Material Rates Material Description Rate 1 Cement Bag 230 2 Filling Sand Cum 700 Coarse sand 909 Fine sand 930 3 Aggregate 6 mm Cum 0 Aggregate 10 mm Cum 445 Aggregate 20 mm Cum 465 Aggregate 40 mm Cum 450 4 Rubble 230mm and above Cum 420 5 No 3 Brick Standard 50 kg No 3 6 Brick Bat CUM 1100 7 Brick Fire No 25 8 Siporex Block (0.65x0.24x0.075) No 65 9 Siporex Block (0.65x0.24x0.1) No 82 10 Siporex Block (0.65x0.24x0.125) No 104 11 Siporex Block (0.65x0.24x0.150) No 121 12 Siporex Block (0.65x0.24x0.20) No 158 13 Concrete Block (600x200x150) No 69 14 Concrete Block (600x200x125) No 57 15 Concrete Block (600x200x100) No 46 16 Concrete Block (600x200x75) No 34 17 Admixture Kg 80 18 Water Proof Compound kg 90 19 Muroom Cum 140 20 Soil good quality Cum 21 Cinder CUM 360 22 Stone Dust Cum 265 23 Mono Bond Lit 1200 24 Shuttering for P.C.C.1:4:8 Sqm 100 25 Scaffolding Sqm 30 26 Neeru kg 5 27 Plaster of Parris Bag 80 28 Through stone No 80 29 Steel R/F Upto 16 mm dia MT 35000 above 16 mm dia Mt 38000 30 Structural Steel MT 42000 31 Binding Wire Kg 40 32 Ceramic Tiles (600 x 600) No 235 33 Vitrified Tiles (600x600) sq.ft 85 34 Sq.mt 375 35 Ceramic Plain tiles (300x300mm) No 25 36 No 35 37 Ceramic Plain tiles (200x200mm) No 11 38 No 132 39 No 1175 40 No 40 41 No 43 42 No 51 43 No 112 44 No 275 45 Colouring Pigments Kg 5 46 Marble stone Sqm 600 47 Granite stone Sqm 650 48 Seera Grey granite 25 mm thick Sq.mt 1510 49 Kotha stone Sqm 370 50 Litr 80 51 Chicken Mesh sq.mtr 15 52 Terrazzo tiles No 10 53 Glazed tiles Sq.mt 325 54 Iron Powder Kg 25 55 60 mm Metal Cum 450 56 Oil Paint Litre 210 57 Stainless steel 306 Grade Kg 350 58 Stainless steel 304 Grade Kg 260 59 RMC M10 Cum M15 Cum 2475 M20 Cum 3250 M25 Cum 3475 M30 Cum 3750 M35 Cum 4250 M40 Cum 60 Metal 60 mm Cum 450 61 Floor hardner Kg 16 62 kg 400 63 LDPE sheet 250 mm micron sq.mt 21 Sr. No. Unit of measurment Brick Standard 35 kg first class Expo Ceramic Anti skid tiles (300x300mm) Ceramic Printed tiles (300x300mm) Ceramic Plain & printed tiles (450x450mm) Ceramic Marbonite Tiles (900x900mm) Exotica Vitrified tiles(300x300) Rustics Vitrified tiles (300x300) Aqua Series Vetrified tiles (300x300) Inviza Exotica Vetrified tiles (445x445) Vitrified (Ivory base colour)tiles (600x600) Chlorophyriphos EC 20% (Anti termite Chemical) Fixit Groove filling sealent

Upload: keyur-gajjar

Post on 17-Nov-2015

27 views

Category:

Documents


13 download

DESCRIPTION

59995053 Rate Analysis

TRANSCRIPT

MaterialMaterial RatesSr. No.Material DescriptionUnit of measurmentRate1CementBag2302Filling SandCum700Coarse sand909Fine sand9303Aggregate 6 mmCum0Aggregate 10 mmCum445Aggregate 20 mmCum465Aggregate 40 mmCum4504Rubble 230mm and aboveCum4205Brick Standard 35 kg first class ExpoNo3Brick Standard 50 kgNo36Brick BatCUM11007Brick FireNo258Siporex Block (0.65x0.24x0.075)No659Siporex Block (0.65x0.24x0.1)No8210Siporex Block (0.65x0.24x0.125)No10411Siporex Block (0.65x0.24x0.150)No12112Siporex Block (0.65x0.24x0.20)No15813Concrete Block (600x200x150)No6914Concrete Block (600x200x125)No5715Concrete Block (600x200x100)No4616Concrete Block (600x200x75)No3417AdmixtureKg8018Water Proof Compoundkg9019MuroomCum14020Soil good qualityCum21CinderCUM36022Stone DustCum26523Mono BondLit120024Shuttering for P.C.C.1:4:8Sqm10025ScaffoldingSqm3026Neerukg527Plaster of ParrisBag8028Through stoneNo8029Steel R/F Upto 16 mm diaMT35000above 16 mm diaMt3800030Structural SteelMT4200031Binding WireKg4032Ceramic Tiles (600 x 600)No23533Vitrified Tiles (600x600)sq.ft8534Ceramic Anti skid tiles (300x300mm)Sq.mt37535Ceramic Plain tiles (300x300mm)No2536Ceramic Printed tiles (300x300mm)No3537Ceramic Plain tiles (200x200mm)No1138Ceramic Plain & printed tiles (450x450mm)No13239Ceramic Marbonite Tiles (900x900mm)No117540Exotica Vitrified tiles(300x300)No4041Rustics Vitrified tiles (300x300)No4342Aqua Series Vetrified tiles (300x300)No5143Inviza Exotica Vetrified tiles (445x445)No11244Vitrified (Ivory base colour)tiles (600x600)No27545Colouring PigmentsKg546Marble stoneSqm60047Granite stoneSqm65048Seera Grey granite 25 mm thickSq.mt151049Kotha stoneSqm37050Chlorophyriphos EC 20% (Anti termite Chemical)Litr8051Chicken Meshsq.mtr1552Terrazzo tilesNo1053Glazed tilesSq.mt32554Iron PowderKg255560 mm MetalCum45056Oil PaintLitre21057Stainless steel 306 GradeKg35058Stainless steel 304 GradeKg26059RMCM10CumM15Cum2475M20Cum3250M25Cum3475M30Cum3750M35Cum4250M40Cum60Metal 60 mmCum45061Floor hardnerKg1662Fixit Groove filling sealent Materialkg40063LDPE sheet 250 mm micronsq.mt2164HDPE 100 mm dia pipe 6 kg/sq.cmrmt39765Silver SandCum31566P.V.C Sheet 150 GSMSq.mt4067Size Stone 250*150*150Cum1500

ConcreteName of ProjectMES Ojhar IICement6.20BagsItem No. from BOQSand0.43CumName of ItemAggregate0.87CumItem DescriptionAdmixture0.31KgSize of MemberShutteringDamp Proof CoarseShuttering for 1 M3 conc.For Qty.1M3Dry Volume1.52M3Proportion of ConcreteCementSandAggregateTotalGrade M-7.51247Sr.No.RequirmentsQty.UnitRateAmountALabour1No325325.00BMaterial1Cement5.75Bags2301322.502Sand0.43Cum909394.773Aggregate0.87Cum465403.894Admixture0.31Kg00.005Shuttering0.00Sqm1250.00A+B2446.15CWater & Elect. Charges%DTools & Plants0.00%0.00EContractors Profit0.00%0.00Total2446.15Rate per Sq.mtr for 100 mm thick244.6151428571Rate / sq.mtr for 40 mm thick97.8460571429Rate per Sq.mtr for 40 mm thick97.8460571429Name of ProjectOjhar IICement3.34BagsItem No. from BOQSand0.47CumName of ItemAggregate0.94CumItem DescriptionAdmixture0.00KgSize of MemberShuttering required for the same concreteShuttering for 1 M3 conc.For Qty.1M3Dry Volume1.52M3Proportion of ConcreteCementSandAggregateTotalGrade M-1014813Sr.No.RequirmentsQty.UnitRateAmountRate for 75 mm thk146.7791538462ALabour1No325325.00BMaterial1Cement3.20Bags230736.002Sand0.47Cum909425.133Aggregate0.94Cum450420.924Admixture0.00Kg00.005Shuttering1.00Sqm5050.00A+B1957.06CWater & Elect. Charges0%0.00DTools & Plants0%0.00EContractors Profit0.00%0.00FLabour & Ecsis0.00%0.00Total1957.06Rate per Sq.mtr 100 mm thick195.7055384615Name of ProjectOjhar IICement4.34BagsItem No. from BOQSand0.46CumName of ItemAggregate0.91CumItem DescriptionAdmixture0.22KgSize of MemberShuttering required for the same concreteShuttering for 1 M3 conc.For Qty.1M3Dry Volume1.52M3Proportion of ConcreteCementSandAggregateTotalGrade M-1513610Sr.No.RequirmentsQty.UnitRateAmountALabour1No325325.00BMaterial1Cement4.20Bags230966.002Sand0.46Cum909414.503Aggregate0.91Cum465424.084Admixture0.21Kg00.005Shuttering1.00Sqm7575.00A+B2204.58CWater & Elect. Charges0%0.00DTools & Plants0%0.00EContractors Profit0.00%0.00FLabour & Ecsis0.00%0.00Total2204.58Rtae / Sq.mtr for 50 mm thk146.9722666667rate for 100 mm thkrate for 150 mm thkrate for 100 mm thkName of ProjectMes ojhar II.Cement2.71BagsItem No. from BOQSand0.48CumName of ItemAggregate0.95CumItem DescriptionAdmixture0.14KgSize of MemberShuttering required for the same concreteShuttering for 1 M3 conc.For Qty.1M3Dry Volume1.52M3Proportion of ConcreteCementSandAggregateTotalGrade M-25151016Sr.No.RequirmentsQty.UnitRateAmountALabour1No325325.00BMaterial1Cement2.50Bags230575.002Sand0.48Cum909431.783Aggregate0.95Cum450427.504Admixture0.13Kg00.005Shuttering1.00Sqm5050.00A+B1809.28CWater & Elect. Charges0%0.00DTools & Plants0%0.00EContractors Profit0.00%0.00FLabour & Ecsis0.00%0.00Total1809.28Name of ProjectMES Ojhar IICement6.20BagsItem No. from BOQSand0.43CumName of ItemAggregate0.87CumItem DescriptionAdmixture0.29KgSize of MemberShuttering required for the same concreteShuttering for 1 M3 conc.For Qty.1M3Dry Volume1.52M3Proportion of ConcreteCementSandAggregateTotalGrade M-251247Sr.No.RequirmentsQty.UnitRateAmountALabour1No325325.00BMaterial1Cement5.80Bags2301334.002Sand0.43Cum909394.773Aggregate0.87Cum450390.864Admixture0.29Kg8023.205Shuttering8.002401920.00A+B4387.82CWater & Elect. Charges0%0.00DTools & Plants0%0.00EContractors Profit0.00%0.00FLabour & Ecsis0.00%0.00Total4387.82Name of ProjectMES Ojhar IICement10.86BagsItem No. from BOQSand0.38CumName of ItemAggregate0.76CumItem DescriptionAdmixture0.54KgSize of MemberShuttering required for the same concreteShuttering for 1 M3 conc.For Qty.1M3Dry Volume1.52M3Proportion of ConcreteCementSandAggregateTotalGrade M-251124Sr.No.RequirmentsQty.UnitRateAmountALabour1No300300.00BMaterial1Cement7.50Bags2301725.002Sand0.38Cum909345.423Aggregate0.76Cum465353.404Admixture0.75Kg8060.005Shuttering0.00Sqm3000.00Rate for 100 mm thick278.382A+B2783.82CWater & Elect. Charges0%0.00DTools & Plants0%0.00EContractors Profit0.00%0.00FLabour & Ecsis0.00%0.00Total2783.82Name of ProjectCement7.90BagsItem No. from BOQ2.3Sand0.41CumName of ItemAggregate0.83CumItem DescriptionAdmixture0.39KgSize of MemberShuttering required for the same concreteShuttering for 1 M3 conc.For Qty.1M3Dry Volume1.52M3Proportion of ConcreteCementSandAggregateTotalGrade M-2511.535.5Sr.No.RequirmentsQty.UnitRateAmountALabour1No400400.00BMaterial1Cement7.20Bags2301656.002Sand0.41Cum909376.823Aggregate0.83Cum465385.534Admixture0.39Kg8031.58rate for 40 mm thk131.59734025975Shuttering2.00Sqm220440.00rate for 100 mm thk328.9933506494A+B3289.93rate for 300 mm trimix986.9800519481CWater & Elect. Charges0%0.00DTools & Plants0%0.00EContractors Profit0.00%0.00FLabour & Ecsis0.00%0.00Total3289.93Name of ProjectCement6.20BagsItem No. from BOQ14Sand0.43CumName of ItemAggregate0.87CumItem DescriptionAdmixture0.31KgSize of MemberShuttering required for the same concreteShuttering for 1 M3 conc.For Qty.1M3Dry Volume1.52M3Proportion of ConcreteCementSandAggregateTotalGrade M-251247Sr.No.RequirmentsQty.UnitRateAmountALabour1No325325.00BMaterial1Cement6.20Bags2301426.942Sand0.43Cum909394.773Aggregate0.87Cum465403.894Admixture0.31Kg8024.825Shuttering8.00Sqm2251800.00A+B4375.41CWater & Elect. Charges0%0.00DTools & Plants0%0.00EContractors Profit10.00%180.00FLabour & Ecsis0.00%0.00Total4555.41Name of ProjectCement7.90BagsItem No. from BOQOjharSand0.41CumName of ItemAggregate0.83CumItem DescriptionAdmixture0.39KgSize of MemberShuttering required for the same concreteShuttering for 1 M3 conc.For Qty.1M3Dry Volume1.52M3Proportion of ConcreteCementSandAggregateTotalGrade M-2511.535.5Sr.No.RequirmentsQty.UnitRateAmountALabour1No300300.00BMaterial1Cement7.00Bags2301610.002Sand0.41Cum909376.823Aggregate0.83Cum465385.534Admixture0.70Kg00.005Shuttering0.00Sqm2750.00A+B2672.35CWater & Elect. Charges0%0.00DTools & Plants0%0.00EContractors Profit0.00%0.00FLabour & Ecsis0.00%0.00Total2672.35Name of ProjectUsing 40 mm aggregateCement4.34BagsItem No. from BOQSand0.46CumName of ItemAggregate0.91CumItem DescriptionAdmixture0.22KgSize of MemberShuttering required for the same concreteShuttering for 1 M3 conc.For Qty.1M3Dry Volume1.52M3Proportion of ConcreteCementSandAggregateTotalGrade M-1513610Sr.No.RequirmentsQty.UnitRateAmountALabour1No300300.00BMaterial1Cement3.50Bags230805.002Sand0.46Cum909414.503Aggregate0.91Cum450410.404Admixture0.18Kg00.005Shuttering1.00Sqm7575.00A+B2004.90CWater & Elect. Charges0%0.00DTools & Plants0%0.00EContractors Profit0.00%0.00FLabour & Ecsis0.00%0.00Total2004.90Rtae / Sq.mtr for 50 mm thk133.6602666667

HYSD RentHYSD ReinforcementName of ProjectBinding Wire10.00KgItem No. from BOQ21Name of ItemR/F steelItem DescriptionFor Qty.1M.T.Wastage1.05M.T.Sr.No.RequirmentsQty.UnitRateAmountALabour1M.T.40004000.00BMaterial1Steel1.05MT3500036750.002Binding Wire with wastage9.00Kg41369.00A+B41119.00CWater & Elect. Charges0%0.00DTools & Plants0.00%0.00EContractors Profit0.00%0.00FLabour & Ecsis0.00%0.00Total41119.00M.T.

Road workRubble Soling Using 60 mm metalFor Qty.1M3Dry Volume1.2M3Sr.No.RequirmentsQty.UnitRateAmountRollerRoller Rent / day=5000ALabour1Cum250250.00Capacity of Roller300BMaterialcompaction / day1Rubble1.20cum550660.00Rent / cum=16.672Packing material0.30Cum00.003Murrum0.08Cum14011.204Roller1.00No16.6716.67A+B937.87CWater & Elect. Charges0%0.00DTools & Plants0%0.00EContractors Profit15%140.68FLabour & Ecsis0.00%0.000Total1078.55

R. SolingRubble SolingItem NoFor Qty.1M3Dry Volume1.25M3Sr.No.RequirmentsQty.UnitRateAmountRollerRoller Rent / day=5000ALabour1Cum200200.00Capacity of Roller400BMaterialcompaction / day1Rubble1.20cum420504.00Rent / cum=12.502Packing material0.10Cum45045.003Murrum0.05Cum1407.004Roller1.00No25.0025.00A+B781.00CWater & Elect. Charges0%0.00DTools & Plants1%7.81EContractors Profit10%78.10FLabour & Ecsis0.00%0.00Rate / sq.mtr0Total0.00Stone filling 40 mm SiemensFor Qty.1M3Dry Volume1.2M3Sr.No.RequirmentsQty.UnitRateAmountRollerRoller Rent / day=5000ALabour1Cum300300.00Capacity of Roller400BMaterialcompaction / day1Rubble1.25cum450562.50Rent / cum=12.502Packing material0.30Cum00.003Murrum0.04Cum1405.604Roller0.00No50.000.00A+B868.10CWater & Elect. Charges0%0.00DTools & Plants0%0.00EContractors Profit0%0.00FLabour & Ecsis0.00%0.00Total868.10

ExcavationExcavation0 to 1.5 mtrFor lead 1 kmExcavation in all soil & condition for foundation pits & cable trench,storm water drain excluding hard rock including shoring & dewateringJCB7180Per DayDumpre2500Per DayOutput200CumOutput200CumCost/M335.9Cost/M312.5a) Up to a depth1.5mJCB8.9758.975Assume Qty1M33621Coieff.0.00500Coieff.Sr. No.RequirmentsQty.UnitRateAmountV. Rollar8000Per DayDozerOutput500CumRent Rs/hr250Cost/M316.00O/P60164.1666666667Coieff.0.00200Coefficient0.0166666667ABy Machinary1Pocklen0.0050Cum718035.90002Rollar0.0020Cum00.00Water tanker0Per Day3Water tanker0.0000Cum00Output16000Litre4Carting of material1.0000Cum2121.485Labour1.000022.006Doazer0.016700.007Shoring0.0000840.00Total59.38Water required per M3125LitreContractors Profit15.00%8.91qty of sand for 50000 lit water128M3Cost/M313Coieff.0.00000Final Rate68.28Say68.28Excavation Depth upto 1.5m to 3 mJCB7180Per DayFor lead 3 kmOutput125CumDumpre2500Per DayQty1M3Cost/M357.44Output125Cum57Cost/M320Sr. No.RequirmentsQty.UnitRateAmountCoieff.0.00800JCB15.385714285715.385714285735Coieff.0.01415V. Rollar0Per DayOutput350CumCost/M30.000Coieff.0.00000Water tanker0Per DayOutput50000LitreABy MachinaryWater required per M3125Litre1Pocklen0.00800Cum718057.44qty of sand for 50000 lit water400M32RollarCum00.00Cost/M333Water tankerCum00.0054Carting of Soil1.00Cum3535.395Shoring0Sq.mt84.38888888890.00Coieff.092.836Contractors profit0.00%0.00Final rateTotal92.83Shoringa) Up to a depth1.5mb)Area of Excavation2.62.61.5Volume of Excavation in cum10.14Shoring area in sq.mtr12.48Sr. No.RequirmentsQty.UnitRateAmountwooden batten.16'*.25'*13.25'*8'*300*22530AMaterialPly17.6*3506160Dozer1Wooden batten8.48cuft3502968Rent Rs/hr2502shuttering ply24sq.mtr3506160O/P604.1666666667Total of A9128Shuttering Repetation6TimesRate / 24 sq.mtr1521.3333333333Rate / sq.mtr63.3888888889BMaterial63.3888888889Labour1sq.mtr18Sundries1L.S3Rate/ sq.mtr84.3888888889Rate for 1 cum84.3888888889

RefillingRefilling Brought fom outsideOjhar IIPocklen12600Per DayDumpre2245Output500CumOutput300Cost/M325.2Cost/M37.4833333333Poklain7.875Assume Qty1M32515Coieff.0.00200Coieff.Sr. No.RequirmentsQty.UnitRateAmountItem No1.10V. Rollar4000Per DayOutput350CumCost/M311.4311Coieff.0.00286AMaterial1Murrum1.15Cum140161.00002Rollar0.0029Cum400011.43Water tanker2100Per Day3Water tanker1.00Cum87.5Output35000Litre4Carting of material1.00Cum00.005Labour1.0000.00Total179.93Water required per M3125LitreContractors Profit10.00%17.99qty of sand for 50000 lit water280M3Cost/M388Coieff.0.00357Final Rate197.92Say197.92

PlasteringMES Ojhar IIQty1M2Dry. Vol1.4M3Thickness5MMCementSandTotal134Sr. No.RequirmentsQty.UnitRateAmountALabour1M25050BMaterial1Cement0.05Bag23011.50Mortar Proportion2Sand0.01Cum9304.88Wet Mortar0.005Cum3Scaffolding1Sqm2020.00Dry Mortar0.007Cum5Chicken Mesh0.1Sqm303.00Cement0.05Bags6Neeru finishSqm0Sand0.01CumTotal (A+B)89.387C.P0.00%0.00Scaffolding1SqmChicken Mesh0.15SqmTotal89.38M2Neeru1kgSand Faced PlasterQty10M2Ojhar IIDry. Vol1.4M3Thickness10MMThickness5MMCementSandTotal145145Sr. No.RequirmentsQty.UnitRateAmountMortar Proportion 1:414 mmWet Mortar0.100CumALabour10Ls90900Dry Mortar0.140CumCement0.80BagsSand0.11CumW/P Compound0.80KgScaffolding10Sqmchiken mesh5rmtBMaterialMortar Proportion 1:46 mm thick1Cement0.80Bags230184.00Wet Mortar0.050Cum2Sand0.11Cum70078.40Dry Mortar0.070Cum3Scaffolding10Sqm25250.00Cement0.40Bags4Chiken mesh2sq.mt4080.00Sand0.06Cum5W/P Compound0.80Kg9072.00W/P Compound0.00KgTotal (A+B)1564.40Scaffolding0CMaterial1Cement0.40Bags23092.002Sand0.06Cum70039.203Scaffolding0Sqm00.004W/P Compound0.00Kg0.000.00Total (A+B+C)1695.60DC.P0.00%0.00Rate per Sq,mt169.56Total1695.60M2Ojhar IIQty1M2Dry. Vol1.4M3Thickness10MMCementSandTotal167Sr. No.RequirmentsQty.UnitRateAmountALabour1M26060BMaterial1Cement0.06Bag23013.14Mortar Proportion2Sand0.01Cum93011.16Wet Mortar0.010Cum3Scaffolding1Sqm2020.00Dry Mortar0.014Cum5Chicken Mesh0.1303.00Cement0.06Bags6lime0kg50.00Sand0.01CumTotal (A+B)107.30CC.P.0.00%0Scaffolding1SqmChicken Mesh0.3RmtTotal107.30M2Water proofingQty1M2Dry. Vol1.4M3Thickness10MMCementSandTotal145Sr. No.RequirmentsQty.UnitRateAmountALabour1M25555BMaterial1Cement0.08Bag23018.40Mortar Proportion2Sand0.01Cum7007.84Wet Mortar0.010Cum3Scaffolding1Sqm1515.00Dry Mortar0.014Cum5Chicken Mesh0.15Sqm00.00Cement0.08Bags6wter proofing comop0.008kg00.00Sand0.01CumTotal (A+B)96.247C.P0.00%0.00Scaffolding1SqmChicken Mesh0.5RmtTotal96.24M2Neeru1kgQty100M2Flush PointingDry. Vol0.7M3Thickness10MMCementSandTotal145Sr. No.RequirmentsQty.UnitRateAmountALabour100M2656500BMaterial1Cement4.00Bag230920.00Mortar Proportion2Sand0.56Cum909509.04Wet Mortar1.000Cum3Scaffolding100Sqm181800.00Dry Mortar0.700Cum5Chicken Mesh0.15Sqm355.25Cement4.00Bags6wter proofing comop0.4kg00.00Sand0.56CumTotal (A+B)9734.297C.P0.00%0.00Scaffolding1Sqm8Injection Water Proof0sq.mtr2500Chicken Mesh0.5RmtTotal9734.29M2Neeru1kgRate / sq.mtr97.3429

Stone SpreadingHard CoreOjharQty1M3Dry. Vol1.25M3Thickness150MMConsider 40 mm thick materialSr. No.RequirmentsQty.UnitRateAmountALabour1M3250.00250.00BMaterial1Aggregate1.10cum450495.002Murrum0.10cum14014.003rolling1.003535.004Watering100.00Litre0.088.00Total (A+B)802.00CPlant charges0.00%0.00Tools & Tackle802.00Total /cum802.00Rate/sq.mt80.20for 100 mm thick120.30Rate for 150 mm thk60.15Rate for 75 mm thkQty1M3Dry. Vol1.15M3Thickness150MMConsider 40 mm thick materialSr. No.RequirmentsQty.UnitRateAmountALabour1M3120.00120.00BMaterial1Aggregate1.20cum450540.002Murrum0.05cum1407.003rolling1.003535.004Watering100.00Litre0.088.00Total (A+B)710.00CPlant charges0.00%0.00Tools & Tackle710.00Total /cum710.00Rate/sq.mt53.26for 75 mm thick

Sand fillingSAND FILLINGName of ProjectItem No. from BOQ1.4Name of ItemSand fillingItem DescriptionFor Qty.1M3Dry Volume1.03M3Sr.No.RequirmentsQty.UnitRateAmountALabour1No100100.00BMaterial1Sand1.02Cum700714.002Dewatering3.00hrs00.003Compaction by plate compactor1.00Cum2020.00A+B834.00CWater & Elect. Charges0%0.00DTools & Plants0%0.00EContractors Profit0%0.00FLabour & Ecsis0.00%0.00Total834.00

Brick workBrick work 230 mm thickMES Ojhar IIName of ProjectCement1.63BagsItem No. from BOQSand0.34CumName of ItemB/WItem DescriptionFor Qty.1M3Dry Volume0.4M3Proportion of ConcreteCementSandTotal167Sr.No.RequirmentsQty.UnitRateAmountALabour1No325325.00BMaterial1Cement1.40Bags230322.002Sand0.34Cum909311.663Scaffolding4.35sq.mt1043.504Bricks502.00No31506.00A+B2508.16CWater & Elect. Charges0%0.00DTools & Plants0%0.00EContractors Profit0.00%0.00FLabour & Ecsis0.00%0.00Total2508.16Rate/Sq.mtr577.9163923634Brick work 115 mm thickMES Ojhar IIName of ProjectCement0.26BagsItem No. from BOQSand0.04CumName of ItemB/WItem DescriptionFor Qty.1sq.mtQty of B/W0.115cumDry Volume0.4cumDry Volume for 10 sq.mt0.046M3Proportion of ConcreteCementSandTotalGrade M-15145Sr.No.RequirmentsQty.UnitRateAmountALabour1sq.mt5050.00BMaterial1Cement0.20Bags23046.002Sand0.04Cum70025.763Scaffolding1.00sq.mt1010.004Bricks57.00Nos3171.005R/F0.50kg4623.006Concrete0.00cum30000.00A+B325.76CWater & Elect. Charges0%0.00DTools & Plants0%0.00EContractors Profit0.00%0.00FLabour & Ecsis0.00%0.00Total325.76Rate for 1 sq.mt325.76Block work 200 mm thickName of ProjectCement0.46BagsItem No. from BOQ200*200*450 mmSand0.06CumName of ItemB/WItem DescriptionFor Qty.1sq.mtQty of B/W0.2cumDry Volume0.4cumDry Volume for 10 sq.mt0.08M3Proportion of ConcreteCementSandTotalGrade M-15145Sr.No.RequirmentsQty.UnitRateAmountALabour1sq.mt8080.00BMaterial1Cement0.46Bags00.002Sand0.06Cum90958.183Scaffolding1.00sq.mt2525.004Concrete Block12.00Nos30360.005R/F0.00kg460.006Concrete0.00cum30000.00A+B523.18CWater & Elect. Charges0%0.00DTools & Plants0%0.00EContractors Profit10.00%52.32FLabour & Ecsis0.00%0.00Total575.49Rate for 1 sq.mt575.4936Brick work 100 mm thickName of ProjectCement0.46BagsItem No. from BOQ400*200*100 mmSand0.06CumName of ItemB/WItem DescriptionFor Qty.1sq.mtQty of B/W0.2cumDry Volume0.4cumDry Volume for 10 sq.mt0.08M3Proportion of ConcreteCementSandTotalGrade M-15145Sr.No.RequirmentsQty.UnitRateAmountALabour1sq.mt8080.00BMaterial1Cement0.46Bags00.002Sand0.06Cum90958.183Scaffolding1.00sq.mt2525.004Bricks13.00Nos16208.005R/F0.00kg460.006Concrete0.00cum30000.00A+B371.18CWater & Elect. Charges0%0.00DTools & Plants0%0.00EContractors Profit10.00%37.12FLabour & Ecsis0.00%0.00Total408.29Rate for 1 sq.mt408.2936Brick work 200 mm thickName of ProjectCement0.46BagsItem No. from BOQ400*200*200Sand0.06CumName of ItemB/WItem DescriptionFor Qty.1sq.mtQty of B/W0.2cumDry Volume0.4cumDry Volume for 10 sq.mt0.08M3Proportion of ConcreteCementSandTotalGrade M-15145Sr.No.RequirmentsQty.UnitRateAmountALabour1sq.mt8080.00BMaterial1Cement0.46Bags00.002Sand0.06Cum90958.183Scaffolding1.00sq.mt2525.004Bricks13.00Nos26338.005R/F0.00kg460.006Concrete0.00cum30000.00A+B501.18CWater & Elect. Charges0%0.00DTools & Plants0%0.00EContractors Profit10.00%50.12FLabour & Ecsis0.00%0.00Total551.29Rate for 1 sq.mt551.2936Brick work 150 mm thickName of ProjectCement0.34BagsItem No. from BOQ400*200*150 mmSand0.05CumName of ItemB/WItem DescriptionFor Qty.1sq.mtQty of B/W0.15cumDry Volume0.4cumDry Volume for 10 sq.mt0.06M3Proportion of ConcreteCementSandTotalGrade M-15145Sr.No.RequirmentsQty.UnitRateAmountALabour1sq.mt8080.00BMaterial1Cement0.34Bags00.002Sand0.05Cum90943.633Scaffolding1.00sq.mt2525.004Bricks13.00Nos19247.005R/F0.00kg460.006Concrete0.00cum30000.00A+B395.63CWater & Elect. Charges0%0.00DTools & Plants0%0.00EContractors Profit10.00%39.56FLabour & Ecsis0.00%0.00Total435.20Rate for 1 sq.mt435.1952Brick work 115 mm thickName of ProjectCement0.26BagsItem No. from BOQ400*200*150 mmSand0.04CumName of ItemB/WItem DescriptionFor Qty.1sq.mtQty of B/W0.115cumDry Volume0.4cumDry Volume for 10 sq.mt0.046M3Proportion of ConcreteCementSandTotalGrade M-15145Sr.No.RequirmentsQty.UnitRateAmountALabour1sq.mt7575.00BMaterial1Cement0.26Bags00.002Sand0.04Cum00.003Scaffolding1.00sq.mt2020.004Bricks57.00Nos00.005R/F0.00kg460.006Concrete0.00cum30000.00A+B95.00CWater & Elect. Charges0%0.00DTools & Plants0%0.00EContractors Profit10.00%9.50FLabour & Ecsis0.00%0.00Total0.00Rate for 1 sq.mt0Brick work 115 mm thickName of ProjectCement0.26BagsItem No. from BOQ400*200*150 mmSand0.04CumName of ItemB/WItem DescriptionFor Qty.1sq.mtQty of B/W0.115cumDry Volume0.4cumDry Volume for 10 sq.mt0.046M3Proportion of ConcreteCementSandTotalGrade M-15145Sr.No.RequirmentsQty.UnitRateAmountALabour1sq.mt7575.00BMaterial1Cement0.26Bags00.002Sand0.04Cum00.003Scaffolding1.00sq.mt2020.004Bricks57.00Nos00.005R/F0.00kg460.006Concrete0.00cum30000.00A+B95.00CWater & Elect. Charges0%0.00DTools & Plants0%0.00EContractors Profit10.00%9.50FLabour & Ecsis0.00%0.00Total0.00Rate for 1 sq.mt0Brick work 115 mm thickName of ProjectCement0.26BagsItem No. from BOQ400*200*150 mmSand0.04CumName of ItemB/WItem DescriptionFor Qty.1sq.mtQty of B/W0.115cumDry Volume0.4cumDry Volume for 10 sq.mt0.046M3Proportion of ConcreteCementSandTotalGrade M-15145Sr.No.RequirmentsQty.UnitRateAmountALabour1sq.mt7575.00BMaterial1Cement0.26Bags00.002Sand0.04Cum00.003Scaffolding1.00sq.mt2020.004Bricks57.00Nos00.005R/F0.00kg460.006Concrete0.00cum30000.00A+B95.00CWater & Elect. Charges0%0.00DTools & Plants0%0.00EContractors Profit10.00%9.50FLabour & Ecsis0.00%0.00Total0.00Rate for 1 sq.mt0