    WEL COME TOPRESENTATION BY

    WARANA DAIRY

    ENERGY CONSERVATION

  • 8/14/2019 41Drugs Foods Waranagar

    2/15

    e uccess tory o aranaDairy.

    A movement called Warana was started by a visionaryTATYASAHAB KOR E in 1951, w ith the establishment of a sugarfactory. Initiated for the cause of the economic upliftment of the poor farmers. Setting a landmark in the field of rural co-operative industry, today, the movement has gathered a

    momentum and has proved to be a precious asset to theeconomic progress.The Success story of WARANA was destined to continuethrough the young and able hands of Shri. Vinay Kore , the

    grandson of Late Shri. Tatyasaheb Kore . Endowed with anundying, positive approach and great optimism, hesuccessfully leads the forw ard march of WARANA GROUP.Shri. C. N. Gulave, Managing Director, has played a massive

    role in contributing to WAR ANA DAIR YS stupendous success.

  • 8/14/2019 41Drugs Foods Waranagar

    3/15

    The Success Story of WaranaDairy .

    WARANA DAIRY Established in 1968 to provide additionalsource of income to the farmers.

    Activity :- To collect the milk and supply to Govt. DairyMiraj.

    500 00 Lt rs. Capacity Processing plant installed in 1974. Activity :- To supply the pasteurized milk by Road Milk Tanker to Govt. Dairys in Mumbai.

    In 1982 Established its ow n market in Mu mbai & Local area.Since 1994 to 1999 capacity of Dairy increase to handle milk up to 5 Lac. Liters in same plant.Now Dairy Produces various milk products like Past. Milk, Milk Powder, Shrikhand, Ghee, Butter, Lassi, Cheese, Paneer BabyFood, Mix Fruit Jam , Fruit Drinks and Many M ore .

  • 8/14/2019 41Drugs Foods Waranagar

    4/15

    Need for Energy Saving.

    To Reduce processing/ productioncost & thereby give maximumreturns to producers / poorfarmers.Need of time to Comparative edgein market competition.Limitation of fuels sources &

    energy.

  • 8/14/2019 41Drugs Foods Waranagar

    5/15

    Task Carried Out.Self Pow er Generation

    Co-Generation P lant w ith W aste Heat Recovery.In operation from July2002.

    2002-03 Unit rate Rs 2003-04 Unit rate Rs

    Units generated 43,17,200 64,33,920Units supplied 39,05,110 59,36,720LDO Ltrs 01,13,050 0.43 00Furnace Oil Ltrs 10,54,600 3.70 16,94,000 3.74

    Diesel Ltrs 26,350 0.16 29,000 0.12Lube Oil Ltrs 15,290 0.23 25,000 0.25Electricity duty 0.33 0.33Unit Generation Cost 4.85 4.44

    SAVING by Heat RecoverySteam 20,16,450 kg - Rs 25,08,000 34,14,540 kg - Rs 40,80,000Chilled Water 91,361 TR - Rs 6,04,000 3,00,101 TR - Rs 23,63,000Diesel saving in MSEB

    shut down 2,53,373 Ltr - Rs 58,14,000 3,76,000 Ltr - Rs 91,15,000Saving per Unit 2.30 3.05Net generation cost 2.55 1.39

  • 8/14/2019 41Drugs Foods Waranagar

    6/15

  • 8/14/2019 41Drugs Foods Waranagar

    7/15

    Task Carried Out.Conversion of F.O. Boiler in to Briquette / W ood fired Boiler.In operation from April 2003 .

    Month Briquttes Equivalent Cost Of Briquttes Saving

    in Kg FO FO Cost CostApr-03 50540 14440 209380 103607 105773May-03 124469 35565 515692 255161 260531Jun-03 97449 27842 403717 199770 203946Jul-03 134817 38519 558527 276374 282152

    Aug.03 19911/ 26272 380952 164320 216632Sep.03 112951 28237 409447 169426 240020Oct.03 66837 16709 242284 100255 142028Nov.03 123350 30837 447143 185025 262118Dec.03 136050 34012 493181 204075 289106

    Jan.04 133450 33362 483756 200175 283581Feb.04 118800 32881 476780 211605 265175Mar.04 81309 23231 336850 146356 190494

    Total 1180022 341907 4957709 2216149 2741556

  • 8/14/2019 41Drugs Foods Waranagar

    8/15

    Task Carried Out.

    Energy saving by reducing Milk Past. Temp. 80 to 75 0C

    Month Milk Handled Lit. Rs. Save (in Lac.)1st Half Year 03-04 424.206 2.33 On Steam1st Half Year 03-04 424.206 2.73 On Refri.2nd Half Year 03-04 600.847 2.67 On Steam2nd Half Year 03-04 600.847 3.41 On Refri.

  • 8/14/2019 41Drugs Foods Waranagar

    9/15

    Task Carried Out.

    W ater saving by Planning & Training.

    Month Milk Handled

    WaterUsed

    Water req.as per LastYear Ratio

    WatersavingLakh Ltrs.

    SavingRs.Lakh

    Total 1025.05 1848.8 3084.29 1235.49 12.39

    424.206932.378(1 : 2.20)

    1281.75(1 : 3.00)

    349.37 3.491stHalf Year 03-04

    600.847 916.422(1 : 1.5)

    1802.54(1 : 3.00)

    886.12 8.902nd Half Year 03-04

  • 8/14/2019 41Drugs Foods Waranagar

    10/15

    Task Carried Out.Pow er saving by Efficient w orkingin M ilk P acking Section.

    Action taken : - machine set to higherspeed.

    Month Hours off Total UnitSave

    SavingIn Lakh

    Rs.

    Total 1775 66136.5 2.84

    860 32043.6 1.371stHalf Year 03-04

    915 34092.9 1.472nd Half Year 03-04

  • 8/14/2019 41Drugs Foods Waranagar

    11/15

    Task Carried Out.

    Workers training on regular basis to create awarenessabout energy and resource Saving.Provision of improved system/ Equipments.Steam, Water, Milk leakage's strictly monitored and

    controlled.Hot water, (Condensate) from NPP, AARP Used for canwasher, crate Washer, tanker cleaning.Excess of hot water (Condensate Water) is Utilized as washpoint for effective cleaning.Various energy audits performed to use as guide line forenergy / resource saving.

    Utilization of Solar water heating system 20000 LPD.

  • 8/14/2019 41Drugs Foods Waranagar

    12/15

    BenefitsWater utilization is reduced to 1.5 Lit./ Lit.of

    Milk handled. (3 Liter. To 1.5 Liter.)Keeping quality of milk is increased by 2hours. (11 hrs. to 13 hrs.)

    Dispatch temp. for tanker is 38-40 0F and formilk pouch dispatch temp. is below 40 0F.

    (60 0F to 40 0F)Improvement in quality of products .

    Improvement in energy saving.

  • 8/14/2019 41Drugs Foods Waranagar

    13/15

  • 8/14/2019 41Drugs Foods Waranagar

    14/15

    PlanningReplacement of refrigeration Condensers .

    Approx. Cost Rs.45 Lakh.Existing Atmospheric

    Replace P.H.E.

    Benefits 1) Plant efficiency will increase by 10 to 15%2)Qty. of Ammonia in circulation will beReduced Considerably. 3)Reduction in fittings hencereduction in Ammonia Leakages considerably .

    Provision of Large Cap. Road Milk Tankers .Existing - 9500 lit. Provision 18000 litSaving 429 lit Diesel /Day X 350 days =150150 ltrs.

    = 150150 Ltrs.X Rs. 30.00= Rs. 4504500.