3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski

Upload: whitney-hunt

Post on 06-Jan-2018

217 views

Category:

Documents


1 download

DESCRIPTION

We can move forward towards the TDR CFS goals with some direction from the Collaborations. –Specific, or exact information is NOT necessary; Placeholders or Ranges will advance our efforts. –CFS would like to focus on those items that are cost drivers –We need requirements, not system designs at this point Requirements are based on detector and physics optimum performance. Requirements are the same for all regions 3/20/11 ALCPG11 Global Design Effort 3

TRANSCRIPT

Page 1: 3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski

3/20/11 ALCPG11 Global Design Effort 1

CFS Detector Hall Considerations

Tom Lackowski

Page 2: 3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski

3/20/11 ALCPG11 Global Design Effort 2

• CFS must advance the IR Region and

Detector Hall design for the TDR.– Improved understanding of the Detector

Requirements for CFS.– Regional CFS Designs that satisfy the Detector

Requirements– A much more complete cost estimate

– The design(s) presented and costed in the TDR must have the concurrence of each of the Detector Collaboration.

Page 3: 3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski

• We can move forward towards the TDR CFS

goals with some direction from the Collaborations. – Specific, or exact information is NOT

necessary; Placeholders or Ranges will advance our efforts.

– CFS would like to focus on those items that are cost drivers

– We need requirements, not system designs at this point

• Requirements are based on detector and physics optimum performance.

• Requirements are the same for all regions

3/20/11 ALCPG11 Global Design Effort 3

Page 4: 3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski

3/20/11 ALCPG11 Global Design Effort 4

RDR Cost

• Distribution of IR RDR Costs

Page 5: 3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski

3/20/11 ALCPG11 Global Design Effort 5

RDR Cost

• Distribution of IR Civil Engineering Costs

Page 6: 3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski

3/20/11 ALCPG11 Global Design Effort 6

RDR Costs

• Further Distribution of IR Underground Costs

Page 7: 3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski

• Some issues, such as studies to determine

ground behavior with respect to settlements and vibration may be out of reach for the TDR for all regions. John’s talk describes a proposed study at CERN. – (Granted my geotechnical course work was

done a while ago, but the geotechnical predictive models and formulas with bore hole test data are bases on empirical data and provide at best a range of potential motion)

3/20/11 ALCPG11 Global Design Effort 7

Page 8: 3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski

3/20/11 ALCPG11 Global Design Effort 8

Requirements Outline• Site

– Access Roads Weight Limits – Parking (# of people)– Storage Hardstands– Cryo and Gas Storage (Mixing)– Fire Brigade Access

• Site Utilities• Water

– Fire Protection– Primary Cooling– Potable (Drinking)– Sanitary Sewer

Page 9: 3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski

Date EventGlobal Design Effort 9

• Utilities (continued)

– Electrical Service– Communications

• Building(s)– Detector Sub-Assembly Space– Ancillary Space

• Control Room• Office • Tech• Electronics• Machine Shop• Testing• Access Control

Page 10: 3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski

3/20/11 ALCPG11 Global Design Effort 10

Building Requirements• Buildings (Continued)

– Mechanical• HVAC

– Temperature range - Stability– Humidity criteria– ODH– Special Ventilation for gases, fire protection

• Process Water loads– Water Temperature– Water Type – LCW / Chilled LCW / Chilled

– Electrical• Power distribution• Lighting• Fire Detection

Page 11: 3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski

3/20/11 ALCPG11 Global Design Effort 11

Detector Hall Access• Shafts or Horizontal Access

– Governing Load dimensions and weights– Services routed in shafts– Shaft environmental criteria (Ground Water

Infiltration)

Page 12: 3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski

3/20/11 ALCPG11 Global Design Effort 12

Detector Hall Requirements • Detector Hall

– Footprint required to construct Detector– Detector Footprint in beam– Detector Footprint in Parked Area(Gross

footprint including access platforms, servies, and detector opened for maintenance)

– Platform dimensions and travel– Cranes, lifts and hoists – Ancillery Space

• Control Room

Page 13: 3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski

Detector Hall Requirements – # of people

• During Construction• During Running• Maintenance Periods• Sub, sub point

3/20/11 ALCPG11 Global Design Effort 13

Page 14: 3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski

3/20/11 ALCPG11 Global Design Effort 14

• So how do we get to our common TDR goals.

– Write down (CFS) the goals and deliverables– Focus on what we know or can scale from

existing detectors– Set a schedule (During THIS MEETING for the

near future deliverables)• Requirements Document

– Outline complete; 30%; 60%; Final TDR Requirements w/ collaboration concurrance

• Design Development Drawings

– Write the Requirements Documents– Identify points of contacts that will get the

tasks done. (TODAY)

Page 15: 3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski

Let’s Start- Can we Concur• Each detector will be designed to provide

beam radiation shielding and no shielding external of the detector is required for unrestrictive occupancy and maintenance of the parked detector.

• Both the MDI and ILD detector will be supported and transported on independent platforms.

3/20/11 ALCPG11 Global Design Effort 15

Page 16: 3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski

Conclusion• A reasonable goal is to have a “mostly

complete” requirements document done by the next meeting in September. – This document should be put under some form

of change control.• Regional CFS Conceptual Document

(Drawings and Text) and much of the cost estimate must be done by a year from now.

3/20/11 ALCPG11 Global Design Effort 16

Page 17: 3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski

Date Event Global Design Effort 17

Page 18: 3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski

Date Event Global Design Effort 18

Page 19: 3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski

Date Event Global Design Effort 19

Page 20: 3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski

Date Event Global Design Effort 20

Page 21: 3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski

Date Event Global Design Effort 21

Page 22: 3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski

Date Event Global Design Effort 22

Page 23: 3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski

Date Event Global Design Effort 23

Page 24: 3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski

Date Event Global Design Effort 24

Page 25: 3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski

Date Event Global Design Effort 25

Page 26: 3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski

Date Event Global Design Effort 26