  • Appendix J Construction Quality Control Plan

  • D ra f t

    Construction Quality Control Plan River Mile 10.9 Removal Action at

    Lower Passaic River Study Area New Jersey

    Revision 00

    Prepared for Cooperating Parties Group, Newark, New Jersey

    November 2012

    OneSouthMainStreet

    Suite1100Dayton,OH45402

  • Draft Construction Quality Control Plan River Mile 10.9 Removal Action

    at Lower Passaic River Study Area New Jersey

    Revision 00

    Prepared for Cooperating Parties Group, Newark, New Jersey

    Prepared by

    One South Main Street

    Suite 1100 Dayton, OH 45402

    Prepared/Approved By:

    __________________________ Project Manager Date

    Approved By:

    Design Manager Date

    Client Acceptance:

    Date

  • Contents Section Page

    III

    AcronymsandAbbreviations...............................................................................................................................v1 Introduction.........................................................................................................................................11

    1.1 ProjectBackground..........................................................................................................................111.2 ScopeofWork..................................................................................................................................111.3 ProjectObjectives............................................................................................................................121.4 PreMobilizationandMobilizationConstructionActivities.............................................................121.5 DocumentObjectivesandOrganization..........................................................................................13

    2 OrganizationandResponsibilities........................................................................................................212.1 CooperatingPartiesGroup..............................................................................................................212.2 CH2MHILLPersonnel......................................................................................................................21

    2.2.1 ProjectDeliveryLead..........................................................................................................212.2.2 ProjectManager.................................................................................................................212.2.3 QualityAssuranceManager................................................................................................222.2.4 ConstructionQualityManager...........................................................................................232.2.5 ConstructionManager........................................................................................................232.2.6 HealthandSafetyManager................................................................................................242.2.7 DesignQualityManager.....................................................................................................242.2.8 SeniorTechnicalConsultant...............................................................................................24

    2.3 OutsideOrganizationsandSubcontractors.....................................................................................253 ConstructionQualityControl................................................................................................................31

    3.1 ProceduresforPerformingtheThreePhasesofControl................................................................313.1.1 PreparatoryPhase..............................................................................................................313.1.2 InitialPhase.........................................................................................................................323.1.3 FollowupPhase.................................................................................................................33

    3.2 CompletionInspection.....................................................................................................................333.2.1 PunchListInspection..........................................................................................................333.2.2 PreFinalInspection............................................................................................................333.2.3 FinalAcceptanceInspection...............................................................................................33

    4 ProjectMeetings..................................................................................................................................414.1 PreconstructionMeeting.................................................................................................................414.2 CoordinationandMutualUnderstandingMeeting.........................................................................414.3 QualityControlMeeting..................................................................................................................41

    5 QualityControlDocumentation...........................................................................................................515.1 ContractorProductionReport.........................................................................................................515.2 ContractorQualityControlReports.................................................................................................515.3 ProjectFiles......................................................................................................................................525.4 FieldDocumentationofOperatingProcedures...............................................................................535.5 FieldLogbook...................................................................................................................................535.6 ReportingandFieldDocumentation...............................................................................................53

    6 ConstructionQualityControlSubmittals..............................................................................................617 ChangesandNonconformances...........................................................................................................71

    7.1 Changes............................................................................................................................................717.2 Nonconformances/Deficiencies......................................................................................................71

  • CONTENTS, CONTINUED

    Section Page

    iv

    8 NoncomplianceandCorrectiveActions................................................................................................819 References...........................................................................................................................................91AttachmentsA CPRFormB CQCRandPreparatoryPhaseReportFormC SubmittalRegisterD FieldChangeNoticeFormE NonConformance/DeficiencyLogTable51 ReportingandFieldDocumentationRequiredFigures11 SiteLocationMap21 OrganizationChart

  • V

    Acronyms and Abbreviations AHA activityhazardanalysisCEP ConstructionExecutionPlanCM constructionmanagerCOPC chemicalofpotentialconcernCPG CooperatingPartiesGroupCQCP ConstructionQualityControlPlanCQCR ContractorQualityControlReportCQM constructionqualitymanagerCRP contractorproductionreportDFOW definablefeatureofworkdmi demaximusInc.DQM designqualitymanagerESBG EnvironmentalServicesBusinessGroupH&S healthandsafetyHSM healthandsafetymanagerLTR leadtechnicalreviewerNCR nonconformancereportORR OperationalReadinessReviewPDL projectdeliveryleadPM projectmanagerQA qualityassuranceQAM qualityassurancemanagerQC qualitycontrolQMP qualitymanagementplanRM10.9AOC SettlementAgreementandAdministrativeOrderonConsentforRemovalAction,DocketNo.

    0220122015RM RiverMileSTC seniortechnicalconsultantUSEPA UnitedStatesEnvironmentalProtectionAgencyyd3 cubicyards

  • 1-1

    SECTION1Introduction CH2MHILLhaspreparedthisConstructionQualityControlPlan(CQCP)forconductingremedialactivitiesatRiverMile(RM)10.9oftheLowerPassaicRiver,NewJersey.PursuanttotheSettlementAgreementandAdministrativeOrderonConsentforRemovalAction,DocketNo.0220122015(UnitedStatesEnvironmentalProtectionAgency[USEPA],2012),bytheCooperatingPartiesGroup(CPG)(hereinafterreferredtoastheRM10.9AOC),contaminatedsedimentfromRM10.9willberemoved.TheAOCbecameeffectiveonJune18,2012.ThesedimentremovalwillbeconductedundertheComprehensiveEnvironmentalResponse,Compensation,andLiabilityActandtheNationalOilandHazardousSubstancesPollutionContingencyPlanasaTimeCriticalRemovalAction.ThisinitialsubmittaloftheCQCPprovidesthebasicqualityassurance(QA)andqualitycontrol(QC)proceduresandpracticestobeimplementedduringthevariousphasesofwork.TheCQCPisalivingdocumentandwillberevisedandamendedasnecessarythroughouttheproject.Forexample,abasiclistofdefinablefeaturesofwork(DFOWs)hasbeenincluded.Thislistwillbecomemoredetailedastheworkprogresses.AllmodificationstotheCQCPwillbeapprovedbytheCPGbeforeimplementation.

    1.1 Project Background TheRM10.9StudyAreaextends,banktobank,betweenRM10andRM12oftheLowerPassaicRiverStudyArea(Figure11).TheRM10.9SedimentDepositArea,anarealargelywithintheRM10.9studyarea,extends2,380feetfromRM10.65toRM11.1.TheRM10.9RemovalAreaisanapproximately5.6acreareaontheeasternsideoftheLowerPassaicRiverStudyAreawithintheRM10.9SedimentDepositArea.TheRM10.9RemovalAreaissituatedalonganinsidebendoftheLowerPassaicRiverupstreamoftheDeJessaParkAvenueBridgeandincludesthemudflatandpointbarintheeasternhalfoftheriverchannel.ItisboundedtothewestbythenavigationchannelofthePassaicRiverandtotheeastbytheRiversideParkcomplex,whichisownedandoperatedbyBergenCountyandtheTownofLyndhurst.TheextentofpotentiallyexposedsurfacesedimentshownonFigure11wasgeneratedfromthe2footelevationcontour(NorthGeodeticVerticalDatumof1929),whichrepresentsthemeanlowwaterforthispartoftheLowerPassaicRiver.ThedatasourcewastheJuly2011bathymetrysurveyconductedaspartoftheRM10.9CharacterizationProgram(CH2MHILLandAECOM2012).Thelinerepresentstheextenttowhichtheriverbottom/sedimentisexposedduringlowtideatmeanlowwater.TheActionMemorandum/Enforcementrequiresremovingthehighestnearsurfaceandshallowsubsurfaceconcentrationsoftheentiredeposit,andthattheRM10.9RemovalAreaincludesthatareathatisexposedatlowtide.TheeasternboundaryoftheRemovalAreaisapproximatelydefinedbythemeanhighwatermark.Becauseofelevatedconcentrationsofpolychlorinateddibenzopdioxins/polychlorinateddibenzofurans,polychlorinatedbiphenyls,polycyclicaromatichydrocarbons,mercury,andotherchemicalsofpotentialconcern(COPCs)andthepotentialforreceptorsfromtheneighboringparktobeexposedtothem,theCPGisrequiredtoperformallactionsnecessarytoremove,treat,and/orproperlydisposeofapproximately18,000cubicyards(yd3)ofsedimentfromthedesignatedportion(thatis,theRemovalArea)oftheRM10.9SedimentDepositArea.

    1.2 Scope of Work Theprojectinvolvesthefollowingelements: Mechanicallydredgethecontaminatedsurface(toadepthof2feet)sedimentfromtheRM10.9Removal

    Area Transportthedredgedmaterialstoadesignatedoffloadingfacility Treatcontaminatedsedimentbystabilizationatawatersidefacility

  • 1 INTRODUCTION

    1-2

    Treattheprocesswastewaterandbargesupernatantatanoffsitefacilitybeforedischarge Capthenewlyexposedsedimentsurface TransportthetreatedsedimenttoanoffsitedisposalfacilityThisdocumentisdesignedtoevolve,withsectionsbeingaddedorupdated,astheprojectdesigndevelops.

    1.3 Project Objectives TheobjectivesoftheremovalactionforRM10.9includethefollowing: ReducethepotentialforexposuretoreceptorsfromsedimentpresentintheRM10.9RemovalArea PreventpotentiallysignificantmigrationofcontaminationfromtheRM10.9RemovalArea EvaluatethemeansandmethodsforsedimentremovalthatcanbeappliedtoalargerareaoftheLower

    PassaicRiver Determinepotentialimpactsofdredgingcontaminatedsedimentonsurfacewatersandthemeans,if

    feasible,tominimizetheseimpacts EvaluateeffectivenessofsedimentcappingmethodsonreducingbioavailabilityandmigrationofCOPCs,

    includingamendingcapswithactivatedcarbontomitigatethepotentialforcontaminantstomigratethroughthesandcaps

    BeginimplementationoftheRM10.9removalactioninMay2013

    1.4 Pre-Mobilization and Mobilization Construction Activities Thefollowingproceduresshallbeusedtofacilitatepremobilizationandmobilizationactivities: OperationalReadinessReview(ORR)isameetingamongkeyprojectpersonnelandfunctionalsupportto

    confirmallnecessaryplanningandactionshavebeenaddressedtoenablethesuccessfulexecutionoftheprojectunderconsideration.ProtocolsforORRarepresentedinthedocumentESP020502POperationalReadinessReview.

    Teamcharteringisacriticalelementofprojectplanning.Throughcharteringmeetings,projectteamswillhaveagreateropportunitytoalignprojectimplementationwithclientexpectations,CH2MHILLexpectations,andindividualgoals.Asuccessfulcharterorlackthereofcandirectlyaffectthesuccessorfailureofaproject.Attractionandretentionofkeyteammembersalsoisincreasedthroughprovidingcleardefinitionoftheprojectvisionandgoals.ProtocolsforteamcharteringarepresentedinthedocumentESP020301PChartertheteam.

    Effectivedeliveryofaprojectisdependentuponastrong,wellmanagedprojectteam.Asuccessfulprojectteamisleadbytheprojectmanager,andasuccessfulprojectrequiresappropriatelycompetentteammembers;clearcharteringofroles,responsibilities,andexpectations;adetailedprojectexecutionplan;acomprehensiveunderstandingoftheobjectivesoftheproject;andclient,technical,andfinancialmanagementthroughoutthelifecycleoftheproject.ManagementofprojectteamiselaboratedinthedocumentESP030101PManagetheProjectTeam.Thisdocumentdescribeshowaprojectteamshouldbeorganizedandmanagedthroughoutthelifecycleofaproject.Theexpectedoutcomeisdevelopingprojectteamsthatdeliverthecontractedscopeofservices,exceedtheclientsexpectations,exceedbudgetedmargintargets,andemploymanagementtechniquesthatwillmaintainteamefficiencythroughouttheproject.

    TheConstructionExecutionPlan(CEP)providesacomprehensiveroadmaptoguidetheprojectteamtosuccessfulconstructionexecutionthroughallassociatedelementsoftheprojectinexecutingtheclientworkplan.TheCEPisacollectionofrequiredprojectdocumentsthatcommunicatesessentialinformationgoals,requirements,strategies,actions,andcontrolprocessesaboutaprojecttoallprojectteammembers.DetailsabouttheCEPisprovidedinthedocumentESP060101PConstructionExecutionPlan.

  • 1 INTRODUCTION

    1-3

    Establishingsiteinfrastructureandlogisticsincludesalltemporaryfacilitiesandservicesrequiredtosupportfieldoperations.Itemsthatareaddressedincludeofficespace;furnishings;utilities;security;fencing/gates;communications(voiceanddata);warehousing;laydownareas;parking;emergencytreatmentfacilities;setupandmanagementofcampfacilities;siteroadsandaccess;lunchroomandwashing/restroomfacilities;changingfacilities;trash/debrisremoval;receivingandinspectionfacilities;etc.Theexpectedoutcomeisasafe,secure,clean,andwellorganizedconstructionsitethatsupportstheoverallneedsoftheproject.Italsoisexpectedthatestablishingsiteinfrastructurewillbeaccomplishedinatimelymannertosupporttheschedulerequirementsoftheproject,forboththeinitialsitemobilizationandongoingconstructionactivities.ProtocolsareavailableinthedocumentCHP060401PEstablishSiteInfrastructureandLogistics.

    1.5 Document Objectives and Organization ThisCQCPdescribestheorganization,procedures,anddocumentationtobeusedbyCH2MHILLinsuccessfullycompletingremovalactioneffortsfortheRM10.9.Thefollowingprincipleswillbeobservedinanefforttoattainthehighestqualityofworkmanship: Ensuretimelyanderrorfreeexecutionofworkthroughpreliminaryplanningmeetingsbeforestartingwork Ensurecompliancewithprojectplansandspecificationsbyreviewingrelevantdocumentation EnsurehighqualityworkmanshipthroughadequatesupervisionandQCinspectionandtestingduringwork

    execution Ensuretimelyresolutionofnonconformancesanddiscrepanciesthroughpromptnotificationofinterested

    parties.TheCQCPisarrangedintothefollowingsections: Section1,Introduction:Introducesthesite,identifiesthescopeofworkandprojectobjectives,anddescribes

    theorganizationoftheCQCP Section2,OrganizationandResponsibilities:Describestherolesandresponsibilitiesoftheprojectteam Section3,ConstructionQualityControl:Describesthethreephasesofcontrolandtheproceduresfor

    completioninspection Section4,ProjectMeetings:Describestheprimarytypesofmeetingsthatwillbeheldduringtheproject Section5,QCDocumentation:DiscussesthemannerinwhichQCactivitieswillbedocumented Section6,ConstructionQCSubmittals:Liststhesubmittalsforthisproject Section7,ChangesandNonconformances:Discussesprotocolfornotifyingprojectparticipantsofchanges

    andnonconformancesandfordocumentingtheseoccurrences Section8,NoncomplianceandCorrectiveActions:Describesactionstobetakenduringnoncompliance Section9,References:Listsreferencescitedthroughoutthetext

  • 2-1

    SECTION2Organization and Responsibilities Thissectiondiscussesthekeyrolesandresponsibilitiesoftheprojectteam.Theprojectorganizationchart(Figure21)depictsthechainofcommandforthistaskandtheindividualsresponsibleforexecutingtheworkasindicated.

    2.1 Cooperating Parties Group PursuanttotheSettlementAgreementandAdministrativeOrderonConsentforRemovalAction,theCPGwillremovecontaminatedsedimentfromRM10.9.TheCPGhascontractedwithCH2MHILLtoperformthedesignandimplementationoftheRM10.9RemovalAction.AsdesignatedTechnicalCoordinatorfortheCPG,demaximisInc.(dmi)interactsroutinelywithCH2MHILLsprojectmanager(PM)andconstructionqualitymanager(CQM)toensuretheoverallqualityoftheprojectandthequalityofworkperformedduringtheremovalaction.

    2.2 CH2M HILL Personnel TheCH2MHILLLowerPassaicRiverprojectorganizationispresentedonFigure21.CH2MHILLreinforcesthatallprojectpersonnelareresponsibleforthequalityofworkontheproject.Rolesandresponsibilitiesdiscussedbelowarelimitedtopersonnelthatdirectlycontroland/orperformQCactivities.TherolesandresponsibilitiesofotherprojectpersonnelarediscussedinvariousotherprojectdocumentsincludingtheQualityManagementPlanfortheLowerPassaicRiverRM10.9TimeCriticalRemovalAction(CH2MHILL,2012a)andothers.2.2.1 Project Delivery Lead Theprojectdeliverylead(PDL)isassignedbytheEnvironmentalServicesBusinessGroup(ESBG)andendorsedbythePMtoprovideoverallprojectdeliveryoversightandserveasaresourceforthePMandprojectteamforrisk,quality,andfinancialmanagementoftheproject.ThePDLsqualitymanagementresponsibilitiesincludethefollowing: Reviewingandapprovingplansforprojectdeliveryconcernsincludingcostproposalsandbudgets Verifyingthatappropriatebudgetshavebeenallocatedforthequalityeffortsrequired Monitoringtheimplementationofthequalityprogramthroughoutthelifeofaproject Periodicallyreviewingandauditingthefinancialstatusandperformanceoftheproject2.2.2 Project Manager ThePMistheprincipalpointofcontactfortheCPG,dmi,andinvolvedfederalandstateregulators.ThePMdirectsthecreationand/orimplementationofprogrampoliciesandprocedurestosatisfycompanypoliciesandclientcontractspecifications,includingpreparingworkandqualityplans.ThePM'sdutiespertainingtoqualitymanagementincludethefollowing: Reviewingbudget,schedule,andperformancereports Reviewingcorrectiveactionsandlessonslearnedtoassesstheeffectivenessofresolutions AllocatingresourcesforqualitymanagementThePMprovidesleadershipanddirectiontotheprojectstaff,andisresponsibleforexecutingallphasesoftheprojectbyefficientlyapplyingthefullresourcesoftheprojectteam.ThePMisresponsibleforthetechnical,financial,administrative,andclientrelatedaspectsoftheprojectandtheprojectteam.ThePMsobjectiveistoproduceaqualityworkproductwithintheauthorizedscheduleandbudget.Toaccomplishthisgoal,thePMperformsthefollowingtasks: Establishestheobjectives,expectations,andscopeofworktobeperformed. Servesasliaisonforcommunicationswiththeclientandsubcontractors.

  • 2 ORGANIZATIONandResponsibilities

    2-2

    CoordinatesandcommunicateswithCPGanddmiaswellastheCH2MHILLmanagementteam,whichincludesthePDLandqualityassurancemanager(QAM),andcontractfinancialandadministrativemanager,asnecessarytokeeptheminformedoftheworkprogress.

    Arrangesforstaffandothernecessaryresources,withsupport/endorsementofprogramresources,toexecutethetaskorder.

    Organizes,directs,andmanagespersonnelandresources,andestablishesclearlinesofcommunicationwithintheCH2MHILLorganization.

    Supervisespreparationandapprovalofprojectspecificprocedures,workplans,andQAprojectplans. Reviewsalldeliverablesforconformancewithclientrequirements,scopeofwork,andthequality

    managementplan(QMP).ThePMisultimatelyresponsiblefortimely,wellplannedreviewsandforincorporatingreviewcomments.

    Approvesandsignsoutgoingcorrespondence. Identifies,documents,andnotifiestheclientandprojectteamofchangesinthescopeofwork,project

    documentation,andactivities. ThePM,inconsultationwiththeQAMandseniortechnicalconsultant(STC),assignsaleadtechnicalreviewer

    (LTR),seniorconsultants,andprojectreviewQCteammembersanddirectstheirongoinginvolvementintheproject.

    Reviewteamsassesstheprojectworkandsamplingplansforadequacy,ensuringclientcontractspecifications,regulatoryrequirements,andtechnicalprocedureshavebeenaddressed.ThereviewteamisresponsibleforimplementingtheQCprocesses.ThereviewteamisledbyanLTRresponsibleforcoordinatingtherevieweffort.

    ThePMhastheauthorityto: Approvesubcontractorselection Approvetaskbaselineschedule Stopworkatthesiteforanyreason Approveinvoicestotheclient Approvepaymenttosubcontractors RespondtoChangeNotices2.2.3 Quality Assurance Manager TheQAMisassignedbythePMandendorsedbytheESBGtoprovidequalitymanagementsupporttotheproject.TheQAMcoordinateswiththePMfordaytodayoperationtoidentifyandcommunicatequalityissuesrelatedtotheplanning,assessment,andassistsinimprovingthequalitymanagementsystem.TheQAMreviewsandapprovesthefollowingdocumentation: ProjectQMPs ProjectlevelqualityworkinstructionsandproceduresTheQAMwillberesponsibleforimplementingthisCQCP,including: Evaluatesprojectqualityrequirements Coordinatestheprojectsubmittalprocessesforbothdesignandconstructiondocumentation SupportsthePMandSTCinprojectteamselectiontosupportimplementationoftheprojecttomeetthe

    qualityrequirements Trainsstaffonqualityprocessesandproceduresandsupportsthedevelopmentanddistributionofquality

    lessonslearnedthatmayariseduringimplementationofaproject

  • 2 ORGANIZATION AND RESPONSIBILITIES

    2-3

    Identifies,notifies,andresolvesnonconformancesanddiscrepancies Hastheauthority,asdoeseachteammember,tostopworkuntilcorrectionsaremadeifthereisevidence

    thatworkperformancewillnotmeetcontractspecifications,companypolicy,regulatoryrequirements,projectqualityrequirements,orifitmayresultinahazardtothehealthorsafetyofpersonnel

    2.2.4 Construction Quality Manager TheCQM,inconsultationwiththePM,isresponsibleforthefollowingelementsofworkrelatedtotheconstructionproject: ExecutestheprojectsconstructionQCsystemandcommunicatestheonsiteQAprogrampolicies,objectives,

    andprocedurestotheprojectteamandsubcontractorsduringprojectmeetingsandinformaldiscussions WiththePM,assignsaconstructionmanager(CM)andconstructionstaffanddirectstheirongoing

    involvementintheproject Ensuressufficientresourcesareallocatedtomaintainprojectscheduleandbudgetandwillprovidedaily

    feedbacktothePMonprojectprogress,issuesrequiringresolution,andotherprojectspecificissues,asrequired

    Leadsdevelopmentofconstructionapproachtomeetclientneeds Participatesinworkplandevelopmentregardingappropriateriskmanagement,deliverystrategies,and

    staffingandsubcontractingstrategies Ensuresconstructionisconductedinaccordancewiththeworkplanandapproveddesign,following

    appropriateconstructionmethodology,andmaintainingquality,andsafetyoftheprojectandtheprojectteamduringthefieldwork

    ReviewsdailyfieldactivitiestoassessoverallprojectqualityandidentifyanypotentialQCissues Coordinatesflowoffeedbackfromconstructionstafftodesignstaffforcontinuousimprovementandchange

    management Conductsinspectionstoensurecomplianceandinitiatescorrectiveactionsfornonconformanceidentified

    onsite NotifiesthePMiftheprojectcannotbecompletedwithregardtoquality,schedule,orcost Hasauthoritytostopworkfornoncompliantoperations Servesasliaisonforcommunicationswiththeprojectstaffandsubcontractors,aswellaswiththeonsite

    clientrepresentatives WorkswiththePMtoreviewsubcontractbidformmeasurementandpaymentschedules Evaluatessubcontractorselection Interfacesdailywiththesubcontractors Monitorsandreportsonsubcontractorqualityandquantities Leadsweeklystatusmeetings Aidsinpreparingconstructionsubmittals2.2.5 Construction Manager TheCMhasthefollowingresponsibilities: Evaluatescurrentsiteconditionsandconstructionmethodsusedontheproject Identifiestheappropriatenessoftheconstructionactivitiesselectedfortheproject

  • 2 ORGANIZATIONandResponsibilities

    2-4

    Supervisesthefieldconstructionstaffontheproject Completedailyqualityreports Reviewsandguidespreparationofprojecttechnicalworkplansandprojectcompletionreports2.2.6 Health and Safety Manager Thehealthandsafetymanager(HSM)isresponsiblefordeveloping,implementing,andmaintainingthehealthandsafety(H&S)programonthisproject.Theresponsibilitiesinclude: ProvidesgeneraloversightofactivitiesperformedatthesitefromH&Sperspectives Setsweeklysafetyobjectives EnforcessitespecificAccidentPreventionPlan ServesasliaisonforH&ScommunicationswiththeprojectstaffandsubcontractorsaswellasprogramH&S

    team ProvidesguidanceonanyH&Sissuesraisedbytheteamtoensurethesafetyofprojectpersonnel ConductsperiodicreviewsandinspectionsoftheH&Sproceduresbeingimplementedatthesite AidsinpreparingH&Sdocumentation ImplementscontinuousimprovementoftheH&Sprogram Hasauthoritytostopworkforunsafepracticesorconditions Initiatescorrectiveactionsfornonconformanceidentifiedonsite Approvesresumptionofworkforresolvedsafetyissues2.2.7 Design Quality Manager Thedesignqualitymanager(DQM),inconsultationwiththePM,isresponsibleforthefollowingelementsofwork: Approvesprojectdesignbases,designparameters,drawings,andreports Approvesprojectconstructionmethodologies Disseminatesprojectrelatedinformationfromtheclientsuchasdesignbases,inputparameters,and

    drawings2.2.8 Senior Technical Consultant TheSTCisassignedbythePMandendorsedbytheESBGandprovidesleadershiponapplyingthebesttechnologiesfromallbusinessgroupstosupporttheprogramandprojectsuccess.TheSTCshouldhavefrequentcommunicationwiththePM,beginningwithprojectplanning,tomonitorprojectprogressandofferconsultation.TheSTCprovidesleadershiptoprovidecosteffectivesolutionstotheclientsby: Leadingprocessproblemdefinition Developingalternativeapproaches,applyingbestpractices,anddevisinginnovativesolutions Monitoringthescope,quality,andcompletenessofprojectreviews,bybothongoingseniorconsultationand

    reviewofprojectdeliverablesTheSTCisfullyengagedintheproject,particularlyinthedecisionmakingandplanningstages.TheSTCalsohasthefollowingresponsibilities: Assistsandassignssubjectmatterexpertsandtechnologyleadstoindividualtasks Ensuresthesubjectmatterexpertsunderstandtherolesandresponsibilitiesofareviewerrelatingtoquality

    componentssuchasformulas,technicalaccuracy,andleveragingintoandoutsideoftheproject

  • 2 ORGANIZATION AND RESPONSIBILITIES

    2-5

    DesignatingandapprovingLTRrequirementsandassignmentsforaprojectWhilereviewsarescheduledandcoordinatedbythePM,theSTCmonitorsthequalityanddeliveryofthereviewsandworkswiththePMtoresolvedifferences.

    2.3 Outside Organizations and Subcontractors CH2MHILLassumesoverallresponsibilityforensuringconformanceofsubcontractedservicesandproducts(includescappingmaterials)toqualityrequirements.However,itistheresponsibilityofsubcontractorstoplan,manage,andaccomplishtheiractivitiesinaccordancewiththeplans,specifications,andlocal,state,andfederalregulations.SubcontractorswillworkinaccordancewiththeirowninternalQCproceduresbutwillberequiredtoperformundertheumbrellaofthisCQCP.CH2MHILLwillmanagesubcontractoractivitiestoensureconformancetotherequirementsofthisCQCP.Subcontractorsincludethoseorganizationssupplyingservicesandproductstotheproject.Anumberofsubcontractorsareanticipatedforbothdesignandimplementationaspectsoftheproject.Eachsubcontractorwillundergoaprequalificationprocesstoensureselectionofonlythehighestqualityorganizations.SubcontractorsreportdirectlytotheCMandareresponsibleforcompletingtheprojectspecificactivitiesassignedtothem.Subcontractorswillverifyconstructionactivitiesandmaterialscomplywiththerequirementsofthecontractplansandspecifications.Services/materialsanticipatedtobesubcontractedinclude: Generalconstructionsubcontractor(s) Specialtyvendor Variousrentalequipmentvendors Chemicallaboratory

  • 3-1

    SECTION3Construction Quality Control TheconstructionQCsapplicabletotheworkactivitiesdescribedintheRM10.9RemovalActionBasisofDesignReport(CH2MHILL,2012b)areoutlinedinthefollowingsubsections.ThePM,QAM,CQM,CM,andHSMwillverifyconformancewiththefieldrequirements.TheCQMwillperformdailyinspectionsoftheactivitiestoensuresafe,efficient,highqualityworkisbeingperformedwhilemeetingtheobjectivesandrequirementsoftheplansandspecifications.ThetasksforthisprojectaregroupedintoDFOWs,whichareworkactivitiesthataresignificantenoughtowarrantseparateinspections.TheDFOWsforthisprojectare: Mobilizationandsitepreparation(clearing,grubbing,erosionandsedimentcontrol,decontaminationpad,

    wastestagingarea) Dredgingofcontaminatedsediment Stabilizationofdredgedsediment Capping Transportationandoffsitedisposaloftreatedand/ordredgedsediment Siterestoration DemobilizationDFOWsaretheelementsbywhichthethreephaseinspection/controlsystemwillbeimplemented.Giventhenatureofthisproject,definablefeaturesmaychangeasthedesignprogresses.

    3.1 Procedures for Performing the Three Phases of Control TheDFOWswillbeinspectedinaccordancewiththethreephasesofcontrolpreparatory,initial,andfollowup.Anoverviewoftheseinspectionprovisionsisoutlinedinthefollowingsubsections.3.1.1 Preparatory Phase Thepreparatoryphaseculminateswiththeplanninganddesignprocessleadinguptoactualremediationofaspecificsite.Successfulcompletionofthepreparatoryphaseverifiesthedeliveryoftheprojectplanshavebeencompletedandarereadytobeimplemented.ApreparatoryphasemeetingwillbeheldinadvanceofworkoneachDFOW.ForeachDFOWestablishedintheCQCP,thefollowingmustbeperformedduringthepreparatoryphasebytheprojectteamresponsiblefortheDFOW: Reviewapplicableplans,specifications,workplans,andothercontractdocuments Confirmtheappropriatetechnicalspecificationsareincorporatedintotheprojectworkplans Confirmtheappropriatecontractdrawingsareincorporatedintotheprojectworkplans Verifyallapplicableplans,specifications,workplans,andothercontractdocumentshavebeenapprovedby

    theCPG Confirmdefinitionofpreliminaryworkrequiredattheworksiteandexaminetheworkareatoconfirm

    requiredpreliminaryworkhasbeenproperlycompletedandisincompliancewiththeapplicableplans,specifications,workplans,andothercontractdocuments

    Confirmavailabilityofrequiredmaterialsandequipment Examinematerialsandequipmenttoconfirmcompliancewithapprovedsubmittalsandprocedures

  • 3 CONSTRUCTIONQualityControl

    3-2

    ReviewthesiteH&Splanandactivityhazardanalysis(AHA)toensuresafetyconcernsareadequatelyaddressedandapplicablesafetyrequirementshavebeenincorporatedintotheplan

    Confirmtheappropriatematerialsafetydatasheetshavebeenidentifiedandproperlysubmitted Discussconstructionmethodstobeemployedduringtheconstructionphase Identifycheckpointsandareasofevaluationthatwillallowdeterminationastowhethertheappropriate

    qualityofconstructionisbeingachieved Reviewconstructiontolerancesandworkmanshipstandardsforthatfeatureofwork Discussproceduresforcontrollingqualityofthework,includingrepetitivedeficiencies ConfirmpermitandotherregulatoryrequirementsaremetAPreparatoryPhaseInspectionChecklistforthisphaseofcontrolwillbepreparedbeforethepreparatoryphasemeeting.ResultsoftheactivitieswillbediscussedduringthepreparatoryphasemeetinganddocumentedinthePreparatoryPhaseReport,whichwillbeattachedtothedailyContractorQualityControlReports(CQCRs).3.1.2 Initial Phase Theinitialphasebeginsatthestartupofremedialactivities,orconstruction,associatedwithaspecificDFOW.TheinitialphaseconfirmstheCQCPisbeingeffectivelyimplementedinaccordancewithcontractandspecificationrequirementsandthedesiredresultsarebeingachieved.Theinitialphaseshallberepeatedwhenacceptablelevelsofspecifiedqualityarenotbeingmetorwhenspecificdeficiencieshavebeenidentified.Asinthepreparatoryphase,propernotificationtoCPGanddmiisrequiredwhencrewsarereadytostartworkonaDFOW.ThefollowingshallbeperformedforeachDFOWduringtheinitialphase: Establishthequalityofworkmanshiprequiredtoproperlydeliverworkinaccordancewithcontract

    requirements.TheCQMensurestheCMhasmadetheworkcrewsawareofexpectationsassociatedwiththeconstructionmethodsestablishedunderthepreparatoryphase.

    Checkworkforcompliancewithapplicableplans,specifications,workplans,andothercontractdocuments.ThisisachievedviaobservationoftheinitialworkactivitiesaswellasinteractionwiththeCMandresponsibleconstructioncreworsubcontractor.

    Establishprotocolforthefollowupinspectionphase. Resolveconflicts.TheCQMwillguidetheCMandresponsiblesupervisorinresolvingconflicts.Should

    conflictsariseinestablishingthebaselinequalityfortheDFOW,theresponsibilitytoresolvetheconflictfallstotheCQM.Shouldtheconflictnotberesolvedinamannerthatsatisfiesthecontractrequirements,theCQMmustelevatetheconflicttothePMandQAMandissueanonconformancereport(NCR).TheCQMmaydirectacessationofworkactivity,withtheconcurrenceofthePMandQAM,shouldtheissuejeopardizetheresultsoftheDFOW,orputtheprojectatriskofnoncompliantperformance.

    TheHSMwillevaluatethesiteH&SplanandAHAsagainstactualworkconditionswiththeCMandresponsiblesupervisortoensurethehazardanalysisconductedtopreparethesafetyplanadequatelyaddressedfieldconditions.TheHSMwillconfirmapplicablesafetyrequirementsarebeingimplementedduringconstructionactivities.

    TheCQMwillobserveandevaluatetheperformanceofsamplingandtestingtechnicians.TheCQMwillconfirmwiththeCMand/orresponsiblesubcontractorthattestingisbeingperformedinaccordancewiththetestingplanandthatallrequiredprotocolsarebeingobserved.Inaddition,theCQMwillreviewallreportsanddocumentationassociatedwithextraction,packaging,transporting,andtestingofsamples;noteanydiscrepancies;anddirectcorrectionaccordingly.

  • 3 CONSTRUCTION QUALITY CONTROL

    3-3

    AnInitialPhaseInspectionChecklistforthisphaseofcontrolwillbeprepared.AninitialphasemeetingandinspectionwillbeheldatthebeginningofaDFOW.ThechecklistwillbeattachedtothedailyCQCR.Uponcompletionoftheinitialphaseactivities,resultsaretobedocumented.Shouldresultsbeunsatisfactory,theinitialphasewillberescheduled.3.1.3 Follow-up Phase CompletionoftheinitialphaseofQCactivityleadsdirectlyintothefollowupphase,whichaddressestheroutinedaytodayactivitiesontheconstructionsite.InspectionactivitiesassociatedwitheachDFOWaretobedocumentedwithintheCQCR.Specificconcernsassociatedwiththefollowupphaseinclude: Inspectionoftheworkactivitytoensureworkisincompliancewiththecontractedscopeofwork Evaluationandconfirmationthatthequalityofworkmanshipisbeingmaintainedatalevelnolessthanthat

    establishedduringtheinitialphase Evaluationandconfirmationthatrequiredtestingisbeingperformedinaccordancewithprocedures

    establishedduringthepreparatoryphaseandconfirmedduringtheinitialphase Confirmationthatnonconformingworkisbeingcorrectedpromptlyandinaccordancewiththedirection

    providedbytheCQMThefollowupphaseinspectionsshouldbeperformeddaily,orasneededuntilthecompletionofeachDFOW.ThefrequencyoftheinspectionswillbedecidedatthebeginningoftheDFOW.

    3.2 Completion Inspection 3.2.1 Punch List Inspection Nearcompletionofallworkoranyincrementthereof,theCQMandQAMwillconductaninspectionoftheworkanddevelopapunchlistofitemsthatdonotconformtotheapprovedfiguresandspecifications.ThispunchlistwillbeattachedtothedailyCQCRonthedayofcompletingthelist,andwillincludetheestimateddatebywhichthedeficiencieswillbecorrected.TheCQMwillmakeasecondinspectiontoascertainalldeficiencieshavebeencorrected.Uponcompletion,theCPGanddmiwillbenotifiedthattheworkiscompleteandreadyfortheclientsprefinalinspection.3.2.2 Pre-Final Inspection TheCQMandPMwillaccompanytheCPGanddmirepresentativesontheprefinalinspection.Anyitemsnotedbytheclientwillbecorrectedinatimelymanner,andtheclientwillbenotifiedofthecorrectionsandreadinessforthefinalacceptanceinspection.3.2.3 Final Acceptance Inspection CPGanddmiwillbenotifiedinadvanceofthescheduledfinalacceptanceinspection,andthenoticemustincludeCH2MHILLsassurancetotheclientthatallworkiscompleteasperapplicableplans,specifications,workplans,andothercontractdocumentsandaccepted.ThePM,QAM,CQM,andtheclientsrepresentative,ataminimum,willattendthisinspection.

  • 4-1

    SECTION4Project Meetings

    4.1 Preconstruction Meeting ThePMwillscheduleandadministerapreconstructionmeetingatthesiteafterNoticetoProceedandbeforethestartofconstructionatthesite.Duringtheconference,groundrulesandunderstandingswillbeestablishedbetweenCPG,dmi,USEPArepresentatives,NewJerseyregulators,CH2MHILL,andmajorsubcontractors.Ataminimum,thedmi,USEPAsonsitecontractor(CDM),CH2MHILLprojectteamandmajorsubcontractorswillattendthismeeting.Thismeetingwillhelpensureallpartiesinvolvedintheprojectunderstandandagreeontheprojectgoalsandobjectives,schedule,submittalrequirements,documentationrequirements,changemanagementprocessesandprocedures,constructionmeansandmethods,reportingandcommunicationrequirements,H&Srequirements,andotherprotocols.Themeetingagendawillinclude,butnotnecessarilybelimitedto,thefollowing: H&Sissues Progressschedules Ownersrequirements,suchasinteractionwiththecommunity Designationofresponsiblepersonnel Linesofauthorityandcommunication Fieldoffices TemporaryfacilitiesandcontrolsprovidedbyCH2MHILL Securityandhousekeepingprocedures Useofthesiteforstorage,vehicleparking,accessroutes,andothersiterequirements Coordinationwithothercontractorsandtheclient Proceduresformaintainingrecorddocuments Proceduresforprocessingfielddecisions,submittals,substitutions,applicationsforpayments,proposal

    requests,fieldorders,workchangedirectives,changeorders,andcloseoutproceduresMinutesofthemeetingwillbepreparedbyCH2MHILLanddistributedtotheparticipantsandthoseaffectedbydecisionsmade.

    4.2 Coordination and Mutual Understanding Meeting Beforeanyonsiteactivitiesbegin,thePM,QAM,andCQMshallmeetwithCPGanddmirepresentativestoreviewtheCQCPandtheQCprogramrequiredbythecontract.ThismeetingistoconfirmCH2MHILLandCPGclearlyunderstandandagreeon: SpecificQCpointsofconcernaboutthefeaturesofwork DutiesandresponsibilitiesofallonsiteCH2MHILLpersonnel Formstobeusedontheprojectandthecorrectprotocolforuseofeachform AdministrationofbothonsiteandoffsiteworkThemeetingshallbeattendedbythePM,QAM,CM,andHSM.Themeetingalsocanbecombinedwiththepreconstructionconference.MinutesofthemeetingshallbepreparedbyCH2MHILLandsignedbydmiandCH2MHILLsrepresentatives.

    4.3 Quality Control Meeting Afterstartingsitework,theCQMshallconductQCmeetingsatafrequencyestablishedasnecessarybythepaceofthework,orasrequiredbytheclient.Typically,meetingsareexpectedtooccuratleastweeklyormorefrequently,dependingontheprojectneeds.Conductingthemeetingsandpreparingthemeetingminutesare

  • 4 PROJECTMeetings

    4-2

    responsibilitiesoftheCQMandCM.AnnotationofconductingthemeetingwillbemadeinthedailyCQCR.TheCM,HSM,andthesupervisorresponsiblefortheupcomingworkshallattendthemeeting.Representativesoftheclientwillbeinvitedtoallmeetings.Tooptimizetime,thesemeetingsshouldbeheldinconjunctionwithothermeetings(forexample,progressmeetings,andweeklysafetymeetings)wherepossible.CH2MHILLhastheresponsibilityforsettingtheagendaforthemeeting.Asaminimum,thefollowingshallbeaccomplishedateachmeeting: Reviewpreviousmeetingminutes Identifyanysafetyconcernsrelativetoanyworkactivity Reviewtheprojectschedule

    Workaccomplishedsincethelastmeeting Reviewtheworkscheduledoverthenext2weekwindow Establishcompletiontargetsforanyoutstandingrework

    Reworkitemsidentifiedsincethelastmeeting Reworkitemscompletedsincethelastmeeting

    Submittalstatus Submittalsreviewedsincethelastmeeting Submittalsexpectedwithinthenext2weekwindow

    IdentifyandscheduleanyDFOWsrequiringpreparatoryphaseactivities IdentifyandscheduleanyDFOWsrequiringinitialphaseactivities IdentifyandscheduleanyDFOWsrequiringfollowupphaseactivities Identifyanytestingrequiredinsupportoforconfirmingremedialactivities Reviewstatusofanyoffsiteactivities IdentifyanyspecialdocumentationrequirementsforeitherproductionorQC AddressandresolveanyproductionorQCproblems IdentifyanyproductionorQCproceduresthatmaybelesseffectivethananticipatedandmayrequirerevising

    theprojectdeliveryorcontingencyplanandannotateanyrecommendations IdentifyanyactivitiesoritemsthatmayrequirerevisingtheCQCPandannotateanyrecommendations

  • 5-1

    SECTION5Quality Control Documentation

    5.1 Contractor Production Report Thecontractorproductionreports(CPRs)isthedailyrecordofoperationsonthejobsiteandmustbekeptcurrent.Thesereportsaretheofficialrecordofworkperformanceandcompliancewithprojectplans,drawings,andspecifications.Itisthereforecriticalthatthereportsarecorrectandtimely.TheCPRswillbeattachedtotheCQCRpreparedforthesameday.Eachcalendardaythroughoutthelifeofthecontractmustbeaccountedfor.Thereportingofworkwillbeidentifiedbyterminologyconsistentwiththeconstructionschedule.CPRsareprepared,signed,anddatedbytheCMandwillcontainthefollowinginformation: Dateofreport,reportnumber,nameofcontractor,contractnumber,title,locationofcontract,andCM

    present Weatherconditionsinthemorningandintheafternoon,includingmaximumandminimumtemperatures Alistofcontractorandsubcontractorpersonnelontheworksite,theirtrades,employer,worklocation,

    descriptionofworkperformed,andhoursworked Alistofjobsafetyactionstakenandsafetyinspectionsconducted.Indicatethatsafetyrequirementshave

    beenmet,includingtheresultsofthefollowing: Wasajobsafetymeetingheld?(IfYES,attachacopyofthemeetingminutes.) Werethereanylosttimeaccidents?(IfYES,attachacopyofthecompletedOccupationalSafetyand

    HealthAdministrationreport.) Wastrenching,scaffolding,highvoltageelectrical,orhighworkdone?(IfYES,attachastatementor

    checklistshowinginspectionperformed.) Washazardousmaterialorwastereleasedintotheenvironment?(IfYES,attachdescriptionofincident

    andproposedaction.) Alistofequipmentandmaterialreceivedeachdaythatisincorporatedintothejob Alistofconstructionequipmentontheworksiteshowingthenumberofhoursused,idle,anddownfor

    repair Remarkssectioncontainingpertinentinformation,suchasdirectionsreceived,problemsencountered

    duringconstruction,workprogressanddelays,conflictsorerrorsinthedrawingsorspecification,fieldchanges,safetyhazardsencountered,instructiongivenandcorrectiveactionstaken,delaysencountered,andarecordofvisitorstotheworksite

    TheCPRformprovidedintheAttachmentAwillbeusedonthisproject.

    5.2 Contractor Quality Control Reports TheCQCRdocumentsthequalityactivitiesontheproject.CQCRsarerequiredforeachdaythatworkisperformedandforevery7consecutivecalendardaysofnowork,onthelastdayofthatnoworkperiod.Eachcalendardaythroughoutthelifeofthecontractmustbeaccountedfor.Thereportingofworkwillbeidentifiedbyterminologyconsistentwiththeconstructionschedule.CQCRsareprepared,signed,anddatedbytheCQMandwillcontainthefollowinginformation: ControlphaseandDFOW.

  • 5 QUALITYControlDocumentation

    5-2

    Resultsofpreparatoryphasemeeting(s),includinglocationoftheDFOWandalistofpersonnelpresentatthemeeting(s).VerifyinthereportthatforthisDFOW,thedrawingsandspecificationshavebeenreviewed;submittalshavebeenapproved;materialscomplywithapprovedsubmittals;materialsarestoredproperly;preliminaryworkwasdonecorrectly;thetestingplanhasbeenreviewed;andworkmethodsandschedulehavebeendiscussed.

    Resultsoftheinitialphasemeeting(s),includinglocationoftheDFOWandalistofpersonnelpresentatthemeeting(s).VerifyinthereportthatforthisDFOW,thepreliminaryworkwasdonecorrectly;sampleshavebeenpreparedandapproved;theworkmanshipissatisfactory;testresultsareacceptable;workisincompliancewiththecontract;andtherequiredtestinghasbeenperformed.Includealistofpersonnelwhoperformedthetests.

    Resultsofthefollowupphaseinspectionsheld,includinglocationoftheDFOW.VerifyinthereportforthisDFOWthattheworkcomplieswiththecontractasapprovedintheinitialphaseandthatrequiredtestinghasbeenperformed.Includealistofpersonnelwhoperformedthetests.

    Resultsofthethreephasesofcontrolforoffsitework,ifapplicable,includingactionstaken. Listreworkitemsidentified,butnotcorrectedbycloseofbusiness. Asreworkitemsarecorrected,providearevisedreworkitemslistalongwiththecorrectiveactiontaken.

    (Note:Allreworkwillbenonfeebearing.) Remarkssectioncontainingpertinentinformation,suchasdirectionsreceived,QCproblemareas,

    deviationsfromtheCQCP,constructiondeficienciesencountered,QCmeetingsheld,acknowledgmentthatasbuiltdrawingshavebeenupdated,correctivedirectiongivenbytheQAM,andcorrectiveactiontaken.

    CQCRcertificationasaccurate,correct,andcomplete.TheCQCRandpreparatoryphasereportarethedailyrecordsofQCsperformedonthejobsiteandmustbekeptcurrent.Thesereportsaretheofficialrecordofworkperformanceandcompliancewithprojectplans,drawings,andspecifications.Itisthereforecriticalthereportsarecorrectandtimely.TheCQCRandpreparatoryphasereportformstobeusedonthisprojectareprovidedintheattachments.

    5.3 Project Files DocumentationgeneratedbytheQCsystemmustbemaintainedinanorderlyfashion.ItissuggestedthatthePMandCQMmaintainaseriesofthreeringbindersforreadyreference.Theseshouldbearrangedbycategoryandtabbedtoincludethefollowingitems: CPR CQCR Photographsandphotographlogs Healthandsafetyreports Testingplanandlog Reworkitemslists Noncompliancenoticesandcorrectiveactions Monthlysummaryoffieldtests Submittalregister Contractmodificationsarrangedinnumericalorder Correspondence Wastedisposalrecords

  • 5 QUALITY CONTROL DOCUMENTATION

    5-3

    5.4 Field Documentation of Operating Procedures Theobjectiveofthefielddocumentationofoperatingproceduresistoensureappropriateprojectinformationisrecordedinlogbooksduringconstruction.ThisdocumentationisimportantforcommunicatingactivitieswithotherstaffmembersandtheCPGanddmipersonnel.

    5.5 Field Logbook TheCQMandCMwillmaintainarecordofdailyQCactivitiesduringconstructioninafieldlogbook.Thefieldlogbookwillbeavailableuponrequestforreviewbytheclient.InformationrecordedintheCPRandCQCRwillbesupplementedwithinformationcontainedinthelogbook,buttheintentisnottorepeatinformation.Asanoperatingprocedureforlogbookentries,thefollowingitemswillberecorded,ataminimum: Date,projectname,andlocation Dailystarttime Summaryofweatherconditions Generaldescriptionofworkactivities,sizeofworkcrew,andtheequipmentandpersonnelonsite Durationoflunchbreak Starttimeanddurationofdowntimeresultingfromequipmentbreakdownorweather SummariesofQCmeetingsandactionsrecommendedtobeperformed QCtestingequipmentandpersonnel Identificationofworklocations Descriptionofmaterialsdeliveredtothesite,includingQCdataprovidedbythesuppliers Recordofdecisionsmaderegardingcorrectivemeasuresimplemented Fieldtests SamplingactivitiesTheCMwillsignorinitialthebottomofeachpageofthefieldlogbookanddatetheentrytoshowthatnotesarebeingtakendaily.Alinethroughwillbeplacedonanyportionofalogbookpagethatisunused.Nocorrectionfluidmaybeused.

    5.6 Reporting and Field Documentation Table51presentsalistofdeliverables,thepartiesresponsibleforpreparingthem,theirfrequency,andcontent.

  • 5 QUALITYControlDocumentation

    5-4

    TABLE 5-1 Reporting and Field Documentation Required

    ReportorDocumentationRequirement

    CompletedBy DeliveredTo Frequency ReportDescription

    CPR CM PM,CQM,QAM,andclient(CPGanddmi)

    Daily,foreachtaskoriginalandonecopydueby10amnextworkingdayaftereachdaythatworkisperformed

    Documentsdailyconstructionactivityoneachsite

    CQCR CQMandCM

    PM,QAM,andclient

    Daily,fortheprecedingbusinessdayoriginalandonecopydueby10amnextworkingdayaftereachdayworkisperformed

    DocumentsthedailyQCactivityfortheproject,includestheCPRs

    TestingPlanandLog

    CQM PM,QAM,andclient

    Monthlyduebyendofeachmonth Definesandrecordsresultsofallonsitetesting,tobemaintainedattimeoftesting,orwhenlaboratoryresultsarereceived

    MonthlySummaryReportofFieldTests

    CQM PM,QAM,andclient

    Monthly,attachedtothelastCQCRsubmittedforeachreportingperiodoriginalandonecopydueattheendofeachmonth

    Summarizesalltestingactivityconductedforthereportingperiodwithtestresults(pass/fail)

    QCMeetingMinutes

    QAM PM,CQM,andclient

    AsattachmenttoappropriateCQCRduewithin2calendardaysofthemeeting

    MinutesofanyQCmeetingheld

    ReworkItemsList

    CQMandCM

    PM,QAM,andclient

    Monthly,attachedtothelastCQCRsubmittedforeachreportingperiodonecopybylastworkingdayofthemonth

    Documentsreworkitemsnotcorrectedonsamedayasdiscovery;includesitemsidentifiedbybothCH2MHILLandclientordesignatedrepresentative

    SubmittalRegister

    CQMandCM

    PM,QAM,andclient

    Maintainedthroughlifeofproject Summarizesthedeliverables

    AsbuiltRecords CQM PM,QAM,andclient

    Maintainedinfieldthroughlifeofprojecttocertifycompleteandaccuraterecordsuponcompletion;includedinConstructionCompletionReport

    RequirementsspecifiedinCQCP;tobemaintainedatjobsiteandinspectedbyQCpersonneltoensuredailyupkeep

    PhotographicRecord

    CQMandCM

    PM,QAM,andclient

    Maintainedinfieldthroughlifeofproject Photographicrecordshowingconstructionprogress,specialsituations

    TransportationandDisposalLog

    CQM WasteDisposalCoordinator

    Monthlyandmaintainedinfieldthroughlifeofproject

    Trackswasteontheprojectfromgenerationtofinaldisposition

  • 6-1

    SECTION6Construction Quality Control Submittals ConstructionQCsubmittalsaregeneratedbyeithertheCQMorthesubcontractorduringorimmediatelybeforeconstructiontodemonstratecompliancewiththeprojectplans.Submittalrequirementsshallbetabulatedinthesubmittalregisteraccordingtotherequirementsidentifiedintheprojectplans.TheQAMandPMwillmonitorsubmittalactivitiestoverify: Submittalcompleteness Requiredsubmittalinclusion Submittalschedulestatus Currentsubmittalstatus ResubmittalsTheCQMwilllogandtracksubmittalsinthesubmittalregister.Specificresponsibilitiesregardingsubmittalsarelistedbelow: Coordinatingsubmittalactions Maintainingnecessarysubmittalrecordsinanorganizedfashion Maintainingandtrackingsubmittalsinthesubmittalregister Reviewingandcertifyingsubmittalsforcompliancewiththeprojectplans,drawings,andspecifications Approvingsubmittals,exceptthosedesignatedtobeapprovedbytheclientandstakeholders Checkingmaterialandequipmentdeliveredtotheprojectforcompliancewiththeprojectplans,drawings,

    andspecificationsCertaindesignatedsubmittalsrequireapprovalbyauthoritiesotherthantheQAM(suchasthePM,STC,DQM,orotherqualifiedpersons).Insuchcases,theQAMforwardsthesubmittaltothePM,whoroutesthesubmittaltotheappropriateapprover.TheCMandCQMareresponsibleforcoordinatingthesubmittaltransmittalandapprovalprocessandforfollowingthroughtoensuretheprocessdoesnotaffecttheprojectschedule.CH2MHILLwillcontrolandschedulesubmittalsandwilldocumenttheprocessinthesubmittalregister.TheCQMisresponsibleforupdatingthesubmittalregisteratleastonceaweekandforwardingacopyofthesubmittalregistertothePM,QAM,andPDLattheendofeachmonthofprojectwork.Eachsubmittalwillberoutedonastandardsubmittalform.Unitsofweightsandmeasuresusedonthesubmittalswillbeconsistentwiththoseusedintheprojectdocuments.Eachsubmittalwillbereviewedforcompletenessandcompliancewithcontractrequirementsbyindividualsqualifiedtoperformthereviewofthatspecificitem.Thesubmittalreviewersandapproverswillbedesignatedbeforeconstructionbegins.TheCQMwillcertifythesubmittalcomplieswiththeprojectrequirements.Submittalsthatdonotcomplywiththerequirementswillbereturnedtotheoriginatorforcorrectionandresubmittal.Substitutionsorvariationsofspecifiedrequirementswillbeclearlynoted.CertificationoftheapprovedsubmittalswillbeindicatedbysigningorinitialinganddatingthesubmittalformbytheCQM.Submittalswillincludebutarenotlimitedtothefollowing: Personnelqualifications Permits Samples Production,inspection,andtestreports Materialcertifications Progressreports,safetyreports,andmanpowerreports Redlinedrawingandasbuiltorcertifieddata QCrecordsandcertifications

  • 6 CONSTRUCTIONQualityControlSubmittals

    6-2

    Sampleandtestresults QCreports Constructionphotographsandphotologs Contractcloseoutdocuments Completedhazardouswastemanifestsanddisposalcertificates

  • 7-1

    SECTION7Changes and Nonconformances

    7.1 Changes Circumstancesmayariseduringtheremedialactionthatnecessitatechangestothedesignand/orconstructionapproachorscopeofwork.Routinechangesalsowilloccurthatdonotaffecttheapproachorscopeofworkbutaredeparturesfromtheplannedcourseofaction.Thesechangesmayincludesucheventsasunanticipatedsiteconditions,useofalternativeconstructionmethods,substitutionofmaterials,andadditionalworkrequestedbyclientwithinthebroadframework/scopeoforiginalprojectrequirements.ItisthePMsresponsibilitytoensurethepromptandaccuratedocumentationofthesechangestominimizeimpactsofthesechangesontheprojectcostandschedule.Verbalnotificationofanychanges(orpotentialforchanges)willbemadeimmediatelyuponidentificationofthechangedcondition.AnyprojectparticipantmayidentifyapotentialchangebyreportingtoeitherthePMortheCQM.Followinganassessmentoftheappropriatenessofthechange,notificationwillbemadetoCPGanddmi.Followingverbalnotifications,changeswillbedocumentedontheFieldChangeNoticeform.Theindividualwhoidentifiesthechangewillcompletethisform.ThenoticewillbereviewedbythePMandthenapprovedbythePDL,andacopytransmittedtoCPGanddmi.ConstructionactivitiesrelatedtothechangedconditionwillnotcommenceuntilapprovalhasbeenobtainedfromCPG.Effortswillbemadetoresolveminorchangesinthefieldtominimizescheduleimpacts.AChangeSummaryLogwillbemaintainedonsitebytheCQMandprovidedtoCPGanddmiweekly.EitherquarterlyorattherequestofeitherCH2MHILLortheclient,ameetingwillbeheldwiththemanagersandstaffstodiscusstheappropriatenessofeachchange.Inpreparationforthemeeting(3daysinadvance),thesponsorofthechangewillprepareapreliminaryscopetodescribethechange,justifythereasonforafeebearingchange,andestimatetheapproximatemagnitude(orrange)ofthecostimpact.AtsuchtimeasbothCH2MHILLandCPGagreethatacontractmodificationisnecessary,theCPGwillrequest,inwriting,thataproposalbesubmittedforsomeoralloftheitemsontheChangeSummaryLog.Themodificationthenwillbeprocessedinaccordancewiththestandardcontractprocedures.Ifanychangesoccurthatappeartobeoutsidethebroadframeworkoftheprojectscope,CH2MHILLwilladviseCPGrepresentativeandseekdirectionastohowtoproceed.

    7.2 Nonconformances/Deficiencies TheoverallgoalofthisCQCPistoensureallworkperformedisofthehighestqualityandisinconformancetoplansandspecifications.Itispossible,however,thatduringfollowuporcompletioninspections,workmaybediscoveredthatdoesnotmeettheplansandspecifications.TheCQMwillfollowtheprocedurebelowwhensuchaneventoccurs: Thepotentialnonconformance/deficiencywillbeverballybroughttotheattentionofprojectpersonnel

    immediatelyinvolvedintheparticularelementofwork.Ifitisagreedthatadeficiencyexists,thesituationwillbecorrected(wherepossible)within1workdayunlessthedeficiencyjeopardizesworkerorpublichealthandsafetyoraffectsoveralldesignintegrity.Ifathreattosafetyandhealthordesignintegritydoesexist,astopworkorderwillbeissuedandworkwillceaseuntilcorrectiveactionistaken.Ineithercase,thedeficiencyandcorrectiveactiontakenwillbenotedinthedailyCQCR.

    Ifthedeficiencycannotbecorrectedbytheendofthefollowingworkday,anNCRwillbeissuedbytheCQM.ThePMandQAMwillbenotifiedimmediatelysostepscanbetakentoresolvetheissueaspromptlyaspossible.CPGanddmialsowillbenotifiedofthesituationatthattime.

  • 7 CHANGESandNonconformances

    7-2

    Iftheabovestepsdonotresolvethedeficiency,theCH2MHILLPDLandtheclientwillbenotifiedofthesituationtoassistinachievingresolution.

    Exceptinthecaseofanemergency,ifastopworkorderistobeissued,attemptswillbemadebytheCQMtoobtainconcurrenceofthePMandQAMbeforeissuingtheorder.WorkwillnotresumeuntilthestopworkorderhasbeenrescindedbytheCQM.NCRswillfullydescribethedeficiencyandtheconditionsrequiringcorrectiveaction.Anapproachandscheduleforthecorrectiveactionalsowillbeincluded.TheNCRwillbeissuedbytheCQM,andacopywillbeattachedtothedailyCQCR.OnlytheCQMwillhaveauthoritytocertifythatadeficiencyhasbeenadequatelycorrected.AllnonconformingconditionswillbetrackedontheNonconformance/DeficiencyLog.Deficiencieswillbesummarizedintabularformatshowingthedateofdiscovery,dateofNCRissuance(whereapplicable),abriefdescriptionofthedeficiency,thenecessarycorrectiveaction,thedateofthecorrectiveaction,andthedateofacceptanceofthecorrectedwork.ThissummarywillbeupdateddailyandprovidedtoCPGanddmiattheweeklyQA/QCmeeting.

  • 8-1

    SECTION8Noncompliance and Corrective Actions TheCQMwillnotifytheCMandsubcontractorsofanydetectednoncompliancewiththeworkplan,specifications,andcontractdocuments.TheCMorsubcontractorwilltakeimmediatecorrectiveactionafterreceiptofsuchnotice.Suchnotice,whendeliveredtotheCMorsubcontractorattheworksite,willbedeemedsufficientnotification.IftheCMorsubcontractorfailsorrefusestocomplypromptly,theCQMmayissueanorderstoppingallorpartoftheworkuntilsatisfactorycorrectiveactionhasbeentaken.Noncompliancenotificationorstopworkorderswillbedocumentedinthedailyreport.CompletionofcorrectiveactionwillbenotedinthedailyCQCR.VerificationofthecorrectiveactionanditsresultswillbeperformedbytheQAManddocumentedintheCQCR.Failingtestresultsornoncompliancereportswillberesolvedthroughacorrectivemeasureplan.TheplanwillbedevelopedbytheCQMinconjunctionwiththeCMandPM.Theagreeduponcorrectivemeasureplanwillbeimplemented,completed,anddocumentedbytheCQM.

  • 9-1

    SECTION9References CH2MHILL.2012a.QualityManagementPlanfortheLowerPassaicRiverRM10.9TimeCriticalRemovalAction.CH2MHILL.2012b.RM10.9RemovalActionBasisofDesignReport.CH2MHILLandAECOM,2012.RiverMile10.9CharacterizationProgramSummary,LowerPassaicRiverStudyArea.U.S.EnvironmentalProtectionAgency(USEPA).2012.SettlementAgreementandAdministrativeOrderonConsentforRemovalAction,DocketNo.0220122015.ESP020502POperationalReadinessReviewathttps://vo.int.ch2m.com/apps/bdpdprocess/_layouts/DocIdRedir.aspx?ID=DOCID2611ESP020301PChartertheteamathttps://vo.int.ch2m.com/apps/bdpdprocess/_layouts/DocIdRedir.aspx?ID=DOCID266ESP030101PManagetheProjectTeamhttps://vo.int.ch2m.com/apps/bdpdprocess/_layouts/DocIdRedir.aspx?ID=DOCID2630ESP060101PConstructionExecutionPlanathttps://vo.int.ch2m.com/apps/bdpdprocess/_layouts/DocIdRedir.aspx?ID=DOCID26121CHP060401PEstablishSiteInfrastructureandLogisticsathttps://vo.int.ch2m.com/apps/bdpdprocess/_layouts/DocIdRedir.aspx?ID=DOCID18423July2011bathymetrysurveyconductedaspartoftheRM10.9CharacterizationProgram

  • Attachment A CPR Form

  • PAGE 1 OF 2

    CONTRACTOR PRODUCTION REPORT (ATTACH ADDITIONAL SHEETS IF NECESSARY)

    DATE OF REPORT: REVISION NO: REVISION DATE:

    PROJECT NAME/LOCATION: REPORT NO:

    PROJECT NO: SUPERINTENDENT: SITE H&S SPECIALIST:

    AM WEATHER: PM WEATHER: MAX TEMP: MIN TEMP:

    SUMMARY OF WORK PERFORMED TODAY

    Was A Job Safety Meeting Held This Date? Yes No TOTAL WORK HOURS ON JOB SITE THIS DATE (Including Continuation Sheets)

    Were there any lost-time accidents this date? (If Yes, attach copy of completed OSHA report)

    Yes No CH2MHILL Onsite Hours

    Was a Confined Space Entry Permit Administered This Date? (If Yes, attach copy of each permit)

    Yes No

    Were Crane/Manlift/Trenching/Scaffold/HV Elec/High Work/Hazmat Work Done?? (If Yes, attach statement or checklist showing inspection performed)

    Yes No Subcontractor Onsite Hours Total Onsite Hours This Date

    Was Hazardous Material/Waste Released into the Environment? (If Yes, attach description of incident and proposed action)

    Yes No Cumulative Total of Work Hours From Previous Report

    Total Work Hours From Start of Construction

    SAFETY ACTIONS TAKEN TODAY/SAFETY INSPECTIONS CONDUCTED (Include Safety Violations, Corrective Instructions Given, Corrective Actions Taken, and Results of Safety Inspections Conducted):

    EQUIPMENT/MATERIAL RECEIVED TODAY TO BE INCORPORATED IN JOB

    DESCRIPTION OF EQUIPMENT/MATERIAL RECEIVED MAKE/ MODEL/

    MANUFACTURER EQUIPMENT/ LOT NUMBER INSPECTION

    PERFORMED BY

    NUMBER/ VOLUME/ WEIGHT

    EQUIPMENT USED ON JOB SITE TODAY.

    EQUIPMENT DESCRIPTION EQUIPMENT MAKE/MODEL SAFETY CHECK PERFORMED

    BY

    NUMBER OF HOURS

    USED IDLE REPAIR

    CHANGED CONDITIONS/DELAY/CONFLICTS ENCOUNTERED (List any conflicts with the delivery order [i.e., scope of work and/or drawings], delays to the project attributable to site and weather conditions, etc.):

    VISITORS TO THE SITE:

    LIST OF ATTACHMENTS (OSHA report, confined space entry permit, incident reports, etc.):

    SAFETY REQUIREMENTS HAVE BEEN MET

    SUPERINTENDENTS SIGNATURE DATE

    JOB

    SAFE

    TY

  • PAGE 2 OF 2

    CONTRACTOR PRODUCTION REPORT (ATTACH ADDITIONAL SHEETS IF NECESSARY)

    DATE OF REPORT: REVISION NO: REVISION DATE:

    PROJECT NAME/LOCATION: REPORT NO:

    PROJECT NO: SUPERINTENDENT: SITE H&S SPECIALIST:

    WORK PERFORMED TODAY EMPLOYEE WORK PERFORMED EMPLOYER FEMALE? MINORITY? TITLE/TRADE HRS

  • Attachment B CQCR and Preparatory Phase Report Form

  • Attachment B: Preparatory Phase Inspection Checklist Date: DefinableFeature: 1.PersonnelPresent Name Title Organization

    2.RevieweachparagraphofthespecificationandeachapplicablefigurefortheDefinableFeatureofWork.Completed?Yes/No?Ifno,explain.

    3.Verifythatallmaterialsand/orequipmenthavebeentested,submitted,andapproved.Completed?Yes/No?Ifno,explain.

    4.Reviewthethreephasesofcontrolandprovisionsforprovidingtherequiredinspection.Completed?Yes/No.Ifno,explain.

    5.Examineworkareatoassureallrequiredpreliminaryworkhasbeencompletedandisincompliancewiththecontract.Resultssatisfactory?Yes/No?Ifno,explain.

    6.Performaphysicalexaminationofrequiredmaterials,equipment,andsampleworktoassuretheyareonhand,conformtosubmittedplans,andproperlystored.Resultssatisfactory?Yes/No?Ifno,explain.

    7.Reviewtheappropriateactivityhazardanalysistoassuresafetyrequirementsaremet.Resultssatisfactory?Yes/No?Ifno,explain.

    8.Discussproceduresforcontrollingqualityoftheworkincludingrepetitivedeficiencies.Documentconstructiontolerancesandworkmanshipstandardsforthisfeatureofwork.

    9.Checktoensuretheportionoftheplanfortheworktobeperformedhasbeenacceptedbytheclient.Resultssatisfactory?Yes/No?Ifno,explain.

    10.DiscusstheInitialPhaseofControl

    11.Arematerialsstoredproperly?Yes/No?Ifno,whatactionwastaken?

    12.Remarks

    QCEngineer: Date:

  • Attachment C Submittal Register

  • Attachment C: Submittal Register

    TransmittalTypeofSubmittal

    ApprovalType Reviewer(s)

    PlannedSubmittal

    Date

    ContractorAction ApprovingAuthorityAction

    ContractorAction

    DateForwardedtoApprovingAuthority/

    DateReceivedFrom

    Contractor

    DateForwardedto

    OtherReviewer

    DateReceivedfromotherReviewer

    ActionCode

    DateofAction

    MailedtoContractor/Receivedfrom

    ApprovingAuthority Remarks

    ProjectManagement

    AdditionalInvestigation

    Design

    Construction

    SiteWalk/TemporaryFacilities

    LaboratorySampleAnalysis

    WasteTransportationandDisposal

  • Attachment D Field Change Notice Form

  • Attachment D: Field Change Notice Form Client/Project: ProposedActivityInScope: PotentialScheduleImpact: Yes/No Yes/No OrderofMagnitudeCostEstimatetoImplement: Task/Subtask(s)Affected:

    AffectedDocuments:

    Activity/ChangeDescription:

    Recommendation(s):

    ApprovalRequestedBy Preparedby: Date: Project/RemediationManagerAuthorization: Date: DesignChange/EngineeringReviewrequired? Yes/No ProjectEngineerAuthorization: Date: ClientApproval Name: Title: Comments:

    ContractModificationRequired: Yes/No Cost/Cost+Fee/NoCost

  • Attachment E Non-Conformance/Deficiency Log

  • Attachment E: Non-Conformance/Deficiency Log

    NCR# DescriptionDiscovery

    DateInvestigation

    DateCorrectiveAction

    Completed CPGNotified Comments

  • FIGURE 1-1RM 10.9 Sediment Deposit and Removal Areas

    Construction Quality Control PlanLower Passaic River Study Area, New Jersey0 100 200 30050 Feet

    LEGENDExtent of Potentially Exposed Surface SedimentNavigation ChannelRM10.9 Removal AreaRM 10.9 Sediment Deposit Area

    Notes:1. Orthophoto: NJGIS, 20072. The Extent of Potentially Exposed Surface Sediment was generated from the -2ft (NGVD29) elevation, which represents the Mean Low Water for this part of the river. The data source was the July 2011 Bathymetry Survey conducted as part of the RM 10.9 Characterization Program (CH2M HILL & AECOM, 2012).

    DAY \\A

    NTIGO

    NE\PR

    OJ\LOW

    ERPAS

    SAICR

    IVERG

    RP\412

    305LOW

    ERPAS

    SAICFS

    \GIS\MA

    PFILES

    \RM10-

    9\SPEC

    IAL\FIG

    1-1_LP

    R_10-9

    _SED_D

    EP_RE

    M_ARE

    A_CD2.

    MXD E

    CLARK1

    10/26

    /2012

    11:28:5

    2 AM

  • USEPARegion2RBasso LPRSADirSVaughn RPM

    LPRSACPG(orFundingParties)

    LPRSACPG CommonCounselK&LGatesBillHyatt

    LPRSACPG Project ManagersdemaximisBillPotterDr.Rob Law

    Stan Kaczmarek

    ProjectManagerRogerMcCready

    SeniorTechnicalConsultantGeorgeHicks

    PrincipleinCharge

    JohnClaussenProject

    DeliveryLeadRexLong

    ContractingMattKluge

    DesignQualityManager

    LouiseAmundsonConstruction

    QualityManagerTBD

    QualityAssuranceManager

    SteveMartzH&SManagerJimBushnell

    DesignManager ConstructionManagerReviewTeam

    LeadersSiteSafety

    C di t Task/Site Manager(s)

    Asst.ProjectManager

    AndreaDePoy

    ProjectControls

    SubcontractingErinBlack

    CostEstimatorManager

    LonnieReese

    CostEstimatorJimBrinkman ManagerTBD

    LeadersVarious

    CoordinatorsVarious

    Task/SiteManager(s)

    TechnicalStaff

    jTBD

    TeamFirmsSubcontractors

    DavidCole

    Subcontractors