Document Produced Under Loan Project Number: 43906-014 October 2015 Visayas Base Load Power Project (Philippines) KSPC Multipartite Monitoring Team Meeting Presentation and Minutes 3Q2014 Prepared by KEPCO SPC Power Corporation for the Asian Development Bank. This report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Upload: buique

Post on 21-Apr-2018

224 views

Category:

Documents


3 download

TRANSCRIPT

Document Produced Under Loan Project Number: 43906-014 October 2015

Visayas Base Load Power Project (Philippines) KSPC Multipartite Monitoring Team Meeting Presentation and Minutes 3Q2014 Prepared by KEPCO SPC Power Corporation for the Asian Development Bank. This report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

10/9/2014

1

Energizing Energizing Lives, PoweringLives, Powering CommunitiesCommunities

Barangay Colon, Naga City CebuBarangay Colon, Naga City CebuOctober 13, 2014October 13, 2014

1

Meeting AgendaMeeting Agenda

3rd 3rd Quarter Barangay Consultations (IEC)Quarter Barangay Consultations (IEC)

Official Inclusion of DOE as MMT MemberOfficial Inclusion of DOE as MMT Member

Updates from Previous Meeting Updates from Previous Meeting

Environmental Monitoring Updates

Future ActivitiesFuture Activities

10/9/2014

2

22ndnd Quarter MMT MeetingQuarter MMT Meeting

1st Quarter MMT Meeting

Date: June 25, 2014 Venue: KSPC Basement Conference Room

10/9/2014

3

22ndnd Quarter MMT Meeting

Date: June 25, 2014 Venue: KSPC Basement Conference Room

1st Quarter MMT Meeting

Date: March 28, 2014 Venue: KSPC Conference Room

10/9/2014

4

B P bli C lt tiB P bli C lt tiBarangay Public Consultation Barangay Public Consultation UpdatesUpdates

Barangay Public Consultation Updates

BrgyBrgy. North . North PoblacionPoblacion (09(09--1717--14)14)

10/9/2014

5

•Barangay Public Consultation Updates

BrgyBrgy. . TangkeTangke (09(09--1919--14)14)

•Barangay Public Consultation Updates

BrgyBrgy. Colon (09. Colon (09--1616--14)14)

10/9/2014

6

Second Quarter Environmental Second Quarter Environmental MonitoringMonitoring

Environmental Monitoring

AMBIENT AIR SAMPLING LOCATIONS

Stn 3 ‐ Brgy. TangkeBasketball Court

Stn 5 – Near Pier Area

KSPC COMPLEX

SPC COMPLEX

Manual Sampling Points

AAQMS Location

Stn 6 ‐ Mangkikis Chapel

Stn 4 – Along National Road

Ash Pond Operation Monitoring PointsNoise and PM 10

Stn 6 – Kading’s Residence – 24 hr test

10/9/2014

7

Environmental Monitoring– Ambient Air

Environmental Monitoring– Ambient Air

10/9/2014

8

Environmental Monitoring– Ambient Air

Environmental Performance Review – Ambient Air

10/9/2014

9

Environmental Performance Review – Ambient Air

Environmental Performance Review – Ambient Air

10/9/2014

10

Environmental Performance Review – AAQMS

Environmental Performance Review – CEMS

10/9/2014

11

Environmental Performance Review – CEMS

Environmental Monitoring

10/9/2014

12

Environmental Performance Review - Effluents

Environmental Performance Review

100‐m radius

Current direction is SW.

M1 (Ambient Temp.)   M2 M3

M4

M5

Discharge Point

10/9/2014

13

Environmental Performance Review

Environmental Monitoring

Leachate Collecting Well (Heavy metals‐ As, Cd, Pb, Cr+6,Hg)

10/9/2014

14

Environmental Performance Review – Water Resource

Environmental Performance Review – Water Resource

10/9/2014

15

Environmental Performance Review – Water Resource

Environmental Performance Review

Marine Life MonitoringMarine Life Monitoring

10/9/2014

16

Marine Life Monitoring – July 2014

Majority of the fish found are relatively small, only few large

The number of fish observed in the current sampling did not decrease from the previous sampling

j y y , y gfish

Water surface temperature is warmer compared to previous Water surface temperature is warmer compared to previous sampling; due to changes in seasonsampling; due to changes in season

Warmer water Warmer water temperature (optimum) helps the corals and (optimum) helps the corals and other organisms to reproduceother organisms to reproduce

Takot Basio hard coral cover was found at 25% in the representative site for 2nd Quarter compared to 40% in another representative site in the first quarter; no signs of coral rubbles observed indicating zero coral destruction

Air Quality Air Quality ModellingModelling

Objectives: -To identify sources of Air Pollution in Naga-To know the gravity of each sourcesg y-To be able to recommend measures to mitigate/minimize such pollution

Sources:-2 Power Plants-CEMEX-Quarry-Other industrial process plants

Parameters:- SOx, NOx, PM10(Dust)

10/9/2014

17

Environmental Monitoring

Date: May 22-23, 2014 Ambient Air, Marine Water, Ground water, Water Effluent, River Water, Fly and Bed Ash TCLP

ADOPT AN ESTEROADOPT AN ESTEROADOPT AN ESTERO ADOPT AN ESTERO ACTIVITYACTIVITY

10/9/2014

18

Environmental Monitoring

Date: June 27, 2014 Activity: Second Quarter Coastal Clean-up and Tree Planting

Before

Date: June 27, 2014 Activity: Second Quarter Coastal Clean-up and Tree Planting

Environmental Monitoring

During

10/9/2014

19

Date: June 27, 2014 Activity: Second Quarter Coastal Clean-up and Tree Planting

Environmental Monitoring

After

Future ActivitiesFuture Activities

Fourth Quarter Environmental Monitoring (November)

MMT TechCom 4th Quarter Meeting (December)

Annual Stakeholders’ Forum

10/9/2014

20

End of Presentation

Thank You

Minqtes of the 2014 Second euarter

October 27,2OL4KSPC Meeting Room

E&C and C&PR Department2014 Second Quarter MMT MeetingJoanne Claire T. Supnet/E&C

lVleeting

Time: 1000H-1200HDate:Location:

Conducted by:

Activity:Facilitator:

Facilitating Attendees:

KSPC MMT held their third quartQr meeting last October L3,

started at around L000H and erlrded 1200H. Majority of themeeting went well. The followi4g meeting agenda were d

nda T

Tabuco/ EMB-

ArielGill EMB-EIA

Klayd delCarmen

Neil Lawrence Miral

o Updates from Previoui Meeting;Design pro

TreatmentMs. Obdul

I for Sanitaryll be presented by

, next meeting

ical records fornext meeting

KSPC - HR&GA(Nurse)

. Barangay Public Consultatircn Mlinutes- Barangay Colon- Barangay North Pcjblacion- Barangay Tangke

o Second Quarter EnvironmentalMonitoring Results- Ambient Air- Water Effluent- Marine Water- Ground Water- River Water- Marine Life Study

o Present pi

caught byof actual fish

KSPC - E&C /Colon FisherfolksAssociation

No. Agenda Comme ts/SuggestionsResponsible

Person/Due Date

4o Environmental Activitips

- Adopt an Estero A[tivityo Monitor tr es planted.

KSPC E&C, DENR-

EMB and Naga

LGU

5

Futu re Activities/Othe r Mbtterso Fourth Quarter 3'd Parpy lVlonitoringo MMT ExeCom Meetingo MMT Fourth Quarter TechCom

Meetingo lnclusion/lnvitation of NGO (PEJC)

representative d uring M MT Technica I

Meetings

o As apprcthe techmemberfrom PEJ

observercommittnext qua

red by majority r

ricalcommitteel, representativeI will be invited i

every technical)e meeting starti'ter.

rf

rS

1g

KSPC E&C

Attachments: A. PhotosB. Attendance Sh

C. Presentation [v

eetlatenial

Prepared hy: Reviewed by: Noted by:

,4- 4 --+- /-<=-/l,w*srlbr'rpr,l.k MIRAL, N]1. sur\ AOY, J AL,V.B/ KlM, H.J.

Attachment A:

KEPCO SPC Power Corporation

Multipartite Monitoring Team

Cebu Power Plant

Colon, City of Naga

Cebu, Pfrilippines

Iel. No. : (032]| 27 2-6290- 91,,93

Fax. No. (032) 489-7010

ATTENDANCE SHEET

MEETf NG; October 13, 2OL4; ADMIN BLDG.

\fwileT'I CLArnV

iaa|ld ! l?*u[*ila illrc^ rrt)nn V{9

ftNW* Po{

i,tnlo j\4 Y voloto qo [fl

Na, Cbrlutla l, Lese*w

\11r4gu ,lti,tp iap flttJ

-iA6/4lN ,EU\4Afi

N'UIL MIF!AL

gari hftr .l . d<rtln

xffiv &lu

F"A G,TIRA{'

4'e+Q41, F,{1.44 -;r4*f A