Document Produced Under Loan Project Number: 43906-014 October 2015
Visayas Base Load Power Project (Philippines) KSPC Multipartite Monitoring Team Meeting Presentation and Minutes 3Q2014 Prepared by KEPCO SPC Power Corporation for the Asian Development Bank. This report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
10/9/2014
1
Energizing Energizing Lives, PoweringLives, Powering CommunitiesCommunities
Barangay Colon, Naga City CebuBarangay Colon, Naga City CebuOctober 13, 2014October 13, 2014
1
Meeting AgendaMeeting Agenda
3rd 3rd Quarter Barangay Consultations (IEC)Quarter Barangay Consultations (IEC)
Official Inclusion of DOE as MMT MemberOfficial Inclusion of DOE as MMT Member
Updates from Previous Meeting Updates from Previous Meeting
Environmental Monitoring Updates
Future ActivitiesFuture Activities
10/9/2014
2
22ndnd Quarter MMT MeetingQuarter MMT Meeting
1st Quarter MMT Meeting
Date: June 25, 2014 Venue: KSPC Basement Conference Room
10/9/2014
3
22ndnd Quarter MMT Meeting
Date: June 25, 2014 Venue: KSPC Basement Conference Room
1st Quarter MMT Meeting
Date: March 28, 2014 Venue: KSPC Conference Room
10/9/2014
4
B P bli C lt tiB P bli C lt tiBarangay Public Consultation Barangay Public Consultation UpdatesUpdates
Barangay Public Consultation Updates
BrgyBrgy. North . North PoblacionPoblacion (09(09--1717--14)14)
10/9/2014
5
•Barangay Public Consultation Updates
BrgyBrgy. . TangkeTangke (09(09--1919--14)14)
•Barangay Public Consultation Updates
BrgyBrgy. Colon (09. Colon (09--1616--14)14)
10/9/2014
6
Second Quarter Environmental Second Quarter Environmental MonitoringMonitoring
Environmental Monitoring
AMBIENT AIR SAMPLING LOCATIONS
Stn 3 ‐ Brgy. TangkeBasketball Court
Stn 5 – Near Pier Area
KSPC COMPLEX
SPC COMPLEX
Manual Sampling Points
AAQMS Location
Stn 6 ‐ Mangkikis Chapel
Stn 4 – Along National Road
Ash Pond Operation Monitoring PointsNoise and PM 10
Stn 6 – Kading’s Residence – 24 hr test
10/9/2014
9
Environmental Performance Review – Ambient Air
Environmental Performance Review – Ambient Air
10/9/2014
12
Environmental Performance Review - Effluents
Environmental Performance Review
100‐m radius
Current direction is SW.
M1 (Ambient Temp.) M2 M3
M4
M5
Discharge Point
10/9/2014
13
Environmental Performance Review
Environmental Monitoring
Leachate Collecting Well (Heavy metals‐ As, Cd, Pb, Cr+6,Hg)
10/9/2014
14
Environmental Performance Review – Water Resource
Environmental Performance Review – Water Resource
10/9/2014
15
Environmental Performance Review – Water Resource
Environmental Performance Review
Marine Life MonitoringMarine Life Monitoring
10/9/2014
16
Marine Life Monitoring – July 2014
Majority of the fish found are relatively small, only few large
The number of fish observed in the current sampling did not decrease from the previous sampling
j y y , y gfish
Water surface temperature is warmer compared to previous Water surface temperature is warmer compared to previous sampling; due to changes in seasonsampling; due to changes in season
Warmer water Warmer water temperature (optimum) helps the corals and (optimum) helps the corals and other organisms to reproduceother organisms to reproduce
Takot Basio hard coral cover was found at 25% in the representative site for 2nd Quarter compared to 40% in another representative site in the first quarter; no signs of coral rubbles observed indicating zero coral destruction
Air Quality Air Quality ModellingModelling
Objectives: -To identify sources of Air Pollution in Naga-To know the gravity of each sourcesg y-To be able to recommend measures to mitigate/minimize such pollution
Sources:-2 Power Plants-CEMEX-Quarry-Other industrial process plants
Parameters:- SOx, NOx, PM10(Dust)
10/9/2014
17
Environmental Monitoring
Date: May 22-23, 2014 Ambient Air, Marine Water, Ground water, Water Effluent, River Water, Fly and Bed Ash TCLP
ADOPT AN ESTEROADOPT AN ESTEROADOPT AN ESTERO ADOPT AN ESTERO ACTIVITYACTIVITY
10/9/2014
18
Environmental Monitoring
Date: June 27, 2014 Activity: Second Quarter Coastal Clean-up and Tree Planting
Before
Date: June 27, 2014 Activity: Second Quarter Coastal Clean-up and Tree Planting
Environmental Monitoring
During
10/9/2014
19
Date: June 27, 2014 Activity: Second Quarter Coastal Clean-up and Tree Planting
Environmental Monitoring
After
Future ActivitiesFuture Activities
Fourth Quarter Environmental Monitoring (November)
MMT TechCom 4th Quarter Meeting (December)
Annual Stakeholders’ Forum
Minqtes of the 2014 Second euarter
October 27,2OL4KSPC Meeting Room
E&C and C&PR Department2014 Second Quarter MMT MeetingJoanne Claire T. Supnet/E&C
lVleeting
Time: 1000H-1200HDate:Location:
Conducted by:
Activity:Facilitator:
Facilitating Attendees:
KSPC MMT held their third quartQr meeting last October L3,
started at around L000H and erlrded 1200H. Majority of themeeting went well. The followi4g meeting agenda were d
nda T
Tabuco/ EMB-
ArielGill EMB-EIA
Klayd delCarmen
Neil Lawrence Miral
o Updates from Previoui Meeting;Design pro
TreatmentMs. Obdul
I for Sanitaryll be presented by
, next meeting
ical records fornext meeting
KSPC - HR&GA(Nurse)
. Barangay Public Consultatircn Mlinutes- Barangay Colon- Barangay North Pcjblacion- Barangay Tangke
o Second Quarter EnvironmentalMonitoring Results- Ambient Air- Water Effluent- Marine Water- Ground Water- River Water- Marine Life Study
o Present pi
caught byof actual fish
KSPC - E&C /Colon FisherfolksAssociation
No. Agenda Comme ts/SuggestionsResponsible
Person/Due Date
4o Environmental Activitips
- Adopt an Estero A[tivityo Monitor tr es planted.
KSPC E&C, DENR-
EMB and Naga
LGU
5
Futu re Activities/Othe r Mbtterso Fourth Quarter 3'd Parpy lVlonitoringo MMT ExeCom Meetingo MMT Fourth Quarter TechCom
Meetingo lnclusion/lnvitation of NGO (PEJC)
representative d uring M MT Technica I
Meetings
o As apprcthe techmemberfrom PEJ
observercommittnext qua
red by majority r
ricalcommitteel, representativeI will be invited i
every technical)e meeting starti'ter.
rf
rS
1g
KSPC E&C
Attachments: A. PhotosB. Attendance Sh
C. Presentation [v
eetlatenial
Prepared hy: Reviewed by: Noted by:
,4- 4 --+- /-<=-/l,w*srlbr'rpr,l.k MIRAL, N]1. sur\ AOY, J AL,V.B/ KlM, H.J.
KEPCO SPC Power Corporation
Multipartite Monitoring Team
Cebu Power Plant
Colon, City of Naga
Cebu, Pfrilippines
Iel. No. : (032]| 27 2-6290- 91,,93
Fax. No. (032) 489-7010
ATTENDANCE SHEET
MEETf NG; October 13, 2OL4; ADMIN BLDG.
\fwileT'I CLArnV
iaa|ld ! l?*u[*ila illrc^ rrt)nn V{9
ftNW* Po{
i,tnlo j\4 Y voloto qo [fl
Na, Cbrlutla l, Lese*w
\11r4gu ,lti,tp iap flttJ
-iA6/4lN ,EU\4Afi
N'UIL MIF!AL
gari hftr .l . d<rtln
xffiv &lu
F"A G,TIRA{'
4'e+Q41, F,{1.44 -;r4*f A