Name of Hon'ble MLA: Smt. Geeta Bhukkal Total population : 225617 Area (Sq km): 541.157 HSAMB Road Network Status HSAMB Roads Chronology: Haryana State Agricultural Marketing Board Summary of Road Network Name of Constituency: Jhajjar (SC) Constituency information (2001) PWD Roads Network: NH 45.39 SH 42.66 MDR 9.60 ODR 117.88 Transferred from HSAMB 91.12 Total 306.65 (Information of PWD road network in the Constituency may not be very accurate) Completed Roads under Maintenance 69 207.19 No SR envisaged roads km 3 8.99 SR Awarded roads km 1 5.40 SR sanctioned but yet to be awarded roads km 73 221.58 Sub Total: roads km New Construction going on 3 10.12 New Construction - Awarded roads km 3 10.12 Sub Total: roads km Transferred 9 33.83 Transferred to PWD (938 roads) roads km 8 40.86 Transferred to PWD (Individual) roads km 17 74.69 Sub Total: roads km 93 306.39 Group Total: roads km 4 9.75 a) Roads Completed before 1-7-1999 roads km 14 45.89 b) Roads Completed between 1-7-1999 and 4-3-2005 roads km 29 114.56 c) Roads Completed between 5-3-2005 and 25-9-2009 roads km 35 106.35 d) Roads Completed between 26-9-2009 and 25-10-2014 roads km 8 19.72 e) Roads Completed after 26-10-2014 roads km 90 296.27 Total: roads km Friday, February 05, 2016 Page 1 of 34 Jhajjar (SC) J

Upload: vanhanh

Post on 01-Jan-2017

270 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 35.Jhajjar (SC)

Name of Hon'ble MLA: Smt. Geeta Bhukkal

Total population : 225617

Area (Sq km): 541.157

HSAMB Road Network Status

HSAMB Roads Chronology:

Haryana State Agricultural Marketing Board

Summary of Road Network

Name of Constituency: Jhajjar (SC)

Constituency information

(2001)

PWD Roads Network:

NH

45.39

SH

42.66

MDR

9.60

ODR

117.88

Transferred from HSAMB

91.12

Total

306.65

(Information of PWD road network in the

Constituency may not be very accurate)

Completed Roads under Maintenance

69 207.19No SR envisaged roads km

3 8.99SR Awarded roads km

1 5.40SR sanctioned but yet to be awarded roads km

73 221.58Sub Total: roads km

New Construction going on

3 10.12New Construction - Awarded roads km

3 10.12Sub Total: roads km

Transferred

9 33.83Transferred to PWD (938 roads) roads km

8 40.86Transferred to PWD (Individual) roads km

17 74.69Sub Total: roads km

93 306.39Group Total: roads km

4 9.75 a) Roads Completed before 1-7-1999 roads km

14 45.89 b) Roads Completed between 1-7-1999 and 4-3-2005 roads km

29 114.56 c) Roads Completed between 5-3-2005 and 25-9-2009 roads km

35 106.35 d) Roads Completed between 26-9-2009 and 25-10-2014 roads km

8 19.72 e) Roads Completed after 26-10-2014 roads km

90 296.27Total: roads km

Friday, February 05, 2016 Page 1 of 34Jhajjar (SC) J

Page 2: 35.Jhajjar (SC)

Completed Roads under Maintenance

No SR envisaged

H - 17 Kheri Asra To Chhudani 3.301) km.

A/R 2015-16 alloted on 24.06.2015 to Sh. Shamsher .109335 14-Sep-15

Constructed 2002, Path 6 karam, crust 225mm, S/R 75mm WBM+PC in 2009. PWD RoadID - 9708. Now crust 225mm

20393 21-Feb-12

H - 19 Shekhupur To Bhadani 2.402) km.

Road is in good condition.109337 14-Sep-15

A/A for Rs. 84.54 lac on 05.08.2014, allotted on 7/8/2014 (M/s Dagar Construction Co.), completed on 20.06.2015.

82165 06-Aug-14

Constructed 2001, Path 6 karam, S/R 2009, 75mm WBM +PC, now crust 225mm, S/R 20.06.2015 Nala on one side 550m+Paver block + 250m GSB + 75mm WBM, RD 0-650m (Shekhupur), in rest 75mm WBM layer + PC. Now crust 300mm.

20391 21-Feb-12

H - 27 Bhadani To Chhudani 4.033) km.

Road is in good condition.109344 14-Sep-15

A/A for Rs. 55.74 Lac on 05.08.2014, allotted on 7/8/2014 (BSG Infratech India Pvt. Ltd), completed on 19/5/2015.

82173 06-Aug-14

Work plan 2014-15: (WBM+PC) in entire length & Rs. 0.25/km (Earth work). Estimated Cost= 63lac

75042 24-Jun-14

Constructed 2004, crust 150 mm. Path-5karam. 75mm WBM + PC done in 5/2010, 75mm WBM + PC on 19/5/2015. Now crust 300mm.

5042 17-Sep-11

H - 35 Chhudani To Kablana 3.504) km.

A/R 2015-16 alloted on 24.06.2015 to Sh. Shamsher .109351 14-Sep-15

Constructed 2005, Crust-225mm, path-6k, Widening to 18' and strengthening done on 15.05.2010 (148 lacs), with 75mm WBM layer + 50mm BUSG + PC. RD 0 to 2820m & in rest CC 2820 to 3500m= 680m. Now crust 350mm.

12386 06-Sep-11

H - 69 Surakhpur To Jhajjar 6.205) km.

A/R 2015-16 alloted on 24.06.2015 to Sh. Shamsher .109372 14-Sep-15

Constructed 2009, Path 6 karam, crust 225mm20407 21-Feb-12

H - 84 Kheri Assra To Surakhpur 2.176) km.

A/R 2015-16 alloted on 24.06.2015 to Sh. Shamsher .109384 14-Sep-15

Against A/A of 141.48 lacs on 19.11.2008 now tech. sanctioned for combined 3 nos roads (ID 4571, 84,5098) on 02.12.2013 for Rs. 129.47 lacs.

59175 04-Dec-13

Constructed-31.03.2010. Crust-225mm, path- RD 0 to 1160 = 8k, RD 1160 to 2120 = 6k,

13063 21-Oct-11

Friday, February 05, 2016 Page 2 of 34Jhajjar (SC) J

Page 3: 35.Jhajjar (SC)

H - 1578 Dhalanwas To Jhamri 4.407) km.

The road under defect liability period with PWD ( B & R) will be taken over afterwords.

105889 20-Jul-15

The roads under defect liability period with PWD (B&R) [will be taken over afterwords]

73011 23-May-14

No come back. Due to liability period. 57285 05-Nov-13

Transferred back from PWD on 17.4.2013 within a list of 550 (76+474) roads.

45683 18-Apr-13

Constructed 30.11.1992, Path 4 & 6 karam, Crust 150 mm, SR Nil13513 31-Oct-11

Transferred to PWD. PWD RoadID : 97537733 03-Oct-11

H - 1579 Bhurawas To Dhani Asthal 0.708) km.

A/R 2015-16 alloted on24.06.2015 to M/s Nidhi Const. Company .109389 14-Sep-15

Constructed 1992. Crust 150mm. Path 5 karam. PC done in 2005, in 11/2012 paver block from RD 0 to 360m in Bhurawas & in rest 75mm WBM payer + PC. Now crust 225mm.

11395 18-Oct-11

H - 1580 Matanhail To Imlota 3.579) km.

The road under defect liability period with PWD ( B & R) will be taken over afterwards.

105891 20-Jul-15

The roads under defect liability period with PWD (B&R) [will be taken over afterwards]

73012 07-Nov-14

No come back PWD B&R due to liability period. 57286 05-Nov-13

Transferred back from PWD on 17.4.2013 within a list of 550 (76+474) roads.

45682 18-Apr-13

Constructed 05.05.1992, Path 6 karam, Crust 150 mm, SR 2008 75mm WBM payer + PC. Now crust 225mm.

13514 31-Oct-11

Transferred to PWD. PWD RoadID : 97527734 03-Oct-11

H - 1581 Nvm Jhajjar To Badli Road 1.0810) km.

work completed on 30.09.2015. Road is in good condition.111685 03-Nov-15

S/R A/A on 19.12.2013 for Rs. 3.25 crore., tech. sanctioned for Rs. 3,17,40,500/-, work alloted on 23.05.2014 (Sh. Vinod kumar).

101421 05-May-15

On dated 13.02.2015, third Party (GMD consultants) inspect and report , Report is satisfactory but no precautionary measure were taken as the level difference of edges are about 1 feet with respect to the C:C top.

99946 16-Apr-15

Constructed 14.04.1992, Path 10 karam, Crust 150 mm, CC pavment done PWD(B&R), SR Nil.

13515 31-Oct-11

H - 1583 Gudha To Jondhi 2.9711) km.

A/R 2015-16 tender received & under process. 109391 14-Sep-15

Constructed 2001. Crust 150mm. Path 5 karam. 75mm WBM + PC done in 2009, 75mm WBM + PC in 10/2012. Now crust 225mm.

11443 18-Oct-11

Friday, February 05, 2016 Page 3 of 34Jhajjar (SC) J

Page 4: 35.Jhajjar (SC)

H - 1585 Kheri Khumhar To Talav 1.6012) km.

A/R 2015-16 alloted on 24.06.2015to Sh. Roshanlal .109392 14-Sep-15

Constructed 12/2001. Path 6 karam. Crust 225mm. CM Announcement no. 3613 for repairs. 75mm WBM+ PC in 4/2010 (28 lacs). Crust 225mm.

17105 05-Jan-12

H - 1586 Tehsil Road To Talav 2.8213) km.

The road under defect liability period with PWD ( B & R) will be taken over afterwards.

105894 20-Jul-15

The roads under defect liability period with PWD (B&R) [will be taken over afterwards]

73013 23-May-14

Transferred back from PWD on 17.4.2013 within a list of 550 (76+474) roads.

45690 18-Apr-13

Constructed 15.04.2002, Path 10, 11 & 12 karam, SR 12/08 strengthing & widening. 0.05 BM + 0.30 M WBM, widening of bridge in 2010. Now crust 300mm in 5.50mm width.

13517 31-Oct-11

Transferred to PWD. PWD RoadID : 97677735 03-Oct-11

H - 1587 Matanhail To Bambulia 3.2514) km.

A/R 2015-16 alloted on 07.08.2015 to Sh. Roshanlal .109393 14-Sep-15

Constructed 08.02.2004, Path 6 & 7 karam, Crust 150 mm, SR 05/2009. 75 mm WBM layer +PC, total crust 225 mm.

13518 31-Oct-11

H - 1589 Akheri Madanpur To Sunderheti 5.8015) km.

work not executed by the original agency .Now tenders to be called . Shortly on risk and cost.

111686 03-Nov-15

Work Completed on 30.12.2014 111277 29-Oct-15

work not executied by the orginal agency . Now tenders to be called shortly on risk and cost .

109154 14-Sep-15

Tender to called shortly101422 05-May-15

Provision has been changed. Agency is not ready tosort out the work on new provision. Tender will called on new DNIT.

97378 10-Mar-15

Panchayat Raj completed 520m CC, balance work is to be done by HSAMB.

88565 12-Nov-14

A/A accorded for Rs. 81.06 lac on 25.08.2014. Tender approved ( The Silani Gate Co-op L&C Society Ltd. ) D.E./T/S for Rs. 81,06,400/- on 26.8.14. Work awarded on 26.08.2014.

83695 26-Aug-14

Work plan 2014-15: Paver Block RD- 5.1km to 5.8km (Sunderheti) & heavy patch on 250m GSB in length 700m= Estimated Cost 75.00 lac.

75008 24-Jun-14

Constructed 12/2002. Path 4 karam. Crust 150mm 75mm WBM+ PC in 4/2010

17106 05-Jan-12

H - 1593 Bahu To Khanpur Kalan 1.4016) km.

A/R 2015-16 alloted on24.06.2015 to M/s Nidhi Const. Company .109394 14-Sep-15

R/A/A of S/R granted on 30.06.2014 for Rs. 25,26,300/-. 76768 02-Jul-14

Friday, February 05, 2016 Page 4 of 34Jhajjar (SC) J

Page 5: 35.Jhajjar (SC)

Work plan: patches + PC (Estimated cost Rs. 10 lacs ), allotted on 30.08.2012 (The Nand Rampur Bass Co-op L&C society Ltd. )

42158 11-Mar-13

Constructed 2005. Crust 150mm. Path 5 karam. SR 3/2013 RD 0 to 1030m Patch+PC, RD 1030 to 1330m CC laid by Panchayati Raj (Khanpur Kalan), hence no R/A/A utilized, RD 1330 to 1400m is existing CC laid by Panchayati Raj.

11401 18-Aug-11

H - 1596 Bahu To Makrana Via Khorra 6.4017) km.

A/R 2015-16 alloted on 07.08.2015 to Sh. Roshanlal .109395 14-Sep-15

A/R 2014-15 alloted on 22.05.2014 (Sh. Dharamvir), completed on 30.03.2015 (Exp. Rs. 2.79 lac)

101308 05-May-15

Constructed 7/2005. Path 6 karam. Crust 150mm 75mm WBM+ PC in 4/2010. Now crust 225mm.

17125 05-Jan-12

H - 1597 Pwd Road To Vill.Rankhanda 4.0018) km.

A/R 2015-16 alloted on 07.08.2015 to Sh. Manjeet .109396 14-Sep-15

A/R 2014-15 alloted on 22.05.2014 (M/s Nidhi const. co.), completed on 28.03.2015

101300 05-May-15

Constructed 2005. Crust 150mm. Path 6 karam. 75mm WBM + PC done in 2010. SR 10.04.2013 75mm WBM + PC in RD 1600 to 3400m. Now crust RD 0 to 1600 & RD 3400 to 4000m i.e 225m & RD 1600 to 3400m i.e 300mm.

11403 18-Oct-11

H - 1598 Goriya To Bharangi 2.5019) km.

A/R 2015-16 alloted on 07.08.2015 to Sh. Roshanlal .109397 14-Sep-15

Constructed 2005. Crust 150mm. Path 5 karam. SR 11/2012 with 75mm WBM + PC. Now crust 225mm.

11405 18-Oct-11

H - 1599 Birthala To Bhurawas 3.5020) km.

A/R 2015-16 alloted on 07.08.2015 to Sh. Manjeet .109398 14-Sep-15

Constructed 22.05.2005, Path 6 karam, Crust 150 mm SR Nil.13522 31-Oct-11

H - 1602 Jamalpur To Bhurawas 1.6021) km.

A/R 2015-16 alloted on 07.08.2015 to Sh. Manjeet .109399 14-Sep-15

A/R 2014-15 alloted on 22.05.2014(Sh. Dharamvir), completed on 31.01.2015

101312 05-May-15

Constructed 12/2008. Path 5 karam. Crust 150 mm 17108 05-Jan-12

H - 1603 Humanyupur To Jhanswa 4.9922) km.

The road under defect liability period with PWD ( B & R) will be taken over afterwards.

105902 20-Jul-15

The roads under defect liability period with PWD (B&R) [will be taken over afterwards]

73014 23-May-14

Transferred back from PWD on 17.4.2013 within a list of 550 (76+474) roads.

45488 18-Apr-13

Friday, February 05, 2016 Page 5 of 34Jhajjar (SC) J

Page 6: 35.Jhajjar (SC)

Constructed 18.01.2009, Path 6 karam, Crust 225 mm, SR Nil.13524 31-Oct-11

Transferred to PWD. PWD RoadID : 97867730 03-Oct-11

H - 1605 Lila Heri To Koelpur Via Mundahera 6.0023) km.

Road is in good condition. Date of completion 30.07.2015.109401 14-Sep-15

const. 2009, crust 225mm , path 6k, S/R -30.07.2015 with PIP RD- 2200-2900m & 5600-6000m, 75mm WBM +PC RD 0-1930m& only PC in RD 2900-3200m & 3920-5600m.rest unthouched .

109400 14-Sep-15

H - 1606 Biror To Mundahera 3.8524) km.

A/R 2015-16 alloted on24.06.2015 to M/s Nidhi Const. Company .109402 14-Sep-15

SR work completed on 31.03.2013. Road in good condition.42675 15-Mar-13

Constructed 2007. Crust 150mm. Path 4, 5 & 7 karam. Flood area.11409 18-Aug-11

H - 1607 Kaliawas To Bhagvi 1.1225) km.

A/R 2015-16 alloted on24.06.2015 to M/s Nidhi Const. Company .109403 14-Sep-15

Work Plan: Paver block 0.04 km, 3 causeways, 75mm WBM + PC in 570m. Rest patches (Estimated cost 11 lacs).

11412 18-Oct-11

Constructed 2007. Crust 225mm. Path 6 karam. S/R 22/11/2012, RD 0 to 25m, RD 250 to 258m, RD 350 to 357m= causeway & RD 550 to 1120m= 570m 75mm WBM layer + PC, in rest patches. Now crust 300mm.

11411 18-Oct-11

H - 1609 Mundsa To Baba Khubidas Ashram 2.0026) km.

A/R 2015-16 alloted on24.06.2015 to M/s Nidhi Const. Company .109404 14-Sep-15

Constructed 6/2007. Path 5 karam. Crust 225mm, CC done by Gram Panchyat (RD 750 to 1200m), SR 11/2014 paver block in Mundsa Phirni . RD 0 to 750m & 75mm WBM layer + PC in RD 1200 to 2000m. Now crust 300mm.

17121 05-Jan-12

H - 1612 Sasrauli To Jhamri 5.7127) km.

work completed on 25.10.2015. Road is in good condition.111688 03-Nov-15

CA asked EIC to get check work from GMD Consultant.99400 15-Apr-15

R/D/E tec. Sanctioned for Rs. 60,80,800/- on 23.02.15.93279 24-Feb-15

440m Phirni work to be reduced in Village Sasrauli.88566 12-Nov-14

S/R work allotted to Sh. Jai Bhagwan contractor on 29.08.2014.84129 08-Sep-14

A/A & D/E on 04.03.2014 for Rs. 1,05,54,100/- S/R work allotted on 04.03.2014 (The Bala Ji Co-Op L&C Society Ltd.)

67329 31-Mar-14

Paver Block (Sasrauli phirni) RD 0 to 500m & (Jhamri phirni) RD 5610 to 5710, In rest 75mm WBM + PC & EW on berms in 5.11 km, Est. Cost 128.50 lacs.

91473 01-Apr-13

Constructed 10/2008. Path 4, 5 karam. Crust 225mm 17101 05-Jan-12

H - 1613 Marot To Bhindawas 3.5628) km.

Friday, February 05, 2016 Page 6 of 34Jhajjar (SC) J

Page 7: 35.Jhajjar (SC)

Road is in good condition.109405 14-Sep-15

Constructed 31.12.2009 , Path 5 & 6 karam , Crust 225mm, CC (0 to 700m), completed on 30.06.12, SR 11/2014 from RD 710 to 1010m= 150mm WBM +PC & in rest WBM patch + PC. Now crust 375mm from RD 0 to 1010m & 225mm from RD 1010 to 3560m.

41943 11-Mar-13

H - 1614 Khanpur Kalan To Baba Guga Pir Mandir 0.9329) km.

A/R 2015-16 alloted on24.06.2015 to M/s Nidhi Const. Company .109406 14-Sep-15

Constructed 31.03.2008, Path 5 karam, Crust 225 mm.13482 31-Oct-11

H - 1615 Bahu To Naya Gaon 4.5430) km.

Road is in good condition.109407 14-Sep-15

W/ EIC has order that SE Rohtak to submit action taken report alongwith his recommendations and call the explanation of EE/ SDO/ JE/ SE for non- complaince of order.

102601 15-May-15

Paver Block (Bahu phirni) RD 0 to 100m & Naya Gaon phirni RD 3900 to 4540m, in rest 75mm WBM + PC & EW on berms in 3236m, Est. Cost 80 lacs. (EE reported: RD 100 to 664m paver block done by PWD but already entered in PDF RD 0 to 800m paver block laid by P

91474 01-Apr-13

Constructed 30.11.2008, Path 6 karam, Crust 225 mm, SR 11/2014 RD 0 -100m(Bahu) & 3900-4540m (Naya Gaon) paver block, In rest 3236m= 75mm WBM + PC. Now crust 300mm. PWD laid CC blocks in 100-664m.

7724 03-Oct-11

H - 1616 Behror To Sehlanga 4.0231) km.

A/R 2015-16 alloted on24.06.2015 to M/s Nidhi Const. Company .109408 14-Sep-15

Constructed 31.03.2009, Path 8 karam, Crust 225 mm, SR Nil. Transferred to PWD. PWD RoadID : 9788. PWD did 0 to 370m CC blocks at a cost of 25 lacs.

8179 03-Oct-11

H - 1617 Sasrouli To Sehlanga 4.9132) km.

A/R 2015-16 alloted on24.06.2015 to M/s Nidhi Const. Company .109409 14-Sep-15

A/R 2014-15 alloted on 22.05.2014 (Sh. Dharamvir), completed on 25.03.2015

101306 05-May-15

Constructed 9/2009. Path 6 karam. Crust 225mm 17128 05-Jan-12

H - 1618 Rudiawas To Nimli 2.6833) km.

work taken up by Panchayti Raj departement . No SR required.111667 03-Nov-15

Case is to be submitted by EE/SE for desanction of SR as the work taken by Panchayati Raj Department.

98950 18-Mar-15

EE Jhajjar vide memo no. 2338 dt. 19.08.2014 has mentioned that Sarpanch has intimated repair of phirni in village Ruraiwas started on the sanctioned of Rs. 35.59 lac by Hon'ble MP Rohtak. The work has been taken up by P. Raj Department in village Rudiawas. Work dropped from W/Plan.

87303 05-Nov-14

A/A accorded for Rs. 54.94 lac on 27.08.2014.83792 28-Aug-14

Work plan 2014-15: 0 to 100m C.C. exist (RD 100 to 600m, paver 75011 24-Jun-14

Friday, February 05, 2016 Page 7 of 34Jhajjar (SC) J

Page 8: 35.Jhajjar (SC)

block on a 250mm GSB + Nala. Est. Cost = 50 lac

Tentative Work plan 2.2 (2013-14) : 80 mm paver block in RD 100 to 500 m (Est. cost Rs.40 lac.)

65675 03-Mar-14

Constructed 5/2009. Path 4,6 karam. Crust 225mm 17119 05-Jan-12

H - 1620 Khaparwas To JLN Feeder 1.8034) km.

A/R 2015-16 alloted on 07.08.2015 to Sh. Roshanlal .109410 14-Sep-15

Constructed 12/2009. Path 7 karam. Crust 225mm. CC Khaparwas Phirni 800m

17109 05-Jan-12

H - 1621 Jhamri To Gothra 4.0735) km.

A/R 2015-16 alloted on24.06.2015 to M/s Nidhi Const. Company .109411 14-Sep-15

Constructed 10.08.2010, Path 6 karam, Crust 225 mm.13483 31-Oct-11

H - 1622 Khanpur Kalan To Khorda 2.6536) km.

A/R 2015-16 alloted on 07.08.2015 to Sh. Manjeet .109412 14-Sep-15

Constructed 15.08.2010, Path 5 & 6 karam,Crust 225 mm.13484 31-Oct-11

H - 1623 Approach Road To Rural Sports Stadium At Villlage Salhawas & Matanhail. 0.6037) km.

A/R 2015-16 alloted on 07.08.2015 to Sh. Roshanlal .109413 14-Sep-15

Constructed 30.6.2010, Path 6 Karam, Crust 150 mm, Metalled width 5.49 m.

13485 31-Oct-11

H - 4523 Jhanswa To Jharli 3.0038) km.

Road is in good condition.109458 14-Sep-15

No A/R executed 2014-15, Road is in good condition101385 05-May-15

Constructed 30.08.2013, path 6 & 7 karam. RD 0 to 100m= CC 175m over 150mm WBM= 325mm in Jhanswa village, RD 100 to 200m= CC laid by Panchayati Raj Department, RD 200 to 300m= 225mm

101667 30-Aug-13

H - 4529 Mundsa To Nogaon 4.8039) km.

PC completed. Work completed on 31.12.2015114624 05-Jan-16

CA asked EIC to get check work from GMD Consultant.99407 15-Apr-15

Work allotted on 14.08.201484156 08-Sep-14

Tender approved on 22.07.2014 (The Silani Gate Co-op L&C Society Ltd.) & R/A/A & Revised D/E for Rs. 1,48,86,600/-.

79988 23-Jul-14

A/A for Rs. 1.03 crore on 14.07.2014.79296 14-Jul-14

Hon'ble CM has approved the construction of this road on 22.11.2013 in super session of all earlier orders.

58823 29-Nov-13

A/A for Rs. 102.73 lacs on 28.04.11 .Technically approved Rs. 147.88 lacs on 20.03.12. Path RD 0-890m= 4 karam, 890-1045=21' 11/2", 1045-1920=4 karam, 1920' 4890=27' 1".

22269 06-Apr-12

Friday, February 05, 2016 Page 8 of 34Jhajjar (SC) J

Page 9: 35.Jhajjar (SC)

H - 4573 Kablana To Badhani 1.9040) km.

A/R 2015-16 alloted on 10.07.2015 to Sh. Deepak Rathi .109453 14-Sep-15

CE- II has order that SE, rohtak to calculate loss due to less consumpation of bitumen and send the complaince report .

102533 15-May-15

Inspection: On dated 24.10.2013,Sh. M.S. Malik (SDO-QC-II) inspect the road. S.E., rohtak has requested to calculate loss caused to the board with your valuable comments/ recommendation on dt. 02.05 & 29.08.2014

100361 17-Apr-15

AA of 8/11/2010 for Rs. 34.61 lacs. Allotted on 16/5/2011 (Sh. Surjeet kumar). Completed on 30.04.12 with 225mm crust.

27337 16-Jul-12

Constructed 31/4/2012, Path ________, crust 225mm.106005 15-Jul-12

H - 4652 Ladayan Nilaheri To Bihror Mundahera Road. 2.5441) km.

A/R 2015-16 alloted on24.06.2015 to M/s Nidhi Const. Company .109465 14-Sep-15

A/R (2014-15) completed on 31.10.2014. Final bill pending. Road is in good condition

101294 05-May-15

Constructed in 31.10.2013, Path RD 0-1470m =5 karam, RD 1470-2540= 6 karam. Crust 225mm.

101714 30-Nov-13

H - 4653 Rankhanda To Karodha 3.2042) km.

A/R 2015-16 alloted on 07.08.2015 to Sh. Roshanlal .109466 14-Sep-15

A/R (2014-15) completed 31.10.2014. Final bill pending, Road is in good condition

101281 05-May-15

Constructed 15.04.2011, Path 6 karam, Crust 225 mm, CC (o to 60m).

13508 31-Oct-11

H - 4654 Goria To Kohard 3.3143) km.

A/R 2015-16 alloted on 07.08.2015 to Sh. Roshanlal .109467 14-Sep-15

A/R (2014-15) completed 31.10.2014. Final bill pending, Road is in good condition

101282 05-May-15

A/R 2014-15 allotted on 22.05.2014 (Sh. Dharamvir)73078 27-May-14

Constructed 20.04.2011, Path 6 karam, Crust 225 mm.13509 31-Oct-11

H - 4655 Ghatoli To Siwadi. 2.1544) km.

Road is in good condition.109481 14-Sep-15

No A/R (2014-15) done, Road is in good condition101367 05-May-15

Constructed in 30.11.2011, path 4, 7 karam, crust 225mm, CC 175mm= RD 0 to 700m in village Ghatoli.

101715 30-Dec-11

H - 4656 Fortpura To Gwalison 2.4645) km.

A/R tender not received on dated 25.08.2015 & yet to be invited very shortly.

109482 14-Sep-15

A/R (2014-15) completed 31.10.2014. Final bill pending, Road is in good condition

101283 05-May-15

Constructed 20.04.2011, Path 5 karam, Crust 225 mm.13510 31-Oct-11

Friday, February 05, 2016 Page 9 of 34Jhajjar (SC) J

Page 10: 35.Jhajjar (SC)

H - 4657 Reduwas To Niwada 1.0246) km.

A/R 2015-16 alloted on24.06.2015 to M/s Nidhi Const. Company .109483 14-Sep-15

A/A on 02.04.2008 for Rs. 22.82 lac, alloted on 07.06.2010, completed on 31.03.2013

101260 05-May-15

Constructed in 31.03.2013, path 6 & 7 Karam, CC laid by Panchayati Raj Deptt., RD 0 to 795m & CC 175mm over 150mm.

101716 30-Dec-11

H - 4659 Nilaheri To Beethla 3.1147) km.

A/R 2015-16 alloted on24.06.2015 to M/s Nidhi Const. Company .109484 14-Sep-15

T/S on 20.12.2013 for Rs. 81.19 lac in group of 8 no. L/R amounting to Rs. 412.41 lacs.(Road ID-4657, 4658, 4659, 5007, 4660, 4661, 4662, )

60413 31-Dec-13

Constructed on 30.09.2013. Path =6 karam. Crust 225mm.5101 09-Nov-12

H - 4661 Bhurawas To Amboli 2.6648) km.

A/R 2015-16 alloted on24.06.2015 to M/s Nidhi Const. Company .109485 14-Sep-15

AR (2014-15) done on 31.03.2015, final bill pending. Road is in good condition

101327 05-May-15

T/S on 20.12.2013 for Rs.40.83 lac in group of 8 no. L/R amounting to Rs. 412.41 lacs.(Road ID-4657, 4658, 4659, 5007, 4660, 4661, 4662, )

60416 31-Dec-13

Constructed in 15.11.2011, path 5 karam, crust 225mm.101717 30-Dec-11

H - 4664 Talav To Jhajjar Chuchakwas Pwd Road. 0.7649) km.

A/R tender not received on dated 25.08.2015 & yet to be invited very shortly.

109486 14-Sep-15

No AR (2014-15) done, Road is in good condition101388 05-May-15

A/A Rs. 9.13 lacs on 31.05.2010 , allotted (The Sharda co-op L&C society) , completed on 30.11.2011.

41946 11-Mar-13

Constructed 30.11.2011, Path 5 karam.Crust 150mm.105448 10-Mar-13

H - 4665 Marot To Surajgarh. (M Ann.) 1.9050) km.

A/R 2015-16 alloted on 07.08.2015 to Manjeet .109475 14-Sep-15

No AR 2014-15 done, Road is in good condition101391 05-May-15

CM Ann. No. 3919 (22.06.2010) , Crust 225 mm , A/A for Rs. 40.74 lacs on 25.08.2010 , allotted (The Sharda Co-op L&C Society ) on 19.07.2011 ,completed on 31.05.2012.

41942 11-Mar-13

Constructed 31/5/2012, path 5k, crust 225mm.106007 31-May-12

H - 4667 Nogaon To Maliwas. 2.5051) km.

A/R tender not received on dated 25.08.2015 & yet to be invited very shortly.

109476 14-Sep-15

AR (2014-15) done on feb 2015, final bill pending, Road is in good condition

101329 05-May-15

Friday, February 05, 2016 Page 10 of 34Jhajjar (SC) J

Page 11: 35.Jhajjar (SC)

Constructed in 31.07.2012, path 5 & 7 karam, crust 225mm. CC RD 0 to 175m in village Nagaon laid by Panchayati Raj Deptt.

101719 30-Dec-11

H - 5005 Niwada To Bhindawas 1.2952) km.

Road is in good condition.109478 14-Sep-15

Constructed 2005. Crust 150mm. Path 5 karam, SR 06.11.2012 50mm BUGS + 75mm WBM layer in 0.96 km in village Bhindawas. CC laid by Panchayati Raj Deptt. In 0.33km in village Niwada. Now crust 275mm.

11441 18-Nov-12

H - 5007 Amboli To Dharoli 3.7053) km.

A/R 2015-16 alloted on24.06.2015 to M/s Nidhi Const. Company .109479 14-Sep-15

EE reported: Road is in good condition.105949 20-Jul-15

AR (2014-15) done in feb 2015, final bill pending, Road is in good condition

101321 05-May-15

T/S on 20.12.2013 for Rs. 50.04 lac in group of 8 no. L/R amounting to Rs. 412.41 lacs.(Road ID-4657, 4658, 4659, 5007, 4660, 4661, 4662, )

60414 31-Dec-13

Constructed 31.03.2011, Path 5 karam, Crust 225 mm.13502 31-Oct-11

H - 5008 Nogaon To Ladayan 7.0054) km.

A/R 2015-16 alloted on24.06.2015 to M/s Nidhi Const. Company .109480 14-Sep-15

AR (2014-15) done on 31.03.2015, final bill pending. Road is in good condition

101328 05-May-15

Constructed 28.02.2011, Path 4 & 6 karam, Crust 225 mm.13503 31-Oct-11

H - 5009 Reduwas To Mundahera 3.6655) km.

A/R 2015-16 alloted on 07.08.2015 to Sh. Manjeet .109493 14-Sep-15

No AR 2014-15 done, Road is in good condition101392 05-May-15

Constructed 31.03.2011, Path 4 & 6 karam, Crust 225 mm13504 31-Oct-11

H - 5079 Kablana To Bodia 3.4856) km.

A/R 2015-16 tender received & under process. 109489 14-Sep-15

A/A on 18/04/11 for Rs. 96.79 lacs. R/A/A of Rs. 144.60 lacs on 15.10.2012 , allotted on 17.10.2012 (Sh. Anil Kumar) , Tech. sanctioned on 13.12.2012 Rs. 144.60 lacs , Path 6 karam diagonal & work completed on 19.05.2014 with crsut 225mm.

42417 14-Mar-13

Constructed 19/5/2014, path 6 angled, crust 400mm, CC (Kablana) by P/Raj RD 0-320m & CC by other deptt. (Bodia) RD 3480-3780m, in rest PIP + 250mm GSB RD 320-840m & PC 840-3480m by HSAMB.

106008 04-Feb-13

H - 5290 Dhana To Bani Mandir 1.4057) km.

Road is in good condition.109491 14-Sep-15

Constructed on 30.06.2015, path 33', crust 400mm.101739 04-Sep-11

Friday, February 05, 2016 Page 11 of 34Jhajjar (SC) J

Page 12: 35.Jhajjar (SC)

H - 5358 Dhalanwas to Sasrouli Rly. Phatak 2.8558) km.

A/R 2015-16 alloted on24.06.2015 to M/s Nidhi Const. Company .109505 14-Sep-15

No A/R (2014-15) done, Road is in good condition101369 05-May-15

Constructed on 31.10.2012, path 5karam, crust 400mm.101802 08-Nov-12

AA Rs. 73.01 lacs on 8/11/11, T/S 71.32 lacs on 18/11/11, Crust 400mm, Path 5 karam

19515 18-Feb-12

H - 5386 Nogaon To Sunderheti 2.2059) km.

A/R 2015-16 alloted on 07.08.2015 to Sh. Manjeet .109506 14-Sep-15

No A/R (2014-15) done, Road is in good condition101370 05-May-15

Path 5 karam, crust 400mm, HP culvert 5 no. Constructed on 30.03.2011.

15861 09-Dec-11

H - 5389 Khetawas To Bilochpura 2.9060) km.

A/R 2015-16 alloted on 07.08.2015 to Sh. Manjeet .109507 14-Sep-15

No A/R (2014-15) done, Road is in good condition101371 05-May-15

Constructed on 20.06.2013, path 5karam, crust 400mm.101804 30-Jun-13

Approved by Hon'ble C.M. on 22.11.2011.15862 09-Dec-11

H - 5390 Khetawas To Surajgarh 2.7061) km.

Road is in good condition.109178 14-Sep-15

Const. 31.12.2014 , crust 400mm , path 5k. 109177 14-Sep-15

Work completed in 1200m, work finalized at it's on 31.12.2014, final bill reviewed

101425 05-May-15

SE Rohtak has intimated vide no. 16233 dated 28.12.2014 that EE Jhajjar allowed to finalized the work as executed by the agency after laying the GSB on entire length and also connect the road end to end by way of Hume pipes as well as const. of bridge whichever is possible.

91732 10-Mar-15

Work held up due to Wild Life Deptt. Objected the construction.84158 08-Sep-14

SE made inspection & submitted report vide his memo No. 12107 dt. 14.07.2014.

82758 05-Aug-14

A/A Rs. 86.85 lacs on 08.01.2013. Allotted on 16.04.13 (Sh. Rajesh Kumar). Tech. Sanctioned on 20.01.2014 for Rs. 88,90,600/-, completed as it is in 1200m on_____.

61878 22-Jan-14

Hon'ble CM has approved on 17.12.12. that the available path is just marginally less than the prescribed norms.

39694 01-Jan-13

On 5/9/2012, MP Rohtak asked to takeup the road on priority.32248 06-Sep-12

Approved by Hon'ble C.M. on 22.11.2011.15863 09-Dec-11

Constructed_________ (1200m out of 2.70km), path 4k or 22.53' straight , crust 400mm.

106025 08-Dec-11

H - 5393 Bahu To Jholri 0.7862) km.

Road is in good condition.109508 14-Sep-15

No A/R (2014-15) done. Road is in good condition101378 05-May-15

Friday, February 05, 2016 Page 12 of 34Jhajjar (SC) J

Page 13: 35.Jhajjar (SC)

Constructed on 14.04.2014, path 5karam, crust 400mm.101805 08-May-14

H - 5396 Jhamri to Khorra 4.2863) km.

Road is in good condition.109509 14-Sep-15

SE Rohtak to recheck the loss calculation sheet as bitumen content taken are not correct. SE Rohtak to reply before 10.05.2015 and SE (V&QC) to put up on 11.05.2015.

101843 08-May-15

R/D/E tec. Sanctioned for Rs. 1,35,25,100/- on 07.05.15101763 07-May-15

No A/R (2014-15) done. Road is in good condition101379 05-May-15

A/A Rs. 125.13 lacs on 30.04.2012. Tender approved on 31.08.2012 (Sh. Jaipal Singh). Tech. sanctioned for Rs. 129.20 lacs on 31.08.2012 alloted on 05.09.2012, completed on 31.05.2014

101274 05-May-15

Constructed on 31.05.2014, path 6karam, crust 400mm. HP culvert + Nos., PIP block RD 4000 to 4310= 310m in village Khorra.

101806 08-Jul-14

H - 5663 Matanhail to Safipur 4.5064) km.

Road is in good condition.109510 14-Sep-15

A/R work allotted on 13.07.15 (Sh Sunil Kumar Contactor).107856 18-Aug-15

A/A on 05.08.2013 for Rs. 142.69 lakh , (Sh. Ramesh Kumar) tech. sanctioned for Rs. 138.85 lakh, alloted on _______, completed on 30.06.2015.

105985 20-Jul-15

Draft Charge sheet against Sh. S.P.Singhmar XEN, Sh. Ram Niwas XEN, Sh. Ajay Rathi SDO & Sh. Kuldeep Singh JE has been sent to Sect. Board for necessary action.

100958 01-May-15

Inspection: On dated 12.11.2014,SDO (QC)- Kurukshetra inspect the road. Sh. Kudrat Singh SDO (QC) Jind to re-check the work on dt. 18.12.2014

100314 17-Apr-15

Charge sheet received from SE Rohtak against Sh. S.P.Singhmar XEN, Sh. Ram Niwas XEN, Sh. Ajay Rathi SDO & Sh. Kuldeep Singh JE vide his office memo No. 1432 on dated 06.04.2015.

99150 07-Apr-15

A/A on 05.08.2013for Rs. 142.69 lacs. Tender approved 06.11.2013 ( Sh. Ramesh Kumar ), Tech. Sanctioned for Rs. 138.85 lacs

57446 06-Nov-13

L= 4.50km , Path RD 0 to 2100m = 33' , 2100 to 2300m = PWD road exist , 2300 to 4500m =28.97', no distance shortened.

42177 12-Mar-13

Hon'ble CM has approved the road on 26.02.2013.41726 06-Mar-13

Constructed 30/6/2015, path 6k (RD 2100-2300m=PWD road exist), crust 400mm.

106026 05-Mar-13

H - 6076 Khorra to Chirya. 4.2065) km.

Road is in good condition.109502 14-Sep-15

No A/R (2014-15) done, Road is in good condition101373 05-May-15

R/D/E tec. Sanctioned for Rs. 1,38,06,300/- on 05.01.15.91779 05-Jan-15

Construction demanded by MP Rohtak on 22/3/2013. CP is 7 karam.43934 26-Mar-13

Constructed on 10.07.2014, path 7karam, crust 400mm. PIP block RD 3800 to 4200m= 400m in Chiriya Village.

101808 08-Nov-12

H - 6832 PWD road Mundahera to Hanuman Mandir 0.7366) km.

Friday, February 05, 2016 Page 13 of 34Jhajjar (SC) J

Page 14: 35.Jhajjar (SC)

Road is in good condition.109513 14-Sep-15

Constructed 22.11.2014, path 5 karam. RD 400 to 730m= PIP block laid by HSAMB. Now Crust 400mm.

101812 08-Dec-14

On 20.12.2013, Hon'ble CM has approved the const. of road.60372 20-Dec-13

H - 6866 Sundrehti to Sahlawas 2.8367) km.

Road is in good condition.109514 14-Sep-15

A/A granted Rs. 85,54,100/- on 11.02.2014, R/tech.sanctioned Rs. 90.84 lakh on 12.11.2014, alloted on 04.03.2014 (Chandar Bhan), completed on 31.05.2015.

105990 20-Jul-15

Path: RD 0 to 1910 m= 27'11", 1910 to 2830m =32'-8.5", crust 400mm.

65574 13-Feb-14

Constructed on 31.05.2015, patch 6karam, crust 400mm.43877 26-Mar-13

H - 7181 Kasni to Fatehpuri 1.9868) km.

A/A on 04.03.2014 for Rs. 84,64,600/-, R/D/E tech. sanctioned on 05.04.2015 for Rs. 92.30 lakh, alloted on 04.03.2014 (Sh. Dharamvir Singh), completed on 30.06.2015.

105991 20-Jul-15

Constructed 30/6/2015, path 6k, crust 400mm.106030 29-Jul-13

H - 7594 Bahu to Bahu Jholri road 0.7869) km.

EE reported: Road is in good condition.105969 20-Jul-15

On 7.06.2014, in the meeting at Dehli, Hon'ble MP Rohtak asked for construction of this road.

74257 10-Jun-14

Constructed on 04.12.2014, path 28'-7'' st. Crust 400mm.101841 09-Jun-14

207.19 km. Sub Total:

SR Awarded

H - 1594 Birdhana To Girawar 2.821) km.

Work Plan 2015, work allotted on dated 15.12.2015 .The Silani Gate Co op. L & C Society Ltd. Likely date 14.03.2016.

114609 05-Jan-16

Tender approved on 4/12/2015, D/E sanction for Rs. 26.43 lacs.113398 04-Dec-15

SE Proposes: [Work plan 2015-16:-RD 500 to 700m=200m(Birdhan) (250mm GSB + Paver block in 5.49m) & in rest WBM Patch + entire PC + Berm repair except CC exist in 300m.(Est. Cost 32 Lakh)]

99611 15-Apr-15

Constructed 25.07.2004, Path 6 karam, Crust 150 mm, SR 05/2009. 75 mm WBM layer +PC, total Crust 225 mm

13520 31-Oct-11

H - 1608 Akheri Madanpur To Jhanswa 3.662) km.

PC completed except 290 mtr portion . Likely date 15.01.2015.114611 05-Jan-16

R/A/A on 12.06.2014 for Rs. 52.12 lac, tech. sanctioned on 23.06.2014 for Rs. 52.12 lac.

75412 25-Jun-14

A/A & D/E of Rs. 44.11 lac & rates approved on 25.10.2013 (Sh. Dharamvir Singh ), allotted on 19.11.2013.

67326 31-Mar-14

Friday, February 05, 2016 Page 14 of 34Jhajjar (SC) J

Page 15: 35.Jhajjar (SC)

75mm WBM + PC & EW on berms, Est. Cost 46.29 lacs.91470 01-Apr-13

S/R works proposed for work plan 2012-13, (WBM and premix carpet)

22700 24-Apr-12

Constructed 7/2007. Path 5,6 &7 karam. Crust 225mm 17126 05-Jan-12

H - 4662 Mohanbari To Jhanswa 2.513) km.

Work plan 2015-2016 . Work allotted to Sh. Satpal Singh Contractor on dated 15.12.2015. Likely date of completion 14.04.2016.

114599 05-Jan-16

A/A accorded for Rs. 15.51 lacs on dated 02.12.2015.113344 03-Dec-15

SE Proposes: [Work plan 2015-16:- RD 1750 to 2150m=400m(Jhanswa) (250mm GSB + Paver block in 5.49m+Berm Repair (Est. Cost Rs. 20 Lakh)]

99610 15-Apr-15

T/S on 20.12.2013 for Rs.47.21 lac in group of 8 no. L/R amounting to Rs. 412.41 lacs.(Road ID-4657, 4658, 4659, 5007, 4660, 4661, 4662, )

60417 31-Dec-13

Constructed in 30.11.2011, path 6, 7, 8 & 9 karam, crust 225mm.101718 30-Dec-11

8.99 km. Sub Total:

SR sanctioned but yet to be awarded

H - 1636 Ismaila To Kultana 5.401) km.

A/A accorded for Rs. 9.90 lacs on dated 08.12.2015.113423 08-Dec-15

Tender received and under process.111669 03-Nov-15

Tenders received & under process. 109198 14-Sep-15

SE Proposes: [Work plan 2015-16:-RD 5200 to 5400m=200m(Kultana)(250mm GSB + Paver Block)(Est. Cost Rs. 10 lakh)]

99608 15-Apr-15

RD 0 to 5200m maintaned by PWD B&R in 2013-14 and being maintaned by them.

91609 17-Dec-14

Road is trafficable.88170 07-Nov-14

Work plan for special repair from RD 0 to 200 mtr. sent to Head Quarter 250 mtr. GSB +75 mm WBM +PIP +Drains. Est. cost -20.00 lacs

73871 06-Jun-14

Constructed 02.11.2002, Path 6 karam, Crust 150 mm,SR 05/2009. 75 mm WBM layer +PC,total Crust 225 mm

13538 31-Oct-11

5.40 km. Sub Total:

Friday, February 05, 2016 Page 15 of 34Jhajjar (SC) J

Page 16: 35.Jhajjar (SC)

New Construction going on

New Construction - Awarded

H - 4660 Amboli To Kosli Rly-Station (Bhatliwali) 4.301) km.

Work is held up. Likely date of completed 31.03.2016.114627 05-Jan-16

PC 1.9 km completed & further 1 km WBM completed. Balance work is not started by agency.

92667 08-Jan-15

EIC directed Sh. Mukesh Arora, SE to inspect and report.88261 10-Nov-14

Clause III imposed in Nov., 2013.69740 25-Apr-14

T/S on 20.12.2013 for Rs.64.28 lac in group of 8 no. L/R amounting to Rs. 412.41 lacs.(Road ID-4657, 4658, 4659, 5007, 4660, 4661, 4662).

60415 31-Dec-13

(Crust 225mm) A/A for Rs.66.42 lacs on 02.04.2008. Allotted to M/S Vinay Const. Co.(09813127123) on 07.06.2010 for completion on 06.02.2011. Agency has work problems as also working on other 14 roads. Path RD 0- 2500=6 karam, 2500-4300=5 karam.

3785 02-Sep-11

H - 6847 Rankhanda to Gwalision 3.722) km.

WBM completed in RD 0 -1200 & 2000-3720. work in progress. Dispute sort out and agency resume the work, likely to be completed 28.02.2016.

111708 03-Nov-15

1st layer WBM completed RD 0-1200m, 2000-3720m, work held up due alignment dispute RD 1200 to 2000m.

105989 20-Jul-15

CA asked EIC to get check work from GMD Consultant.99415 15-Apr-15

D/E sanction for Rs. 118.28 lac on 12.12.2014.91604 16-Dec-14

A/A on 17.12.2014 for Rs. 119 lac, allotted on 04.03.14 (Sh. Dhramvir Singh Contractor ) 21.5% above NIT (under HRDF), Tech. Sanctioned on 12.12.2014 for Rs. 118.28 lac.

66075 16-Dec-14

Action under clause -II taken84166 08-Sep-14

On 25.03.2014, Hon'ble CM already approved the construction of road.

67318 31-Mar-14

On 8.2.2014, a meeting was held to take up pending roads which are required to be constructed in public interest.Hon'ble CM has ordered that the road be taken up for construction by Marketing Board as deposit work of HRDF. The process of calling tenders be initiated. HRDF to deposit funds on submission of estimated cost by the marketing board.

62894 11-Feb-14

Path RD 0 to 250 m= no path , 250 to 1770m = 35'-5", 1770 to 2550m = 33', 2550 to 3720m = 29'-6", no distance shortened.

42064 11-Mar-13

Recommended by MP Rohtak path is 0 to 250m not available and 7 & 4 karam.

41692 06-Mar-13

H - 7407 Bhadani to Kablana-Chuddani road 2.103) km.

Work completed upto 1st coat surfacing.Likely date 30.11.2015.111713 03-Nov-15

2nd layer of matel in progress. Llikely date 15.10.2015.109186 14-Sep-15

W/ EIC has order that SE, Rohtak to submit the peersonal status of work after checking.

102592 15-May-15

Friday, February 05, 2016 Page 16 of 34Jhajjar (SC) J

Page 17: 35.Jhajjar (SC)

Inspection: On dated 12.11.2014,SDO (QC) Kurukshetra inspect the road. S.E., Rohtak to re-check and report within 10 days loss if any, be also intimated on dt. 26.11.2014

100355 17-Apr-15

R/D/E tech. sanctioned on 26.02.2015 for Rs. 70,45,900/-93601 05-Mar-15

Earnest money forfeitted on 22.05.2014.74000 06-Jun-14

Notice issued to the agency for start the work. Now GSB laid.71525 04-May-14

A/A on 04.03.2014 for Rs. 66,17,300/- also tech. sanctioned. Allotted on 04.03.2014 (Sh. Dharamvir Singh).

66083 10-Mar-14

On 20.12.2013, Hon'ble CM has approved the construction of road to availability of path as per required norms and found to be beneficial in marketing operations although no distance to mandi is shortened.

60360 30-Dec-13

On 18.12.2013, Hon'ble MP Rohtak demanded construction of this road. Path 33'. No distance shortened.

60090 18-Dec-13

10.12 km. Sub Total:

Friday, February 05, 2016 Page 17 of 34Jhajjar (SC) J

Page 18: 35.Jhajjar (SC)

Planned - New Construction

PR Upward of Engineer-In-Chief

H - 6077 Noswa to Bahu. 4.651) km.

PR sent to ACS (A) office vide CA office No. 68 dated 29.01.2016.115715 01-Feb-16

Path RD 0 to 4650m =5 K, no distance shortened115519 19-Jan-16

Path: RD 0 to 4650m= 5karam, Case sent to CA on dated 18.01.2016.

115428 18-Jan-16

Hon'ble CM has not approved the proposal on 13.12.12.due to not availability of path prescribed in the norms, Path 4.53k

39751 04-Jan-13

On 5/9/2012, MP Rohtak asked to takeup the road on priority.32229 06-Sep-12

Path 4.5k. No distance shortened. Upward from E-in-C on 27/6/2012.

26380 27-Jun-12

4.65 km. Sub Total:

Friday, February 05, 2016 Page 18 of 34Jhajjar (SC) J

Page 19: 35.Jhajjar (SC)

Transferred

Transferred to PWD (938 roads)

H - 36 Bir Sunarwala Akhodwala To Bahdani 2.401) km.

Road is in good condition.109352 14-Sep-15

PWD executing / has executed work worth 34.07 lacs.43321 19-Mar-13

Constructed 2005, Path 6 karam, crust 225mm20395 21-Feb-12

Transferred to PWD. PWD RoadID : 97137726 03-Oct-11

H - 1577 Birdhana To Mehrana 3.082) km.

Constructed 12.08.2002, Path 6 karam, Crust 150 mm, SR 05/2009. 75 mm WBM layer +PC, total Crust 225 mm.

13512 31-Oct-11

H - 1584 Khatiwas To Gawalison 4.603) km.

ORD Repair required for the year 2013-201448039 04-Jun-13

Constructed 30.09.200, Path 6 karam, Crust 150 mm, SR 05/2009. 75 mm WBM layer +PC, total Crust 225 mm.

13516 31-Oct-11

Transferred to PWD. PWD RoadID : 97567736 03-Oct-11

H - 1591 Gudha To Dhaur 1.174) km.

Good condition48040 04-Jun-13

Constructed 25.08.2004, Path 6 karam, Crust 150 mm. SR Nil.13519 31-Oct-11

H - 1595 Jhanswa To Jamalpur Upto Jakhar Hospital 5.215) km.

Work is in progress under HSRDC Jhajjar Division48042 04-Jun-13

Constructed 08.06.2005, Path 6 karam, Crust 150 mm, SR Nil.

13521 31-Oct-11

Transferred to PWD. PWD RoadID : 97747727 03-Oct-11

H - 1601 Akheri Madanpur To Nogaon 5.406) km.

Constructed 06.07.2007, Path 6 karam, Crust 225 mm, SR Nil.13523 31-Oct-11

Transferred to PWD. PWD RoadID : 97797737 03-Oct-11

H - 1604 Akheri Madanpur To Rudiawas 4.807) km.

Work is in progress under HSRDC Jhajjar Division48043 04-Jun-13

Constructed 10.03.2009, Path 7 karam, Crust 225 mm, SR Nil.13525 31-Oct-11

H - 1610 Akheri Madanpur To Baba Bhaiyan Samadh 1.218) km.

Good condition48044 04-Jun-13

Constructed 19.04.2007, Path 6 karam, Crust 225 mm, SR Nil.13526 31-Oct-11

Friday, February 05, 2016 Page 19 of 34Jhajjar (SC) J

Page 20: 35.Jhajjar (SC)

Transferred to PWD. PWD RoadID : 97807731 03-Oct-11

H - 1619 Jhajjar To Birdhana 5.969) km.

TS dated 04.05.2012 22964 07-May-12

33.83 km. Sub Total:

Transferred to PWD (Individual)

H - 1588 Mohanbari To Goriya 4.051) km.

Road transferred to PWD B&R vide XEN office memo no. 102 dt. 16.04.2014 under PMGSY Scheme.

73023 23-May-14

CC of panchayat work in progress in village Goriya balance work of OR is awarded on 28.02.2013

42676 15-Mar-13

Work of CC pavement has been taken up by Panchayat in vill. Goriya in a length 820 mtr. (RD 3180 to 4000) and balance part of road will be repaired under oridinary repair in a length 1.50 km. (RD 0 to 1500), tenders to be received on 15.02.2013 as balance length 1680 mtr. (RD 1500 to 3180 mtr. ) has been undertaken by N.T.P.C. Plant.

41199 14-Feb-13

Work Plan: Pavers in 570m (Mohanbari), rest only minor repairs (Estimated cost 17 lacs).

11398 18-Oct-11

Constructed 2000. Crust 150mm. Path 5 karam. No S/R done.11397 18-Oct-11

H - 1592 Sundreheti To Nilaheri Via Ladayan 10.432) km.

Road transferred to PWD B&R vide XEN office memo no. 102 dt. 16.04.2014 under PMGSY Scheme.

73025 23-May-14

S/R work allotted on 16.11.2012 (Shiv const. co.), completed on 27.10.2013

57281 05-Nov-13

Work allotted on 16/11/2012 (Shiv Const. Co.)37718 26-Nov-12

A/A for S/R on 25.10.12. for Rs. 104.56 lacs , technical sanctioned on 06.11.12. for Rs. 104.56 lacs. Tender approved on 06.11.12. (M/s Shiv and company)

37167 08-Nov-12

Work Plan: 700m raising; Pavers in 300m (Ladayan); rest PC with Patches (Estimated cost 141 lacs).

11400 18-Oct-11

MP Rohtak asked for repairs on 3/9/2011.4007 05-Sep-11

Constructed 2006. Crust 150mm. Path 3, 5 & 6 karam. Damaged under flood.

11399 18-Aug-11

H - 1600 Salhawas To Jhanswa 3.903) km.

Work is to be taken up by PWD B&R recently conveyed by EE PWD under upgradation programme.

37220 09-Nov-12

Tender approved, work be allotted on 10.10.2012 (Dawla co. socity).

33640 27-Sep-12

R/C/E in division office under process. 30389 20-Aug-12

Tender received on 17/7/2012 and under process in circle office.28831 30-Jul-12

Friday, February 05, 2016 Page 20 of 34Jhajjar (SC) J

Page 21: 35.Jhajjar (SC)

No tender received on 17.04.2012 and recall due to higher rates and tender to be invited shortly.

25342 14-Jun-12

Bad reaches RD 0 to 110m, Kacha road due to L/A, case for LA submitted to SE vide EE no. 3111 dated 12.12.11

22539 24-Apr-12

Work Plan: Patch the road (Estimated cost 5 lacs).11446 18-Oct-11

Constructed 2006. Crust 150mm. Path 5 karam. But 180m could not be done due to dispute.

11445 18-Oct-11

MP Rohtak asked for repairs on 3/9/2011.4006 05-Sep-11

H - 1611 Silani Gate M.C. Office To Salodha Via Babra Vill. 6.604) km.

Transfer to PWD B&R87292 22-Oct-14

Work come under PMGSY of PWB B&R & work will be handed over by EE, HSAMB to PWB (B&R).

69044 17-Apr-14

A/A & D/E of Rs. 45,56,400/- & rates approved on 12.09.2013 (Sh. Ravinder Kumar ), allotted on 19.11.2013.

67328 31-Mar-14

Work of GSB is in progress.61689 14-Jan-14

A R (2013-2014) Allotted on 8/8/2013 (sh. Satish sharma )54458 06-Sep-13

Transferred back from PWD on 17.4.2013 within a list of 550 (76+474) roads.

45490 18-Apr-13

75mm WBM + PC & EW on berms in RD 0 to 700m, 1200to 2800m, 3200 to 3600m, 4000 to 4200m, 4800 to 4900m, 5400 to 6000m, Est. Cost 44.90 lacs. (In rest repaired by PWD B&R. Existing Railway line Jhajjar to Rewari, No RUB / ROB, so no local crossing on the

91472 01-Apr-13

Constructed 25.06.2009, Path 6 karam, Crust 225 mm, SR Nil.13527 31-Oct-11

Transferred to PWD. PWD RoadID : 97907728 03-Oct-11

H - 4658 Nilaheri To Chandol 2.885) km.

Road transferred to PWD B&R vide XEN office memo no. 102 dt. 16.04.2014 under PMGSY Scheme.

73029 23-May-14

T/S on 20.12.2013 for Rs. 40,70,300/- in group of 8 no. L/R amounting to Rs. 412.41 lacs.(Road ID-4657, 4658, 4659, 5007, 4660, 4661, 4662, )

60412 31-Dec-13

Crust 225mm A/A for Rs. 55.59 lacs on 02.04.2008 allotted(M/s Vinay const. co) on 7.06.2010, completed on 31.08.2011

54622 09-Sep-13

H - 4663 Bahu To Bhagot 6.056) km.

Road transferred to PWD B&R vide XEN office memo no. 102 dt. 16.04.2014 under PMGSY Scheme.

73030 23-May-14

(Crust 225mm) A/A Rs. 144.19 lacs on 02.04.08.Allotted (Vinay const. Co.) on 7.06.10.A length of 820m is under road ID 4895, Rewari Division. The remaining length 6.05 km in Jhajjar, work completed.

22399 17-Apr-12

H - 5006 Sunderheti To Jharli 3.807) km.

Road transferred to PWD B&R vide XEN office memo no. 102 dt. 16.04.2014 under PMGSY Scheme.

73031 23-May-14

Friday, February 05, 2016 Page 21 of 34Jhajjar (SC) J

Page 22: 35.Jhajjar (SC)

T/S on 20.12.2013 for Rs. 72,48,500/- in group of 8 no. L/R amounting to Rs. 412.41 lacs.(Road ID-4657, 4658, 4659, 5007, 4660, 4661, 4662, )

60410 31-Dec-13

Work order issued on 30/10/2012 (Jai Deep Singh) and work completed on 15/11/2012.

39381 21-Dec-12

Constructed 31.03.2011, Path 6 karam, Crust 225 mm.13501 31-Oct-11

H - 5216 Machhrouli To Khudan 3.158) km.

Road transferred to PWD B&R vide XEN office memo no. 102 dt. 16.04.2014 under PMGSY Scheme.

73032 23-May-14

A/A on 18.06.2012 for Rs. 1.15 crore, tech. sanctioned on 22.10.2012 for 115.90 lac. Allotted on 31.10.2012 (M/s Shiv & Co.), completed on 30.11.2013.

67333 31-Mar-14

Work completed on 30.11.201366565 14-Mar-14

CM rejection conveyed on 14/9/2010. Heavy trucks and buses can not pass through subway. Path 4 karam.The order of CM dated 13.09.2011 to take up on priority. AA accorded for 1.15 crore on 18.6.2012. Field to look into if any problem of NOC from railways.

25508 18-Jun-12

40.86 km. Sub Total:

Friday, February 05, 2016 Page 22 of 34Jhajjar (SC) J

Page 23: 35.Jhajjar (SC)

Other

Dropped

H - 4666 Mundsa To Rudiawas. 2.601) km.

Tender case /Road is not approved by CA board on 15.10.12. in view of the order of Hon'ble CM has not approved keeping in view the available path is less than required width dated 19.09.2011.

36177 19-Oct-12

Path RD 1660 to 1895m=4 k in rest 5 karam angled, crust 400mm, HP culvert 5no.

33190 25-Sep-12

AA on 18/6/2012 for Rs. 72.29 lacs.25976 25-Jun-12

CM approved on 13.05.2010 & the same was also not approved on 25.10.2010 again approved on 13/9/2011. AA for Rs. 49.41 on 21/1/2011.

5107 17-Sep-11

H - 5246 Jhajjar Gurgaon Road To Jhajjar Gurgaon-Surah Road 0.802) km.

MP Rohtak advised to keep pending : Meeting at Haryana Bhawan dated 3.9.2011.

3943 05-Sep-11

Bridge construction on drain no. 8 involved for Rs. 2.5 crore. On 28/4/2011, MP Rohtak asked to keep pending.

3875 02-Sep-11

H - 5264 Khanpur Khurd To Bahu3) km.

On enquiry it is found that this is existing road of PWD and they are re-constructing it (Reported by EE).

14025 31-Oct-11

The order of CM dated 13.09.2011 to take up on priority.13174 28-Oct-11

MP Rohtak raised demand for this road on 3/9/2011.3977 05-Sep-11

H - 5392 Dhana To Sudhrana 3.604) km.

Due to General Assembly Elections a Code of Conduct is imposed.Hon'ble Agriculture Minister has desired that this file may be put up in the next financial year.

85176 19-Sep-14

PR sent to Hon'ble AM vide ACS (A) memo no. 1063 on 30.05.14.80625 28-Jul-14

P/R sent to ACS(A) vide CA no. 168 on 02.06.2014.73618 04-Jun-14

Submitted to Govt. vide CA Board No.309 dated 15.07.2011 Path : 0-2850=6, 2850-3600=4, Hon'ble C.M. not approved on 23.11.2011 (Due to less path). EE was asked to send the PR again in view of order of Hon'ble MP on 5/9/2012. Hon'ble CM, Haryana order No. SE (R)-2011/207 dated 09.12.2011 and Not approved on dated 10.12.2011 conveyed vide EIC Panchkula memo No. AR-II-2011/19598 dated 15.12.2011. Fresh PR sent to CE Pkl. Vide this office memo no. 5441-42 dated 12.03.2013. P/R resubmitted to PSA vide CA no. 263 dt. 29.04.2013. On 25.03.14, Hon'ble CM asked to put up after the Lok Sabha Election Model Code of Conduct is over.

4827 17-Sep-11

H - 5665 Matanhail to JLN (Khaparwas) and bridge on JLN. 1.255) km.

Worthy CA board has ordered on 11.06.2015 to drop the proposal.103658 15-Jun-15

Estimate received on 04.09.2014 after compliance of observations.84149 08-Sep-14

Friday, February 05, 2016 Page 23 of 34Jhajjar (SC) J

Page 24: 35.Jhajjar (SC)

R/C/E sent to CE Panchkula vide SE (Jhajjar) memo no. 713 dated 30.05.2013. L-section in R/C/E is not complete, SE/EE asked to explore the possibility of reducing earth work.

50448 01-Jul-13

Hon'ble CM has approved the const. of road on 17.12.12., Path RD 0 to 1250 m = 37.35', L= 1.25km

39708 01-Jan-13

H - 6505 Bhamboolia To Mundsa 2.546) km.

R/C/E returned to SE Rohtak on 14.03.14 with the remarks when the road is declared non feasible by Govt. to elaborate why there is need to sent to Govt. now.

66530 14-Mar-14

Path ; RD 0 to 260m= CC Exist, RD 260 to 1090m = 34'-10.5" RD 1090 to 1500,=24'11", RD 1510 to 2080m=27'1", 2080 to 2280m=3 no. bridge in progress, RD 2280 to 2440m=27'1".

59349 09-Dec-13

R/C/E returned to SE Rohtak for compliance of observation memo no. 10677 dt. 26.07.2013 along with remarks path is also less then norms of board etc.

59348 09-Dec-13

Non - Feasible:- declarled by Govt. CE Board No. AR-II-2011/2802 dated 24.02.2011.5 k. The Hon'ble M.P. Rohtak has desired to construct the road along the bank of JSB/JLN as per physibilty in the meeting dated 21.04.2011 at Jhajjar on alternatives alignment.

25452 16-Jun-12

H - 6774 Rohad road to Kharhar 2.957) km.

Due to General Assembly Elections a Code of Conduct is imposed. Hon'ble Agriculture Minister has desired that this file may be put up in the next financial year.

85700 24-Sep-14

P/R with AM vide MOS memo no.651 dated 08.10.201366943 25-Mar-14

Case sent to MOS vide PSA no. 2489 dated 30.09.2013.56330 10-Oct-13

Path= RD 0 to 299m= 24'2", 299 to 2150m=33', 2150 to 2410m=33', 2410 to 2950m=24'9", wide st. , No distance shortened.

53473 22-Aug-13

In Meeting dated 11.1.2013, MP Rohtak asked for construction of this road.

39956 11-Jan-13

H - 6782 Ahmedshahpur to Mundsha 1.758) km.

Case sent to AM vide PSA memo no. 695 dated 11.04.2013.66918 24-Mar-14

P/R sent to PSA vide CA no. 183 dated 13.03.13.43724 21-Mar-13

In Meeting dated 11.1.2013, MP Rohtak asked for construction of this road.

39964 11-Jan-13

H - 6864 Chhara to Agarpur Khera 1.009) km.

Due to General Assembly Elections a Code of Conduct is imposed. Hon'ble Agriculture Minister has desired that this file may be put up in the next financial year.

85748 24-Sep-14

P/R with AM vide MOS memo no.646 dated 08.10.201366944 25-Mar-14

Case sent to MOS vide PSA no. 2494 dated 30.09.2013.56331 10-Oct-13

PR sent to PSA on 28.09.2013.55538 28-Sep-13

Path= RD 0 to 1687m= 33', 1687 to 2183m=30'-8.5", 2183, 3400m= 16'6"wide st, 0.65km distance shortened.

53398 22-Aug-13

EE reported : falls within Abadi area , no consolidation path exists. 43994 29-Mar-13

Friday, February 05, 2016 Page 24 of 34Jhajjar (SC) J

Page 25: 35.Jhajjar (SC)

Construction demanded by MP Rohtak on 22/3/2013. Path 5.5 karam.

43875 26-Mar-13

H - 6865 Mandothi to Silothi 1.9810) km.

Due to General Assembly Elections a Code of Conduct is imposed Hon'ble Agriculture Minister has desired that this file may be put up in the next Financial year.

85851 29-Sep-14

P/R with AM vide MOS memo no.641 dated 08.10.201366945 25-Mar-14

Case sent to MOS vide PSA no. 2503 dated 30.09.2013.56415 10-Oct-13

PR sent to PSA on 28.09.2013.55533 28-Sep-13

Path= Rd 0 to 850m= 33', RD 850 to 900m=No Path available, 900 to 1980m= 37'4", wide st., no distance shortened.

53474 22-Aug-13

EE reported: Already rejected by Govt. as consolidation path is not as per Board policy , P/R will be submitted upto 15.04.2013.

43982 29-Mar-13

Construction demanded by MP Rohtak on 22/3/2013.43876 26-Mar-13

H - 6868 Ashodha Todran to Barhai 1.6311) km.

Worthy CA board has D-sanctioned the A/Approval amount for Rs. 97,55,400/- on 23.07.15.

106084 23-Jul-15

E/W in progress in 1 km.86487 16-Oct-14

Due to General Assembly Elections a Code of Conduct is imposed. Hon'ble Agriculture Minister has desired that this file may be put up in the next financial year.

85750 24-Sep-14

Work started on 10.09.1484295 11-Sep-14

Work allotted on dt.26.06.2014.82081 06-Aug-14

A/A on 23.06.2014 for Rs. 97,55,400/- tender approved on 24.06.2014 (BSG Infratech Pvt. Ltd) tech. sanctioned for Rs. 97.55 lac, allotted on 26.06.2014.

77298 03-Jul-14

Tender allotted on dated 23.06.2014 (B.S.G. Infratech India Pvt.)74925 24-Jun-14

On 20.12.2013, Hon'ble CM has approved the construction of road by giving minor relaxation in norms of HSAMB regarding availability of path and found to be beneficial to marketing operations although distance to mandi is not shortened.

60365 30-Dec-13

Path= RD 0 to 145m=29'11", 145 to 630m=26'11", 630 to 660m=proposed bridge, 660 to 1115m=26'5", 1115 to 1630m=49'6" wide st., 360m distance shortened.

53472 22-Aug-13

Construction demanded by MP Rohtak on 22/3/2013.43879 26-Mar-13

H - 6961 Khetawas to Azad Nagar 3.2712) km.

Due to General Assembly Elections a Code of Conduct is imposed. Hon'ble Agriculture Minister has desired that this file may be put up in the next financial year.

85326 19-Sep-14

PR sent to Hon'ble AM vide ACS (A) memo no. 1095 on 29.05.14. 80650 28-Jul-14

P/R sent to ACS(A) vide CA no. 232 on 02.06.2014.73656 04-Jun-14

PR sent to CA on 22.05.2014.72905 22-May-14

Recommended by MP RohtakPath is 5,6 &7 karam. Length 3.27Km, Path RD 0 to 960m = 31’-8.5” , 960 to 1020m= 27’6” ,1020to 1640m= 35’10”,1640 to 2565m = 33’,2565 to 3270m = 35’ straight,

47586 23-May-13

Friday, February 05, 2016 Page 25 of 34Jhajjar (SC) J

Page 26: 35.Jhajjar (SC)

no distance shortened. Case sent to PSA vide CA memo no. 330 dated 12-06-2013. On 25.3.2014, Hon'ble CM has asked to put up after the Lok Sabha Elections Model Code of conduct is over.

P/R sent to PSA vide CA No. 330 dt. 12.06.201349318 08-May-13

H - 7053 Dighal Rohtak road to Baland 3.4713) km.

Due to General Assembly Elections a Code of Conduct is imposed. Hon'ble Agriculture Minister has desired that this file may be put up in the next financial year.

85786 24-Sep-14

P/R with AM vide MOS memo no.638 dated 08.10.201366954 25-Mar-14

Case sent to MOS vide PSA no. 2499 dated 30.09.2013.56372 10-Oct-13

PR sent to PSA on 28.09.2013.55542 28-Sep-13

PR sent to CA on 22.08.2013.53641 27-Aug-13

Path= RD 0 to 900m=33', 900 to 1552m=32'8", 1552 to 3465m=17'10" wide st, distance shortened 1.67KM.

53525 22-Aug-13

H - 7115 Mundsa to Mundahera 3.2514) km.

Due to General Assembly Elections a Code of Conduct is imposed Hon'ble Agriculture Minister has desired that this file may be put up in the next financial year.

85998 29-Sep-14

P/R with AM vide MOS memo no.648 dated 08.10.201366955 25-Mar-14

Case sent to MOS vide PSA no. 2496 dated 30.09.2013.56373 10-Oct-13

PR sent to PSA on 28.09.2013.55540 28-Sep-13

Path=RD 0 to 420m=21'8", 420 to 1100 m=21'-2.5", 1100 to 2540m=20'7", 2540 to 3250m=23' wide st., 1.60km distance shortened.

53104 14-Aug-13

Recommended by MP Rohtak, Path is 3, 4, 5 karam.51087 04-Jul-13

H - 7160 Dhaur to Khatiwas 3.7115) km.

Worthy CA board has ordered on 11.06.2015 to drop the proposal.103661 15-Jun-15

EE was asked to send the case to HQ for declaring it non feasible from the Govt. The road may be declared non feasible. Case sent to H.Q. on 04.09.2014

84153 08-Sep-14

SE Rohtak has intimated vide no. 10276-77 dt. 13.05.2014 that construction of road is not feasible due to less path.

73033 23-May-14

Path RD 0 to 1630m=5k, RD 1630 to 2204m=3k, RD 2204 to 3076=2K, RD 3076 to 3950m=5k, P/R has not been received in CE office till date.

72322 12-May-14

On 20.12.2013, Hon'ble CM has approved the construction of road to availability of path as per required norms and found to be beneficial in marketing operations although no distance to mandi is shortened.

60357 30-Dec-13

Road does not fall in the policy of the board. Rejected by Govt. order dated 08.06.2009

52200 23-Jul-13

H - 7166 Ukhalchana Kot to Jahangirpur 2.1916) km.

Due to General Assembly Elections a Code of Conduct is imposed 86015 29-Sep-14

Friday, February 05, 2016 Page 26 of 34Jhajjar (SC) J

Page 27: 35.Jhajjar (SC)

Hon'ble Agriculture Minister has desired that this file may be put up in the next financial year.

P/R with AM vide MOS memo no.645 dated 08.10.201366958 25-Mar-14

Case sent to MOS vide PSA no. 2493 dated 30.09.2013.56375 10-Oct-13

PR sent to PSA on 28.09.2013.55539 28-Sep-13

Path= RD 0 to 1880m= 33', 1880 to 2190m=24'11" wide st, no distance shortened.

53691 29-Aug-13

MP Rohtak demanded construction of this road.52397 29-Jul-13

H - 7179 Chandpur to Chhapaar17) km.

There is no direct route from village chandpur to chapper as verified by EE.

53637 27-Aug-13

Hon'ble MP Rohtak demanded construction of this road. Path 3 k.52415 29-Jul-13

H - 7405 Dhaur to Jahazgarh 3.9018) km.

Worthy CA board has ordered on 11.06.2015 to drop the proposal.103660 15-Jun-15

Tender not received on 23.01.2014 and now to be received on 21.02.2014. EE was asked to send the case to HQ for declaring non feasible from the Govt. The road may be declared non feasible. Case sent to H.Q. on 04.09.2014

84154 08-Sep-14

SE Rohtak has intimated vide no. 10276-77 dt. 13.05.2014 that due dispute of chackbandi consolidation path presently not available. However 5 karam C.P. proposed in consolidation but the same has not been finalized due to objection of the villagers. Hence not feasible.

73034 23-May-14

No consolidation path not available due to dispute of Chak Bandi, hence perposal is not feasible.

72368 13-May-14

On 20.12.2013, Hon'ble CM has approved the construction of road to availability of path as per required norms and found to be beneficial in marketing operations although no distance to mandi is shortened.

60363 30-Dec-13

On 18.12.2013, Hon'ble MP Rohtak demanded construction of this road. Path 5 & 6k. No distance shortened.

60088 18-Dec-13

H - 7432 Bawwa to Bisowa 2.5019) km.

Due to General Assembly Elections a Code of Conduct is imposed. Hon'ble Agriculture Minister has desired that this file may be put up in the next financial year.

85714 24-Sep-14

PR sent to AM vide ACS (A) memo no.240 on 03.02.14.66746 19-Mar-14

P/R sent to PSA vide CA memo no. 62 dated 29.01.14.62401 30-Jan-14

Path RD 0 to 2500m =22' wide st. Distance shortened is 1.55KM to reach nearest Kosli Mandi.

61821 16-Jan-14

On 15.1.2014, Hon'ble MP Rohtak demanded for construction of this road.

61786 15-Jan-14

H - 7479 Gurgaon road to Jahangirpur via Surah20) km.

Worthy CA board has ordered on 11.06.2015 to drop the proposal.103657 15-Jun-15

Friday, February 05, 2016 Page 27 of 34Jhajjar (SC) J

Page 28: 35.Jhajjar (SC)

A/A not granted and pending in Head Quarter87299 13-Nov-14

Estimate sent to MD, HRDF for arranging A/A as approved by Hon'ble C.M. Vide no. 14086 dt. 9.9.2014 for combined road ID 7479 & 1660.

84321 12-Sep-14

Duplicate with RoadID: H-1660.72275 09-May-14

On 11.2.2014, Hon'ble CM has approved the widening and strengthening from 12’ to 18’ (metalled width) of road Gurgaon road to Jahangir via Surah; part of which Mehandwari Bridge To Surah [H-1660] belongs to HSAMB and rest is with PWD. The widening and strengthening be done by HSAMB in full stretch after taking over part of road from PWD.

63248 12-Feb-14

On 8.2.2014, a meeting was held to take up pending roads which are required to be constructed in public interest. Hon'ble CM has ordered that the road be taken up for construction by Marketing Board as deposit work of HRDF. The process of calling tenders be initiated. HRDF to deposit funds on submission of estimated cost by the marketing board.

62892 11-Feb-14

SE reported: Jhajjar-Gurgaon road to Surah constructed by HSAMB [H-1660] and Surah to Jahangirpur is constructed by PWD.

62842 10-Feb-14

On 10.2.2014, Hon'ble MP Rohtak asked for widening of road from 12' to 18'.

62841 10-Feb-14

H - 7586 Bahu to Garhi 5.8321) km.

Due to General Assembly Elections a Code of Conduct is imposed. Hon'ble Agriculture Minister has desired that this file may be put up in the next financial year.

85315 19-Sep-14

PR sent to Hon'ble AM vide ACS (A) memo no. 1334 on 24.06.14 80696 28-Jul-14

P/R sent to ACS (Agri.) vide CA memo no. 334 dt. 23.06.1480213 24-Jul-14

P/R sent to ACS(A) vide CA no. 334 dt23.06.2014. 79633 17-Jul-14

Case sent to ACS (A) vide CA memo no. 334 dated 23.06.2014.74964 24-Jun-14

Path: RD 0 to 2250m=27'6", 2250 to 3500m=21'1", 3500 to 4800m=16'6", 4800 to 4980m=no revenue path available, 4980 to 5830m=22' wide st, no distance shortened.

74895 23-Jun-14

On 7.06.2014, Hon'ble MP Rohtak asked for construction of this road.

74106 10-Jun-14

H - 7587 Mangawas to Jhajajgarh 2.0522) km.

Due to General Assembly Elections a Code of Conduct is imposed.Hon'ble Agriculture Minister has desired that this file may be put up in the next financial year.

85175 19-Sep-14

PR sent to Hon'ble AM vide ACS (A) memo no. 1322 on 24.06.14 80690 28-Jul-14

P/R sent to ACS (Agri.) vide CA memo no. 321 dt. 20.06.1480224 24-Jul-14

Case sent to ACS (A) vide CA memo no. 321 dated 20.06.2014.74966 24-Jun-14

Path : RD 0 to 1930m=20'8" wide st, & RD 1930 to 2050m= No revenue path available, no distance shortened.

74869 23-Jun-14

On 7.06.2014, Hon'ble MP Rohtak asked for construction of this road.

74107 10-Jun-14

H - 7700 Lohari to Karola 3.0023) km.

Friday, February 05, 2016 Page 28 of 34Jhajjar (SC) J

Page 29: 35.Jhajjar (SC)

On dated 06.08.2014, Hon'ble CM has seen and desired to examine & take necessary action.

83151 21-Aug-14

H - 7702 Lohari to Faridpur 2.0024) km.

On dated 06.08.2014, Hon'ble CM has seen and desired to examine & take necessary action.

83153 21-Aug-14

55.27 km. Sub Total:

Duplicate

H - 6867 Shamshan Ghat to Sasroli Main Gate1) km.

This ID covered on Maliyawas to Sunderheti (H- 6848) already resubmitted to CE Panchkula vide XEN Office memo no. 4923 dated 22.02.2013.

47813 30-May-13

Construction demanded by MP Rohtak on 22/3/2013.43878 26-Mar-13

H - 6871 Wajirpur to Beri-Jhajjar road2) km.

PR case sent to CE Panchkula vide XEN Office memo no. 516 dated 30.04.2013. This Road is duplicate with Road ID H-6927.

47817 30-May-13

Construction demanded by MP Rohtak on 22/3/2013.43882 26-Mar-13

H - 7222 Kheri Aasra to Chhara3) km.

Duplicate with RoadID: H-49.54751 10-Sep-13

On 21.08.2013, Hon'ble CM has desired for execution if fulfills guideline/ norms. Estimate be submitted within a week positively.

53852 03-Sep-13

H - 7611 Khorda Mor to Jholri Mor4) km.

EE Jhajjar reported, (Email dated 15.07.2014) Duplicate with Road ID-7594.

79415 16-Jul-14

On 24.06.2014, Hon'ble MP Rohtak demanded construction of this road.

76726 27-Jun-14

H - 7881 Bhindawas to Bilochpura 0.965) km.

Duplicate with Road ID 6710106155 28-Jul-15

Recommendation of Hon'ble AM.103804 26-Jun-15

H - 7892 Bahu to Noswa 4.656) km.

Duplicate with Road ID 6077.115004 08-Jan-16

Recommendation of Hon'ble AM, Haryna.103835 29-Jun-15

5.61 km. Sub Total:

Friday, February 05, 2016 Page 29 of 34Jhajjar (SC) J

Page 30: 35.Jhajjar (SC)

Rejected by Government

H - 5258 Sehlanga To Maliyawas 4.201) km.

Hon'ble CM not approved the proposal on 18.09.12 due to nonavailbility of consolidation path prescribed in the norms of HSAMB.Path (4k) 21.56'

34264 05-Oct-12

R/C-cum-D/E sent to Govt. on 26/3/2012. 1.5 km distance shortened. Non feasible due to less path.

23111 12-May-12

H - 5266 Goria To Mumtajpur 1.212) km.

Hon'ble CM has not approved the proposal on 17.09.12.due to not availability of path prescribed in the norms, Path RD 0to 2554 m = 26.05' ,RD 2554 to 3080m = 34.65' , L= 3.08km , Est.cost 107 lacs

39716 01-Jan-13

The order of CM dated 13.09.2011 received for take up this road.5257 18-Sep-11

MP Rohtak raised demand for this road on 3/9/2011.3979 05-Sep-11

H - 5272 Gugodh To Mubarikpur 2.263) km.

Hon'ble CM not approved the proposal on 17.09.12 due to nonavailbility of consolidation path prescribed in the norms of HSAMB.Path RD 0 to 1075m=(5k) 21.95', RD 1075 to 1725m=(4K)20'.06"

34263 05-Oct-12

Length 1.72 km, Path RD 0 to 1075m=21.95', RD 1075 to 1725m=20'.06", crust 400m, Est cost. 49.72 lacs.

22584 24-Apr-12

The order of CM dated 13.09.2011 to take up on priority.13177 28-Oct-11

MP Rohtak raised demand for this road on 3/9/2011.3985 05-Sep-11

H - 5376 Bhadani To Goyla Kalan 3.174) km.

Not approved by CM on dated 25/10/10.19519 18-Feb-12

Filed on 23.08.2010 due less path. Path : RD 0-2250=6k, 2250-3170=Nil

4811 17-Sep-11

H - 5377 Paharpur Minor To Plot No. 7 0.845) km.

Not relates to Bahadurgarh Division42519 14-Mar-13

Not approved by Hon'ble CM vide orders dated 13.12.2012 due to less path.

39820 09-Jan-13

Announced by CM code no. 3721 dated 12.08.09 CM not approved the road on dated 23.08.10 being a parllel road Path is 5 Karam

4812 17-Sep-11

H - 5379 Sailana To Chhabili 3.456) km.

H - 5385 Mundahera To Chandwana 3.007) km.

On 04.03.2014, Hon'ble CM has not approved the construction of road due to non-availability of consolidation path prescribed in the

66398 13-Mar-14

Friday, February 05, 2016 Page 30 of 34Jhajjar (SC) J

Page 31: 35.Jhajjar (SC)

norms of HSAMB.

R/C/E is kept pending till the decision of P/R by Govt. 65769 05-Mar-14

Case sent to Hon'ble AM Vide PSA memo no 1880 on 29.07.2013.52376 29-Jul-13

PR sent to PSA vide CA memo no. 410 dated 17/07/2013.51612 18-Jul-13

On 19.06.2013, Hon'ble CM has desired to put up the case for construction of the roads immediately.

49482 19-Jun-13

In Meeting dated 11.1.2013, MP Rohtak asked for construction of this road.

40127 28-Jan-13

CM has not approved the proposal on 23/12/2011 due to less path (RD 0 - 890m = 5 karam, 890 -1040m = 4 karam, 1040 -3000m = 7 karam).

16884 04-Jan-12

H - 5387 Khaliwas To Kachhroli 1.308) km.

CM has not approved the proposal on 17/9/2012 due to non-availability of consolidate path prescribed in the norms of HSAMB. Path (4k) 22'.

33877 05-Oct-12

MP demanded on 03/09/2011. CM approved on 13/09/2011.14041 31-Oct-11

H - 5388 Sehlanga To Meghawala Johar Upto Mandir 2.109) km.

CM has not approved the proposal on 23/12/2011 due to less path 4 karam in entire length.

16892 04-Jan-12

H - 5391 Dharnia To Pwd B&R Road Juddi To Kosli Road 1.9010) km.

Hon'ble CM has not approved the proposal on 13.12.12.due to not availability of path prescribed in the norms, Path 21.37'

39752 04-Jan-13

Path is 5 Karam. Approved by Hon'ble C.M. on 22.11.2011.15864 09-Dec-11

H - 5662 Matanhail to Goghri11) km.

Hon'ble CM has not approved the proposal on 13.12.12 due to non availabilityof path with prescribed norms, Path RD 0 to 800m = 5.87k , RD 800 to 2700m = ok , RD 2700 to 3100m = 4.91 k., RD 800 to onward bank of JLN canal NOC required form Irr. Deptt.

39880 09-Jan-13

H - 5664 Matanhail to Satour / Saropgarh12) km.

CM has not approved the proposal on 17/9/2012 due to non-availability of consolidate path prescribed in the norms of HSAMB.

33905 05-Oct-12

H - 6298 Melothi to kiroli13) km.

Decleard non feacible vide CE no. 2533 dated 23.01.2010 due to less path.

17931 03-Feb-12

H - 6512 Dalanwas Railway Door to Patuwas More 2.0014) km.

Govt. has been decleared non feasible due to insufficient path of 3 karam.

25476 17-Jun-12

Friday, February 05, 2016 Page 31 of 34Jhajjar (SC) J

Page 32: 35.Jhajjar (SC)

H - 6617 Bahu to Bawwa 6.2815) km.

On 15.1.2014, Hon'ble MP Rohtak demanded for construction of this road.

61783 15-Jan-14

Hon'ble CM has not approved the const. of road on 01.03.2013 due to less path .

43063 18-Mar-13

Recommended by MP Rohtak. Path RD 0 to 3900mtr 25'-3" & RD 3900 to 6280=4k. No distance shortened. Upward from EIC on 14/9/2012.

29085 08-Aug-12

H - 6618 Redhuwas to Kondrawali 2.5016) km.

On 04.03.2014, Hon'ble CM has not approved the construction of road due to non-availability of consolidation path prescribed in the norms of HSAMB.

66391 13-Mar-14

PSA to AM vide memo no. 981 dated 11.04.2013.50655 27-Jun-13

P/R sent to PSA vide CA No. 247 dt. 10.04.201349305 08-May-13

Recommended by MP Rohtak path RD 0 to 340mtr 27'-6" 340 to 1130m= 25' 3", 1130-2500= 36' 7.5". Distance shortened. 2.5km, parallel to PWD road Chuchakwas to sahlawas.

29086 08-Aug-12

H - 6783 Amadalshahpur to Panghalon Dhani 1.2917) km.

On 04.03.2014, Hon'ble CM has not approved the construction of road due to non-availability of consolidation path prescribed in the norms of HSAMB.

66432 13-Mar-14

Case sent to Hon'ble AM vide PSA no. 636 dated 11/04/201346690 03-May-13

RD 0 to 1290m = 16' 6". No distance shortened. Road does not falls in the policy.

41603 05-Mar-13

In Meeting dated 11.1.2013, MP Rohtak asked for construction of this road.

39965 11-Jan-13

H - 6845 Amadalpur Sahpur to Mundsa Nogaon 1.7518) km.

On 04.03.2014, Hon'ble CM has not approved the construction of road due to non-availability of consolidation path prescribed in the norms of HSAMB.

66444 13-Mar-14

Case sent to Hon'ble AM vide PSA no. 695 dated 11/04/201346691 03-May-13

Case sent to PSA on 13.03.2013.42209 13-Mar-13

Path RD 0 to 1750m = 16'-6" , no distance shortened.42061 11-Mar-13

Recommended by MP Rohtak path is 3 karam41694 06-Mar-13

H - 6846 Rankhanda- Gwalision path (Kachcha) (Proposed) to village Kheri Hosdapur CC street

3.4619) km.

On 04.03.2014, Hon'ble CM has not approved the construction of road due to non-availability of consolidation path prescribed in the norms of HSAMB.

66414 13-Mar-14

Case sent to Hon'ble AM vide PSA no. 691 dated 11/04/201346692 03-May-13

P/R sent to PSA vide CA no. 181 dated 13.03.13.43701 21-Mar-13

Path RD 0 to 830m = 33', 830 to 920m =path not available , 920 to 2030m = 24'-9", distance shortened 1.18km .

42067 11-Mar-13

Friday, February 05, 2016 Page 32 of 34Jhajjar (SC) J

Page 33: 35.Jhajjar (SC)

Recommended by MP Rohtak path is 6 karam, 3 gatha.41693 06-Mar-13

H - 6848 Maliawas to Sundhreti 3.3920) km.

On 04.03.2014, Hon'ble CM has not approved the construction of road due to non-availability of consolidation path prescribed in the norms of HSAMB.

66377 13-Mar-14

Case sent to Hon'ble AM vide PSA no. 792 dated 11/04/201346694 03-May-13

Case sent to PSA, CA memo no. 192 dated 25.03.2013. .43352 25-Mar-13

Recommended by MP Rohtak, Path RD 0 to 900m = 37'-9", 900 to 1480m =24'-3", 1480 to 3390m = 19'-4",no distance shortened .

42352 14-Mar-13

H - 6869 Niwada to Dhakla border21) km.

On dated 01.05.2015, Hon'ble ACS has seen. Repair of this road requested by the villagers of village Subana, Dhakla, Bithla & Niwada.

101744 07-May-15

On 04.03.2014, Hon'ble CM has not approved the construction of road due to non-availability of consolidation path prescribed in the norms of HSAMB.

66425 13-Mar-14

Length 3.34km, path RD 0 to 710m& 2545 to 3340m=38'6", 710 to 2035m=33', 2035 to 2185m=no path, 2185 to 2545m=16'6" straight, distance shortened 1.30km, not falls in policy

47895 31-May-13

P/R sent to PSA vide CA No. 332 dt. 12.06.201349320 08-May-13

Construction demanded by MP Rohtak on 22/3/2013.43880 26-Mar-13

H - 6870 Chehra Dhani Khanpur Khurd to Khanpur-Bahu 0.4422) km.

On 04.03.2014, Hon'ble CM has not approved the construction of road due to non-availability of consolidation path prescribed in the norms of HSAMB.

66406 13-Mar-14

Case sent to Hon'ble AM Vide PSA memo no 1811 on 29.07.2013.52363 29-Jul-13

Case sent to PSA vide CA no. 395 dated 10.7.2013.51357 10-Jul-13

Path RD 0 to 82m =24'6", RD 125 to 217m= 27'6", RD 182 to 125m & RD 217 to 440m = no path, no distance shortened, leads to Dhani, not falls in policy.

50568 27-Jun-13

Construction demanded by MP Rohtak on 22/3/2013.43881 26-Mar-13

44.54 km. Sub Total:

Relates to other department

H - 6665 Gawalison to Gijarod1) km.

EE reported: It is PWD (B&R).34331 08-Oct-12

EE reported that this existing road relates to PWD(B&R).32650 13-Sep-12

On 5/9/2012, MP Rohtak asked to takeup the road on priority.32249 06-Sep-12

H - 6771 Mehmoodpur chahal to Garhi Ujjale khan, upto Khanpur road. 4.702) km.

Friday, February 05, 2016 Page 33 of 34Jhajjar (SC) J

Page 34: 35.Jhajjar (SC)

On 19.08.2013, Hon'ble CM has asked to put up the feasibility construction of this road be examined and putup to him within a week positively.

53856 03-Sep-13

SE (Jhajjar) PWD B&R submitted RCE vide endst. No. 588-89 dated 28/2/2012 to EIC PWD B&R for AA amounting to Rs. 198.74 lacs under Head 5054 R&B (Plan)

39950 11-Jan-13

In Meeting dated 11.1.2013, MP Rohtak asked for construction of this road.

39953 11-Jan-13

H - 7180 Surheti to Samashpur Majra3) km.

This road has been constructed by PWD (B&R).53636 27-Aug-13

Hon'ble MP Rohtak demanded construction of this road.52416 29-Jul-13

4.70 km. Sub Total: