    Value = Desired performance(P)

    Overall Costs (C)

    Value can be increased by either improving the

    Performance or reducing the cost.

    VALUE

  • 7/31/2019 4203776 Value Analysis and Value Engineering

    3/33

    VALUE METHODOLOGYValue Methodology (also called Value

    Engineering, Value Analysis or ValueManagement) is a powerful problem-

    solving tool that can reduce costs whilemaintaining or improving performanceand quality requirements.

    It is a function-oriented, systematicteam approach to providing value in aproduct or service.

  • 7/31/2019 4203776 Value Analysis and Value Engineering

    4/33

    Continued.The value methodology helps organizations

    compete more effectively in local, national andinternational markets by:

    - Decreasing costs

    - Increasing profits- Improving quality

    - Expanding market share

    - Saving time- Solving problemsUsing resources more effectively

  • 7/31/2019 4203776 Value Analysis and Value Engineering

    5/33

    Value AnalysisVA is an step by step approach to identify thefunctions of a product, process, system orservice; to establish a monetary value for thatfunction and then provide the desired functionat an overall minimum cost without affectingany of the existing parameters like Quality,Maintainability, Productivity, Safety and otherPerformance characteristics.

  • 7/31/2019 4203776 Value Analysis and Value Engineering

    6/33

    Value EngineeringValue Engineering is where the value of all

    the components used in the construction of aproduct from design to final delivery stage arecompletely analyzed and pursued.

  • 7/31/2019 4203776 Value Analysis and Value Engineering

    7/33

    Origin

    Value Engineering began at General Electric Co. during World War II. Becauseof the war, there were shortages of skilled labor, raw materials, and componentparts. Lawrence Miles and Harry Erlicher at G.E. looked for acceptablesubstitutes. They noticed that these substitutions often reduced costs, improvedthe product, or both. What started out as an accident of necessity was turnedinto a systematic process. They called their technique as Value Analysis.

    In the year 1954, US Navy Bureau of ships adopted same technique in theireffort at cost avoidance during the design stage and saved millions of dollars.They named it as Value Engineering. VE follows thought process that is basedexclusively on function, i.e. what something does not what it is.

  • 7/31/2019 4203776 Value Analysis and Value Engineering

    8/33

    DIFFERNCE BETWEEN VALUE ANALYSIS ANDVALUE ENGINEERING

    VALUE ANALYSISIndicates application on

    the product that is intomanufacturing.

    All factors come togetherincluding workers,subcontractors, engineersto make a team with total

    experience and knowledge

    VALUE ENGINEERING Indicates application on

    the product at its designstage.

    It is always done by aspecific product design(engineers) team.

  • 7/31/2019 4203776 Value Analysis and Value Engineering

    9/33

    DIFFERNCE BETWEEN VALUE ANALYSIS ANDVALUE ENGINEERING

    VALUE ANALYSISIt may change the

    present stage of theproduct or operation

    It is worked out mostlywith help of knowledgeand experience

    VALUE ENGINEERINGthe changes are executed

    at the initial stages only.

    It requires specific

    technical knowledge.

  • 7/31/2019 4203776 Value Analysis and Value Engineering

    10/33

    OVERALL COSTS?

    Overall costs means different to different people.

    For a producer overall cost is the summation of all

    the elements of the cost required to produce aproduct or service such as labour, material,overhead, etc.

    For a consumer overall cost is the monetary sum(price) for which the products or services arepurchased in the market.

  • 7/31/2019 4203776 Value Analysis and Value Engineering

    11/33

    increased by four methods

    1. Decrease the cost while ensuring the same level ofperformance.

    2. Enhance the performance at the same cost.

    3.Decrease the cost and increase the performance4. Increase both performance and cost ensuring thatperformance increases more than the increment inthe cost.

  • 7/31/2019 4203776 Value Analysis and Value Engineering

    12/33

    VALUE ANALYSIS TESTS

    Does its use contribute value?

    Is its cost proportional to its usefulness?

    Does it need all its features?

    Is there anything better for the intended use? Can a usable part be made by a lower cost method?

  • 7/31/2019 4203776 Value Analysis and Value Engineering

    13/33

    VALUE ANALYSIS TESTS

    Can a standard product be found which will beusable?

    Is it made on proper tooling, considering quantitiesused?

    Do materials, reasonable labour, overhead, andprofit total its cost?

    Will another dependable supplier provide it for less?

    Is anyone buying it for less?

  • 7/31/2019 4203776 Value Analysis and Value Engineering

    14/33

    FUNCTION OF VA/VE

    FUNCTION HERE MEANS NEED

  • 7/31/2019 4203776 Value Analysis and Value Engineering

    15/33

    THE VARIOUS TYPES OF

    FUNCTION ARE AS FOLLOWS: Use function and Aesthetic function

    Primary function and secondary function

    Higher order and secondary function

  • 7/31/2019 4203776 Value Analysis and Value Engineering

    16/33

    USE FUNCTION ANDAESTHETIC FUNCTION

    Use function-Performs some action,expresses in active tone

    Aesthetic function-Pleases customer,expressed in passive or non-measurabletone

  • 7/31/2019 4203776 Value Analysis and Value Engineering

    17/33

    Primary function and

    secondary function

    Primary function - Basic purpose forwhich a product exists

    Secondary function - Arises out ofspecific design chosen to fulfill theprimary function

  • 7/31/2019 4203776 Value Analysis and Value Engineering

    18/33

    Higher order and secondary

    function

    Higher order function - Reason of

    satisfying the basic function

    Lower order function - Means of

    achieving the basic function

  • 7/31/2019 4203776 Value Analysis and Value Engineering

    19/33

    EXAMPLEFUNCTION OF A TORCH

    GIVE LIGHT FACILITATE VIEWING LIGHT THE BULB

    SUPPLY CURRENT INSERT BATTERY

    WHY?

    HOW ? HOW ?

    HOW ?

  • 7/31/2019 4203776 Value Analysis and Value Engineering

    20/33

    Job Plan with Specific Phases

    Orientation

    Information

    Function

    Creation

    Evaluation

    Recommendation

    Implementation

    Audit/Follow up

  • 7/31/2019 4203776 Value Analysis and Value Engineering

    21/33

    Orientation

    To creat awareness and learn the methodology oftools

    Training sessions for all supervisory andmanagerial staff on VA & VE

    Exposure to techniques like ABC, Pareto etc. for

    selection of project

    Formation of team of experts from variousfunctions

  • 7/31/2019 4203776 Value Analysis and Value Engineering

    22/33

    Information

    To collect all the information pertaining tothe project (product)

    Work can be divided among team members

  • 7/31/2019 4203776 Value Analysis and Value Engineering

    23/33

    Function

    To develop FAST diagram

    Start from basic function and probe furtherwith WHY? And HOW?

    List down all the functions for all the parts

  • 7/31/2019 4203776 Value Analysis and Value Engineering

    24/33

    Creation

    To develop alternate means to achieve these

    functions

    Brainstorming sessions to generate ideas

  • 7/31/2019 4203776 Value Analysis and Value Engineering

    25/33

    5. Evaluation phase:

    The objective of this is to select for further analysis of themost promising of the ideas generated during the creative

    phase and to subject the ideas to a preliminary screening toidentify those which satisfy the following criteria.

    Will it work?Is it less costlier than the present design?

    Is it feasible to implement?

  • 7/31/2019 4203776 Value Analysis and Value Engineering

    26/33

    There are four techniques associatedwith this phase:

    Refine and combine ideas: The ideas must be practicable anto make them so we may have to refine an idea or combine twoor more than two ideas

    Estabilish cost on all ideas: calculating potential costs ofimplementing the ideas.

    Develop function alternatives: Mould the individualfunctional solutions into total solutions.

    Evaluate by comparison: Once the rough total solutions andtheir related estimates of costs have been established, they are

    compared to determine which one will provide the greatestvalue advantage.

  • 7/31/2019 4203776 Value Analysis and Value Engineering

    27/33

    6. Recommendation Phase:

    To submit the details about the proposed changes withfinancial implications. Report includes proposed changes,reasons of changing, new investments and annual savings.

    7. Implementation:

    To execute the proposed/ accepted changes list down all theactivities and fix up the time frame for each. Make theentire team responsible for all the activities.

  • 7/31/2019 4203776 Value Analysis and Value Engineering

    28/33

    8. Audit / Follow up:

    To compare the actual results with that ofexpected. It can be done only after completeexecution of the project. This is the responsibilityof top management alone.

  • 7/31/2019 4203776 Value Analysis and Value Engineering

    29/33

    THE RED POINTER AND RED INK

  • 7/31/2019 4203776 Value Analysis and Value Engineering

    30/33

    On an appliance knob, a strip of bright metal

    containing a red pointer was mounted.

    Function: knob conceals the screw and providesthe appearance which the customer wished.

    The value audit of the product showed that $20000was spent each year on the production of 1 millionpieces.

    Developing alternatives to reduce costs.

    A polished stainless steel part was one alternativewhich would accomplish the function and be likedby the customer as well.

  • 7/31/2019 4203776 Value Analysis and Value Engineering

    31/33

    The industrial stylist asked, Why does the red pointer increasethe cost so much?

    The answer was that it caused the small part to become a nameplate, which imposed certain costs and restrictions on itsmanufacture and procurement.

    Some of the other alternatives, such as the polished stainless

    steel, were merely small stampings not using name platetechnology and not limited to the sources of supply who providename plates.

    Instructions by stylist: to take out the red pointer and use polished stainless steel.

    the red arrow was not good, that it caused the product to lookmore like a toy and less the mature and he never had liked thered color

    The change was made, both improving the customer appearancevalue of the product and eliminating 815,000 of unnecessary cost.

  • 7/31/2019 4203776 Value Analysis and Value Engineering

    32/33

    Although the answer , once developed, and the thinking processseen simple, $15,000 cash each year ($1250 each month) for thedesign life of three to four years shows the benefits of anoptimum problem solving system for simple as well as involvedmatters.

    Value analysis is a problem-solving system implemented by theuse of a specific set of techniques, a body of knowledge, and agroup of learned skills.

    An organized creative approach to efficiently identify unnecessarycosts

    Leads to orderly utilization of better approaches, alternativematerials, newer processes, and abilities of specialized suppliers.

    It focuses engineering, manufacturing and purchasing attention onone objective-equivalent performance for lower cost.

    Step by step procedures for accomplishing its objectives efficiently

    with assurance.

  • 7/31/2019 4203776 Value Analysis and Value Engineering

    33/33