350-1827 equipment manufacturer · 3. footings need special consideration: a. footings are...

10
Equipment Manufacturer 350-1827

Upload: others

Post on 17-Mar-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 350-1827 Equipment Manufacturer · 3. Footings need special consideration: a. Footings are substancial. See installtion instructions for specifications. b. A seven day cure time is

Equipment Manufacturer350-1827

Page 2: 350-1827 Equipment Manufacturer · 3. Footings need special consideration: a. Footings are substancial. See installtion instructions for specifications. b. A seven day cure time is

Equipment Manufacturer350-1827

Page 3: 350-1827 Equipment Manufacturer · 3. Footings need special consideration: a. Footings are substancial. See installtion instructions for specifications. b. A seven day cure time is

0.5 1.0

05'

Meters2.0 3.0

10'

36"

0,92M

36"

0,92M

25'-6"

[7.78M]

26'

[7.93M]

6'-1"

[1.86M]

6'-2"

[1.88M]

6'-1"

[1.84M]

6'-1"

[1.86M]

6'-2"

[1.88M]

6'-1"

[1.87M]

6'-1"

[1.86M]

SQUARE

SHADE

HAT

TRANSFER

STATION

W/ STEP

WIDE GLIDE

SLIDE

CLIMBING

SQUARES

BEANSTALK

CLIMBER

90° GLIDE

SLIDE

SILO

CLIMBER

POST

MOUNT

WHEEL

PLAYWORLD SYSTEMS, INC.

1000 Buffalo Road

Lewisburg, PA

17837-9795 USA

BPaper Size

DATE:

SCALE:PROJECT NO:

*PLAYGROUND SUPERVISION REQUIRED

DRAWN BY:

USER CAPACITY: AGE GROUP:

AREA: PERIMETER:

EQUIPMENT SIZE:

USE ZONE:

FALL HEIGHT:

CPSC #325ASTM F1487-

350-

1827

CA

TA

LO

G P

RE

-D

ES

IG

N

350-1827 1/4"=1'-0"

M. MERTZ

17-MAY-18

13'10" x 12'3" x 8'5"4,22M x 3,73M x 2,57M

26'0" x 25'6"7,93M x 7.78M

529 SqFt.49,14 Sqm.

83 Ft.25,3M

3'0"0,91M

19 2-5

11

Total Elevated Play Activities:

Total Ground-Level Play Activities:

AccessibleElevatedActivities

AccessibleGround-Level

Activities

AccessibleGround-LevelPlay Types

Required

Provided

AD

A S

CH

EDU

LE 5

3

5

2

2

2

2

2

POST

MOUNT

BELL

Page 4: 350-1827 Equipment Manufacturer · 3. Footings need special consideration: a. Footings are substancial. See installtion instructions for specifications. b. A seven day cure time is

0.5 1.0

05'

Meters2.0 3.0

10'

36"

0,92M

36"

0,92M

25'-6"

[7.78M]

26'

[7.93M]

6'-1"

[1.86M]

6'-2"

[1.88M]

6'-1"

[1.84M]

6'-1"

[1.86M]

6'-2"

[1.88M]

6'-1"

[1.87M]

6'-1"

[1.86M]

5

6

7

8

9

10

11

12

13

15

PLAYWORLD SYSTEMS, INC.

1000 Buffalo Road

Lewisburg, PA

17837-9795 USA

BPaper Size

DATE:

SCALE:PROJECT NO:

*PLAYGROUND SUPERVISION REQUIRED

DRAWN BY:

USER CAPACITY: AGE GROUP:

AREA: PERIMETER:

EQUIPMENT SIZE:

USE ZONE:

FALL HEIGHT:

CPSC #325ASTM F1487-

350-

1827

CA

TA

LO

G P

RE

-D

ES

IG

N

350-1827 1/4"=1'-0"

M. MERTZ

17-MAY-18

13'10" x 12'3" x 8'5"4,22M x 3,73M x 2,57M

26'0" x 25'6"7,93M x 7.78M

529 SqFt.49,14 Sqm.

83 Ft.25,3M

3'0"0,91M

19 2-5

11

Total Elevated Play Activities:

Total Ground-Level Play Activities:

AccessibleElevatedActivities

AccessibleGround-Level

Activities

AccessibleGround-LevelPlay Types

Required

Provided

AD

A S

CH

EDU

LE 5

3

5

2

2

2

2

2

Page 5: 350-1827 Equipment Manufacturer · 3. Footings need special consideration: a. Footings are substancial. See installtion instructions for specifications. b. A seven day cure time is

DATE:

SCALE:

DRAWN BY:

SPIRAL SLIDE CENTER POST FOOTING (DETAIL1)

SUPPORT POST FOOTING (DETAIL 1 or 4) INDICATES POST LENGTH)

CANTILEVER, "T" POST, AND COMPONENTPOST FOOTING (DETAIL 2)

(ZZCH1850 INDICATES PART NUMBER)

GROUND ZERO POST FOOTING (DETAIL 2) INDICATES POST LENGTH)

COMPONENT FOOTING (DETAIL 3)

(112"

(144"

Page 6: 350-1827 Equipment Manufacturer · 3. Footings need special consideration: a. Footings are substancial. See installtion instructions for specifications. b. A seven day cure time is

T

R

A

N

S

F

E

R

S

T

A

T

I

O

N

T

R

A

N

S

F

E

R

S

T

A

T

I

O

N

1

2

4

"

1

2

4

"

1

5

6

"

1

5

6

"

1

5

6

"

1

5

6

"

36"

5"

36"

18"

16"

19"

32"

41" 16"

20"

8"

37"

17"

11" 10"

15"

18"

16"

12"

29"

58"

131"

127"

14"

TRANSFER

STATION

W/ STEP

WIDE GLIDE

SLIDE

CLIMBING

SQUARES

BEANSTALK

CLIMBER

90° GLIDE

SLIDE

SILO

CLIMBER

151"

97"

8"

47"

PLAYWORLD SYSTEMS, INC.

1000 Buffalo Road

Lewisburg, PA

17837-9795 USA

BPaper Size

DATE:

SCALE:PROJECT NO:

*PLAYGROUND SUPERVISION REQUIRED

DRAWN BY:

FOOTING LEGEND

1

1

2

"

1

8

5

0

Z

Z

C

H

1

4

4

"

G

Z

SPIRAL SLIDE CENTER POST FOOTING (DETAIL1)

SUPPORT POST FOOTING (DETAIL 1 or 4)(112" INDICATES POST LENGTH)

CANTILEVER, "T" POST, AND COMPONENTPOST FOOTING (DETAIL 2)

(ZZCH1850 INDICATES PART NUMBER)

GROUND ZERO POST FOOTING (DETAIL 2)(144" INDICATES POST LENGTH)

COMPONENT FOOTING (DETAIL 3)

350-

1827

CA

TA

LO

G P

RE

-D

ES

IG

N

350-1827 1/4"=1'-0"

M. MERTZ

17-MAY-18

36"

36"

36"

48"

Page 7: 350-1827 Equipment Manufacturer · 3. Footings need special consideration: a. Footings are substancial. See installtion instructions for specifications. b. A seven day cure time is

PLAYWORLD SYSTEMS, INCSales and Marketing 1000 BUFFALO ROAD LEWISBURG, PA 17837 Phone: 1-570-522-9800 Fax: 1-570-522-0268

Re: Shade Hat footing concrete volume for drawing 350-1827

Dear Sales and Marketing,

Project: 350-1827

This design contains shade product. Please note the following as applicable:

Posts supporting the hat shade will require deeper than usual footings. To assist with your installation cost estimations, please note the following:

The amount of concrete noted is limited to the posts which support the hat shade only. It does not include any concrete needed to install the remaining posts in this design.

Consult the local stipulations for the proposed installation site to ensure the hat shade meets or exceeds these requirements (wind speed, etc.) prior to placing the order.

Free Standing Shade

1. Consult the local code authority for permitting requirements prior to order.Stamped engineering drawings are available for a fee if required.

2. A crane will be needed for the installation of free-standing shade (>20' x 20').Ensure site is crane accessible. See dealer sheets on crane and tools.

3. Footings need special consideration:a. Footings are substancial. See installtion instructions for specifications.b. A seven day cure time is required.c. Must be located at least 72" from other equipment unless subterranean.d. Anchor bolts must be embedded accurately to ensure proper assembly.

4. A height clearance of 84" must be maintained over existing equipment.Consult your Customer Satisfaction Representative prior to ordering free-standingshade not previously quoted."

Please review all installation instructions for your specific shade model(s) on the BBS.

Hat Shade

Thank You,

Megan MertzPlayground Designer1.800.233.8404Playworld Systems, Inc.

Wednesday, December 05, 2018

4.00 posts in this drawing will require a combined total of 1.86 cubic yards of concrete per a 150 mph wind speed factor.

Page of1 1Monday, November 04, 2019 www.PlayworldSystems.com

Page 8: 350-1827 Equipment Manufacturer · 3. Footings need special consideration: a. Footings are substancial. See installtion instructions for specifications. b. A seven day cure time is

Posts

ZZCH0018 21 3.5in OD x 124in STEEL POST W/RIVETED CAP

ZZCH0217 42 3.5in OD x 156in SWAGED STEEL POST

Decks & Kick Plates

ZZCH0616 13 SQUARE COATED DECK ASSEMBLY

ZZCH0636 14 DOUBLE SLIDE COATED DECK ASSEMBLY

ZZUN2290 15 COATED DECK TO DECK CONNECTION KIT

ADA Items

ZZCH2006 16 TRANSFER STATION (36in DECK)

ZZUN2019 17 APPROACH STEP FOR TRANSFER STATION

Slides

ZZCH3129 18 90 DEGREE GLIDE SLIDE (36in DECK)

ZZCH3538 19 NUVO 36in DOUBLE SLIDE

Activity Panels

ZZCH4290 110 POST MOUNTED STEERING WHEEL

Climbers

ZZCH7087 111 CLIMBING SQUARES BLOCK CLIMBER (36in)

ZZCH7949 112 SILO CLIMBER (36in DECK)

ZZCH8100 113 BEANSTALK CLIMBER (36in DECK)

Audible Activities

ZZCH4556 114 7in BELL (POST MOUNT)

Roofs & Arches

ZZCH9716 115 SQUARE HAT SHADE (CH)

Additional Tool & Maintenance Kits

ZZUN1471 116 INSTALLER HARDWARE KIT

ZZUN9910 117 SURFACING WARNING LABEL KIT

ZZUN9930 118 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL

ZZXXGNGUID 119 GENERAL INSTALLERS GUIDE

Part No. Description

Design Number: 350-1827 - Bill Of Material

350-1827

Ref.No. Quantity

Monday, November 04, 2019 Page of1 1 Playworld.com

Page 9: 350-1827 Equipment Manufacturer · 3. Footings need special consideration: a. Footings are substancial. See installtion instructions for specifications. b. A seven day cure time is

CertifiedZZCH00181 3.5in OD x 124in STEEL POST W/RIVETED CAP

2 77.82 108 0 2.00 0.25 0

CertifiedZZCH02172 3.5in OD x 156in SWAGED STEEL POST4 315.24 254 0 2.00 0.50 0

CertifiedZZCH06163 SQUARE COATED DECK ASSEMBLY 1 54.86 174 3 1.00 0.00 0

CertifiedZZCH06364 DOUBLE SLIDE COATED DECK ASSEMBLY1 63.86 185 3 1.00 0.00 0

CertifiedZZUN22905 COATED DECK TO DECK CONNECTION KIT1 0.29 4 0 0.50 0.00 0

CertifiedZZCH20066 TRANSFER STATION (36in DECK) 1 145.80 308 2 2.00 0.09 0

CertifiedZZUN20197 APPROACH STEP FOR TRANSFER STATION1 35.83 72 1 1.00 0.04 0

CertifiedZZCH31298 90 DEGREE GLIDE SLIDE (36in DECK)1 96.73 418 2 2.00 0.03 1

CertifiedZZCH35389 NUVO 36in DOUBLE SLIDE 1 157.29 683 2 2.00 0.06 1

CertifiedZZCH429010 POST MOUNTED STEERING WHEEL 1 7.83 44 1 0.25 0.00 1

CertifiedZZCH708711 CLIMBING SQUARES BLOCK CLIMBER (36in)1 129.12 437 2 4.00 0.12 1

CertifiedZZCH794912 SILO CLIMBER (36in DECK)1 70.33 129 1 1.50 0.06 1

CertifiedZZCH810013 BEANSTALK CLIMBER (36in DECK)1 69.63 273 1 1.00 0.03 1

CertifiedZZCH455614 7in BELL (POST MOUNT) 1 4.61 41 1 0.25 0.00 1

CertifiedZZCH971615 SQUARE HAT SHADE (CH) 1 362.58 3,021 0 9.00 0.00 0

N/AZZUN147116 INSTALLER HARDWARE KIT 1 57

CertifiedZZUN991017 SURFACING WARNING LABEL KIT 1 0.05 1 0 0.25 0.00 0

N/AZZUN993018 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL

1 90

N/AZZXXGNGUID19 GENERAL INSTALLERS GUIDE 1 1

DescriptionConcrete

(Yds3)

TotalWeight

(lbs) Users

Design Number: 350-1827 - Compliance and Technical Data

350-1827

Pre-Consumer

Recycled Content(lbs)

CO2eFootprint

(kgs)InstallHours

Ref.No.

Reference Document: ASTM F1487

UnitASTMStatus

ActivePlay

Events

Post-

Part No. Qty.

196 411 6,295 19 29.75 1.181,591.87 7Totals:

6 Metric Tons185 Kg88 Kg716.34 Kg 0.90 m3

Monday, November 04, 2019 Page of1 2 Playworld.com

Page 10: 350-1827 Equipment Manufacturer · 3. Footings need special consideration: a. Footings are substancial. See installtion instructions for specifications. b. A seven day cure time is

DescriptionConcrete

(Yds3)

TotalWeight

(lbs) Users

Design Number: 350-1827 - Compliance and Technical Data

350-1827

Pre-Consumer

Recycled Content(lbs)

CO2eFootprint

(kgs)InstallHours

Ref.No.

Reference Document: ASTM F1487

UnitASTMStatus

ActivePlay

Events

Post-

Part No. Qty.

The lay-out for this custom playscape, design number 350-1827, has been configured to meet the requirements of the ASTM F1487 standard. In addition, each of the above components listed as "Certified" have been tested and are IPEMA certified. Components listed as "Not Applicable" do not fall within the scope of the ASTM F1487 standard and have not been tested. IPEMA certification can be verified on the IPEMA website, www.ipema.org. In the interest of playground safety, IPEMA provides a Third Party Certification Service which validates compliance.

The CO2e (carbon footprint given in Kilograms and Metric Tons) listed above is a measure of the environmental impact this play structure represents from harvesting raw materials to the time it leaves our shipping dock. Playworld Systems nurtures a total corporate culture that is focused on eliminating carbon producing processes and products, reducing our use of precious raw materials, reusing materials whenever possible and recycling materials at every opportunity. Playworld Systems elected to adopt the Publicly Available Specification; PAS 2050 as published by the British Standards Institute and sponsored by Defra and the Carbon Trust. The PAS 2050 has gained international acceptance as a specification that measures the greenhouse gas emissions in services and goods throughout their entire life cycle.

The lay-out was also designed to meet the 2010 Standards published 15-Sep-2010, by the Department of Justice when installed over a properly maintained surfacing material that is in compliance with ASTM F1951 "Accessibility of Surface Systems Under and Around Playground Equipment" as well as ASTM F1292, "Impact Attenuation of Surfacing Materials Within the Use Zone of Playground Equipment", appropriate for the fall height of the structure.

Installation times are based on one experienced installer. A crew of three experienced individuals can perform the installation within the given time, each member working 1/3 of the given hours. [Eg. Installation Time = 30 hours. For a crew of three, each member will work 10 hours on the installation for a total of 30 hours on the project.]

A measurement, in pounds, that qualifies the amount of material that was captured as waste and diverted from landfill during an initial manufacturing process and is being redirected to a separate manufacturing process to become a different product. E.g. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as rods, flat bars and H-channels.

A measurement, in pounds, that qualifies the amount of material that was once another product that has completed its lifecycle and has been diverted from a landfill as a solid waste through recycling and is now being used in a Playworld Systems' product. E.g. **20% to 40% of the steel in our steel tubing and sheet steel have been diverted from landfills. Automobiles are scrapped and recyclable steel is purchased by the steel mill that produces our raw product.** The amount of Post-Consumer recycled steel fluctuates daily based on the availability of the recycled steel.

ASTM F1487

2010 ADA Standards for Accessible Design

Installation Times

Carbon Footprint

Pre-Consumer Recycle Content

Post-Consumer Recycle Content

Monday, November 04, 2019 Page of2 2 Playworld.com