LEBT CERN, 18.December 2013 Uli Raich BE/BI Faraday Cup BCT Wire Grids

TRANSCRIPT

Page 1: 3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee 10.1.2013 CERN, 18.December 2013 Uli Raich

3 MeV instrumentation commissioning

U. Raich, Federico Roncarolo, F. ZoccaLinac-4 Beam Coordination Committee

10.1.2013

CERN, 18.December 2013

Uli Raich BE/BI

Page 2: 3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee 10.1.2013 CERN, 18.December 2013 Uli Raich

Current Setup

CERN, 18.December 2013

Uli Raich BE/BI

Page 3: 3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee 10.1.2013 CERN, 18.December 2013 Uli Raich

LEBT

CERN, 18.December 2013

Uli Raich BE/BI

Faraday Cup

BCT

Wire Grids

Page 4: 3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee 10.1.2013 CERN, 18.December 2013 Uli Raich

MEBT (chopper line)

CERN, 18.December 2013

Uli Raich BE/BI

BCT BCT

BWS BWS

Page 5: 3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee 10.1.2013 CERN, 18.December 2013 Uli Raich

Measurement Bench

CERN, 18.December 2013

Uli Raich BE/BI

EmittanceMeter Slit

EmittanceMeter Grid

BCT

BSM

SpectrometerMagnet Spectrometer

GridHaloMonitor

BCT

BPM

Page 6: 3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee 10.1.2013 CERN, 18.December 2013 Uli Raich

Instruments installed• LEBT:

– Faraday Cup– Wire Grid

• MEBT (chopper line)– 2 wire scanners– 2 Beam Current Transformers (BCTs)

• Measurement Line– Slit/Grid Emittance meter– 2 BCTs– 2 (3) Beam Position Monitors (BPMs)– Bunch Shape Monitor– Spectrometer– Halo Monitor

CERN, 18.December 2013

Uli Raich BE/BI

Page 7: 3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee 10.1.2013 CERN, 18.December 2013 Uli Raich

Measurement campaigns• ~ 3 months at the 3 MeV test stand• May – October move and re-installation into the L4

tunnel• Since November ~ 3 weeks of measurements

CERN, 18.December 2013

Uli Raich BE/BI

Page 8: 3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee 10.1.2013 CERN, 18.December 2013 Uli Raich

Faraday Cup• Connected to remotely accessible Oscilloscope• Guard ring polarization set to -1000V

CERN, 18.December 2013

Uli Raich BE/BI

Page 9: 3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee 10.1.2013 CERN, 18.December 2013 Uli Raich

Wire Grids in LEBT

CERN, 18.December 2013

Uli Raich BE/BI

24 wires per plane with spacing 1mm, 3mm, 5mmWire signals sampled with 250 kHz

Page 10: 3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee 10.1.2013 CERN, 18.December 2013 Uli Raich

Wire Grid in LEBT

CERN, 18.December 2013

Uli Raich BE/BI

• Can polarize frameand wires

• Measurements for different solenoid settings

• Add wire signals and compare to FC

• Frame needs to be polarized, wire polarization is less important

Page 11: 3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee 10.1.2013 CERN, 18.December 2013 Uli Raich

Beam Current Transformers

CERN, 18.December 2013

Uli Raich BE/BI

Instrument mostly used to see if beam arrivesSignal sampled at max. 200 MHz (2 samples added -> 100 MHz)Multiple level shieldingCalibration after each beam pulse

Page 12: 3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee 10.1.2013 CERN, 18.December 2013 Uli Raich

BCT signalsWhite areas show integration windows

CERN, 18.December 2013

Uli Raich BE/BI

Page 13: 3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee 10.1.2013 CERN, 18.December 2013 Uli Raich

BCTs give an idea on chopper rise time

CERN, 18.December 2013

Uli Raich BE/BI

Page 14: 3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee 10.1.2013 CERN, 18.December 2013 Uli Raich

Wire scanners• 40 um carbon wires• First X-shaped, now

L-shaped• Wires can be polarized• Readout at 205 kHz• Now configured in

L-shape

CERN, 18.December 2013

Uli Raich BE/BI

Page 15: 3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee 10.1.2013 CERN, 18.December 2013 Uli Raich

Wire Scanners and Chopper

CERN, 18.December 2013

Uli Raich BE/BI

Page 16: 3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee 10.1.2013 CERN, 18.December 2013 Uli Raich

Crosstalk between wires• On L-shaped wire scanners crosstalk from one wire to

the next can be separated• Measured crosstalk when increasing positive wire

polarization• Profile size shows ~ 2% dependence on wire polarization

up to ~ 40V.

CERN, 18.December 2013

Uli Raich BE/BI

Page 17: 3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee 10.1.2013 CERN, 18.December 2013 Uli Raich

Crosstalk versus polarization

CERN, 18.December 2013

Uli Raich BE/BI

0 5 10 15 20 25 30 35-4000

-3500

-3000

-2500

-2000

-1500

-1000

-500

0

500

Position (mm)

Am

plitu

de (a

.u.)

WS2 – 0V

0 5 10 15 20 25 30 35-7000

-6000

-5000

-4000

-3000

-2000

-1000

0

Position (mm)

Am

plitu

de (a

.u.)

0 5 10 15 20 25 30 35-4000

-3500

-3000

-2500

-2000

-1500

-1000

-500

0

500

Position (mm)

Am

plitu

de (a

.u.)

0 5 10 15 20 25 30 35-7000

-6000

-5000

-4000

-3000

-2000

-1000

0

Position (mm)

Am

plitu

de (a

.u.)

WS2 – 5V

0 5 10 15 20 25 30 35-4000

-3500

-3000

-2500

-2000

-1500

-1000

-500

0

500

Position (mm)

Am

plitu

de (a

.u.)

0 5 10 15 20 25 30 35-7000

-6000

-5000

-4000

-3000

-2000

-1000

0

Position (mm)

Am

plitu

de (a

.u.)

WS2 – 10V

0 5 10 15 20 25 30 35-4000

-3500

-3000

-2500

-2000

-1500

-1000

-500

0

500

Position (mm)

Am

plitu

de (a

.u.)

0 5 10 15 20 25 30 35-7000

-6000

-5000

-4000

-3000

-2000

-1000

0

Position (mm)

Am

plitu

de (a

.u.)

WS2 – 15V

0 5 10 15 20 25 30 35-4000

-3500

-3000

-2500

-2000

-1500

-1000

-500

0

500

Position (mm)

Am

plitu

de (a

.u.)

0 5 10 15 20 25 30 35-7000

-6000

-5000

-4000

-3000

-2000

-1000

0

Position (mm)

Am

plitu

de (a

.u.)

WS2 – 20V

0 5 10 15 20 25 30 35-4000

-3500

-3000

-2500

-2000

-1500

-1000

-500

0

500

Position (mm)

Am

plitu

de (a

.u.)

0 5 10 15 20 25 30 35-7000

-6000

-5000

-4000

-3000

-2000

-1000

0

Position (mm)

Am

plitu

de (a

.u.)

WS2 – 40V

0 5 10 15 20 25 30 35-4000

-3500

-3000

-2500

-2000

-1500

-1000

-500

0

500

Position (mm)

Am

plitu

de (a

.u.)

0 5 10 15 20 25 30 35-7000

-6000

-5000

-4000

-3000

-2000

-1000

0

Position (mm)

Am

plitu

de (a

.u.)

WS2 – 60V

0 5 10 15 20 25 30 35-4000

-3500

-3000

-2500

-2000

-1500

-1000

-500

0

500

Position (mm)

Am

plitu

de (a

.u.)

0 5 10 15 20 25 30 35-7000

-6000

-5000

-4000

-3000

-2000

-1000

0

Position (mm)

Am

plitu

de (a

.u.)

WS2 – 80V

0 5 10 15 20 25 30 35-4000

-3500

-3000

-2500

-2000

-1500

-1000

-500

0

500

Position (mm)

Am

plitu

de (a

.u.)

0 5 10 15 20 25 30 35-7000

-6000

-5000

-4000

-3000

-2000

-1000

0

Position (mm)

Am

plitu

de (a

.u.)

WS2 – 100V

0 5 10 15 20 25 30 35-4000

-3500

-3000

-2500

-2000

-1500

-1000

-500

0

500

Position (mm)

Am

plitu

de (a

.u.)

0 5 10 15 20 25 30 35-7000

-6000

-5000

-4000

-3000

-2000

-1000

0

Position (mm)

Am

plitu

de (a

.u.)

WS2 – 120V

Page 18: 3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee 10.1.2013 CERN, 18.December 2013 Uli Raich

Emittance Meter

CERN, 18.December 2013

Uli Raich BE/BI

Labview program sets Motor position of slit and grid(controlled by PLC and FESA)

Accesses FESA class to controlAmplifier gain, plane ...

Reads ADCs and saves data in.csv format for further evaluation

1 emittance plot every 4 µs

Page 19: 3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee 10.1.2013 CERN, 18.December 2013 Uli Raich

Beam position monitorsBPMs measure • Position• Intensity• Phase

CERN, 18.December 2013

Uli Raich BE/BI

Page 20: 3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee 10.1.2013 CERN, 18.December 2013 Uli Raich

Intensity BCT-BPM

CERN, 18.December 2013

Uli Raich BE/BI

Page 21: 3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee 10.1.2013 CERN, 18.December 2013 Uli Raich

Bunch Shape Measurements• Has been used to adjust the bunchers in the test stand• Brought back into operation in the L4 tunnel • No bunch shape measurements yet because of missing

buncher control

CERN, 18.December 2013

Uli Raich BE/BI

050

100150200250300350400450500

100 150 200 250 300

Inte

nsity

, rel

. uni

ts

Phase, deg 352.2 MHz120

130

140

150

160

170

180

190

200

210

220

1000 1500 2000 2500 3000

Bunc

h Ce

ntre

, deg

352

.2 M

Hz

Buncher #2 Amplitude, rel. units

Page 22: 3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee 10.1.2013 CERN, 18.December 2013 Uli Raich

22

Concept of Laser Emittance MeterDiamondDetector

H- beam H0 beamlet beamletafter drift

Principle:

H-H0

Bending Magnet

x-scan

y-scan

H- beam

Diamond Detector

Type Polycrystalline

Size 18 x 18 mm

Resolution

5 channels

Thickness

500 µm

Readout 5 GS/s Scope

Pulsed fiber-laser

Wavelength 1080 nm

Energy 0.9 mJtpulse 110 ns

Beam quality – M2 1.7

Repetition rate 30kHz Beam transport Fiber

Particlesstripped

/ bunch< 4e5

Page 23: 3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee 10.1.2013 CERN, 18.December 2013 Uli Raich

23

Setup at 3 MeV Diagnostics Testbench

Laser Focusing

Laser Delivery optics

Diamond Detector

Bending Magnet

H- beam H0

Fiber delivery