2416 West Campus Drive Tempe, AZ 85282 480.517.9040 Fax 480.517.9140 1.866.794.9040 www.swhaz.com 1953 West Grant Road Tucson, AZ 85745 520.622.3607 Fax 520.622.3643 1.800.279.5266 STATEMENT OF QUALIFICATIONS INTRODUCTION Southwest HAZARD CONTROL, Inc. (SHC) is a woman owned small business that is a financially sound, growth-oriented environmental remediation company. Our staff applies innovative procedures to solve environmental problems for our customers. Our employees strive to be the best at solving environmental issues in a safe and effective manner. Our goal is to do the job right the first time, on time and within budget. We treat our customers as the reason for the existence of SHC. We also actively promote sound environmental practices within the community by participation in a variety of business and professional organizations. SHC offers a variety of remediation and disposal services for commercial business, private residences, and government agencies. SHC is fully insured and will provide the necessary remediation and disposal documentation to satisfy requirements from local, state, and federal government agencies. The full range of environmental contracting services offered by SHC includes: FIRM ESTABLISHMENT SHC was founded in 1982 by Gerald J. Karches and Chrisann Karches. Mr. Karches retired in 1999 and the company is now solely managed by Chrisann Karches making SHC a woman owned enterprise. It is the oldest, continuously operating asbestos abatement company in Arizona. SHC established itself as a hazardous materials remediation company in 1985 and began lead abatement services in 1991. Cleanup of Chemical & Industrial Spills Mercury Cleanup & Disposal Underground Storage Tank (UST) Removal Petroleum Contaminated Soil (PCS) Remediation Blood Borne Pathogens & Bio-Hazard Cleanup Packaging & Disposal of Unused Chemicals (Lab Pack) Hazardous Waste Disposal Disposal of Used Oil Confined Space Entries Asbestos Abatement Lead & Lead-based Paint Removal Storage Tank Cleaning Abandoned Waste Cleanup & Disposal Homeless Camp Cleanups Lighting & Ballast Disposal Environmental Sampling & Analysis Bioremediation Mold Abatement Animal Feces Cleanup Lab Dismantling & Cleanup Hazardous Materials Transportation Sewage Spill Cleanup Roll-off Service

Upload: graham-fraser-shc-marketing-manager

Post on 20-Jun-2015

38 views

Category:

Business


0 download

DESCRIPTION

Asbestos qualifications

TRANSCRIPT

Page 1: 72195 shc stmnt of qual 6

2416 West Campus Drive • Tempe, AZ 85282480.517.9040 • Fax 480.517.9140 • 1.866.794.9040

www.swhaz.com

1953 West Grant Road • Tucson, AZ 85745520.622.3607 • Fax 520.622.3643 • 1.800.279.5266

STATEMENT OF QUALIFICATIONSINTRODUCTION

Southwest HAZARD CONTROL, Inc. (SHC) is a woman owned small business that is a financially sound, growth-oriented environmental remediation company. Our staff applies innovative procedures to solve environmental problems for our customers. Our employees strive to be the best at solving environmental issues in a safe and effective manner. Our goal is to do the job right the first time, on time and within budget. We treat our customers as the reason for the existence of SHC. We also actively promote sound environmental practices within the community by participation in a variety of business and professional organizations.

SHC offers a variety of remediation and disposal services for commercial business, private residences, and government agencies. SHC is fully insured and will provide the necessary remediation and disposal documentation to satisfy requirements from local, state, and federal government agencies. The full range of environmental contracting services offered by SHC includes:

FIRM ESTAbLIShMENT

SHC was founded in 1982 by Gerald J. Karches and Chrisann Karches. Mr. Karches retired in 1999 and the company is now solely managed by Chrisann Karches making SHC a woman owned enterprise. It is the oldest, continuously operating asbestos abatement company in Arizona. SHC established itself as a hazardous materials remediation company in 1985 and began lead abatement services in 1991.

• Cleanup of Chemical & Industrial Spills

• Mercury Cleanup & Disposal

• Underground Storage Tank (UST) Removal

• Petroleum Contaminated Soil (PCS) Remediation

• Blood Borne Pathogens & Bio-Hazard Cleanup

• Packaging & Disposal of Unused Chemicals (Lab Pack)

• Hazardous Waste Disposal

• Disposal of Used Oil

• Confined Space Entries

• Asbestos Abatement

• Lead & Lead-based Paint Removal

• Storage Tank Cleaning

• Abandoned Waste Cleanup & Disposal

• Homeless Camp Cleanups

• Lighting & Ballast Disposal

• Environmental Sampling & Analysis

• Bioremediation

• Mold Abatement

• Animal Feces Cleanup

• Lab Dismantling & Cleanup

• Hazardous Materials Transportation

• Sewage Spill Cleanup

• Roll-off Service

Page 2: 72195 shc stmnt of qual 6

STATEMENT OF QUALIFICATIONS

www.swhaz.com

CONTACTS

Chrisann Karches, President/[email protected]

Eric Fritz, HAZMAT Operations [email protected]

Jim Santino, HAZMAT Project [email protected]

Bob Peshak, HAZMAT Project Manager, [email protected]

Dave Giles, HAZMAT Division [email protected]

Jeffrey Zenan, HAZMAT Operations [email protected]

Eric Donaldson, HAZMAT Project [email protected]

LICENSES

Arizona • General Commercial Contractor 79036 B-1 • Asbestos Abatement, Hazardous Waste Remediation & Lead Abatement (Com) 104551 BE • Asbestos Abatement, Hazardous Waste Remediation & Lead Abatement (Res) 116401 C-5 • Wrecking 215888 K-57 • Underground Storage Tank Removal 092741 L-5

New Mexico • Asbestos Abatement 25562 GB98 GS29

California • Asbestos Abatement & Containment 515656 C-2 Asb

Nevada • Asbestos Abatement C-173 • General Contractor 0023810 A13 & A23

Transportation • EPA ID# AZR000507152 (Tucson) • ADEQ Special Waste ID# 302576 (Tucson) • EPA ID# AZD982463101 (Phoenix) • ADEQ Special Waste ID# 320254 (Tempe) • US DOT Hazardous Materials Certificate of Registration No. 112211 550 012TV • EPA ID# NMR000017681 (New Mexico)

Page 3: 72195 shc stmnt of qual 6

STATEMENT OF QUALIFICATIONS

www.swhaz.com

PROjECT NAME & LOCATION: KORITA REPACK - Nogales, AZ

Nature of SHC’s Responsibility:SHC responded to an emergency response request from Korita Repack in Nogales, AZ to clean up a diesel fuel spill on asphalt and concrete. The spill covered a large area and was discovered to have penetrated the asphalt and concrete to the soil below. SHC excavated and disposed of 402 tons of petroleum contaminated soil, asphalt, and concrete. Once all of the contaminated soil was gone, SHC collected confirmation samples and backfilled the excavation.

Total Cost of the Project: $91,703.95(T&M Contract)Completion Date: May 2009

PROjECT NAME & LOCATION: NU ChROME - Tucson, AZ

Nature of SHC’s Responsibility:SHC was originally contracted to perform site characterization of former chrome electroplating facility that was under enforcement action from the EPA at the time. After soil sampling results confirmed the existence and chrome and lead contamination up to a depth of 8 feet in the soil, SHC bid and was awarded the remediation work that was required. After developing an EPA approved Site Assessment Plan and Site Cleanup Plan, SHC successfully excavated and disposed of approximately 400 tons of chrome and lead contaminated soil classifying as hazardous waste. Once removed SHC backfilled and compacted the excavation.

Total Cost of the Project: $171,573.51(Fixed & Unit Rate Contract)Completion Date: October 2009

PROjECTS

Page 4: 72195 shc stmnt of qual 6

STATEMENT OF QUALIFICATIONS

www.swhaz.com

PROjECT NAME & LOCATION: ADOA I-19, INTERSTATE 19 KILOMETER POST 16.5 MEDIAN

Nature of SHC’s Responsibility:At the request of the Arizona Department of Transportation, SHC responded to a tanker truck accident on I-19. The tanker truck was hauling up to 7800-gallons of gasoline and diesel fuel. The accident resulted in the release of several hundred gallons of fuel onto the soil in the median, some of which also passed into a stormwater drainage canal. The spill was of particular concern due to the proximity of the Santa Cruz River and the fact that the groundwater levels in the area ranged between 15 and 60 feet below ground surface. SHC set up the necessary traffic control, installed stormwater controls, obtained clearance from Blue Stake, and obtained the necessary permits to complete the remediation. Petroleum contaminated soil (pcs) was removed from the stormwater drainage canal and the median and was loaded into end dump trucks to be hauled off to the Cactus Landfill for disposal. Approximately 3,069 tons of pcs was hauled offsite and disposed of. SHC completed confirmation sampling throughout the remediation project to ensure that contaminant levels were below the applicable Arizona Residential Soil Remediation Levels and Groundwater Protection Levels. Following confirmation that the remediation was complete, SHC backfilled the excavation and returned the site to pre-spill conditions.

Total Cost of the Project: $331,972.09(T&M Contract)Completion Date: July 2010 (Project Duration: 2 months)

PROjECT NAME & LOCATION: SUNDT hISTORIC LANDFILL REMEDIATION - Tucson, AZ

Nature of SHC’s Responsibility:SHC was contracted to remediate a historic landfill that had been in operation during the 1960’s and 1970’s. Scrapers, front loaders, bull dozers, an excavator, a blade, dump trucks, a water pull, and a water truck were some of the equipment used to remediate the landfill that was located on a site that encompassed an area less than 10 acres. SHC was responsible for removing and stockpiling the overburden soil covering the top of the landfill, constructing engineered benched side walls and entrance ramps, and removing and disposing of all of the landfill waste. SHC’s responsibilities also included environmental overview of the project to include Air Quality Permit and SWPPP implementation, dust control, odor control, and environmental sample collection and analysis. This remediation project was completed in approximately 3-months from initial site preparation to collection of over 125 confirmation soil samples. At the completion of the project, over 35,000 cubic yards of overburden soil had been removed and stockpiled and over 31,500 cubic yards of landfill waste was removed and disposed of. This included over 47,600 tons of municipal solid waste hauled offsite in over 2300 truckloads, disposal of approximately 100 cubic yards of tires, 800 tons of concrete, and 32 tons of hazardous waste. At the successful completion of the project, SHC secured for the client a “No Further Action” determination from the Arizona Department of Environmental Quality Voluntary Remediation Program for the soils remediation on the site.

Total Cost of the Project: $1,743,224.00(Fixed & Unit Rate Contract)Completion Date: March 2011

PROjECTS

Page 5: 72195 shc stmnt of qual 6

STATEMENT OF QUALIFICATIONS

www.swhaz.com

PROjECT NAME & LOCATION: FREEPORT TANKS - Near Silver City, NM

Nature of SHC’s Responsibility:Removal of product and cleanout of over 100, fuel, oil, and corrosive material storage tanks at the Freeport McMoRan Cobre Operations Mine and Tyrone Operations Mines in New Mexico. Several of these tanks required confined space entries to complete the scope of work.

Total Cost of the Project: $111,863.94(Fixed Contract)Completion Date: December 2010

PROjECT NAME & LOCATION: TEP bUNKER OIL TANK - Tucson, AZ

Nature of SHC’s Responsibility:SHC won a contract to clean out a 10,000,000 gallon bunker oil tank at the Tucson Electric Power Plant in preparation for demolition. After cutting an 8x8 foot doorway through the 1 3/8” thick steel sidewalls, SHC began the process of cleaning the tank. This opening allowed us to drive a man lift into the tank so personnel could power wash the 48 foot walls. Due to the extreme temperatures of August in Tucson, the work was completed at night. This physically demanding, confined space operation took SHC 19 working days to complete.

Total Cost of the Project: $110,085.67(Fixed Contract)Completion Date: August 2011

PROjECTS

Page 6: 72195 shc stmnt of qual 6

STATEMENT OF QUALIFICATIONS

www.swhaz.com

PROjECT NAME & LOCATION: MT. GRAhAM - Mt. Graham Observatory, AZ

Nature of SHC’s Responsibility:At the request of the University of Arizona, SHC responded to a large diesel spill from an above ground storage tank at the Mount Graham Observatory. After working with University of Arizona personnel to work out a plan of action, SHC personnel mobilized to the Observatory on two occasions to provide bioremediation services to areas around the observatory where soil excavation was not feasible. SHC collected and analyzed initial samples and final samples of the bioremediation areas to confirm that bioremediation efforts were successful. SHC also collected and analyzed confirmation soil samples from the excavation areas. The University of Arizona excavated the pcs from other areas around the Observatory and transported the wastes to the base station at the base of the mountain. SHC provided transportation of the wastes from that point to the Los Reales landfill in Tucson, AZ. A total of 1,515 tons of pcs was removed and disposed of as a result of the spill. SHC also provided transportation of clean backfill back to the base station to be used by Universitypersonnel for backfilling.

Total Cost of the Project: $87,819.57(T&M Contract)Completion Date: October 2011

PROjECT NAME & LOCATION: DM ShOOTING RANGE – Davis Monthan Air Force base

Nature of SHC’s Responsibility:SHC was contracted to alter the design of an existing small arms shooting range contaminated with lead at the Air Force Base in Tucson, AZ. SHC using a bull dozer, excavator, and loader moved a berm meant to trap lead shot to extend out the length of the range. Once the berm was moved, SHC had to install new drainage culverts and ensure that pooling of rainwater would not occur crating a ricochet hazard.

Total Cost of the Project: $34,165.00(Fixed Contract)Completion Date: September 2011

PROjECTS

Page 7: 72195 shc stmnt of qual 6

STATEMENT OF QUALIFICATIONS

www.swhaz.com

PROjECT NAME & LOCATION: FM NAhS TANK – Freeport McMoRan Sierrita Mine

Nature of SHC’s Responsibility:SHC was contracted to perform a confined space entry and clean out a sodium hydrosulfide tank in preparation for demolition. SHC pumped the corrosive, toxic, and potentially flammable chemical out of the tank, removed the liner, washed the tank, and applied a hydrogen peroxide solution to neutralize any hydrogen sulfide producing residues. SHC also neutralized and decontaminated all wastes produced during the clean out.

Total Cost of the Project: $43,975.91(T&M Contract)Completion Date: December 2011

PROjECT NAME & LOCATION: TMC DIESEL FUEL SPILL ER – Tucson Medical Center

Nature of SHC’s Responsibility:SHC responded to an emergency response request from TMC after a 1500+ gallon diesel fuel spill occurred on a Saturday evening. The spill traveled over a public walking path and traveled into a wash with a concrete floor. SHC removed all pooled liquids, excavated contaminated soil and asphalt, and removed sections of the concrete floor from the wash and removed contaminated soil from the wash. SHC disposed of 35 roll-offs filled with petroleum contaminated soil.

Total Cost of the Project: $121,683.33(T&M Contract)Completion Date: February 2012

PROjECTS

Page 8: 72195 shc stmnt of qual 6

STATEMENT OF QUALIFICATIONS

www.swhaz.com

PROjECT NAME & LOCATION: PARAMOUNT – Phoenix, AZ

Nature of SHC’s Responsibility:SHC removed asphalt material from a secondary containment around an asphalt tank farm. Once all spilt material was removed, new imported fill material was added to the containment where contaminated fill had been removed. In the areas of the containment with a concrete floor the spilt asphalt was removed and the area power washed.

Total Cost of the Project: $57,012.50(T&M Contract)Completion Date: March 2012

PROjECT NAME & LOCATION: TUCSON UNIFIED SChOOL DISTRICT – Tucson, AZ

Nature of SHC’s Responsibility:For over 10 years, SHC has provided emergency response and remediation services to the Tucson Unified School District (TUSD). Since 2010, SHC has responded to and remediated mercury and sewage spills, completed mold abatement services, and disposed of bulk and lab packed chemical wastes to include hazardous wastes, universal wastes, pharmaceutical wastes, and non-regulated wastes. The SHC Hazardous Materials Division has completed over 30 projects for TUSD since 2010.

Total Cost of the Project: $150,000+(T&M and Fixed Contracts)Completion Date: N/A - SHC completes year-round projects for TUSD

PROjECTS