7.2. status of wind power development in the philippines and drafting of the wind power roadmap by...

Upload: quantumleapwind

Post on 30-May-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/9/2019 7.2. Status of Wind Power Development in the Philippines and Drafting of the Wind Power Roadmap by v. Perez

    1/15

    Status of Wind Power Development

    in the Philippinesand Drafting of the Philippines Wind

    Next Steps

    Vincent S. Prez

    Chairman, AlternergyChairman, Merritt PartnersVice Chairman, National Renewable Energy Board

    Quantum Leap in Wind Power in Asia: Structured ConsultationAsia Clean Energy Forum Pre-event Workshop

    Asian Development Bank, 21 June 2010

    The views expressed in this presentation are those of the presenter and do not necessarily represent those of the Asian Development Bank.

  • 8/9/2019 7.2. Status of Wind Power Development in the Philippines and Drafting of the Wind Power Roadmap by v. Perez

    2/15

    Existing Wind Power Projects

    1.5MW wind-diesel hybrid project ofNational Power Corp., Mt. Samhao,Mahatao, Batan Island, Batanes

    33MW wind farm project of NorthwindPower Development Corp., Bangui, IlocosNorte

    2

  • 8/9/2019 7.2. Status of Wind Power Development in the Philippines and Drafting of the Wind Power Roadmap by v. Perez

    3/15

    Milestones in Wind Power

    Development, Philippines

    Commercial

    operation of1.5MW Basco

    wind power

    project of

    National Power

    Corp.

    Commercial

    Operation of

    the 25MW

    Bangui Wind

    Farm of

    Northwind

    Power

    Development

    Passage of the

    Renewable

    Energy Act

    Issuance of the

    Implementing

    Rules and

    Regulations of

    the RE Act

    MOA between

    DOE and BOI

    Award of

    Renewable

    Drafting of FIT

    Rules

    Award of

    Renewable

    Renewable

    Energy Policy

    Framework

    Additional

    8MW in

    Northwinds

    capacity

    200920082004 2005

    orp.

    2010

    Contracts

    Energy Service

    Contracts

    2002

    Wind

    Investment Kit

    3

  • 8/9/2019 7.2. Status of Wind Power Development in the Philippines and Drafting of the Wind Power Roadmap by v. Perez

    4/15

    Existing Capacity: 33 MW

    Currently, the biggest wind powerproducer in SE Asia

    Wind Regions:

    Philippines Wind Resource Atlas750 MW of Wind Power Potential

    4

    atanes an a uyan s an

    Northwest tip of Luzon (Ilocos Norte)

    Higher interior terrains of Luzon, Mindoro,

    Samar, Leyte, Panay, Negros, Cebu, Palawan,

    Eastern Mindanao

    East-facing coastal locations from N. Luzon

    southward to Samar Wind corridor between Luzon and Mindoro

    Between Mindoro and Panay

    Source: DOE NREL Study

  • 8/9/2019 7.2. Status of Wind Power Development in the Philippines and Drafting of the Wind Power Roadmap by v. Perez

    5/15

    Wind Power Capacity Targets

    800

    900

    1000903 MW

    Philippine Energy Plan Update 2009-2030

    5

    0

    100

    200

    300

    400

    500

    600

    700

    2010 2015 2020

    33 MW

    199 MW

    Source: DOE

  • 8/9/2019 7.2. Status of Wind Power Development in the Philippines and Drafting of the Wind Power Roadmap by v. Perez

    6/15

    Proposed Philippine

    Wind Power Roadmap

    Issues Proposed Actions

    How do we ensure the sustainability of the

    policies of the RE Act to be attractive enough to

    encourage investments?

    Establish attractive initial Feed in Tariff (FiT)

    for onshore wind power projects

    What additional policies should government Implementation of Rules on Renewable

    Regulatory

    adopt to increase off-take from wind power? Portfolio Standards, Net Metering, and

    Green Energy Option

    How do we incentivize NGCP to invest in

    extending additional transmission lines to wind

    corridors?

    Assist NGCP in long term transmission

    development planning to connect wind power

    Promulgate a special transmission incentive forNGCP to construct transmission assets to inter-

    connect wind power projects to the grid

    6

  • 8/9/2019 7.2. Status of Wind Power Development in the Philippines and Drafting of the Wind Power Roadmap by v. Perez

    7/15

    Proposed Philippine

    Wind Power Roadmap

    Issues Proposed Actions

    How would the government promote micro

    wind power use for household use?

    Implement Net Metering for micro wind

    turbines for residential installation

    How would the government promote wind Implement FiT Rules for Off Grid Areas and

    Off-grid and Micro

    power use for Off Grid Areas? establish appropriate payment and settlement

    mechanism for Off Grid Areas

    7

  • 8/9/2019 7.2. Status of Wind Power Development in the Philippines and Drafting of the Wind Power Roadmap by v. Perez

    8/15

    Proposed Philippine

    Wind Power Roadmap

    Issues Proposed Actions

    How do we integrate wind power projects in the

    Transmission and Distribution Development

    Plan?

    Inclusion in the Third TDP planning period for

    2010-2015; active involvement of private sector

    in the planning process

    Technical

    How do we strengthen the Philippine electricity

    grid system to allow penetration of intermittent

    power supply?

    Include wind transmission issues in Grid Code,

    assist NGCP in determining maximum allowable

    wind penetration level

    How do we facilitate easier interconnection of

    wind farms into the grid?

    Standardize a template interconnection

    agreement between NGCP and wind developers

    8

  • 8/9/2019 7.2. Status of Wind Power Development in the Philippines and Drafting of the Wind Power Roadmap by v. Perez

    9/15

    Proposed Philippine

    Wind Power Roadmap

    Issues Proposed Actions

    How do we develop local manufacturing

    capability for wind turbine components?

    Encourage investments in wind turbine

    component domestic manufacturing, such as

    steel towers and nacelles

    Technology Transfer

    How do we promote local expertise on wind

    power operation and maintenance?

    Enhance educational system in the tertiary level

    to train mechanical and electrical engineers on

    wind farm O & M

    9

  • 8/9/2019 7.2. Status of Wind Power Development in the Philippines and Drafting of the Wind Power Roadmap by v. Perez

    10/15

    Proposed Philippine

    Wind Power Roadmap

    Issues Proposed Actions

    How do we encourage banks to be aggressive in

    extending financing to wind power projects?

    Training of local project finance lenders on

    lending to wind power projects

    How to facilitate increased access to financing Increase awareness and strengthen capacity of

    Financing

    by existing wind power projects? local lending institutions to open credit facilities

    and increase access to funds for wind projects

    10

  • 8/9/2019 7.2. Status of Wind Power Development in the Philippines and Drafting of the Wind Power Roadmap by v. Perez

    11/15

    Proposed Philippine

    Wind Power Roadmap

    Issues Proposed Actions

    Are the current institutions capable of

    supporting and addressing the requirements of

    a highly developed wind energy sector?

    A program that would strengthen and develop

    capacity building for the following agencies

    should be implemented: DOE, ERC, WESM,

    Transco, NGCP, ECs/DUs, LGUs and other

    Institutional Capacity Building

    , ,

    universities, private developers

    What simplified measure should be introduced

    to facilitate FiT payment to wind farm

    developers?

    Draft a template of Renewable Energy Payment

    Agreement (REPA) between NGCP and wind

    farm developers

    11

  • 8/9/2019 7.2. Status of Wind Power Development in the Philippines and Drafting of the Wind Power Roadmap by v. Perez

    12/15

    Proposed Philippine

    Wind Power Roadmap

    Issues Proposed Actions

    What is the Philippines actual wind resource

    potential and where are the most viable wind

    sites located?

    Conduct an updated wind resource mapping to

    come up with a Philippine Wind Resource Atlas

    including onshore and offshore potential

    Resource Assessment

    12

  • 8/9/2019 7.2. Status of Wind Power Development in the Philippines and Drafting of the Wind Power Roadmap by v. Perez

    13/15

    Proposed Philippine

    Wind Power Roadmap

    BY WHOM? WHEN?

    Engaging the stakeholders actively Setting working timelines

    13

  • 8/9/2019 7.2. Status of Wind Power Development in the Philippines and Drafting of the Wind Power Roadmap by v. Perez

    14/15

    Possible Technical Assistance from ADB

    Upgrade of the Philippine Grid Code

    Training of project finance lenders Awareness campaign and capacity building of

    local lendin institutions

    Formulation of the Renewable Energy PaymentAgreement (REPA) between NGCP and windfarm developers

    Conduct an updated wind resource mapping Net metering for micro wind turbines

    14

  • 8/9/2019 7.2. Status of Wind Power Development in the Philippines and Drafting of the Wind Power Roadmap by v. Perez

    15/15

    Thank you

    Vincent S. PrezChairman, Alternergy

    Chairman, Merritt PartnersVice Chairman, National Renewable Energy Board

    Quantum Leap in Wind Power in Asia: Structured Consultation

    Asia Clean Energy Forum Pre-event WorkshopAsian Development Bank, 21 June 2010