Eradicate 500’ of 10’ Lane Skips
A0
Barrels
Cones
Cones
Barre
ls
B0 &
40’ Spacing
I-81 NB LANE SHIFT AT END OF C/D ROUTE
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
63
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
64
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
65
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
66
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
67
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
68
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
69
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
70
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
71
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
72
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
73
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
74
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
75
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
76
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
77
Route 641 - Den Hill Road
Route 641 - Wayside Drive
0.05 miles
11/4
60
B10
NORTH
460 & DEN HILL RD MONTGOMERY COUNTY
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
78
0.13 miles
SHAWSVILLE Existing
B11
11/460
11/460
NO
RTH
460 (ENTERING SHAWSVILLE) MONTGOMERY COUNTY
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
79
Route 633 - Dark Run Road
0.10 miles
B12
11/4
60
NORTH
460 & DARK RUN RD MONTGOMERY COUNTY
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
80
Route 636 - Seneca Hollow Road
0.15 miles
EASTERN MONTGOMERY ELEMENTARY
0.16 miles
B13
11/4
60
NORTH
460 & SENECA HOLLOW RD MONTGOMERY COUNTY
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
81
Route 844 - Old Roanoke Road
0.42 miles
B14
11/460
NO
RTH
460 & OLD ROANOKE RD MONTGOMERY COUNTY
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
82
Route 821 - Peaceful Drive
0.57 miles
B15
11/460
NORTH
460 & PEACEFUL DR ROANOKE COUNTY
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
83
11/4
60
Route 639 - West River Road
0.06
mile
s
B16
I-81
0.41
mile
s
0.58
mile
s
NORTH
NORTH
460 & DOW HOLLOW RD ROANOKE COUNTY Flagging traffic control shown on or
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
84
I-81
I-81
200’ 200’
A17
<-
<-
<-
Dow
Hollow
Road (R
oute 647)
Dow
Hollo
w R
oad (R
oute 6
47)
11/4
60
500’
500’
500’
500’
660’
Mer
ging
Ta
per
500’
Buf
fer
500’
500’
80’ Spacing
40’ Spacing
200’
200’
245’ Merging
Taper 40’ Spacing
20’ Spacing
500’
500’
500’
500’
660’
Mer
ging
Ta
per
500’
Buffe
r
500’
500’
80’ Spacing
40’ Spacing
80’ Shoulder
Taper
220’ Shoulder Taper
Fallbrook Drive (Route 940)
I-81 N
B O
n-R
am
p
I-81 NB O
ff-Ramp
*
* Provide tapered opening in
barrels for any entrances (see example below)
FLAGGING DIAGRAM FOR U.S. 460 & DOW HOLLOW ROAD INTX.
AT I-81 EXIT 132
Dixie Caverns Entrance
I-8
1 S
B O
n-R
am
p
I-81 SB Off-Ramp
200’
200’
11
/460
B17 &
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
85
CARS
650’
650’
650’
1300’ 1300’
650’ 650’
650’ 650’
MM 115.17
@ MM 114.7
Width Restriction = TTC 25.0
TRUCKS
USE LEFT
LANE
AA MM 116.4
A7
1300’ 1300’
RESTRICTED WIDTH ROUTE
11FT 0 IN
NORTH
USE EXIT 118C
CARS
EXCEPT
WIDE
LOADS
MM 115.15 - Cover 70 MPH SPEED LIMIT SIGNS
EXCEPT WIDE LOADS
EXCEPT WIDE LOADS
650’
650’
650’
650’
ALL TRAFFIC MUST EXIT
118 A-B-C
Cover sign during split lane
Screen 1
Screen 2
Dual Indicate @ MM 115.0
I-81
N
TRAFFIC CONTROL PRECEDING MM116.4 DURING SPLIT LANE
CONCEPT
* Place CB Wizard in grass gore or
good location near Exit 109
Type B Type B
Type B
650’
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
86
MM 115.17
Width Restriction = TTC 25.0
ROAD
DETOUR
4 MILES
ALL
LANES
EXIT
BB
1300’ to MM 116.4
B7
MM 115.15 - Cover 70 MPH SPEED LIMIT SIGNS
MM 116.4 1300’ 1300’
650’
650’
650’
650’
ALL TRAFFIC MUST EXIT
118 A-B-C
RESTRICTED WIDTH ROUTE
11FT 0 IN
NORTH
USE EXIT 118C Dual Indicate @ MM 115.0
@ MM 114.7
Screen 1
Screen 2
* Place CB Wizard in grass gore or
good location near Exit 109
TRAFFIC CONTROL PRECEDING MM116.4
DURING DETOUR CONCEPT
CARS
650’
650’
650’
1300’ 1300’
650’ 650’
650’ 650’
CARS
EXCEPT WIDE LOADS
EXCEPT WIDE LOADS
Cover sign during split lane
I-81
N
Type B
Type B
650’
Cover Signs during detour
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
87
Stripe 1000’ Solid White Centerline over 10’ Lane Skips Stripe 500’ Solid White Centerline
Stripe 440’ Solid White Centerline over 10’ Lane Skips
Keep 480’ Existing Solid White Centerline
Stripe 500’ Solid White Centerline
Stripe 780’ Yellow Solid Edgeline over Existing White Solid Lane Separation
Marking
Tie into Existing Yellow Edgeline
Stripe 920’ of Yellow Edgeline over 10’ Lane Skips
Tie into Yellow Edgeline at Physical Gore
Eradicate 500’ of 10’ Lane Skips
Eradicate 500’ of 2’ Mini-Skips Eradicate 500’ White Solid Lane Separation Marking
Eradicate 500’ of 2’ Mini-Skips
Stri
ping
Pha
se
E
radi
catio
n P
hase
Stripe 500’ Solid Yellow Edgeline
Stripe 500’ Solid Yellow Edgeline
*** White Edgeline to remain as existing in field
***
*** ***
***
***
***
Eradicate 250’ of Yellow Edgeline
Eradicate 250’ of 10’ Lane Skips
Physical Gore
I-81 NB LANE SHIFT PAVEMENT MARKINGS A7P B7P &
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
88
This is the appropriate TTC to be used if a
lane closure is deemed necessary by the
Engineer approaching the work area where
patching is taking place.
Dual-indicated 55 MPH SPEED LIMIT signs
should be posted approximately every 2
miles throughout work area.
END ROAD WORK signs should be shifted
as the work area progresses throughout the
project limits.
INSIDE LANE CLOSURE
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
89
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
90
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
91
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
92
UNIT QTY
Sq. Ft. 2900
HR. 716
Day 5200
HR. 537
Day 448
L.F. 6550
L.F. 2500
L.F. 25
EA. 14
HR. 952
HR. 537
NOTE: Individual quantities shown for Lump Sum Maintenance of Traffic items are for estimating purposes only and are based on the sign layout and traffic control sheets included in this contract. The Contractor is responsible for determining actual quantities based onfield conditions when bidding Lump Sum Maintenance of Traffic.
ELECTRONIC ARROW
CONSTR. PAVE. MARK. TY. E. 6"
CONSTR. PAVE. MARK. TY. D. CL. III 8"
WARNING LIGHT TYPE B
ITEM
GROUP 2 CHANNELIZING DEVICES
FLAGGER SERVICE
CONSTR. PAVE. MARK. TY. D. CL. I 24"
TYPE III BARRICADE 8'
PORTABLE CHANGEABLE MESSAGE SIGN
REMARKS
SUMMARY OF ESTIMATED QUANTITIESLUMP SUM MAINTENANCE OF TRAFFIC
CONSTRUCTION SIGNS
TRUCK MOUNTED ATTENUATOR
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
93
Attachment 3: Guardrail Quantities
Guardrail Upgrade Schedule I-81 NB
From: MM 120.96 To: MM 125.19
Mile Markers Referenced From MM 120.80
I-81 Northbound Roanoke/Montgomery Co.
Site No. : 1 Lane : NBL Mile Post : 120.80 Side : RT Rating : D Steel/Low/Rusty Remove : 1350.0
0 L.F. NS REMOVE EXIST. GUARDRAIL GR
Install : 4.00 Ea. NS GUARDRAIL OFFSET BLOCK (WOOD OR COMPOSITE) 25.00 L.F. GUARDRAIL GR-10 1350.0
0 L.F. GUARDRAIL GR-2
1350.00
L.F. NS RECONSTRUCT EXIST. SHOULDER RESTORATION
79.00 Ton ASPHALT CONCRETE TY. SM-9.5D 1.00 Ea. GUARDRAIL TERMINAL GR-11
Comments : Tie into the existing line on both ends; end at rock fence on Northern end. The removal starts at M.M. 121.26. Place GR-11 at mm 121.60.
Site No. : 2 Lane : NBL Mile Post : 121.15 Side : LT Rating : A Remove : 1.00 Ea. REMOVE ALTERNATE BREAKAWAY CABLE TERMINAL (GR-9)
1.00 Ea. REMOVE GUARDRAIL TERMINAL GR-11
Install : 1.00 Ea. GUARDRAIL TERMINAL GR-11 1.00 Ea. NS GUARDRAIL REUSE EXISTING GR-9 TERMINAL 850.00 L.F. NS RESET EXIST. GUARDRAIL GR-2 1.00 Ea. GUARDRAIL TERMINAL SITE PREPARATION
Comments : Remove and reset GR for asphalt to be pulled against post.
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
94
Site No. : 3 Lane : NBL Mile Post : 121.83 Side : LT Rating : Remove : None Existing
Install : 1.00 Ea. ALTERNATE BREAKAWAY CABLE TERMINAL (GR-9)
1.00 Ea. GUARDRAIL TERMINAL SITE PREPARATION 600.00 L.F. GUARDRAIL GR-2 1.00 Ea. GUARDRAIL TERMINAL GR-11
Comments :
Site No. : 4 Lane : NBL Mile Post : 121.89 Side : RT Rating : D Steel/Low/Rusty/GR-6 Remove : 450.00 L.F. NS REMOVE EXIST. GUARDRAIL GR
12.50 L.F. REMOVE GUARDRAIL TERMINAL GR-6
Install : 625.00 L.F. GUARDRAIL GR-2 625.00 L.F. NS RECONSTRUCT EXIST. SHOULDER RESTORATION 1.00 Ea. ALTERNATE BREAKAWAY CABLE TERMINAL (GR-9) 1.00 Ea. GUARDRAIL TERMINAL SITE PREPARATION 35.00 Ton ASPHALT CONCRETE TY. SM-9.5D
Comments : Extend the guardrail 225' South from the existing location including end sections. Connect to Site # 5
Site No. : 5 Lane : NBL Mile Post : 122.01 Side : RT Rating : D Steel/Low/Rusty Remove : 300.00 L.F. NS REMOVE EXIST. GUARDRAIL GR
12.50 L.F. REMOVE GUARDRAIL TERMINAL GR-6
Install : 575.00 L.F. GUARDRAIL GR-2 575.00 L.F. NS RECONSTRUCT EXIST. SHOULDER RESTORATION 1.00 Ea. GUARDRAIL TERMINAL GR-11 33.00 Ton ASPHALT CONCRETE TY. SM-9.5D
Comments : Extend the guardrail 275' South from the existing location and tie into line # 4. Connect to Site # 4
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
95
Site No. : 6 Lane : NBL Mile Post : 122.07 Side : LT
Remove : 1.00 Ea. REMOVE GUARDRAIL TERMINAL GR-9
1.00 Ea. REMOVE GUARDRAIL TERMINAL GR-11 1062.5
0 LF NS RESET EXIST. GUARDRAIL GR-2
20.00 Ea. NS GUARDRAIL OFFSET BLOCK (WOOD OR COMPOSITE) 1.00 Ea. NS GUARDRAIL REUSE EXISTING GR-9 TERMINAL 1.00 Ea. GUARDRAIL TERMINAL SITE PREPARATION 1.00 Ea. GUARDRAIL TERMINAL GR-11
Comments : Remove and reset GR for asphalt to be pulled against post. Replace block outs that are damaged.
Site No. : 7 Lane : NBL Mile Post : 122.21 Side : RT Rating : D Steel/Low/Rusty Remove : 350.00 L.F. NS REMOVE EXIST. GUARDRAIL GR
12.50 L.F. REMOVE GUARDRAIL TERMINAL GR-6
Install : 525.00 L.F. GUARDRAIL GR-2 525.00 L.F. NS RECONSTRUCT EXIST. SHOULDER RESTORATION 1.00 Ea. ALTERNATE BREAKAWAY CABLE TERMINAL (GR-9) 1.00 Ea. GUARDRAIL TERMINAL SITE PREPARATION 1.00 Ea. GUARDRAIL TERMINAL GR-11 30.00 Ton ASPHALT CONCRETE TY. SM-9.5D
Comments : Extend the guardrail 225' South from the existing location including end sections.
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
96
Site No. : 8 Lane : NBL Mile Post : 122.36 Side : RT Rating D Steel/Low/Rusty Remove : 650.00 L.F. NS REMOVE EXIST. GUARDRAIL GR
12.50 L.F. REMOVE GUARDRAIL TERMINAL GR-6
Install : 800.00 L.F. GUARDRAIL GR-2 800.00 L.F. NS RECONSTRUCT EXIST. SHOULDER RESTORATION 1.00 Ea. ALTERNATE BREAKAWAY CABLE TERMINAL (GR-9) 1.00 Ea. GUARDRAIL TERMINAL SITE PREPARATION 1.00 Ea. GUARDRAIL TERMINAL GR-11 47.00 Ton ASPHALT CONCRETE TY. SM-9.5D
Comments : Extend the guardrail 200' South from the existing location including end sections.
Site No. : 9 Lane : NBL Mile Post : 122.66 Side : RT Rating D Steel/Low/Rusty Remove : 2000.0
0 L.F. NS REMOVE EXIST. GUARDRAIL GR
12.50 L.F. REMOVE GUARDRAIL TERMINAL GR-6
Install : 1.00 Ea. ALTERNATE BREAKAWAY CABLE TERMINAL (GR-9) 1.00 Ea. GUARDRAIL TERMINAL SITE PREPARATION 1.00 Ea. GUARDRAIL TERMINAL GR-11 2100.0
0 L.F. GUARDRAIL GR-2
2100.00
L.F. NS RECONSTRUCT EXIST. SHOULDER RESTORATION
125.00 Ton ASPHALT CONCRETE TY. SM-9.5D
Comments : Extend the guardrail 150' South from the existing location including end sections.
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
97
Site No. : 10 Lane : NBL Mile Post : 122.85 Side : LT
Remove : 1.00 Ea. REMOVE GUARDRAIL TERMINAL GR-9
1.00 Ea. REMOVE GUARDRAIL TERMINAL GR-11 2250.0
0 LF NS RESET EXIST. GUARDRAIL GR-2
23.00 Ea. NS GUARDRAIL OFFSET BLOCK (WOOD OR COMPOSITE) 1.00 Ea. NS GUARDRAIL REUSE EXISTING GR-9 TERMINAL 1.00 Ea. GUARDRAIL TERMINAL GR-11 1.00 Ea. GUARDRAIL TERMINAL SITE PREPARATION
Comments : Remove and reset GR for asphalt to be pulled against post. Replace block outs that are damaged.
Site No. : 11 Lane : NBL Mile Post : 123.11 Side : RT Rating D Steel/Low/Rusty Remove : 800.00 L.F. NS REMOVE EXIST. GUARDRAIL GR
1.00 Ea. REMOVE GUARDRAIL TERMINAL GR-9
Install : 1.00 Ea. ALTERNATE BREAKAWAY CABLE TERMINAL (GR-9) 1.00 Ea. GUARDRAIL TERMINAL SITE PREPARATION 800.00 L.F. GUARDRAIL GR-2 800.00 L.F. NS RECONSTRUCT EXIST. SHOULDER RESTORATION 1.00 Ea. GUARDRAIL TERMINAL GR-11 47.00 Ton ASPHALT CONCRETE TY. SM-9.5D
Comments : Extend the guardrail 50' South from the existing location including end sections.
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
98
Site No. : 12 Lane : NBL Mile Post : 123.32 Side : LT
Remove : 1.00 Ea. REMOVE GUARDRAIL TERMINAL GR-9
1.00 Ea. REMOVE GUARDRAIL TERMINAL GR-11 1187.5
0 LF NS RESET EXIST. GUARDRAIL GR-2
6.00 Ea. NS GUARDRAIL OFFSET BLOCK (WOOD OR COMPOSITE) 1.00 Ea. GUARDRAIL TERMINAL GR-11 1.00 Ea. NS GUARDRAIL REUSE EXISTING GR-9 TERMINAL 1.00 Ea. GUARDRAIL TERMINAL SITE PREPARATION
Comments : Remove and reset GR for asphalt to be pulled against post. Replace block outs that are damaged.
Site No. : 13 Lane : NBL Mile Post : 123.35 Side : RT Rating D Steel/Low/Rusty Remove : 375.00 L.F. NS REMOVE EXIST. GUARDRAIL GR
12.50 L.F. REMOVE GUARDRAIL TERMINAL GR-6
Install : 1.00 Ea. ALTERNATE BREAKAWAY CABLE TERMINAL (GR-9) 1.00 Ea. GUARDRAIL TERMINAL SITE PREPARATION 600.00 L.F. GUARDRAIL GR-2 600.00 L.F. NS RECONSTRUCT EXIST. SHOULDER RESTORATION 34.00 Ton ASPHALT CONCRETE TY. SM-9.5D
Comments : Extend the guardrail 250' South and 25' North from the existing location including end sections. Connect to line # 14.
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
99
Site No. : 14 Lane : NBL Mile Post : 123.50 Side : RT Rating D Steel/Low/Wood Blocks,Low Remove : 2675.0
0 L.F. NS REMOVE EXIST. GUARDRAIL GR
12.50 L.F. REMOVE GUARDRAIL TERMINAL GR-6
Install : 3075.00
LF GUARDRAIL GR-2
3075.00
LF NS RECONSTRUCT EXIST. SHOULDER RESTORATION
182.00 Ton ASPHALT CONCRETE TY. SM-9.5D 25.00 LF GUARDRAIL GR-10 142.00 Ea. NS GUARDRAIL OFFSET BLOCK (WOOD OR COMPOSITE)
Comments : This run is 7400 L.F. and 2 sections are going to be replaced in run. Starting at mm
123.50 & 124.08. Extend the guardrail 400' North from the run-on end of existing line including end sections. Connect to line # 13. Replace block outs that are
damaged on remainder of run.
Site No. : 15 Lane : NBL Mile Post : 123.99 Side : LT
Remove : 1.00 Ea. REMOVE GUARDRAIL TERMINAL GR-9
1.00 Ea. REMOVE GUARDRAIL TERMINAL GR-11
Install : 925.00 LF NS RESET EXIST. GUARDRAIL GR-2 1.00 Ea. GUARDRAIL TERMINAL GR-11 1.00 Ea. NS GUARDRAIL REUSE EXISTING GR-9 TERMINAL 1.00 Ea. GUARDRAIL TERMINAL SITE PREPARATION
Comments : Remove and reset GR for asphalt to be pulled against post. Replace block outs that are damaged.
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
100
Site No. : 16 Lane : NBL Mile Post : 124.63 Side : LT
Remove : 1.00 Ea. REMOVE GUARDRAIL TERMINAL GR-11
25.00 L.F. NS REMOVE EXIST. GUARDRAIL GR
Install : 2575.00
LF NS RESET EXIST. GUARDRAIL GR-2
39.00 Ea. NS GUARDRAIL OFFSET BLOCK (WOOD OR COMPOSITE) 1.00 Ea. GUARDRAIL TERMINAL GR-11 25.00 L.F. GUARDRAIL GR-2
Comments : Remove and reset GR for asphalt to be pulled against post. Replace block outs that are damaged; tie into existing radial guardrail at south end. Replace 25' damaged GR-2
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
101
Maintenance Division District: 1/6/2014 Date: Commonwealth of Virginia -- Department of Transportation
Salem
Page 1 of 9 Montgomery Co. Schedule: PM-2R-14 State Project Number: PM2R-060-F14, P401; 0081-060-F14, P401
Route: Subdivision: Lane: Traf Grp:
Milepost From:
Milepost To:
16.864 MM 121.7
20.21 0.02 MI. S. MM 125 N
XVII From Intersection: 14.17 Miles: JB:NCL CHRISTIANSBURG
14.23 Miles: I-81N Dist/Coll at mp118; Ramp Intersection:END COLLECTOR ROAD - RTS 460/PARKWAY DR & 11 From X/Y Coordinates: From Offset: 2.694 MI
To X/Y Coordinates: To Offset: 5.98 MI To Intersection:
Quantity UOM Lbs/SqYd Gal/SqYd Dep(in) Wid(ft) Len(mi) Detail Item Code & Description 10065 - AGGR. MATL. NO. 1 FOR PATCH @ APPROX. MM
124.86 - VARIABLE DEPTH 0.04 8 123.9 TON
10065 - AGGR. MATL. NO. 1 No. 1s IN THE BOTTOM OF PATCHES
0.9 13 10 3775.2 TON
10700 - RUMBLE STRIP, ASPHALT RUMBLE STRIPS-RIGHT & LEFT
17667 LF
10701 - LIQ.ASPH.COATING (RUMBLE STRIP) LIQ. ASPH. COATING FOR RUMBLES-BOTH SIDES
2945 SY
13232 - GEOTEXTILE DRAINAGE FABRIC 10253 SY 13315 - GUARDRAIL TERMINAL GR-11 11 EA 13320 - GUARDRAIL GR-2 9725 LF 13345 - ALTERNATE BREAKAWAY CABLE TERMINAL(GR-9)
7 EA
13349 - GUARDRAIL TERMINAL SITE PREPARATION 11 EA
13355 - GUARDRAIL GR-10 25 LF 13401 - NS GUARDRAIL OFFSET BLOCK (WOOD OR COMPOSITE)
230 EA
13401 - NS GUARDRAIL REUSE EXISTING GR-9 TERMINAL
4 EA
16242 - AGR.BASE MAT.TY.I OR II NO. 21A OR21B RIGHT SHOULDER STONE 2.6 2 1.5 251.68 TON
16242 - AGR.BASE MAT.TY.I OR II NO. 21A OR21B LEFT SHOULDER STONE 2.2 1 1.5 106.48 TON
16325 - NS ASPHALT CONCRETE SM-19.0D
RIGHT LANE & RUMBLES INLAY
3.35 14 3 330 4534.5 TON
16340 - ASPHALT CONCRETE TY. SM-9.5D RIGHT SHOULDER OVERLAY 3.346 8 1.5 1295.57 TON
16340 - ASPHALT CONCRETE TY. SM-9.5D SPOT PAVING-LEFT SHOULDER ADJACENT TO PATCHES
1.08 4 1.5 209.09 TON
16340 - ASPHALT CONCRETE TY. SM-9.5D ASPHALT FOR UNDER GUARDRAIL
533 TON
16370 - ASPHALT CONCRETE TY. IM-19.0D RIGHT SHOULDER INLAY - MM123 TO MM124.6
1.61 8 2 831.19 TON
16370 - ASPHALT CONCRETE TY. IM-19.0D LEFT LANE & LEFT SHOULDER INLAY
3.346 16 3 330 5182.28 TON
16392 - ASPHALT CONCRETE TY. BM-25.0D BASE PATCHING 0.9 13 12.5 1375 4719 TON
PCN: M214PMR105047
37.16776, -80.31428
37.19537, -80.26982
UPC: 105047 81 (R-VA IS00081NB)
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
102
Page 2 of 9 Montgomery Co. Schedule: PM-2R-14 State Project Number: PM2R-060-F14, P401; 0081-060-F14, P401
16392 - ASPHALT CONCRETE TY. BM-25.0D BASE PATCHING @ APPROX. MM 124.86 TO MM 124.9
0.04 8 12.5 1375 129.07 TON
16403 - STONE MATRIX ASPH SMA-12.5(76-22) LEFT SHOULDER OVERLAY 3.346 4 1.5 647.79 TON 16403 - STONE MATRIX ASPH SMA-12.5(76-22) MAINLINE OVERLAY 3.346 24 1.5 165 3886.71 TON 16516 - FLX.PAV.TIE-IN PLANING 0"-2" TIE-IN MILL 0.1 24 1.5 1408 SY 16522 - FLEXIBLE PAVE.PLANING 0"-2" SPOT MILLING-LEFT
SHOULDER ADJACENT TO PATCHES
1.08 4 1.5 2534.4 SY
16522 - FLEXIBLE PAVE.PLANING 0"-2" RIGHT SHOULDER MILLING - MM123 TO MM124.6
1.61 8 2 7556.27 SY
16523 - FLEXIBLE PAVEMENT PLANING ABOVE 2"-4" LEFT LANE & LEFT SHOULDER
3.346 16 3 31407.79 SY
16523 - FLEXIBLE PAVEMENT PLANING ABOVE 2"-4" RIGHT LANE & RIGHT RUMBLES
3.35 14 3 27481.81 SY
24430 - DEMO. OF PAVEMENT (FLEXIBLE) FOR PATCH @ APPROX. MM 124.86 TO MM 124.9
0.04 8 189 SY
24430 - DEMO. OF PAVEMENT (FLEXIBLE) 22" DEEP PATCHES - APPROX 10" ASPHALT, 12" STONE
0.9 13 6859 SY
24504 - NS REMOVE EXISTING GUARDRAIL TERMINAL GR-11
5 EA
24504 - NS REMOVE EXISTING GUARDRAIL TERMINAL GR-9
5 EA
24601 - NS REMOVE EXIST. GUARDRAIL GUARDRAIL REMOVAL
7625 LF
24601 - NS REMOVE EXIST. GUARDRAIL TERMINAL GR-6
87.5 LF
24611 - NS RESET EXIST. GUARDRAIL GR-2
8037.5 LF
24640 - NS RECONSTRUCT EXIST. SHOULDER RESTORATION
9100 LF
54022 - TY. A PAVEMENT LINE MARKING 6" TEMPORARY LINE MARKINGS 50015 LF
54076 - TY.B CL.VI PAVE. LINE MARK. 6" - White EDGELINE & SKIPS 27786 LF 54076 - TY.B CL.VI PAVE. LINE MARK. 6" - Yellow EDGELINE 22229 LF
54210 - REMOVE EXIST. RAISED PAVEMENT MARKER
278 EA
54217 - SNOW PLOW. RAISED PAVE. MARKER ASPH.CONC
278 EA
54550 - CONSTR.PAVE.MARK.(TY.F,CL.I)4" TEMPORARY LINE MARKINGS 12700 LF
595 - OUTLET PIPE OUTLET PIPE FOR UD-7 TO EW-12 CONNECTION
1310 LF
596 - ENDWALL EW-12 REQUIRED @ UD-7 OUTFALLS
89 EA
597 - UNDERDRAIN UD-7 UD-7s RIGHT SIDE ONLY. MAX LENGTH = 200'
17667 LF
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
103
Page 3 of 9 Montgomery Co. Schedule: PM-2R-14 State Project Number: PM2R-060-F14, P401; 0081-060-F14, P401
Notes: Miscellaneous Notes The Milling and Overlay Detail
located elsewhere in this contract is to note the detail of milling and overlay.
Miscellaneous Notes The Guardrail Schedule located elsewhere in this contract is to note the locations for the installation and removal of guardrail items.
Rideablity Pay Factor is in effect for this item. The Patching Detail located elsewhere in this contract is to note the locations and details for the patching.
Rideablity Pay Factor is in effect for this item. All work must be completed between the hours of: REFER TO TMP FOR
SPECIFIC ALLOWABLE WORK HOURS
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
104
Page 4 of 9 Montgomery Co. Schedule: PM-2R-14 State Project Number: PM2R-060-F14, P401; 0081-060-F14, P401
Route: Subdivision: Lane: Traf Grp:
Milepost From:
Milepost To:
15.98 N. END RTE. 641 BRIDGE
16.864 MM 121.7 N
XVII From Intersection: 12.12 Miles: I-81N Dist/Coll at mp118; Ramp Intersection:BEGIN COLLECTOR RD - RT 460/PARKWAY DRIVE & RT
14.17 Miles: JB:NCL CHRISTIANSBURG
From X/Y Coordinates: From Offset: 3.86 MI
To X/Y Coordinates: To Offset: 2.694 MI To Intersection:
Quantity UOM Lbs/SqYd Gal/SqYd Dep(in) Wid(ft) Len(mi) Detail Item Code & Description 10065 - AGGR. MATL. NO. 1 No. 1s IN THE BOTTOM OF
PATCHES 0.05 13 10 209.73 TON
10700 - RUMBLE STRIP, ASPHALT RUMBLE STRIPS-RIGHT & LEFT
9335 LF
10701 - LIQ.ASPH.COATING (RUMBLE STRIP) LIQ. ASPH. COATING FOR RUMBLES-BOTH SIDES
1556 SY
13232 - GEOTEXTILE DRAINAGE FABRIC 442 SY 13315 - GUARDRAIL TERMINAL GR-11 2 EA 13320 - GUARDRAIL GR-2 1340 LF 13349 - GUARDRAIL TERMINAL SITE PREPARATION 1 EA
13355 - GUARDRAIL GR-10 25 LF 13401 - NS GUARDRAIL OFFSET BLOCK (WOOD OR COMPOSITE)
4 EA
13401 - NS GUARDRAIL REUSE EXISTING GR-9 TERMINAL
1 EA
16242 - AGR.BASE MAT.TY.I OR II NO. 21A OR21B LEFT SHOULDER STONE 0.7 1 1.5 33.88 TON
16242 - AGR.BASE MAT.TY.I OR II NO. 21A OR21B RIGHT SHOULDER STONE 0.2 2 1.5 19.36 TON
16325 - NS ASPHALT CONCRETE SM-19.0D
RIGHT LANE AND RIGHT RUMBLES INLAY
0.88 14 3 330 1198 TON
16340 - ASPHALT CONCRETE TY. SM-9.5D SPOT PAVING-LEFT SHOULDER ADJACENT TO PATCHES
0.06 4 1.5 11.62 TON
16340 - ASPHALT CONCRETE TY. SM-9.5D RIGHT SHOULDER OVERLAY 0.884 8 1.5 342.28 TON
16340 - ASPHALT CONCRETE TY. SM-9.5D ASPHALT FOR UNDER GUARDRAIL
79 TON
16370 - ASPHALT CONCRETE TY. IM-19.0D LEFT LANE & LEFT SHOULDER INLAY
0.884 16 3 330 1369.14 TON
16392 - ASPHALT CONCRETE TY. BM-25.0D BASE PATCHING 0.05 13 12.5 1375 262.17 TON 16403 - STONE MATRIX ASPH SMA-12.5(76-22) LEFT SHOULDER OVERLAY 0.884 4 1.5 171.14 TON 16403 - STONE MATRIX ASPH SMA-12.5(76-22) MAINLINE OVERLAY 0.884 24 1.5 165 1026.85 TON 16516 - FLX.PAV.TIE-IN PLANING 0"-2" TIE-IN MILL 0.03 24 1.5 422.4 SY 16522 - FLEXIBLE PAVE.PLANING 0"-2" SPOT MILLING-LEFT
SHOULDER ADJACENT TO PATCHES
0.06 4 1.5 140.8 SY
16523 - FLEXIBLE PAVEMENT PLANING ABOVE 2"-4" LEFT LANE & LEFT SHOULDER
0.884 16 3 8297.81 SY
16523 - FLEXIBLE PAVEMENT PLANING ABOVE 2"-4" RIGHT LANE & RIGHT RUMBLES
0.884 14 3 7260.59 SY
PCN: M214PMR105301
37.15767, -80.32353
37.16776, -80.31428
UPC: 105301 81 (R-VA IS00081NB)
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
105
Page 5 of 9 Montgomery Co. Schedule: PM-2R-14 State Project Number: PM2R-060-F14, P401; 0081-060-F14, P401
24430 - DEMO. OF PAVEMENT (FLEXIBLE) 22" DEEP PATCHES - APPROX 10" ASPHALT, 12" STONE
0.05 13 378 SY
24504 - NS REMOVE EXISTING ALTERNATE BREAKAWAY CABLE TERMINAL (GR-9)
1 EA
24504 - NS REMOVE EXISTING GUARDRAIL TERMINAL GR-11
1 EA
24601 - NS REMOVE EXIST. GUARDRAIL GUARDRAIL REMOVAL
1340 LF
24611 - NS RESET EXIST. GUARDRAIL GR-2
850 LF
24640 - NS RECONSTRUCT EXIST. SHOULDER RESTORATION
1340 LF
54022 - TY. A PAVEMENT LINE MARKING 6" TEMPORARY LINE MARKINGS 10502 LF
54076 - TY.B CL.VI PAVE. LINE MARK. 6" - White EDGELINE & SKIPS 5834 LF 54076 - TY.B CL.VI PAVE. LINE MARK. 6" - Yellow EDGELINE 4668 LF
54210 - REMOVE EXIST. RAISED PAVEMENT MARKER
58 EA
54217 - SNOW PLOW. RAISED PAVE. MARKER ASPH.CONC
58 EA
54550 - CONSTR.PAVE.MARK.(TY.F,CL.I)4" TEMPORARY LINE MARKINGS 2000 LF
595 - OUTLET PIPE OUTLET PIPE FOR UD-7 TO EW-12 CONNECTION
720 LF
596 - ENDWALL EW-12 REQUIRED @ UD-7 OUTFALLS
24 EA
597 - UNDERDRAIN UD-7 UD-7s RIGHT SIDE ONLY. MAX LENGTH = 200'
4667 LF
Notes: Miscellaneous Notes The Patching Detail located
elsewhere in this contract is to note the locations and details for the patching.
Miscellaneous Notes The Guardrail Schedule located elsewhere in this contract is to note the locations for the installation and removal of guardrail items.
Miscellaneous Notes The Milling and Overlay Detail located elsewhere in this contract is to note the detail of milling and overlay.
Rideablity Pay Factor is in effect for this item. All work must be completed between the hours of: REFER TO TMP FOR
SPECIFIC ALLOWABLE WORK HOURS
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
106
Page 6 of 9 Montgomery Co. Schedule: PM-2R-14 State Project Number: PM2R-060-F14, P401; 0081-060-F14, P401
Schedule Totals Item UOM Quantity 10065 - AGGR. MATL. NO. 1 4108.83 TON 10700 - RUMBLE STRIP, ASPHALT 27002 LF 10701 - LIQ.ASPH.COATING (RUMBLE STRIP) 4501 SY 13232 - GEOTEXTILE DRAINAGE FABRIC 10695 SY 13315 - GUARDRAIL TERMINAL GR-11 13 EA 13320 - GUARDRAIL GR-2 11065 LF 13345 - ALTERNATE BREAKAWAY CABLE TERMINAL(GR-9) 7 EA 13349 - GUARDRAIL TERMINAL SITE PREPARATION 12 EA 13355 - GUARDRAIL GR-10 50 LF 13401 - NS GUARDRAIL OFFSET BLOCK (WOOD OR COMPOSITE)
234 EA
13401 - NS GUARDRAIL REUSE EXISTING GR-9 TERMINAL
5 EA
16242 - AGR.BASE MAT.TY.I OR II NO. 21A OR21B 411.4 TON 16325 - NS ASPHALT CONCRETE SM-19.0D
5732.5 TON
16340 - ASPHALT CONCRETE TY. SM-9.5D 2470.56 TON 16370 - ASPHALT CONCRETE TY. IM-19.0D 7382.61 TON 16392 - ASPHALT CONCRETE TY. BM-25.0D 5110.24 TON 16403 - STONE MATRIX ASPH SMA-12.5(76-22) 5732.49 TON 16516 - FLX.PAV.TIE-IN PLANING 0"-2" 1830.4 SY 16522 - FLEXIBLE PAVE.PLANING 0"-2" 10231.47 SY 16523 - FLEXIBLE PAVEMENT PLANING ABOVE 2"-4" 74448 SY 24265 - NS MAINTENANCE OF TRAFFIC WRECKER - 40 TON TOWER TRUCK (120 HOURS)
1 LS
24430 - DEMO. OF PAVEMENT (FLEXIBLE) 7426 SY 24504 - NS REMOVE EXISTING ALTERNATE BREAKAWAY CABLE TERMINAL (GR-9)
1 EA
24504 - NS REMOVE EXISTING GUARDRAIL TERMINAL GR-11
6 EA
24504 - NS REMOVE EXISTING GUARDRAIL TERMINAL GR-9
5 EA
24601 - NS REMOVE EXIST. GUARDRAIL GUARDRAIL REMOVAL
8965 LF
24601 - NS REMOVE EXIST. GUARDRAIL TERMINAL GR-6
87.5 LF
24611 - NS RESET EXIST. GUARDRAIL GR-2
8887.5 LF
24640 - NS RECONSTRUCT EXIST. SHOULDER RESTORATION
10440 LF
54022 - TY. A PAVEMENT LINE MARKING 6" 60517 LF 54076 - TY.B CL.VI PAVE. LINE MARK. 6" - White 33620 LF 54076 - TY.B CL.VI PAVE. LINE MARK. 6" - Yellow 26897 LF 54210 - REMOVE EXIST. RAISED PAVEMENT MARKER 336 EA 54217 - SNOW PLOW. RAISED PAVE. MARKER ASPH.CONC 336 EA 54550 - CONSTR.PAVE.MARK.(TY.F,CL.I)4" 14700 LF
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
107
Page 7 of 9 Montgomery Co. Schedule: PM-2R-14 State Project Number: PM2R-060-F14, P401; 0081-060-F14, P401
595 - OUTLET PIPE 2030 LF 596 - ENDWALL EW-12 113 EA 597 - UNDERDRAIN UD-7 22334 LF
Schedule Notes
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
108
Page 8 of 9 Montgomery Co. Schedule: PM-2R-14 State Project Number: PM2R-060-F14, P401; 0081-060-F14, P401
All temporary or permanent line markings shall be placed at the end of each workday accordingly. Where the 1.5” overlay of the right shoulder is called for, the pavement drop-off at the face of guardrail shall not be located any closer than 2’-0” in front of the face of guardrail. The drop-off shall be limited to a range of 1½” in height with a 4:1 or flatter wedge to minimize the effect of the drop-off on a vehicle. Any drop-off that should happen to fall within 2’-0” of the face of guardrail shall be corrected by the Contractor with a method suitable to the VDOT engineer and shall be at no additional cost to the Department. The " PHASE 1: Inside Shoulder Patching for Maintenance of Traffic" located elsewhere in this contract is to note the details for the spot patching in left side shoulder on I-81 NB county Milepost 15.98 to 20.21 in Montgomery Co. The "Patching Detail" located elsewhere in this contract is to note the locations and details for the patching on I-81 NB county Milepost 15.98 to 20.21 in Montgomery Co. If excavation is used in lieu of milling for pavement demolition of the asphalt layers, the asphalt shall be sawcut around the perimeter of the excavation and the price for sawcutting shall be included in the price for pavement demolition (24430 – Demolition of Pavement). The bottom of the patches shall be graded as shown in the "Patching Detail" to properly drain to UD-7s. The cost for grading shall be included in the base bid line item for "24430 – Demolition of Pavement". After placement of the No. 1 Aggregate (10065 – AGGR. MATL. NO. 1), a method of compaction consisting of at least three passes with a steel drum vibratory roller weighing no less than 10 tons shall be used. The Milling and Overlay Detail located elsewhere in this contract is to note the detail of milling and overlay on I-81 NB county Milepost 15.98 to 20.21 in Montgomery Co. Intermediate layer shall be placed (over/through the patches) as soon as possible following completion of the patching. Base Asphalt (BM-25.0) shall be subject to traffic for no more than 14 calendar days. UD-7s are required on the right side only and shall be placed outside of the rumble strips approximately 2 feet from the right edge line. Outlets shall be supplied approximately every 200 feet and in all sag locations. When excavating for the UD-7 adjacent to the base patches, the UD-7 and backfill shall be placed immediately in a continuous operation as to not impact the integrity of the base patches. The Guardrail Schedule located elsewhere in this contract is to note the locations for the installation and removal of guardrail items on I-81 NB county Milepost 15.98 to 20.21 in Montgomery Co. Detour signs on northbound Route 11/eastbound Route 460 will be left in place after construction is complete and will become property of the Department. All remaining detour signs will be removed with the project.
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
109
Page 9 of 9 Schedule: PM-2R-14 State Project Number: PM2R-060-F14, P401; 0081-060-F14, P401
The construction sequence for I-81 NB county Milepost 15.98 to 20.21 in Montgomery Co. shall be as follows unless approved otherwise by the Engineer: Phase 1: Spot patching in left side shoulder adjacent to outside lane patches Phase 2: Full depth patching in outside lane Phase 3: Mill outside lane and place back SM-19.0D asphalt Phase 4: Install underdrains Phase 5: Mill outside shoulder from MM 123 to MM 124.6 and place back IM-19.0D asphalt Phase 6: Mill inside lane and place back IM-19.0D asphalt Phase 7: Install and replace guardrail Phase 8: Place asphalt surface course and permanent pavement markings Phase 9: Install rumble strips
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
110
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
111
(c211hg0-1209) POLISHING AGGREGATE IN ASPHALT CONCRETE - Section 211—Asphalt Concrete of the Specifications is amended as follows:
Section 211.02—Materials is amended by replacing (e) with the following:
Fine or coarse aggregate that tend to polish under traffic will not be permitted in any final surface exposed to traffic except as permitted within the limits of Section 211.04(a) and (b) of the Specifications and as designated by the Engineer or as permitted elsewhere in these Specifications.
Section 211.04—Asphalt Concrete Mixtures is amended by replacing (a) and (b) with the following:
Asphalt concrete mixtures shall conform to the requirements of Table II-14 and the following:
(a) Types SM-9.0A, SM-9.0D, SM-9.0E, SM-9.5A, SM-9.5D and SM-9.5E asphalt concrete shall consist of crushed stone, crushed slag, or crushed gravel and fine aggregate, slag or stone screenings or a combination thereof combined with asphalt cement. NOTE: For all surface mixes, except where otherwise noted, no more than 5 percent of all aggregate retained on the No. 4 sieve and no more than 20 percent of the total aggregate may be polish susceptible. At the discretion of the Engineer, a SM-9.5AL may be specified and polish susceptible aggregates may be used (without percentage limits).
(b) Types SM-12.5A, SM-12.5D, SM-12.5E, IM-19.0A, IM-19.0D,
and IM-19.0E asphalt concrete shall consist of crushed stone, crushed slag, or crushed gravel and fine aggregate, slag or stone screenings or a combination thereof combined with asphalt cement. NOTE: At the discretion of the Engineer, an intermediate mix may be designated as either a SM-19.0A or SM-19.0D. For SM-12.5 and SM-19.0 surface mixes, no more than 5 percent of the aggregate retained on the No. 4 sieve may be polish susceptible. All material passing the No. 4 sieve may be polish susceptible. No more than 35 percent of the total aggregate composition (polish and non-polish susceptible) shall be passing the No. 8 sieve. At the discretion of the Engineer, a SM-12.5AL may be specified and polish susceptible aggregates may be used (without percentage limits).
10-7-09 (SPCN)
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
112
SECTION 108.02 LIMITATION OF OPERATIONS of the Specifications is amended to include the following: The Contractor may close a single lane on I-81 five days a week, Sunday to Thursday, between 10:00 PM and 6:00 AM the following morning. In the event that the allocated time limits are exceeded and the Contractor fails to restore all traffic for any lane a User Fee will be assessed. The User Fees for failure to restore all lanes to traffic by the designated time will be assessed at the rate of $1,400 per 15 minutes, and prorated for any portion thereof, and calculated in accordance with the following example. These fees will be deducted from the next monthly progress estimate. User Fee’s Calculation Example # 1: If Lane Closure remains in place until 7:40 AM, the resulting fee will be calculated as follows: 6:00 AM to 7:30 AM = (6 fifteen minute periods) x $1,400.00 = $8,400.00 7:30 AM to 7:40 AM = 10/15 minutes x $1,400.00 = $933.33 Total User Fee = $8,400.00 + $933.33 = $9,333.33 The Contractor may close one lane on I-81 from Sunday at 7:00 PM to Monday of the following week at 6:00 AM for 179 consecutive hours to perform full depth patching (Phase 2) operation. During this period, a full closure of the interstate will be allowed Sunday to Sunday of the following week daily, between 10:00 PM and 6:00 AM the following morning. These closures will only be allowed during one of the following weeks:
March 23 to March 31 April 6 to April 14 April 27 to May 5
During the full closure of the interstate, if the Contractor fails to restore one of the two lanes of traffic by 6:00 AM, a User Fee will be assessed. The User Fees for failure to restore at least one lane to traffic by the designated time will be assessed at the rate of $3800 per 15 minutes, and prorated for any portion thereof, and calculated in accordance with the following example. These fees will be deducted from the next monthly progress estimate. User Fee’s Calculation Example # 2: If both lane closures remain in place until 7:40 AM, the resulting fee will be calculated as follows: 6 to 7:30 AM = (6 fifteen minute periods) x $3,800.00 = $22,800.00 7:30 AM to 7:40 AM = 10/15 minutes x $3,800.00 = $2,533.33 Total User Fee = $22,800.00 + $2,533.33 = $25,333.33 In the event that the Contractor fails to restore traffic for the second lane within the 179 hours from First Sunday at 7:00 PM, a User Fee will be assessed at the rate of $1400 per 15 minutes, and prorated for any portion thereof, and calculated in accordance with Example #1. These fees will be deducted from the next monthly progress estimate.
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
113
If the full depth patching (Phase 2) is completed and both lanes of traffic are restored in less than 179 consecutive hours an incentive will be awarded to the contractor in the amount of $1400 per 15 minutes, and prorated for any portion thereof, and calculated in accordance with the following example. Incentive Calculation Example: If all full depth patches are completed and both lanes of traffic are open at 11:40 PM on Saturday, the resulting incentive will be calculated as follows: Saturday 11:45 PM to Monday 6:00 AM = (120 fifteen minute periods) x $1400.00 = $168,000.00 Saturday 11:40 PM to Saturday 11:45 PM = 5/15 minutes x $1400.00 = $466.67 Total Incentive = $168,000.00 + $466.67 = $168,466.67 The maximum possible incentive is $270,000.00. If rain, snow, natural disaster or other event beyond the control of the Contractor requires work on the full depth patches to cease prior to 6:00 AM on the second Monday, the Contractor will be allowed to restore both lanes and open to traffic. Personnel, equipment, material supply, and material production are all being considered to be within the control of the Contractor. The Contractor shall then provide a work plan for completing full depth patching (Phase 2) within the remainder of the 179 hours. The lane closures can then be resumed for the remainder of the 179 hours once the Engineer reviews and approves the Contractor’s plan. No incentive will be awarded in this scenario and the user fee for not restoring one lane of traffic at 6:00 AM of $3800 per 15 minutes will still apply. Once the 179 hours are exceeded, no further full closure of the interstate will be allowed and the general user fee of $1400 per 15 minute period will apply for hours outside of Sunday to Thursday between 10:00 PM and 6:00 AM the following morning. No lane closures are allowed on I-81 beginning on Thursday April 17, 2014 through Monday April 21, 2014 (Easter Holiday). No lane closures are allowed on I-81 on the weeks of Virginia Tech and Radford University Graduations, from Wednesday May 07, 2014 to Saturday May 17, 2014. No lane closures are allowed on I-81 beginning on Thursday May 22, 2014 through Tuesday May 27, 2014 (Memorial Day Holiday). No lane closures are allowed on I-81 from the Wednesday prior to, until the Monday after Virginia Tech and Radford Student move in dates. No lane closures are allowed on I-81 on Fridays of the weekend of any Virginia Tech Home Football Game and on Thursdays of weeks that Virginia Tech plays a home football game on Thursday night, unless otherwise approved by the Engineer. For the purpose of this provision restoration of traffic shall mean placing back an asphalt surface meeting the requirements of the specifications with less than a 2” drop off in the open lane with center line and edge line pavement markings, the opening of the lane to traffic, the removal or relocation of work zone traffic control devices and signs to their approved site as determined by the Engineer, and removal of all workers, materials and equipment from the opened lane of traffic. The fees are imposed, not as a penalty, but in order to minimize the impact of lane closures and construction operations on roadway users. The fee amount is based on daily road user costs, which are defined as representing the average daily cost of interference and inconvenience to the road user. The Contractor waives any defense as to the validity of any fees stated in the Contract, the Contract Documents or these Specifications and assessed by the Department against the Contractor on the grounds that such fees are void as penalties or are not reasonably related to actual damages.
ORDER NO.: 234 CONTRACT ID. NO.: C000105047N01
114
Any liquidated damages assessed in accordance with Section 108.06 of the Specifications will be in addition to any fees assessed as shown herein. 10-22-13 (SPCN) SMA SCHEDULE WORK DATES (Salem District Only) — Section 105.01—Notice To Proceed of the Specifications is amended to include the following:
The Notice to Proceed date for this contract shall be as specified elsewhere in this contract; however, SMA shall only be placed between June 1, 2014 and October 1, 2014 or June 1, 2015 and June 30, 2015.
9-1-11a (SPCN) Pavement Marking and Markers: The Special Provision for Temporary Construction and Permanent Pavement Marking (S704M03) and the Supplemental Specification Section 704 – Pavement Marking and Markers (SS70401) are hereby deleted from Volume 2 and the Special Provision for Section 704 – Pavement Marking and Markers is added to Volume 1 of the proposal. 1-8-14 (SPCN) VIRGINIA TEST METHOD, VTM-102: Whenever testing by Virginia Test Method VTM-102 is referenced in Section 211 – Asphalt Concrete and the Special Provisions for Reclaimed Asphalt Shingles, the latest version, modified December 13, 2013, shall be the test method used. This version is currently available on the Department’s website at: http://www.virginiadot.org/business/resources/Materials/bu-mat-VTMs.pdf 1-6-14 (SPCN)