2001 ConceptFlow 0
Project Reviews and Examples
-
7/27/2019 8 Project Reviews
2/36
2001 ConceptFlow 1
Module Learning Objectives
Understand that projects can utilize one or several of the 3 SixSigma elements
Discuss the components of Black Belt project reviews
Recognize that project reviews ensure consistency and timing
of project completion Provide project examples to demonstrate Six Sigma
methodologies
-
7/27/2019 8 Project Reviews
3/36
2001 ConceptFlow 2
Six Sigma Projects
The Project Champions approach to reviews is consistent
regardless of the type of project
While there are three elements comprising the Six Sigma foundation,projects can utilize:
A singular element as the focus
Growth
Eliminate unnecessary steps Reduce variability
Multiple elements
Growth + Reduce variability
-
7/27/2019 8 Project Reviews
4/36
2001 ConceptFlow 3
Project Reviews
Regularly scheduled reviewsdemonstrate achievements
When:
Project reviews are conducted at logical tollgates
Academic reviews occur during Black Belt training with classmates
Business reviews occur with Business Managers and ProcessOwners
Final reviews for senior leadership at project completion
-
7/27/2019 8 Project Reviews
5/36
2001 ConceptFlow 4
Project Reviews
Single, concise formatcomplex business problems
How:
Use standard template
Project Champions, Black Belts, Business Managers and ProcessOwners in attendance
10 uninterrupted minutes for presentation5 minute questions &
answers
Strict time discipline ensures continued participant involvement
-
7/27/2019 8 Project Reviews
6/36
2001 ConceptFlow 5
Project Reviews
What:
Method to assess the project progress and team engagement
Method to learn Six Sigma through participation
Way to provide visible support
Way to recognize and energize the teams
Way to leverage best practices
The project review demonstrating significant progress
-
7/27/2019 8 Project Reviews
7/36 2001 ConceptFlow 6
Elimination of Unnecessary Steps - Lean
-
7/27/2019 8 Project Reviews
8/36 2001 ConceptFlow 7
Elimination of Unnecessary Steps - Lean
Streamlined Processes
The method of reducing unnecessary steps to reduce rework, save time,save cost, and extend capacity of valuable resources
Lean
Identifying waste and making it visible is the first step
-
7/27/2019 8 Project Reviews
9/36 2001 ConceptFlow 8
Portfolio Reviews Project Overview
Problem Statement
The process for portfolio reviews varies in depth and time to prepare from 1 day to 8days, but the elapsed time can extend to almost 40 days from first contact to execution.
Project Objective Statement
To understand what steps are non-value added and eliminate those steps.
Financial Benefits Revenue Increase $7.0M
Other Cost Savings $0.5M
Total Benefits $7.5M
Client Benefit
Executing a consistent portfolio review process with only value added steps willreduce the time from when the Advisor and Client identify the need for a sessionand the point when the session is able to be conducted.
Employee Benefit
Advisors, call centers and service teams will be able to manage client reviews in amore organized fashion with only work important to the client being accomplished.
-
7/27/2019 8 Project Reviews
10/36 2001 ConceptFlow 9
Step 1 -Map the As-IsValue Stream
As-Is Process
Cycl e Time:
E/T = 249 Hrs
W/T = 18.08 Hrs
VA/T = 6.63 Hrs
E/T = Elapsed Tim e
W/T = Work Time
VA/T = Value-Ad ded Tim e
Portfolio Review Duration
-
7/27/2019 8 Project Reviews
11/36 2001 ConceptFlow 10
Step 2 - Prio rit ize Waste /Defect Opp ortun i t ies
As-Is Process
Cycl e Time:
Cross Functional Team Prioritizes Opportunities
Red Greatest Potential Benefit
Yellow Worthwh i le Opportun ity E/T = 249 Hrs
W/T = 18.08 Hrs
VA/T = 6.63 Hrs
-
7/27/2019 8 Project Reviews
12/36 2001 ConceptFlow 11
Step 3 - Ident i fy Lean Method s and Ass ign Act ion Items
Waste Opportun i ty Imp act Ease Prior i ty Six Sigma / Lean Method
Conduct Portfolio Analysis
Develop Financial Strategy
Present Solution to Client
Execute Strategy
5 2 1
5 3 2
3 3 3
4 5 4
Provide Client a simple checksheet of
information needed call centers work as
Concierge for this feature
Using call centers in meeting with advisors,
information is directly typed into website for
immediate information flow to servicesBased on reduced variation, client return meeting
is scheduled with confidence during first visit
Work variation reduction project to
understand how to get the client to yes
at greater percentages at presentation
Process Blitz Action Items
During Process Blitz the cross functional team identified
standardization and technological solutions to waste issues. Team recommended
only those technology solutions that were available, but not currently activated.
-
7/27/2019 8 Project Reviews
13/36
2001 ConceptFlow 12
Step 4 - Future State Map
Future Process
Cycl e Time:
E/T = 146 Hrs
W/T = 15.92 Hrs
VA/T = 6.63 Hrs
Future State Map
Red Greatest Potential Benefit
Yellow Worthwh i le Opportun ity
Previous ProcessCycle Time:
E/T = 249 Hrs
W/T = 18.08 Hrs
VA/T = 6.63 Hrs
-
7/27/2019 8 Project Reviews
14/36
2001 ConceptFlow 13
Variation Reduction DMAIC
-
7/27/2019 8 Project Reviews
15/36
2001 ConceptFlow 14
Variation Reduction - DMAIC
A few input variables typically have extraordinary influence on the output
Managing Process Inputs
The basic premise of variation reduction is that sources of variationcan be:
Identified
Quantified
Eliminated or Controlled
DMAIC
-
7/27/2019 8 Project Reviews
16/36
2001 ConceptFlow 15
Opportunities for Six Sigma Projects Page Space Utilization - Logos, Margins, Name -Phase I
Standardize/Reformat the Display of Individual Sections - Phase II
Paper Redesign - Phase III
Eliminate Redundant Information - Daily Activity
Presort Statements Statement Production Cycle Time
Convert IRA Accounts to Quarterly
Alternate Delivery Medium - On Line, Email, CD Rom
Reduce Number of Duplicate Copy Statements
Duplicate Statements - Household and On Line Delivery Convert Growth to Portrait Format
Reduce Error and Correction Statements
Reduce/Eliminate Low Balance/No Activity Accounts
Statement Efficiency TeamUSPC Landscape Client Statement
-
7/27/2019 8 Project Reviews
17/36
2001 ConceptFlow 16
Statement Efficiency TeamUSPC Landscape Client Statement
-
7/27/2019 8 Project Reviews
18/36
2001 ConceptFlow 17
Product Overview
Client Statement Background - April 2001Monthly Annualized
Statement Volume 3,700,000 44,800,000
Page Volume 54,000,000 650,000,000
Postage Expense $2,750,000 $33,000,000Supplies & Print $ 440,000 $ 5,300,000
Sub-total Direct $4,190,000 $38,300,000
Labor, Maint. Space $1,500,000 $18,000,000
Full MLPT Expense $5,690,000 $56,300,000
Average Length per Client Statement - 14.5 Pages
Monthly Production Cycle - 7 days
-
7/27/2019 8 Project Reviews
19/36
2001 ConceptFlow 18
Define Phase
Problem Statement:
The current USPC landscape statements are
long in length which has a direct impact on
cost and service.
Defect Definition:
The defects include: Top margin requirement of a minimum of 2.25
inches before any client specific information
can appear
Fixed information in Sections within the
statement used to display client information
Spacing inconsistencies within a statement
Initial Sigma Statistics for Process
2.2 Sigma Level - Page Space Usage
77% Effective Page Space Use
2.2 Sigma Level - Defective Lines
78% Effective Line Display
Highlights
1.25 2.00 .75 4.508.50
minimum clear space left at bottom of imageclear space at top of page for name, preprint, etc.height of headernet space available for statement data per image
Page Utilization
0 100 200
Length Delivery Ease
Negative
Comments
-
7/27/2019 8 Project Reviews
20/36
2001 ConceptFlow 19
Measure Phase
Length
of stmt
Statement Summary
Current Portfolio
Section
Daily Activity Section
Bottom Margin
Monthly Activity
Section
Tax InformationSection
Top Margin
Regulatory
information
Headers
Footnote
Not within sectionToo many lines
Headers
Consolidate 4 lines to 3
Line Spacing
No linesskipped
between titleand columnheaders
Spacing forfirst categorytitle
Inconsistent spacing
Headers
Different headers for
different categories
Spacing forfirst categorytitle
Inconsistent spacing
Pre-printon paper
Size of logo shade box
Location ofname (pg 2+)
Inconsistent start
Size of
main logo
Logos
Size andlocation ofsecondarylogo
Rules onsections
Inconsistentend
Income Information
Cash Flow
ELS Page
Account Summary
Realized Gain & Loss
Fish Bone Diagram
-
7/27/2019 8 Project Reviews
21/36
2001 ConceptFlow 20
Analysis Phase
Line Reduction Projections
Impact per Opportunity Impact on Different Stmt Lengths
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
Impact per Opportunity0
20
40
60
80
100
120
140
10 Page 20 Page 40 Page
Logo & Name Current Portfolio Monthly Activity
Daily Activity Customer Service Cash Flow
Bank Dep Cap Gain Tax Info
Visa Misc
-
7/27/2019 8 Project Reviews
22/36
2001 ConceptFlow 21
Improve Phase
High
Medium
Low
High
Medium
Low
Phase 1 Phase 2 Phase 3
-
7/27/2019 8 Project Reviews
23/36
2001 ConceptFlow 22
Solution Validation
Tested in replicated statement environment
Statistical analysis to quantify page savings
Ensure project goal alignment
Pre-Project
Statement
Volumes by Page
Count
Post-Project
Statement Volumes
by Page Count
Impact of Opportunity Calculations
Reduction
by Page
Count
Stmt
Efficiency
Phase I
avg CP
occ
avg MA
occ
avg DA
occ
avg
Accts
CP Lines
saved
MA
Lines
saved
DA
Lines
saved
CS
Lines
saved
CF
Lines
saved
BD
Lines
saved
RCG
Lines
saved
TIS
Lines
saved
Visa
Lines
saved
Misc
Lines
saved
Pages Stmts pages images 3.00 0.00 1.00 2.00 2.50 2.00 2.00 5.00 1.00 2.00
2 207,413 414,826 829,652 0. 89 0. 52 0. 39 1.00 2. 67 0. 00 1.39 2.00 2.50 2.00 2.00 5.00 1.00 2.00
3 812, 863 2, 438, 589 4, 877, 178 1. 54 1. 06 0. 62 1. 00 4. 62 0. 00 1. 62 2. 00 2. 50 2. 00 2. 00 5. 00 1. 00 2. 004 806, 200 3, 224, 800 6, 449, 600 2. 75 1. 37 0. 77 1. 01 8. 26 0. 00 1. 77 2. 03 2. 52 2. 01 2. 01 5. 00 1. 00 2. 03
5 4 39, 171 2, 229, 528 4, 459, 056 3. 75 1. 77 1. 25 1. 03 11. 26 0. 00 2. 25 2. 06 2. 54 2. 02 2. 02 5. 00 1. 00 2. 06
6 2 88, 036 1, 685, 210 3, 370, 419 4. 60 2. 20 1. 42 1. 17 13. 81 0. 00 2. 42 2. 34 2. 71 2. 11 2. 11 5. 00 1. 00 2. 34
7 1 86, 746 1, 325, 344 2, 650, 687 5. 15 2. 55 1. 83 1. 42 15. 46 0. 00 2. 83 2. 84 3. 02 2. 28 2. 28 5. 00 1. 00 2. 84
8 1 38, 473 1, 123, 209 2, 246, 419 5. 93 2. 97 2. 04 1. 65 17. 79 0. 00 3. 04 3. 30 3. 31 2. 43 2. 43 5. 00 1. 00 3. 30
9 1 10, 387 1, 000, 120 2, 000, 240 6. 81 3. 44 2. 22 1. 87 20. 43 0. 00 3. 22 3. 73 3. 58 2. 57 2. 57 5. 00 1. 00 3. 73
10 92,716 913,175 1,826,349 7. 86 4. 01 2. 43 2.12 23. 57 0. 00 3.43 4.24 3.90 2.74 2.74 5.00 1.00 4.24
11 75,459 836,706 1,673,412 8. 88 4. 39 2. 48 2.37 26. 65 0. 00 3.48 4.74 4.21 2.90 2.90 5.00 1.00 4.74
12 60,860 757,953 1,515,907 9. 35 4. 89 2. 78 2.64 28. 05 0. 00 3.78 5.28 4.55 3.08 3.08 5.00 1.00 5.28
13 51, 522 696, 923 1, 393, 845 10. 14 5. 56 2. 98 2. 85 30. 42 0. 00 3. 98 5. 70 4. 81 3. 22 3. 22 5. 00 1. 00 5. 70
14 43, 111 631, 790 1, 263, 580 11. 27 6. 22 3. 25 2. 92 33. 81 0. 00 4. 25 5. 84 4. 90 3. 27 3. 27 5. 00 1. 00 5. 84
15 35, 061 557, 259 1, 114, 518 11. 93 6. 77 3. 38 3. 13 35. 80 0. 00 4. 38 6. 25 5. 16 3. 40 3. 40 5. 00 1. 00 6. 25
total
lines
saved
Images
reduced
redux 1
pg
redux 2
pg
un
affected
stmts
Stmt
Efficiency
Phase II
41.00 1 2 Stmts pages images
20.56 0.50 207,413 414,826 829,652
22.75 0.55 812,863 2,438,589 4,877,17826.63 0.65 968,021 3,872,082 7,744,164
30.21 0.74 161,821 0 277,350 396,261 1,981,303 3,962,606
33.85 0.83 118,910 0 169,126 254,614 1,527,684 3,055,368
37.54 0.92 85,488 0 101,258 171,490 1,200,430 2,400,860
41.59 1 .01 70,232 0 68,241 129,945 1,039,559 2,079,118
45.84 1 .12 61 ,704 0 48,683 106,167 955,505 1,911,010
50. 84 1. 24 5 7, 484 0 35, 232 86, 435 864, 352 1, 728, 705
55. 64 1. 36 5 1, 204 0 24, 255 68, 124 749, 367 1, 498, 733
59. 11 1. 44 4 3, 869 0 16, 991 56, 614 679, 368 1, 358, 735
63. 06 1. 54 3 9, 623 0 11, 899 47, 208 613, 707 1, 227, 414
67. 16 1. 64 35, 309 0 7, 802 38, 007 532, 097 1, 064, 195
70. 64 1.72 30,205 0 4, 856 32, 589 488, 836 977, 673
-
7/27/2019 8 Project Reviews
24/36
2001 ConceptFlow 23
Revised Statement Page
-
7/27/2019 8 Project Reviews
25/36
2001 ConceptFlow 24
Accomplishments
Average Length per Client Statement - 11.8 Pages
Monthly Production Cycle - 5.9 days
Phase I - Top Margin - August 2001 Page Reduction 6% Savings $1.1 Million
Phase II - Header Consolidation - November 2001 Page Reduction 10% Savings $1.3 Million
Phase III - Modify Paper - March 2002
Page Reduction 5% Savings $600,000
-
7/27/2019 8 Project Reviews
26/36
2001 ConceptFlow 25
Growth Design for Six Sigma
-
7/27/2019 8 Project Reviews
27/36
2001 ConceptFlow 26
Growth - Design For Six Sigma
DFSS
Integrate client and business needs and wants
before launching products and services
Know client requirements
Design products, services, and processes that satisfy bothclient and business needs at Six Sigma quality
Approach for understanding and translating client requirements fornew products and services
Client is involved at each stage
Avoid developing products with no market
-
7/27/2019 8 Project Reviews
28/36
2001 ConceptFlow 27
Marketing Proposal ProcessIdentify Phase Overview
Problem Statement
Currently there doesnt exist a repeatable process to develop a marketing proposalon any of the 45 major products (major products sell for $9000 or higher andhave volume sufficient to provide at least $1Million in revenue).
Project Objective Statement
To create a repeatable process that takes into consideration the needs of theClients.
Financial Benefits
Revenue Increase $2.0M
Other Cost Savings $0.3M
Total Benefits $2.3
Client BenefitCreating a systemic repeatable proposal process will allow the Client to have arepeatable proposal process which should simplify the sourcing function at theClient.
Employee Benefit
The current frustration of not having a process to follow is placing undue stress on
the support team and the proposal leaders.
-
7/27/2019 8 Project Reviews
29/36
2001 ConceptFlow 28
CTQ Identification
The CTQs will be identified during the QFD process, but it appearsthat Win rate at a particular margin is appropriate, delivery of theproposal on time, and repeatability / reproducibility are criticalcomponents.
Cost of Poor Quality
Estimated at 5% of the deals lost ($75Million) 3.75 M Rev
Lost Productivity of Team 0.3 M Cost
Lost Productivity of Sales Force 1.0 M Rev
Project Overview
-
7/27/2019 8 Project Reviews
30/36
2001 ConceptFlow 29
Preliminary Baseline Metrics
Variation of cost between similar products
Costs BCosts A
10500
9500
8500
Boxplots of Costs A and Costs B
(means are indicated by solid circles)
The evidence showed there was anissue that went beyond wasteelimination or even variance reduction.
Four Proposal Leaders were asked to
write down the process that they followto prepare a proposal as expected,it was painful and the processes werevery different between the proposalleaders.
Was one the entitlement? Reviewingthe winning proposals and noting thatthe 20% win rate was scatteredamong the 4 proposal leaders - weidentified no difference in proportions.
AnalyzeMeasure Improve ControlDefine M I CD A
DFSS
Yes
Is the
Improvement
a new or
redesigned
process or
service?
NoDoes the
process/
product
exist?
No No
YesWillachieving
entitlement
accomplish
goals?
Yes
-
7/27/2019 8 Project Reviews
31/36
2001 ConceptFlow 30
Key Actions
1.Completed SIPOC to determine true stakeholdersdeveloped plan tomake sure that only appropriate Clients received proposals
2.Redesigned the proposal process to a 7 step tollgate process withelectronic templates for each step
3. Developed a stakeholder meeting team that acted as tollgate reviewers
4.Sign-in and metric validation for each RFQ
5. Validated Clients and developed a link to Client contact / history
6.Created pivot tables / access queries to pull latest cost information fromlegacy systems
7.Trained Proposal Leaders and created templates on Margin Analysis,NPV, IRR, and other specific financial calculations needed determine
the stakeholders CTQs8. Created templates for all Cost and Price Waterfalls to ensure that the
Client and company addressed each issue surrounding title transferand risk of loss
9. Implemented the process and simulated proposals to ensure low
variation among the proposal leaders
-
7/27/2019 8 Project Reviews
32/36
2001 ConceptFlow 31
SIPOC / QFD & Tollgate
Proposal Process
Determine NPV
Gather data
Match requirements
To opportunities
Validate supply chain
Can support the deal
Sign off the deal
Requirements
Inputs Outputs Clients
InputBoundary OutputBoundary
ProcessSuppliers
Requirements
Proposal signed
And returned by
Due date
Shareholders
Sales Force
Manager
External Clients
General Manager
Signed documents
Cost SystemSystem entry
Client Requirements
External Clients
Operating Business
Supply Chain
Financial Analysts
-
7/27/2019 8 Project Reviews
33/36
2001 ConceptFlow 32
Win rate actually have a metric (trending up)
Frustration reduced at Client / selling team Revenue increase up $5m CM $ increase $2.2m CM percentage stable
Achievements / Validation
New Costs BNew Costs A
9700
9600
9500
9400
9300
9200
9100
9000
8900
8800
C5
C4
Boxplots of C4 by C5(means are indicated by solid circles)
Costs A Costs B
8500
9500
10500
Boxplots of Costs A and Costs B(means are indicated by solid circles)
Note scale difference
Visually and statistically there is a difference between the original set of costs,
while after the implementation there is no visual nor statistical difference
-
7/27/2019 8 Project Reviews
34/36
2001 ConceptFlow 33
Project Reviews Key Points
Ensure that the Process Owners attend the reviews
Be an active participant these projects impact the performance ofthe business
If projects are not progressing, find and address the issues
Confer frequently with Black Belts:
Outside of formal project reviews
Early in a project
Black Belt success is ultimately the responsibility of the
Project Champion & Process Owner
-
7/27/2019 8 Project Reviews
35/36
2001 ConceptFlow 34
Module Learning Objectives
Understand that the projects will streamline processes utilizing oneor more of the 3 elements of Six Sigma
Discuss the Black Belt Project Reviews particulars
Recognize that Project Reviews ensure consistency and timing of
project completion Provide project examples to demonstrate Six Sigma methodologies
-
7/27/2019 8 Project Reviews
36/36
Trademarks and Service Marks
Six Sigma is a federally registered trademark of Motorola, Inc.
Breakthrough Strategy is a federally registered trademark of Six Sigma Academy.
VISION. FOR A MORE PERFECT WORLD is a federally registered trademark of Six Sigma Academy.
ESSENTEQ is a trademark of Six Sigma Academy.
FASTART is a trademark of Six Sigma Academy.
Breakthrough Design is a trademark of Six Sigma Academy.
Breakthrough Lean is a trademark of Six Sigma Academy.
Design with the Power of Six Sigma is a trademark of Six Sigma Academy.
Legal Lean is a trademark of Six Sigma Academy.
SSA Navigator is a trademark of Six Sigma Academy.
SigmaCALC is a trademark of Six Sigma Academy.
SigmaFlowis a trademark of Compass Partners, Inc.
SigmaTRAC is a trademark of DuPont.
MINITAB is a trademark of Minitab, Inc.