Final Report The Study on Vientiane Water Supply Development Project Annex 16 - 22 6 Alternatives Compared (1) Alternative C-1 1) Intake and Treatment Plant 1st Stage (Expansion of the existing Chinaimo Water Treatment Plant, see Figure 4) - Intake Facilities: Use of the existing intake structure, replacement of 4 of 6 existing pumps - Treatment Plant: Expansion of 40,000 m3/day 2nd Stage (Construction of New Thangone Water Treatment Plant, see Figure 8) - Intake Facilities: Construction of new intake facilities on the Nam Ngum River - Treatment Plant: Construction of 60,000 m3/day Expansion of 40,000 m3/day at the existing Chinaimo Treatment Plant for the 1st Stage and a new treatment plant of 60,000 m3/day at Thangone for the 2nd Stage are considerations for Alternative C-1. Treatment processes are planned to be the same as those at the existing Chinaimo Treatment Plant. For the expansion of the existing Chinaimo Treatment Plant during the 1st Stage, additional intake structures will not be required and only the replacement of intake pumps will be required. Figure 11 and Figure 12 show a plan of the treatment facilities, and a flow diagram for the expansion of 40,000 m3/day at the Chinaimo Treatment Plant for the 1st Stage. Figure 13 and Figure 14 show a plan of treatment facilities and a flow diagram for the expansion of 60,000 m3/day at Thangone Treatment Plant for the 2nd Stage. Detailed specifications of treatment facilities for Alternative C-1 are attached to Annex 14. 2) Pipelines 1st Stage - Clear Water Transmission Pipelines: Installation of 2.2 km of pipelines - Booster Pumping Stations: Improvement of the Km6 Booster Pumping Station - Distribution Trunk Mains: Installation of 30.8 km of pipelines 20,000 Service Area in 2015 Existing Treatment Plant Proposed Treatment Plant Proposed Reservoir Proposed Transmission Main 20,000 20,000 Proposed Treatment Plant 20,000 80,000 40,000 60,000 Alternative C-1

Upload: others

Post on 14-Apr-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 6 Alternatives Compared (1) Alternative C-1

Final Report The Study on Vientiane Water Supply Development Project

Annex 16 - 22

6 Alternatives Compared

(1) Alternative C-1

1) Intake and Treatment Plant

1st Stage (Expansion of the existing Chinaimo Water Treatment Plant, see Figure 4)

- Intake Facilities: Use of the existing intake structure, replacement of 4 of 6 existing pumps

- Treatment Plant: Expansion of 40,000 m3/day

2nd Stage (Construction of New Thangone Water Treatment Plant, see Figure 8)

- Intake Facilities: Construction of new intake facilities on the Nam Ngum River

- Treatment Plant: Construction of 60,000 m3/day

Expansion of 40,000 m3/day at the existing

Chinaimo Treatment Plant for the 1st Stage and a

new treatment plant of 60,000 m3/day at

Thangone for the 2nd Stage are considerations for

Alternative C-1. Treatment processes are

planned to be the same as those at the existing

Chinaimo Treatment Plant. For the expansion of

the existing Chinaimo Treatment Plant during the

1st Stage, additional intake structures will not be

required and only the replacement of intake

pumps will be required. Figure 11 and Figure 12

show a plan of the treatment facilities, and a flow

diagram for the expansion of 40,000 m3/day at the

Chinaimo Treatment Plant for the 1st Stage.

Figure 13 and Figure 14 show a plan of treatment

facilities and a flow diagram for the expansion of

60,000 m3/day at Thangone Treatment Plant for

the 2nd Stage. Detailed specifications of treatment facilities for Alternative C-1 are attached to

Annex 14.

2) Pipelines

1st Stage

- Clear Water Transmission Pipelines: Installation of 2.2 km of pipelines

- Booster Pumping Stations: Improvement of the Km6 Booster Pumping Station

- Distribution Trunk Mains: Installation of 30.8 km of pipelines

20,000

Service Area in 2015

Existing Treatment Plant

Proposed Treatment Plant

Proposed Reservoir

Proposed Transmission Main

20,000

20,000

Proposed Treatment Plant

20,000

80,000

40,000

60,000

Alternative C-1

Page 2: 6 Alternatives Compared (1) Alternative C-1

Final Report The Study on Vientiane Water Supply Development Project

Annex 16 - 23

2nd Stage

- Clear Water Transmission: Installation of 10.6 km of pipelines

- Distribution Centre: Construction of a new distribution centre for 60,000 m3/day

- Booster Pumping Stations: Improvement of the Km12 Booster Pumping Station

- Distribution Trunk Mains: Installation of 74.1 km of pipelines

Improvement of the Km6 booster pumping station (BPS) in the 1st Stage will be for securing the

water supply to the northern part of Vientiane, especially the Dongdok area. The improvement will

include replacement of the existing pumps with new larger capacity and higher head pumps and

construction of a pump house. Improvement of Km12 BPS in the 2nd Stage will be mainly for the

water supply to the new industrial area in the eastern part of the City.

For the 2nd Stage, clear water is to be transmitted from the new Thangone Treatment Plant to a

distribution centre and from there, to consumers. The distribution centre is proposed to be

constructed near the junction of National Roads 10 and 13 in the northern part of the city, near the

Dongdok area.

Figure 15 shows the clear water transmission pipelines and distribution trunk mains required for

Alternative C-1. These required pipelines are obtained from a hydraulic network analysis. The

required pipeline length by pipeline diameter by stages are summarized in Figure 10.

Figure 10 Required Pipelines by Diameters for Alternative C-1

0

5,000

10,000

15,000

20,000

25,000

30,000

150 200 250 300 350 400 450 500 600 700 800 900Pipeline Diameter (mm)

Leng

th (m

)

2nd Stage

1st Stage

Page 3: 6 Alternatives Compared (1) Alternative C-1

Final Report The Study on Vientiane Water Supply Development Project

Annex 16 - 24

Figure 11 Plan of Treatment Facilities for Expansion of 40,000 m3/day at Chinaimo Treatment Plant

175.00

174.40

173.74

173.55

174.05

169.90

170.96

173.35173.51

170.10170.50

168.50

173.51

171.00

174.05173.74

175.00

169.90

173.74174.34

174.40175.00

E p.Jt.

Raw

Wate

r

Filt

ere

d W

ate

rC

hannel

(To E

ist C

hannel)

173.18 173.17

170.74

Filter Control Desk

Wash Water Channel

DIN 500/400Filter Regulater Valvocet

Filter Sand

169.75

Filtered Water Channel

Oriffice

171.41

171.29

28009350

4500400 600

2700

2700

350 350

2800 250

200

350

350

900

900

350

1000

8850

250

900

900

200

6700

37150 6500200

20000200

93850

350

500

500

350

13600

13600

28250

350

28250

4500

400

1300

14000

2500

300

400200300

900

900

150

150

5500

27700

250

250

950

2500

1500

300300

1000

400

GL 171.00 GL 171.30

A

A

AA

B B

B

B

Page 4: 6 Alternatives Compared (1) Alternative C-1

Final Report The Study on Vientiane Water Supply Development Project

Annex 16 - 25

Figure 12 Flow Diagram for Expansion of 40,000 m3/day at Chinaimo Treatment Plant

Page 5: 6 Alternatives Compared (1) Alternative C-1

Final Report The Study on Vientiane Water Supply Development Project

Annex 16 - 26

Figure 13 Plan of Treatment Facilities for the proposed Thangone Treatment Plant, 60,000 m3/day

188.10

187.50

186.81

186.61

187.10

183.00183.91

185.10

186.41186.70

183.20

182.14

180.54

186.70

183.94

187.10186.81

185.10

188.10

183.00

186.81187.41

187.50188.10

E p.Jt.

186.15 186.14

183.28

Filter Control Desk

DIN 500/400Filter Regulater Valvocet

Filter Sand

182.67

Filtered Water Channel

Oriffice

184.29

184.24184.68

176.86

Clear Water Pumping Pit

Distribution Pump

184.41

To Clear W ater

Reservoir

(for Direct Filtration)

Raw

Wate

rNormal

From Clear

W ater Reservoir

350011450

4500400 600

3400

3400

350 3503500

250

200

350

3100

350 900

900

350

1000

9900

250

900

900

900

900

200

6750

23100

1300

250

6500200

15000200

83850

350

400

400

400

350

13700

13700

13700

42500

44050

350

350

44050

4500

400

400250200

3000

4500

28503000

9300

1300

13700

2500

300

400200300

1100

1100

150

150

5700

43550

200

200

950

2500

1500

3500

3400 3400

350

350

3500

250

200

350

350

300300

12000

200

11450

400

GL 184.00 GL 184.00

2500 1000

A

A

AA

B B

B

B

Page 6: 6 Alternatives Compared (1) Alternative C-1

Final Report The Study on Vientiane Water Supply Development Project

Annex 16 - 27

Figure 14 Flow Diagram for the proposed Thangone Treatment Plant, 60,000 m3/day

Page 7: 6 Alternatives Compared (1) Alternative C-1

Final Report The Study on Vientiane Water Supply Development Project

Annex 16 - 28

Figure 15 Clear Water Transmission and Distribution Trunk Mains Required

for Alternative C-1

Chinaimo WTP: Existing : 80,000 m3/day1st Stage : 40,000 m3/day

Thangone WTP: 2nd Stage : 60,000 m3/day

Transmission Main at 1st StageDistribution Main at 1st StageTransmission Main at 2nd StageDistribution Main at 2nd Stage

Treatment PlantDistribution CenterElevated ReservoirBooster Pumping Station

Dongdok

Phonekheng

Phonethane

PhonetongXamkhe

Salakham

Nongteng

Km6

Km12

Kaolieo WTP: Existing : 20,000 m3/day

DistributionCenter

150

200 250

300

150

600

450

600

450

450

250700

250

150

150200

200

250

200 150

300

300

250

300

400

300

700

250

700300

250

200

Page 8: 6 Alternatives Compared (1) Alternative C-1

Final Report The Study on Vientiane Water Supply Development Project

Annex 16 - 29

3) Costs (Construction, O/M)

Based on the results of facility planning as mentioned above for Alternative C-1, preliminary cost

estimates have been conducted for the alternative comparison, and the results of these cost estimates

are as shown in Table 4 in US Dollars. It should be noted that common costs for the following

works are excluded from the costs of the alternative comparison.

• Rehabilitation of the existing Kaolieo Treatment Plant

• Separation of distribution and transmission systems of the existing Chinaimo Treatment

Plant

• Installation costs of small diameter distribution pipelines, house connections

• Engineering costs, contingencies, administrative costs

• Annual operation and maintenance costs for the existing system

Table 4 Preliminary Cost Estimates for Alternative C-1 (x 1,000 US$)

Alternative C-1 Total Foreign Local1. Construction Cost 56,514 39,297 17,217

1.1 Treatment Plants 22,209 14,257 7,952 Expansion of Chinaimo T.P. 8,782 5,564 3,218 Construction of Thangone T.P. 13,427 8,693 4,734

1.2 Clear Water Transmission Pipelines 7,930 6,535 1,395 For the 1st Stage 409 337 72 For the 2nd Stage 7,521 6,198 1,323

1.3 Distribution Center 4,376 2,984 1,392 For the 1st Stage - - - For the 2nd Stage 4,376 2,984 1,392

1.4 Booster Pump Station 1,103 901 202 For the 1st Stage 737 607 130 For the 2nd Stage 366 294 72

1.5 Distribution Trunk Mains 20,896 14,620 6,276 For the 1st Stage 8,802 6,490 2,312 For the 2nd Stage 12,094 8,130 3,964

2. Operation and Maintenance Cost 6,407 1,208 5,199 2.1 Electricity 5,067 - 5,067

Expanded Chinaimo T.P. 2,194 - 2,194 Thangone T.P. 1,030 - 1,030 Distribution Center 809 - 809 Booster Pump Station 1,034 - 1,034

2.2 Chemical Cost 1,208 1,208 - Expanded Chinaimo T.P. 895 895 -

Alum 620 620 - Polymer 18 18 - Chlorine 257 257 -

Thangone T.P. 313 313 - Alum 154 154 - Chlorine 159 159 -

2.3 Salary 132 - 132 Treatment Plant 132 - 132

Expanded Chinaimo T.P. 36 - 36 Thangone T.P. 96 - 96

Total Costs 62,921 40,505 22,416