BE USED AND THEHANDLES MOUNTED AT THE VAULT OR MANHOLE ENTRANCETO ALLOW FOR SWITCHING FROM OUTSIDE THE VAULT ORMANHOLE.
FAULT INDICATOR READOUTSSHOULD BE MOUNTED NEAR THE CORRESPONDING REMOTEHANDLE AND LABELED TO ASSIST IN TROUBLESHOOTINGFAULTED CIRCUITS.
TRAIN AND SECURE REMOTE CABLES TO NOT EXCEED 7"MINIMUM BENDING RADIUS. COIL EXCESS CABLE.
GROUND REMOTE HANDLE
MOUNTING ANGLE WITH
CIRCLE THE TOPOF THE VACUUMSWITCH WITH#2 BC
#2 BC TO THE
VAULT GROUNDING GRID.
5-1/2" 8"
4-1/4"
CABLE ADJUSTINGNUTS
WITH SWITCHCLOSED
RUN BOTH #2 BC GROUND WIRES DOWN THE SIDE OF THE VACUUM SWITCH AND CONNECT THEMSEPARATELY TOTHE VAULT GROUNDING LOOP
REMOTE OPERATOR INSTALLATION ON THE VACUUM SWITCH
ADJUST TO
AFTER REMOVING THE MANUAL HANDLE AND HASPLOOSELY ATTACH THE MOUNTING POST "1" TO THETHREADED BOSSES "2" ON THE SWITCH. USE THETHREADED STUD "3".
LOOSELY ATTACH CABLE AND TOP BAR ASSEMBLY"4" WITH THE BOLTS AND WASHERS PROVIDED TOTHE MOUNTING POSTS.
REMOVE THE DETENT PIN "5" FROM THE BRASSCOUPLING "6" ON THE END OF THE CABLE.
MAKE SURE THE NEOPRENE BELLOWS "7" IS INPOSITION ON THE SWITCH OPERATING SHAFT.
POSITION THE BRASS COUPLING OVER THEOPERATOR SHAFT AND ATTACH WITH THEDETENT PIN. THEN TIGHTEN THE MOUNTINGPOST AND TOP BAR BOLTS.
ADJUST THE CABLE USING THE ADJUSTING NUTS "8" AS SHOWN.
"1"
"2"
"3"
"4"
"5"
"6"
"7"
"8"
SEE NOTE 3
ALLOW 20" CLEARANCEFROM THE TOP OF THE SWITCH WHEN USING REMOTE OPERATORS
DWG.
29.05-01
2"
6. USE SINGLE-PHASE FAULT INDICATORS IF TAP FEEDS FUSES OR A TRANSFORMER BANK (SEE SECTION 23).
5. USE THREE-PHASE FAULT INDICATORS ON SOURCE AND FEED CIRCUITS (SEE SECTION 23).
8/25/10 GUINN GUINN ELKINS
VACUUM SWITCH GROUNDING - FAULT INDICATORS
AND REMOTE OPERATORSR
0
3
2
1
APPR.REVISED BY CK'D
NOTES:
1. CHECK GAS PRESSURE BEFORE INSTALLING. DO NOT INSTALL IF GAS PRESSURE IS LOW.
ONE LINE DIAGRAM ONE LINE DIAGRAM
350 LBS 450 LBS
MANUAL SWITCHOPERATOR 8-1/2"
3"
CLOSE
OPEN
27" 34-1/2"
MANUAL SWITCH OPERATORS
NOTES:
2. VACUUM SWITCHES ARE SUBMERSIBLE AND CAN BE USED IN VAULTS OR MANHOLES. IF THE LOCATION ISSUBJECT TO FLOODING, SECURE THE SWITCH TO PREVENT FLOATING. VACUUM SWITCHES CAN BE MOUNTEDON WALLS OR UPSIDE DOWN.
3. VACUUM SWITCHES HAVE 600 AMP BUSHINGS (WITH REMOVABLE STUDS) TO ACCEPT 600 AMP ELBOWS AND
4. AN EXTERNAL OPERATING SHAFT IS USED TO PERFORM THE SWITCHING FUNCTION; PUSH TO CLOSE, PULL TOOPEN. A LOCKING HASP IS PROVIDED TO PADLOCK THE OPERATING HANDLE IN THE OPEN
5. CABLE TRAINING AND TERMINATION SHOULD BE CAREFULLY PLANNED. SUPPORT THE CABLES 3' TO 4' FROM THE ELBOW TERMINATIONS.
6. THE VACUUM BOTTLES ARE INSULATED WITH NONFLAMMABLE, HEAVIER THAN AIR, SF6 GAS. THE GAS
CN 11243300CN 11243201
CN 11243102
ONE LINE DIAGRAM
25"
ALL FEET ARE REMOVABLE
9/16" HOLESON 28-5/8"MOUNTING CIRCLE
9/16" HOLESON 23-5/8"MOUNTING CIRCLE
9/16" HOLESON 35-7/8"MOUNTING CIRCLE
22"
SF6 FILL VALVE
GAUGE TOCHECK GASPRESSURE
GROUNDLUGSSEE DWG.
PRESSURE SHOULD BE CHECKED DURING VAULT INSPECTIONS AND SCHEDULED MAINTENANCE. THE PRESSURE SHOULD BE BETWEEN 6 PSI AND 14 PSI. THIS SHOULD BE RECORDED AND COMPARED WITH LATER READINGS. IF THERE IS MORE THAN A 2 PSI DROP THE SWITCH SHOULD BE MONITORED CLOSELY FOR FURTHER DROP. IF THE PRESSURE IS BELOW 4 PSI (FOR NO APPARENT REASON) THE SWITCH SHOULD
TO CHECK THE GAS PRESSURE ONOLDER SWITCHESWITHOUT GAUGESUSE A GOODTIRE GAUGE
SEE NOTE 6
TOP VIEW
FRONT VIEW
SEE NOTE 4
600 AMP BUSHINGSSEE NOTE 3
BE RECHARGED. (CONTACT MATERIAL RECOVERY FOR THE CHARGING KIT) IF SWITCH HAS AGAIN LOST PRESSURE WITHIN 6 MONTHS OF RECHARGING. THE SWITCH SHOULD THEN BE REPLACED. IF THE PRESSUREGAUGE ON THE SWITCH SHOWS LOW PRESSURE, DOUBLE CHECK WITH A TIRE GAUGE BEFORE TAKINGACTION. MATERIAL RECOVERY HAS A DIGITAL PRESSURE GAUGE AVAILABLE FOR LOAN. ALWAYS PUT THE
DWG.
29.05-03
TO REDUCE TO 200 AMP. SEE DWG. 26.03-09. HOWEVER, VACUUM SWITCHES CAN BE ORDERED WITH 200 AMP
OR CLOSED SWITCHED POSITION. SEE DWG. 29.05-01 FOR REMOTE OPERATORS.
8/25/10 GUINN GUINN ELKINS
CAP BACK ON THE VALVE STEM.
KEARNEY VACUUM SWITCHES
SUBMERSIBLE, VAULT TYPE
29.05-01
R
7. ASSIGN EACH SWITCH HANDLE A NUMBER. LABEL AT VACPAC AND AT REMOTE OPERATOR LOCATION. WHENMORE THAN ONE VACPAC IS INSTALLED IN VAULT, USE NEW NUMBER FOR EACH SWITCH.
EXAMPLE: TWO THREE WAY - USE NUMBERS 1, 2, 3, 4, 5 & 6.
0
3
2
1
APPR.REVISED BY CK'D
BUSHINGS IF SUFFICIENT LEAD TIME IS AVAILABLE.
600A CU VSVP2WAY60025C
600A CU VSVP3WAY60025C 600A CU VSVP4WAY60025C
200A CU VSVP3WAY20025CCN 9220168597 (SEE NOTE 3)
4-WAY 2-600A, 2-200ACU VSVAC4W662225C
CN 9220173810 (SEE NOTE 3)
1. CHECK GAS PRESSURE BEFORE INSTALLING. INSTALL IF GAS PRESSURE IS LOW.
DWG.
29.06-01
SOME OF THE TERMS USED WITH TRANSFER SCHEMES ARE LISTED BELOW WITH AN EXPLANATION:
TRANSFER TIMER:
AN ADJUSTABLE TIMER, FROM 2-60 SECONDS, THAT ALLOWS THE ENGINEER TO DELAY THE TRANSFER FROMTHE PREFERRED TO THE ALTERNATE SOURCE. THIS CAN BE SET TO COORDINATE WITH ANY OF THE FEEDERBREAKER OR RECLOSER DELAYED OPERATIONS ALLOWING THE TRANSFER TO TAKE PLACE FOLLOWING A QUICKTRIP THAT DID NOT CLEAR THE CIRCUIT OR ALLOWING PREFERRED SOURCE FEEDER BREAKER OR RECLOSER
AUTO-MAN RESTORE SWITCH:
IF SET IN AUTO, THE LOAD WILL BE RETURNED TO THE RE-ENERGIZED PREFERRED SOURCE. IF SET IN MAN, THELOAD WILL REMAIN ON THE ALTERNATE SOURCE EVEN AFTER THE PREFERRED SOURCE IS RE-ENERGIZED. INTHE MAN POSITION, SERVICE PERSONNEL WILL MANUALLY HAVE TO SWITCH BACK TO THE PREFERRED SOURCE.
RESTORE TIMER:
AN ADJUSTABLE TIMER, FROM 5-180 SECONDS, THAT ALLOWS THE ENGINEER TO DELAY THE AUTOMATICTRANSFER BACK TO THE RE-ENERGIZED PREFERRED SOURCE.
NOTE: THE TRANSFER BACK TO THE PREFERRED SOURCE OCCURS ONLY IF THE RESTORE SWITCH IS SET IN THEAUTO POSITION.
CLOSE-OPEN TRANSITION SWITCH:
THIS DETERMINES WHETHER THE PREFERRED AND ALTERNATE SOURCE WILL BE PARALLELED DURING THE AUTORESTORE SEQUENCE. IF SET TO CLOSE, FOLLOWING THE TIMING OUT OF THE RESTORE TIMER, THE PREFERREDSOURCE WILL CLOSE BEFORE THE ALTERNATE SOURCE OPENS. THIS PARALLELS THE TWO SOURCES FOR ONLY6 CYCLES WHICH IN MOST CASES IS NOT LONG ENOUGH TO AFFECT LOAD FLOWS OR ALLOW REGULATORS TOTHE VOLTAGE CHANGES. THIS ALLOWS THE RESTORATION TO THE PREFERRED SOURCE WITHOUT THE CUSTOMER EXPERIENCING WHAT LOOKS LIKE A QUICK TRIP OPERATION. IF SET TO OPEN, FOLLOWING THETIMING OUT OF THE RESTORE TIMER, THE ALTERNATE SOURCE WILL OPEN AND THEN 6 CYCLES LATER, THE PREFERRED SOURCE WILL CLOSE. THE CUSTOMER WILL EXPERIENCE A MOMENTARY DURING THIS OPERATION.
FAULT-BLOCK:
FAULT BLOCK PREVENTS A FAULTED CIRCUIT FROM BEING TRANSFERRED TO THE ALTERNATE SOURCE BYSENSING OVERCURRENTS ON THE LOAD SIDE FAULT DETECTORS. THIS LATCHES THE NORMAL TRANSFERSCHEME OUT AND ONLY ALLOWS THE PREFERRED SOURCE TO OPEN WITHOUT THE ALTERNATE SOURCE CLOSING. THE INDICATOR IN THE CONTROL CABINET WILL BE LIT WHEN SERVICE PERSONNEL ARRIVE AND
BLOWN FUSES ARE REPLACED AND THE FAULT BLOCK BUTTON IS PUSHED, THE SYSTEM WILL AUTOMATICALLYTIME OUT AND RESET TO NORMAL. IF THE FAULT BLOCK LATCHES DUE TO INRUSH CURRENT BUT THERE IS NOLOSS OF VOLTAGE, A TIMER WILL RESET THE FAULT BLOCK AND THE SYSTEM WILL RETURN TO NORMAL WITH NO TRANSFER OCCURRING. WITH FUSES LOCATED ON THE LOAD TAP, FAULTS WILL BE CLEARED BY THE FUSESAND EVEN THOUGH THE FAULT BLOCK DETECTORS WILL LATCH THE FAULT, NO UNDER-VOLTAGE WILL OCCUR AT THE SENSORS AT THE PREFERRED SOURCE ELBOWS AND THE INRUSH RESTRAINT TIMER WILL CANCEL
FOR PAD-MOUNTED TRANSFERS, THERE ARE SEVERAL PACKAGES AVAILABLE THAT (LIKE THE SUBMERSIBLE
DISTRIBUTION STANDARDS FOR ASSISTANCE IN DESIGN AND ORDER INFORMATION.VERSION SHOWN ON DWG. 29.06-03) CAN BE TAILORED FOR SPECIAL APPLICATIONS AS NEEDED. CONTACT
TO LOCKOUT BEFORE TRANSFERRING TO THE ALTERNATE SOURCE.
6/17/10 DANNA GUINN ELKINS
AUTOMATIC TRANSFER SCHEMES R
0
3
2
1
APPR.REVISED BY CK'D
BOTH PREFERRED AND ALTERNATE SWITCH POSITIONS WILL BE OPEN. AFTER THE TROUBLE IS CLEARED, THE
THE FAULT BLOCK AND NOTHING WILL OCCUR.
DWG.
29.06-03
FOR THREE-PHASE SENSING, USETHREE POTENTIAL TRANSFORMERS
VACUUM SWITCHCN 11243201
3-WAY JUNCTIONOR FEEDTHROUGH
PREFERRED SOURCE ALTERNATE SOURCE
FUSES, CT'S OR 200 AMP FAULT DETECTORSFOR FAULT BLOCK
PT FOR VOLTAGE SENSINGOF ONE PHASE AND CONTROLPOWER FOR THE OPPOSITE SOURCE TRANSFER OPERATOR
VAULT TRANSFORMERBANK
SUBMERSIBLECONTROL CABINET
REMOTE CABLE OPERATOR
REMOTE PUSH BUTTONSTO TEST TRANSFER FROM OUTSIDE THE VAULT
TRANSFER SEQUENCE
NORMALLY CLOSEDTRANSFER OPERATOR
NORMALLY OPENTRANSFER OPERATOR
FAULT OCCURS UPSTREAM OF THE 200 AMP FAULT DETECTORS CAUSING A FEEDER LOCKOUT OR SINGLEPHASING DUE TO A BLOWN FUSE ON THE PREFERRED SOURCE.
CONTROL TIMES OUT AND OPENS THE PREFERRED SWITCH OPERATOR AND CLOSES THE ALTERNATE SOURCE SWITCH OPERATOR.
AFTER THREE-PHASE PREFERRED SOURCE IS RESTORED THE RESTORE TIMER OPENS THE ALTERNATE SWITCH POSITION AND CLOSES THE PREFERRED SWITCH POSITIONRETURNING THE SYSTEM TO NORMAL.
THE CONTROLS HAVE AN OPEN OR CLOSE TRANSITION RESTORE SWITCH TO ALLOW THE RETURN TO THE PREFERRED SOURCE WITHOUT THE CUSTOMER EXPERIENCING A MOMENTARY. THIS PARALLELS THE PREFERRED AND ALTERNATE FEED FOR ABOUT 10 CYCLES.
THE VAULT ENTRANCE
ALTERNATEPT LEADS
PREFERREDPT LEADS
FAULT SENSINGLEADS
TRANSFERCABLE
PREFERRED
ALTERNATE
CABLETRANSFER
LOAD
FAULTED LOAD CIRCUIT DOWNSTREAM OF THE FAULT SENSORS
BANK FAULTS AND BLOWS DIP POLE FUSE(S)
FAULT BLOCK IS LATCHED FROM CURRENT FLOW THROUGH THE SENSORS ON THE LOAD CIRCUIT UPSTREAM OF THE TRANSFORMER BANK.
TRANSFER TIMES OUT AND PREFERRED SWITCH POSITION OPENS.
ALTERNATE FEED DOES NOT CLOSE DUE TO FAULT BLOCK.
SERVICE PERSONAL OPENS LOAD TAP WITH REMOTE HANDLE.
BANK TROUBLE IS CLEARED UP.
RESET FAULT BLOCK INSIDE THE CONTROL CABINET
DIP POLE IS RE-FUSED
RESTORE TRANSFER TIMER WILL CLOSE PREFERRED SOURCE.
LOAD TAP IS CLOSED BY REMOTE OPERATOR HANDLE.
BUSHING
FOR DELTA BANKS, USE A PHASE SEQUENCE RELAY FOR VOLTAGE SENSING.
ABOVEGROUND OR
CN 11241106 AT
6/17/10 DANNA GUINN ELKINS
VAULT AUTO
TRANSFER SCHEMER
0
3
2
1
APPR.REVISED BY CK'D
23"
10-3/8"
WALL
UNIVERSALMOUNTINGBRACKET
BACKJUNCTION
PLATE
GROUNDING LUGWALL
4"MIN.
MOUNTING ANGLEWALL
TO GROUND
STEP 1
LOOSELY ATTACH UNIVERSAL MOUNTINGBRACKETS TO JUNCTION BACK PLATE ANDPLACE ASSEMBLY AGAINST WALL. ADJUSTBRACKETS FOR PROPER ALIGNMENT ANDMARK THEIR LOCATION ON WALL.
DETACH UNIVERSAL MOUNTING BRACKETS
STEP 2
FROM JUNCTION BACK PLATE. MOUNTBRACKETS ON WALL ACCORDING TO MARKSMADE IN STEP 1.
STEP 3
WITH UNIVERSAL MOUNTING BRACKETSSECURE, FASTEN BACK PLATE (WITHJUNCTION ATTACHED) TO MOUNTINGBRACKETS, MAKING SURE PARKING STANDSARE IN UPRIGHT POSITION.
ADJUST MOUNTING ANGLE TO DESIRED
STEP 4
POSITION.
SYSTEM GROUND USING #4 BC.
STEP 5
TIGHTEN ALL BOLTS SECURELY TO ASSURE NO MOVEMENT DURING OPERATION. GROUND JUNCTION BRACKET TO
REMOVE PROTECTIVE CAPS, CLEAN AND LUBRICATE JUNCTION BUSHING INTERFACE WITH SILICONE GREASE
LOADMAKE OPERATING PROCEDURE.
DWG.
29.08-01
SEE DWGS. 25.01-03A, 25.01-03BFOR PAD-MOUNTED APPLICATIONS
FOR 600 AMP DEADBREAK APPLICATIONSUSE CN 11185402
6/17/10 DANNA GUINN ELKINS
LOADBREAK THREE-WAY JUNCTION -
WALL MOUNTEDR
25.01-10A, 25.01-10B AND 25.01-11.
PROVIDED OR CN 30520803. MATE THREE LOADBREAK ELBOWS TO JUNCTION BUSHINGS FOLLOWING APPLICABLE
NOTES:
1. IF ELBOW IS CLOSED INTO A FAULT, REPLACE ELBOW AND JUNCTION.
0
3
2
1
APPR.REVISED BY CK'D
CN 11186301CU FDTHR253WWMTC
DWG.
29.09-01
THREE-PHASE VAULT TRANSFORMERS R
REVISED CK'DBY APPR.
1
0
3
2
CATALOG NUMBER
THREE-PHASE VAULT TRANSFORMERS
KVA
500750
1296302112963047
HV
14/24Y/1414/24Y/14
LV
208Y/120208Y/120
COMPATIBLE UNIT
TU500V314DYBCTU750V314DYBC
12963013
12963070
12963096
12963062
12963039
12963088
12963100
NO LONGER PURCHASED*
*
10005007501000150025003000
14/24Y/1414/24Y/1414/24Y/1414/24Y/1414/24Y/1414/24Y/1414/24Y/14
208Y/120480Y/277480Y/277480Y/277480Y/277480Y/277480Y/277
TU1000V314DYBCTU500V314DYFCTU750V314DYFCTU1000V314DYFCTU1500V314DYFCTU2500V314DYFCTU3000V314DYFC
NOTES:
1. TRANSFORMERS ARE DESIGNED FOR THE ENCLOSED ROOM VAULT ENVIRONMENT. SPECIAL FEATURESINCLUDE 304L STAINLESS STEEL TANK, DELTA-WYE SWITCH, TAP CHANGER, INTERNAL CARTRIDGEEXPULSION FUSE, LOW-FLAMMABLE OIL, JACKING AND ROLLING PROVISIONS AND A TOP OILTHERMOMETER.
2. UNITS ARE RATED 55°C RISE AND DESIGNED FOR OPERATION IN ENCLOSED LOCATIONS AT AMBIENT
TEMPERATURES OF UP TO 50°C.
3. UNITS SHOULD BE INSTALLED WITH AN EXTERNAL FULL-RANGE CURRENT LIMITING FUSE FOR PROTECTION.
4. THE 3000 KVA UNIT (NO LONGER PURCHASED) IS A STANDARD 65°C RISE UNIT RATED FOR 30° AMBIENT.
PER IEEE STD. C57.91, THIS UNIT SHOULD BE DE-RATED 1.5% FOR EACH DEGREE CELCIUS ABOVE 30°C
AMBIENT. IN A 50°C AMBIENT ENVIRONMENT, ITS RATING WOULD BE ONLY 2100 KVA.
5. WHILE SOME SPARES ARE STOCKED IN GARNER, ALL UNITS SHOULD BE CONSIDERED AS SPECIAL-ORDERNON-STOCK.
6. SEE DWG 29.09-03 FOR OUTLINE DRAWING AND DIMENSIONS.
7. SEE DWG 29.09-05 FOR SECONDARY BUSHING COVER DETAIL.
SEE SECTION 29.04.
6/17/10 DANNA GUINN ELKINS
DWG.
29.09-036/17/10 DANNA GUINN ELKINS
THREE-PHASE VAULT TRANSFORMERS
DIMENSIONS
10 10
8.3 8.3 5.5
9.5 6.5 6.5 6.5
6.5
T
X
X
X
X
13
11
1
7
11
15
8 6
HHHH
2
KVA
DIMENSIONS IN INCHES
M P T(MAX)H
(MAX)W
(MAX)D
64
71
71
71
77
70
83
83
83
83
66
66
66
66
66
34
46
51
51
51
9
9
11.9
11.9
11.9
31
42
46
46
46
500
1500
2500
1000
750
1. FILL PLUG2. TAP CHANGER3. DELTA/WYE SWITCH4. TANK GROUNDS5. DRAIN VALVE AND SAMPLER6. LIQUID LEVEL GAUGE7. THERMOMETER8. PRESSURE/VACUUM REGULATOR AND GAUGE9. SCHRADER VALVE
10. HANDHOLES PER SPECIFICATION11. NAMEPLATE12. LIFTING LUGS13. KVA RATING PLATE14. NON-PCB DETAIL15. BOLTS FOR SECONDARY COVER16. FULLY INSULATED HV NEUTRAL
R
12
12
12
12D
H
W
M
P
4 4
5
14
9
16
3
0
1
2
3
0321
0
3
2
1
APPR.REVISED BY CK'D
WEIGHT
(LBS.)
5270
7500
10,250
10,370
16,250
DWG.
29.09-0510/4/10 GUINN GUINN ELKINS
VAULT TRANSFORMER
SECONDARY BUSHING SUPPORTR
0
3
2
1
APPR.REVISED BY CK'D
NOTES:
1. MAXIMUM OF 14-750 KCMIL CU OR AL CONDUCTORS FOR THIS INSTALLATION USING 2-8 HOLE TERMINALBLOCKS AND USING THE END 2 HOLES FOR BUSHING SUPPORT.
INSTALL 78" FIBERGLASS GUY STRAININ LAST TWO HOLES TO SUPPORTSECONDARY BUSHINGS. CUT ENDS OFFINSULATOR TO INSERT INTO BLOCK
VAULT FLOOR
SET SCREW BLOCK CONNECTORS
MAY BE INSTALLED BACK-TO-BACKON SAME TERMINAL.
SEE DWG. 27.06-12 (TYPICAL)
CONNECTOR. SEE DWG. 02.04-18.
10/25/12 GUINN GUINN ADCOCK
ON
OFF
15' CORD
GREEN WIRE TOVAULT GROUND
WHITE WIRE TO SYSTEM NEUTRAL
BLACK WIRE TO FUSE
CONNECT TO 120 VOLTSOURCE ONLY
LOAD SIDE
1. INSTALL LIGHT SWITCH AND PLUG AT THE VAULT ENTRANCE.
2. PLUG IS TO ALLOW LIGHTING CIRCUIT TO BE ENERGIZED FROM A GENERATOR DURING VAULT SOURCE
3. THE SWITCH AND FIXTURE ARE WATERTIGHT BUT NOT SUBMERSIBLE.
4. THE PACKAGE TO ADD AN ADDITIONAL LIGHT IS CONNECTED TO THE FIRST LIGHT FIXTURE. AS MANY AS TEN
5. CABLE CLAMPS AND LEAD INSERTS ARE INCLUDED IN THE PACKAGE. USE 1/2" BIT FOR INSERTS AND 1/4" SS
SEAL END OF THECABLE INSULATION
CUT 25' CORD
CONNECT BLACK TO THE SWITCH AND NUT WHITE TO WHITEAND GREEN TO GREEN
TO CONNECT ADDITIONAL LIGHTS REMOVE ONE OF SCREW CAPS IN THE EXISTING FIXTURE AND INSTALL THE WATERTIGHT CONNECTOR AND WIRE NUT MATCHING
15' CORD
6. USE 150 WATT BULB MAXIMUM.
NOTES:
OUTAGES.
ADDITIONAL LIGHTS CAN BE ADDED TO THE ORIGINAL PACKAGE.
OR BRONZE BOLTS IN THE INSERTS.
ARE NOT INCLUDED IN COMPATIBLE UNITNOTE: FUSE HOLDER AND 30 AMP FUSE
DWG.
29.01-01
AS NEEDED
CU LGTVLTKITC
CU LGTVLTADDCCN 13082607
CN 13082706
CN 11130101 FUSE HOLDER - FUSESEC30CCN 21143102 30 AMP FUSE
VAULT LIGHTING KITS (FMO)
WIRE COLORS
0
3
2
1
APPR.REVISED BY CK'D
7. CUSTOMER TO SUPPLY VAULT LIGHTING IN NEW VAULT INSTALLATIONS. DRAWING IS FOR MAINTENANCE ONLY.
HOLDER
7/9/13 KATIGBAK GUINN ADCOCK
CL 2'-8"
3'-8"
5"
12" 12"
TOP VIEW
4'-7"
32"
11" 21"
SOURCE SIDE
FCABNT23VLTRTC
11/16" DIA.
CABINETCN 14413504
HOLES
FUSEHOLDERCN 11129905FHLDRMRK3SMLZ4C
LOAD SIDE
#4 BCGROUND
NOTES:
1. FUSE CABINET IS RAIN TIGHT AND WHEN REQUIRED MAY BE USED IN ALL ABOVE OR BELOW GROUND VAULTS.
2. USE 200 AMPERE LOADBREAK ELBOWS FOR PRIMARY CABLE TERMINATIONS.
12"12"
2"
4'-0"
HASP FOR PADLOCKING
3. FUSE CABINETS ARE SHIPPED WITH FUSEHOLDER MOUNTINGS BUT WITHOUT FUSEHOLDERS AND FUSES. TYPE SML-4Z FUSEHOLDERS ARE REQUIRED. THESE FUSEHOLDERS ARE LOADBREAK, AND GIVE A VISIBLE INDICATION OF A BLOWN FUSE.
4. THE ABOVE FUSES ARE AVAILABLE AT THE GENERAL WAREHOUSE. OTHERS ARE AVAILABLE BY SPECIAL ORDER.
5. FUSE CABINET HAS AN INTERNAL SAFETY BARRIER BETWEEN THE DOOR AND THE FUSEHOLDERS THAT MUST BE REMOVED FOR ACCESS TO THE FUSEHOLDERS. THE FUSEHOLDERS CAN BE SEEN THROUGH THE CLEAR SAFETY BARRIER.
6. FUSE CABINET IS TO BE GROUNDED WITH #4 BC GROUND WIRE.
7. THE MINIMUM MOUNTING HEIGHT TO THE BOTTOM OF THE FUSE CABINET IS 3'.
8. WEIGHT: APPROXIMATELY 400 LBS.
DWG.
29.04-09
11"
21141809
21141908
21142005
21142104
21142203
21142302
21142401
21142500125E
100E
60E
65E
50E
40E
25E
15E
FSM4100ES23KC
FSM4125ES23KC
FSM465ES23KC
FSM480ES23KC
FSM415ES23KC
FSM425ES23KC
FSM440ES23KC
FSM440ES23KC
CNFUSES COMP. UNIT
FRONT VIEW SIDE VIEW
6/17/10 HOFFMAN GUINN ELKINS
FUSE CABINET, WALL MOUNTED TYPE,
200 AMPERE, THREE-PHASE (FMO)R
0
3
2
1
APPR.REVISED BY CK'D
B
H
G
1/2" - 13 GROUNDING NUT
E D
C
A
F
I
DWG.
29.04-12C6/17/10 HOFFMAN GUINN ELKINS
G&W - CURRENT LIMITING SUBMERSIBLE FUSE DIMENSIONS (FMO)
REVISED CK'DBY APPR.
1
0
3
2R
1.6"
.56"
FRONT VIEW
TOP VIEW
SIDE VIEW
ROTATINGPARKINGSTANDS
LOAD SIDEIS ENGRAVED
#304 STAINLESS STEEL MOUNTING BRACKET.REMOVABLE STRAPS ALLOW FUSE REPLACEMENTWHILE BRACKET IS MOUNTED TO WALL
MECHANICALLY REINFORCED, EPOXY INSULATION WITHEXTERNAL SEMICON
200A BUSHING WELLW/ REMOVABLE STUD
NOTES: 1. SEE DWG. 29.04-12D FOR APPLICATIONS.
(INCHES)"H" DIM
4.1
4.1
(INCHES)"B" DIM
6.3
7.450-100 29.0
CURRENT RATING
25.93-40
(AMPS)"A" DIM
(INCHES)
15.912.0 6.55.4 5.5
(INCHES)"E" DIM
5.3
(INCHES)"C" DIM
12.0 4.3
"D" DIM(INCHES)
5.5
(INCHES)"F" DIM
13.0
"G" DIM(INCHES) (INCHES)
"I" DIM
3.2
4.3
LOAD
SID
E
DWG.
29.04-12D6/17/10 HOFFMAN GUINN ELKINS
G&W - CURRENT LIMITING SUBMERSIBLE FUSE -
APPLICATIONS (FMO)REVISED CK'DBY APPR.
1
0
3
2R
2. FUSES ARE FULL RANGE CURRENT LIMITING.
3. LOAD SIDE IS ENGRAVED.
5. NO DERATING OF THE FUSE IS REQUIRED.
6. FUSE CAN BE MOUNTED HORIZONTAL OR VERTICAL.
4. SEE DWG. 29.04-12C FOR DIMENSIONS.
3000
1500
2500
1000
500
750
1000
500
750
TRANSFORMER OR BANKHV LV
14/24Y/14
480Y/277
480Y/277
480Y/277
480Y/277
480Y/277
480Y/277
208Y/120
208Y/120
208Y/12014/24Y/14
14/24Y/14
14/24Y/14
14/24Y/14
14/24Y/14
14/24Y/14
14/24Y/14
14/24Y/14125 AMPS
100 AMPS
125 AMPS
80 AMPS
40 AMPS
65 AMPS
80 AMPS
40 AMPS
65 AMPS
CN 85
CN 4555
CN 85
CN 84
CN 151331
CN 151333
CN 84
CN 151331
CN 151333
FUSE/CAT. NO.
FSUB40ES25KC
COMP. UNIT
FSUB65ES25KC
FSUB80ES25KC
FSUB40ES25KC
FSUB65ES25KC
FSUB80ES25KC
FSUB100ES25KC
FSUB125ES25KC
FSUB125ES25KC
12KV
65 AMPS
100 AMPS
40 AMPS
18 AMPS
30 AMPS
40 AMPS
18 AMPS
30 AMPS
CN 151333
CN 4555
CN 151331
CN 10239
CN 151330
CN 151331
CN 10239
CN 151330
FUSE/CAT. NO.
FSUB18ES25KC
COMP. UNIT
FSUB30ES25KC
FSUB40ES25KC
FSUB18ES25KC
FSUB30ES25KC
FSUB40ES25KC
FSUB65ES25KC
FSUB100ES25KC
23KV
100 AMPSCN 4555
FSUB100ES25KC
BRACKET FOR FUSES 50 TO 125 AMPS: CN 10236BRACKET FOR FUSES TO 40 AMPS: CN 10238
TOTAL 3Ø KVA OF
300 14/24Y/24 208Y/12025 AMPS
CN 151329FSUB25ES25KC
12 AMPSCN 00074
FSUB12ES25KC
300 14/24Y/24 480Y/27725 AMPS
CN 151329FSUB25ES25KC
12 AMPSCN 00074
FSUB12ES25KC
NOTES:
1. THESE FUSES TO BE USED FOR MAINTENANCE REPLACEMENTS. SEE DWGS. 29.04-12A AND 29.04-12B FORFOR NEW INSTALLATIONS.