7 steps of ltmo - frtr€¦ · checklist (important stuff) • site description/history – rfi,...
TRANSCRIPT
![Page 1: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/1.jpg)
7 Steps of LTMO
Mindy Vanderford, Ph.D.Groundwater Services, Inc.
![Page 2: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/2.jpg)
2
CreditsRoadmap for Long-Term Monitoring OptimizationContributors:Carolyn Nobel, PARSONSJohn Anthony, MitertekDave Becker, USACE
Demonstration of Two Long-Term Monitoring Optimization Methods
USEPA Office of Superfund Remediation and Technology Innovation
Guidance for Monitoring at Hazardous Waste Sites
OSWER Directive No. 9355.4-28
![Page 3: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/3.jpg)
3
Goals
• Introduce language,concepts and methods central to LTMO
• Define steps common to LTMO analyses
• Determine if and when optimization is appropriate for your program
• Introduce methods available and appropriate for your program
![Page 4: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/4.jpg)
4
Phases of a SitePhases of a Site
Site Characterization
(uncertainty reduction)
Site Characterization
(uncertainty reduction)
Remedy Selection/Monitoring(engineered processes)
Remedy Selection/Monitoring(engineered processes)
Long-Term Monitoring
(natural processes)
Long-Term Monitoring
(natural processes)
![Page 5: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/5.jpg)
5
7 Steps of LTMO
Examine Existing Data
Decide if site is a Candidate for LTMO
Determine the type of evaluation
Choose LTMO Method
Implement Plan
Perform Optimization
Define and Document Current Program
![Page 6: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/6.jpg)
6
Components of your Current Monitoring Program
• Conceptual Site Model
• Objectives
• Monitoring Conceptual Model
• Design of Monitoring Plan
• Management Decision Rules
Know Thyself!Know Thyself!
Current Monitoring Program
![Page 7: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/7.jpg)
7
Current Monitoring Program
Conceptual Site Model
• Sources• Analytes• Matrices• Potential receptors • Regulatory framework• Property use/community issues• Assumptions/Uncertainties
SOIL SOURCE
GW SOURCE
![Page 8: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/8.jpg)
8
Current Monitoring Program
ObjectivesObjectives
(USEPA, 2004)
• Site Characterization Phase
– Determine/delineate COCs
– Quantify COCs
– Characterize subsurface
Understand your
motivation
Understand your
motivation
![Page 9: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/9.jpg)
9(USEPA, 2004)
• Monitoring Objectives– Evaluate remedy effectiveness– Evaluate contaminant
migration– Evaluate changes in natural
resource– Comply with regulatory
requirements
Understand your
motivation
Understand your
motivation
ObjectivesObjectives
Current Monitoring Program
![Page 10: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/10.jpg)
10
• Temporal state of constituent concentrations– Single location over time– In or near the remedial zone to monitor
remedial performance
• Spatial extent of contaminant distribution– Migration of constituents– Potential receptors
?
ObjectivesObjectives
Current Monitoring Program
![Page 11: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/11.jpg)
11
Monitoring Conceptual Model
Identifies the relationship between site activity and outcome.
(Hint: Its Science.)
Current Monitoring Program
Refine Objectives to be consistent with Monitoring Conceptual Model
![Page 12: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/12.jpg)
12
Monitoring Conceptual Model
• Monitoring hypothesis– COC concentrations are changing with
time.• Monitoring question
– What is changing?– How fast is it changing?– Where is it changing?
Current Monitoring Program
![Page 13: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/13.jpg)
13
Monitoring Conceptual Model
• Collect data to evaluate hypothesis• Hypothesis testing
– Analyze data using appropriate methods/statistics
• Scientific Management Decision Point– Document decision with data/weight of
evidence.
Current Monitoring Program
![Page 14: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/14.jpg)
14
Design of Current Monitoring Program
• What data have been collected and why?– Analytical methods– Detection limits
• How are data collected?• Where have data been collected?• How have data been analyzed?• How is the dataset managed?• How much does this cost?• Who is paying for this?
Current Monitoring Program
![Page 15: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/15.jpg)
15
Management Decision Rules
• Identify actions taken and criteria for actions taken.
• Have monitoring objectives been met?
• How has the monitoring program been altered through time and why.
Current Monitoring Program
![Page 16: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/16.jpg)
16
Current Monitoring Program
Regulatory/Community Issues
• Is the site moving to a different regulatory status/phase?
• What are the long-term goals of property re-use?
• What is my current relationship with stakeholders?
• How can LTMO improve the current stakeholder relationship/property re-use?
![Page 17: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/17.jpg)
17
Summary• Conceptual Site Model
• Objectives
• Monitoring Conceptual Model
• Design of Monitoring Plan
• Management Decision Rules
Know Thyself!Know Thyself!
Current Monitoring Program
![Page 18: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/18.jpg)
18
7 Steps of LTMO
Define and Document Current Program
Examine Existing Data
Implement Plan
Perform Optimization
Choose LTMO Method
Determine the type of evaluation
Decide if site is a Candidate for LTMO
![Page 19: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/19.jpg)
19
Examine Existing Data
Acquire and Process Data
• Data acquisition and availability• Data format• Data reduction
![Page 20: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/20.jpg)
20
Examine Existing Data
Checklist (Important stuff)
• Site description/history– RFI, CSM, ROD
• Historical COC data– Investigation and monitoring reports
• Site hydrology/geology– RFI, CSM
![Page 21: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/21.jpg)
21
Examine Existing Data
Checklist (Important stuff)
• Description of current monitoring program
• Location coordinates (survey, GPS)– Wells and Property boundaries– Sources and Receptors– Surface water, Roads
![Page 22: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/22.jpg)
22
Examine Existing Data
Checklist (Important stuff)
• Well construction/completion intervals– Construction diagrams
• Regulatory context, cleanup goals– Risk based goals
• Location of potential receptors– Risk assessments
??40 CFR
?
![Page 23: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/23.jpg)
23
Examine Existing Data
Checklist (Useful stuff)• Logistical and policy issues
– Stakeholders, property owners • Site features
– Aerials, AutoCad, GIS base maps• Historic hydrology• Geochemistry• Costs and budgets
Budget$$$
![Page 24: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/24.jpg)
24
Examine Existing Data
Checklist
More important than you think
• Current property use• Future property use• Pending sale/re-use/litigation
Cost Distributions
Cost Distributions
0 300 400100 200
Policy Option BPolicy
Option A
Deed
![Page 25: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/25.jpg)
25
Examine Existing Data
Data Format
Clean-up your data!• Hunt, gather, beg, create• Convert to electronic files• Database format• Identify spurious points/artifacts• Data deficiencies?
![Page 26: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/26.jpg)
26
Examine Existing Data
Data Reduction
• How are data flags handled?– J flags– Non-detect results
• How are duplicates interpreted?• Dilution factors• Data consolidation• Missing detection limits?
![Page 27: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/27.jpg)
27
Examine Existing Data
Summary
• Gather Reports• Organize Data (Electronic format)• Review Data• Data Reduction/Consolidation• Expensive ($$$)
Good Data
Good Data
![Page 28: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/28.jpg)
28
7 Steps of LTMO
Define and Document Current Program
Examine Existing Data
Determine the type of evaluation
Choose LTMO Method
Implement Plan
Perform Optimization
Decide if site is a Candidate for LTMO
![Page 29: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/29.jpg)
29
Candidates for LTMO
Is my site a Candidate?
• Is the site investigation complete?
• Minimum Data requirements fulfilled?
• Remediation status consensus?
• Budget and labor considerations?
You won’t have this site to investigate anymore
![Page 30: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/30.jpg)
30
Candidates for LTMO
Is my site a Candidate?
• Is the site investigation complete?– Source identified?– Plume delineated?
• Vertical• Horizontal
![Page 31: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/31.jpg)
31
Candidates for LTMO
Is my site a Candidate?
• Is the site investigation complete?– COC’s identified?– Hydrology known/modeling
complete?– Conceptual Site Model complete?– Receptors Identified
![Page 32: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/32.jpg)
32
Candidates for LTMO
Is my site a Candidate?
•• Data requirements fulfilled?Data requirements fulfilled?–– Temporal: > 4 to 6 sample Temporal: > 4 to 6 sample
events, 8 events suggested for events, 8 events suggested for significance for some statistical significance for some statistical teststests
?
CC
TimeTime
Good Data
Good Data
![Page 33: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/33.jpg)
33
Candidates for LTMO
Is my site a Candidate?
•• Data requirements fulfilled?Data requirements fulfilled?–– Spatial: > 6 to 15 monitoring Spatial: > 6 to 15 monitoring
locationslocations–– Housekeeping: Housekeeping:
data organized and completedata organized and complete
?
CC
TimeTime
Good Data
Good Data
![Page 34: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/34.jpg)
34
Candidates for LTMO
Is my site a Candidate?
• Remediation status confirmed?– Stakeholders agree – Intensive remedies completed
• No further construction– Pump and Treat or Natural
Attenuation remedies on-going
REMEDY UNDERWAYREMEDY UNDERWAY
MNA
TTPump & Treat SystemPump & Treat SystemSoil Cove
r
![Page 35: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/35.jpg)
35
Candidates for LTMO
Things to consider• Effort and budget to perform
optimization
• Technical capabilities of team
• Resistance to implementation
• Potential benefits vs. cost
• Deficiencies in current monitoring program
• Likelihood of further remediation
• Effort and budget to perform optimization
• Technical capabilities of team
• Resistance to implementation
• Potential benefits vs. cost
• Deficiencies in current monitoring program
• Likelihood of further remediation
![Page 36: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/36.jpg)
36
Candidates for LTMO
Summary
• The site investigation is complete.
• Minimum Data requirements fulfilled.
• Remediation status consensus.
• Budget and labor adequate.
Not so tricky, now!
![Page 37: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/37.jpg)
37
7 Steps of LTMO
Define and Document Current Program
Examine Existing Data
Choose LTMO Method
Implement Plan
Perform Optimization
Decide if site is a Candidate for LTMO
Determine the type of evaluation
![Page 38: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/38.jpg)
38
Evaluation Type
Evaluation Strategies
Qualitative
Quantitative
Evaluation Strategies
Qualitative
Quantitative
![Page 39: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/39.jpg)
39
Evaluation Type
Evaluation Strategies
Qualitative evaluations based on professional judgment, intimate knowledge of site, decision rules, heuristic methods
State Rules
![Page 40: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/40.jpg)
40
Evaluation Type
Evaluation Strategies
• Geology/Hydrology• Fate and transport of COCs• Monitoring objectives, migration
pathways and receptors• History and regulatory framework State
Rules
![Page 41: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/41.jpg)
41
Evaluation Type
Evaluation Strategies
Decision LogicDecision Logic•• Monitoring Well important for:Monitoring Well important for:
–– Vertical/horizontal delineationVertical/horizontal delineation–– Background water qualityBackground water quality–– Proximity to source/receptorProximity to source/receptor–– Regulatory complianceRegulatory compliance
State Rules
![Page 42: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/42.jpg)
42
Evaluation Type
Good News
Qualitative Evaluations• Context specific, multiple factors, includes
intuitive, less tangible information• Good for including regulatory and community
issues
REALITYREALITYMODELMODEL VS.VS.
![Page 43: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/43.jpg)
43
Evaluation Type
Less-Good News
Qualitative Evaluations
• Problem if stakeholders do not agree
• Consultant dependent
• May not reveal data inadequacies, may carry over biases
• Specific personnel required
Hmmm.
![Page 44: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/44.jpg)
44
Evaluation Type
Evaluation Strategies
Quantitative evaluations based on statistical, mathematical, modeling or empirical evidence
![Page 45: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/45.jpg)
45
Evaluation Type
StatisticsStatistics
Analytical ModelsAnalytical Models
CC
XX
TOOLSTOOLS
Numerical ModelsNumerical Models
MeanMeanUpper 95%
Upper 95%
Evaluation Strategies
Quantitative Evaluations• Trend analysis• Geo-statistics• Information Weighting
![Page 46: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/46.jpg)
46
Evaluation Type
StatisticsStatistics
Analytical ModelsAnalytical Models
CC
XX
TOOLSTOOLS
Numerical ModelsNumerical Models
MeanMeanUpper 95%
Upper 95%
Evaluation Strategies
Quantitative Evaluations• Modeling studies and simulations
– Projected concentrations– Projected attenuation
• Algorithms for temporal sampling
![Page 47: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/47.jpg)
47
Evaluation Type
Good News
Quantitative Evaluations• Bring stakeholders together with
quantitative analysis• Specific justification for action• Can highlight data deficiencies,
mis-interpretations, uncertainty.
![Page 48: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/48.jpg)
48
Evaluation Type
Less-Good News
Quantitative Evaluations• More rigorous data requirements• Cost• Time and effort• Technical expertise• Junk in Junk out
Less-Good News
Quantitative Evaluations• More rigorous data requirements• Cost• Time and effort• Technical expertise• Junk in Junk out
Hmmm.
![Page 49: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/49.jpg)
49
Evaluation Type
Evaluation Strategies
QualitativeQuantitative
(Both needed)Independent Review?
![Page 50: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/50.jpg)
50
7 Steps of LTMO
Define and Document Current Program
Examine Existing Data
Determine the type of evaluation
Implement Plan
Perform Optimization
Decide if site is a Candidate for LTMO
Choose LTMO Method
![Page 51: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/51.jpg)
51
Choose LTMO Method
LTMO Methods
Choice should reflect:• Balance qualitative and quantitative methods• Time, effort, skill set and cost• Stakeholder consensus• Appropriate to size, complexity, dataset and risk
of site
![Page 52: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/52.jpg)
52
Choose LTMO Method
LTMO Guidance
Guidance Documents:
• Naval Facilities Engineering Service Center• AFCEE• DOD• USEPA
![Page 53: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/53.jpg)
53
Choose LTMO Method
LTMO Team
• Geology/hydrology• Statistical • Data management• Regulatory
![Page 54: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/54.jpg)
54
Choose LTMO Method
LTMO Tools
• Decision logic• Statistical trend analysis• Statistical significance testing• Interpolation• Mathematical Optimization
![Page 55: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/55.jpg)
55
Choose LTMO Method
LTMO Tools
• Decision logic
“If the concentration is increasing, then sample semi-annually.”
![Page 56: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/56.jpg)
56
Choose LTMO Method
LTMO Tools
• Statistical trend analysis– Linear Regression– Mann-Kendall– Sen’s, Mann-Wilcoxon
![Page 57: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/57.jpg)
57
Choose LTMO Method
LTMO Tools
• Statistical significance testing– Student’s T-test– Sequential T-test– Power analysis
![Page 58: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/58.jpg)
58
Choose LTMO Method
LTMO Tools
• Interpolation– Kreiging– Delaunay method– Mesh creation
![Page 59: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/59.jpg)
59
Choose LTMO Method
Mathematical Optimization
Branch of computational science seeking a ‘best’ result for any question that can be answered by a numerical value.
Techniques:• Simulated annealing• Genetic algorithms• Evolutionary strategies
Mathematical Optimization
Branch of computational science seeking a ‘best’ result for any question that can be answered by a numerical value.
Techniques:• Simulated annealing• Genetic algorithms• Evolutionary strategies
![Page 60: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/60.jpg)
60
Choose LTMO Method
Mathematical Optimization
Relatively new field (~1970’s)Computational and Programming challenges
Key Terms:
Objective Function – Value to be optimizedDecision Variables – Parameters subject to changeConstraints – Restrictions on allowed parameters
Objective Function – Value to be optimizedDecision Variables – Parameters subject to changeConstraints – Restrictions on allowed parameters
![Page 61: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/61.jpg)
61
Choose LTMO Method
LTMO Methods
• Cost Effective Sampling• Parsons Three Tiered• MAROS (Monitoring and Remediation
Optimization Software)• GTS (Geostatistical Temporal/Spatial
Optimization Algorithm)• Mathematical Optimization Methods
![Page 62: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/62.jpg)
62
Choose LTMO Method
Summary
• Balance qualitative and quantitative methods• Balance time, effort and cost with size,
complexity, data and risk• Guidance available• Many tools and methods available
![Page 63: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/63.jpg)
63
7 Steps of LTMO
Define and Document Current Program
Examine Existing Data
Determine the type of evaluation
Implement Plan
Decide if site is a Candidate for LTMO
Choose LTMO Method
Perform Optimization
![Page 64: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/64.jpg)
64
Perform Optimization
Expected Results• Spatial – Locations
– Remove wells from program– Addition of wells to characterize high
uncertainty• Temporal – Frequency• Different results for different COCs• Different results for different GW units
![Page 65: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/65.jpg)
65
Perform Optimization
Bonus Results
• Change in site conceptual model• Change in monitoring objectives• Change in sampling or analytical methods• Evaluate effects of remediation activities
![Page 66: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/66.jpg)
66
Perform Optimization
Cost• Small site, stakeholder agreement, uncomplicated
hydrology and constituents– $2,500 - $5,000
• Larger site, stakeholder skepticism, uncomplicated hydrology
– $5,000 - $15,000
• Larger site, stakeholder hostility, complicated hydrology, multiple units, legal issues
– >$25,000
![Page 67: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/67.jpg)
67
7 Steps of LTMO
Define and Document Current Program
Examine Existing Data
Determine the type of evaluation
Decide if site is a Candidate for LTMO
Choose LTMO Method
Perform Optimization
Implement Plan
![Page 68: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/68.jpg)
68
Assess and Implement
Assessment and Implementation
• Reality Check• Compare with original monitoring program• Compare across COCs• Cost savings review• Stakeholder review of recommendations
![Page 69: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/69.jpg)
69
Assess and Implement
Stakeholder Review
• Decision Document – LTMO Report– Response Action Completion Report
• Consistent with regulations and property use• Modify SAP’s, QAPP’s, etc. • Modify permits, and institutional controls.• Vendor contracts/services
![Page 70: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/70.jpg)
70
Assess and Implement
Costs
• Decision Document ($)• Modification of documents ($$)• Modify permits, and institutional controls ($$)• Potential savings ~ $750 per sample
![Page 71: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/71.jpg)
71
Assess and Implement
Review
• Flexible decision documents• Periodic re-evaluation
– Acquisition of statistically significant sample size
– Change in well status (i.e. <MCL)• Property transactions
![Page 72: 7 Steps of LTMO - FRTR€¦ · Checklist (Important stuff) • Site description/history – RFI, CSM, ROD • Historical COC data – Investigation and monitoring reports • Site](https://reader030.vdocument.in/reader030/viewer/2022011903/5f1790c338375b4d250a32df/html5/thumbnails/72.jpg)
72
7 Steps of LTMO
Define and Document Current Program
Examine Existing Data
Determine the type of evaluation
Decide if site is a Candidate for LTMO
Choose LTMO Method
Perform Optimization
Implement PlanReviewReview