3# assembly point - kvaleid · 2020. 2. 3. · container terminal transport ‐own international...

58

Upload: others

Post on 18-Jan-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather
Page 2: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather
Page 3: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

We are here

2# Assembly Point

3# Assembly Point

1# Assembly Point

Medical Center

ASSEMBLY POINT

Page 4: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

Piping workshop Structure workshop

Equipment Maintenance Workshop

#1 Drycok(360x65M)

Canteen

#2 Drydock(300x74M)

Training Center

Operation Building

Stainless steel piping workshop

M & E workshop

Scrap Material storage

Main Office Building

Client Warehouse

LAYOUT

We are here

Page 5: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

Head ‐‐‐‐‐‐ Safety helmet Foot  ‐‐‐‐‐‐Safety shoes

Hand ‐‐‐‐‐‐ Gloves (manual handing) Body ‐‐‐‐‐‐ Coveralls/Jackets

Eyes ‐‐‐‐‐‐ Safety Glasses Fall ‐‐‐‐‐‐ Safety harness(working  above 2 m)

PPE REQUESTED

Page 6: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

Main Building

Operation Building

Medical Center

PPE Free ZonePPE Zone

SMOKING ONLY AT ASSIGNED LOCATION

PPE ZONE

Page 7: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

Piping workshop Structure workshop

Equipment Maintenance Workshop

#1 Drycok(360x65M)

Canteen

#2 Drydock(300x74M)

Training Center

Operation Building

Scaffolding Area

M & E workshop

Scrap Material storage

Main Office Building

Client Warehouse

SITE TOUR

We are here

Page 8: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

CONTENTS

Page 9: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

Location ‐Located In The Southern Part Of China

‐Close proximity To Hong Kong & Nansha

Container Terminal

Transport‐ Own 

International Ports 

‐Easily Access By land, Sea 

& Air Transport

Weather ‐RelativelyWarm 

Weather With Lowest Temp 

At 5°C

‐ Work Can Be Carried Out Throughout The year

Facilities‐Ultra Modern 

Facilities Including Large Dry Dock & Long Quayside To accommodate 

VLCC

Experience‐More Than 61 years of

Experiences and Resources

In Ship Repair& Conversion

$$$ ‐Financially Very Strong ‐A Subsidiary Of China State Shipbuilding Corporation 

(CSSC) 

ADVANTAGE

Page 10: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather
Page 11: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

Shenzhen Airport, 40 mins by car

MACAU

Guangzhou Airport75 mins by car

Anchorage, 28 miles

LONGXUE ISLAND, NANSHA

HKIA, 75 mins by ferry

Page 12: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather
Page 13: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

CERTIFICATE

BUSINESS LICENSE ISO 9001:2008

Page 14: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

Purchase & Storage Department

Commercial Department

Offshore Department

Administration Office

President

HR Department

Financial Department

Southern Special Coating Department

CFO

VP, Operations

Safety Director

Engineering Department

QA/QC Department

Enterprise Control Department

Facilities Department

Legal Counsel Department

S & E Department

Operation Department

Underwater work Workshop

M & E, Piping Workshop

Audit Department

VP, Technology

Structure Workshop

ORGANIZATION CHART

VP, Procurement

Page 15: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

HUMAN RESOURCES

0

500

1000

1500

Management team: 80 Persons Permanent employee: 1,450 Persons In‐house subcontractor:3,000~4,000 Persons

Page 16: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

Management team training in Dyna‐Mac Project team training in Dyna‐Mac

MANAGEMENT TEAM TRAINING

Page 17: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

Engineers training in MARIC, GUMECO. Foreman training in house.

TACHNICAL & FOREMAN TRAINING

Page 18: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

WORKERS TRAINING

Page 19: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather
Page 20: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

S/N NAME DIMENSION (L x W x D) LIFTING CAP.

1 CXG No.1 360 x 65 x 13.3 100 ton crane: 1 Nr

2 CXG No.2 300(431) x 74 x 13.3 100 ton crane: 1 Nr

3 GSI No.1 490 x 106 x 13.1 600 ton crane: 2 Nrs

4 GSI No.2 480 x 92 x 13.1 600 ton crane: 2 Nrs

5 HP No.1 360 x 96 x 14.3 600 ton crane: 2 Nrs

AVAILABLE DRYDOCK

300m

131m

Page 21: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

BERTH LENGTH (m) DEPTH (m)

1# Berth ~ 4# Berth 1,500 9.5

5# Berth 410 9.5

1,500M 410M

BERTH INFORMATION

Page 22: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

Cap    : 32 T           Boom : 80M

Cap    : 45 T           Boom : 80M

Cap  : 100 T           Boom : 80M

Cap    : 32 T           Boom : 80M

Cap    :  45 T           Boom : 80M

Cap    : 32 T           Boom : 80M

Cap    : 32 T           Boom : 80MCap    : 32 T           

Boom : 80M

Cap    : 100 T           Boom : 80M

Cap    : 45 T           Boom : 80M

Cap    : 32 T           Boom : 80M

BERTH CRANE 

Page 23: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

S/N NAME MAX LIFTING CAP. (T)

MAX LIFTING HEIGHT (m)

REMARK

1 Zhengyang 1002 2,600 80

2 Teshun 1,000 75

3 Yue 0063 500 42

4 Long 150 150 77 Own

5 Long 40 40 28 Own

FLOATING CRANE 

Page 24: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

MODULE FABRICATION AREA FOR DYNA‐MAC

Module Fabrication

Area (35,000 sq.m)

Module Fabrication Area (14,000 sq.m)

Module Fabrication Area (80,000 sq.m)

Page 25: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather
Page 26: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

CERTIFICATE

Page 27: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

Daily tool box meeting Daily vessel safety co‐ordination

committee meeting (VSCC) Monthly HSE committee meeting

HSSE

Page 28: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

SAFETY TRAINING

HSSE Training in house HSSE Operation Training

Page 29: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

EMERGENCY DRILLING

Drop down drill Fire fighting drill

Oil Pollution drill Evacuation drill

Page 30: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

HSSE CELEBRATION

FPSO CDM + CDS achieved 18 Million man hours without LTI up to 11 June 2015

Page 31: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

24 hours CCTV Monitoring Security checks and registration of

personnel and vehicle entry 

SECURITY

Page 32: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

ANNUAL MEDICAL EXAMINATION

HSSE

Page 33: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather
Page 34: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

CERTIFICATE

Page 35: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

DIMENSIONS CONTROL

Page 36: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

INSPECTION

Page 37: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather
Page 38: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

7 vessels of single hull tanker convert to double hull 

tanker

5 vessels container vessel lengthen 30m in mid and 3 

vessels lengthen 28m in FWD.

3 single hull tanker convert to bulk carrier

1 bulk carrier convert to passenger vessel.

14 passenger vessels renovation.

1 VLCC convert to VLOC.

CONVERSION PROJECTS 

Page 39: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

One (1) VLCC to FSO (Delivery by Dec. 2011)

Helideck fabrication and installation

Spread mooring system/riser    

balcony fabrication and installation

Accommodation extend to 70 POB

10,000 m piping work

CONVERSION PROJECTS 

Page 40: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

146 M high leg sand blasting and coating Platform leg bracing renew 2 sets deck crane renewal Drilling rig structure renewal Ballast tank coating

Five (5) Jack‐up refurbishment

CONVERSION PROJECTS 

Page 41: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

Three (3 )Semi‐submersible platforms refurbishment

CONVERSION PROJECTS 

Page 42: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

2,800 tons steel structure fabrication

60,000 square meter coating

500 tons piping fabrication and installation

Deck crane installation

New upper module of Jack up fabrication 

NEW BUILDING PROJECT 

Page 43: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

FPSO “NANHAI KAITUO” & “NANHAI FENJIN refurbishment

200 tons steel structure renewal in tanks 30,000 sq.m coating in tanks 200 tons piping renewal Equipment overhaul in E/R, P/R

CONVERSION PROJECTS 

Page 44: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

FPSO Cidade de Ilhabela (from Sept 1, 2011 to Oct 30, 2013)

Before Conversion

15,600 ton steel structure 2,100 tons piping installation Tank coating: 90,000 sq.m Cable pulling & Terminating: 920 km  Fabrication & Installation of New 

Accommodation for 140 POB Modules integration: 9 Nrs

After Conversion

CONVERSION PROJECTS

Page 45: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

FSPO Cidade de Marica (from May 11, 2013 to April 4, 2015)

21,000 tons steel structure 2,100 tons piping fabrication and installation Tank coating: 420,000 sq.m Cable pulling & Terminating: 900 km Fabrication & Installation of New 

Accommodation for 140 POB Modules integration: 15 Nrs

CONVERSION PROJECTS 

Sail away from yard’s quay side on April 4, 2015

Page 46: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

FPSO Cidade de Sequarema (from May 7, 2013 to August 28, 2015)

22,500 tons steel structure 2,100 tons piping fabrication and installation Tank coating: 420,000 sq.m Cable pulling & Terminating: 900 km Fabrication & Installation of New 

Accommodation for 140 POB Modules integration: 15 Nrs

CONVERSION PROJECTS 

Ready for Sail away on August 28, 2015

Depart from BRASA yard to oil field on May 22, 2015

Page 47: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

1. Main deck complete renewal

(4 meters below from main deck)

a. CDI, 9 blocks, total 4,500 tons

b. CDM, 13 blocks, total 8,500 tons

c. CDS, 13 blocks, total 8,500 tons

PICTURES OF MAJOR WORK

Page 48: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

2. New building of Accommodation (included ENIF 

room, Battery room, wheel house, POB: 140)

2 Blocks, total 1,824 tons included outfitting.

PICTURES OF MAJOR WORK

Page 49: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

3. Upper & Lower Riser Balcony

(16 blocks, total 1,500 tons)

PICTURES OF MAJOR WORK

Page 50: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

4. Spread Mooring Structure

total 4 locations, FWD PORT & STBD, AFT 

PORT & STBD, total 500 tons

PICTURES OF MAJOR WORK

Page 51: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

5. Deck Equipment Installation

a. Deck cranes iwo STBD side (SWL: 150 tons)

b. FWD & AFT mast and the rest

PICTURES OF MAJOR WORK

Page 52: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

6. Module Support, E&I and Piping support

a. Module support:422 Nrs, 

b. Cable tray and support: for 920 km cables 

totally.

c. Other deck equipment foundation: 92 Nrs

PICTURES OF MAJOR WORK

Page 53: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

7. New piping fabrication and installation

a. Iwo deck:3,005 spools

b. Iwo cargo tank: 7,949 spools

c. Iwo E/R & P/R:2,857 spools

PICTURES OF MAJOR WORK

Page 54: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

8. Cable pulling and termination: 920 kms

totally

PICTURES OF MAJOR WORK

Page 55: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

9. Flare Tower and Helideck fabrication and 

installation.

PICTURES OF MAJOR WORK

Page 56: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

10. Modules lifting and integration

a. Max weight:2,408 tons (CO2

Compression with pipe rack)

b. Total: 15 Nrs

PICTURES OF MAJOR WORK

Page 57: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather

OUR VISION

‐ To Be A Leading FPSO / FSO Conversion & Topside Modules Fabrication Yard In China;

‐ Safely Working, High Quality, On Time Delivery.

Page 58: 3# Assembly Point - KVALEID · 2020. 2. 3. · Container Terminal Transport ‐Own International Ports ‐Easily Access By land, Sea & Air Transport Weather ‐Relatively Warm Weather