    2001 ConceptFlow 0

    Project Reviews and Examples

  • 7/27/2019 8 Project Reviews

    2/36

    2001 ConceptFlow 1

    Module Learning Objectives

    Understand that projects can utilize one or several of the 3 SixSigma elements

    Discuss the components of Black Belt project reviews

    Recognize that project reviews ensure consistency and timing

    of project completion Provide project examples to demonstrate Six Sigma

    methodologies

  • 7/27/2019 8 Project Reviews

    3/36

    2001 ConceptFlow 2

    Six Sigma Projects

    The Project Champions approach to reviews is consistent

    regardless of the type of project

    While there are three elements comprising the Six Sigma foundation,projects can utilize:

    A singular element as the focus

    Growth

    Eliminate unnecessary steps Reduce variability

    Multiple elements

    Growth + Reduce variability

  • 7/27/2019 8 Project Reviews

    4/36

    2001 ConceptFlow 3

    Project Reviews

    Regularly scheduled reviewsdemonstrate achievements

    When:

    Project reviews are conducted at logical tollgates

    Academic reviews occur during Black Belt training with classmates

    Business reviews occur with Business Managers and ProcessOwners

    Final reviews for senior leadership at project completion

  • 7/27/2019 8 Project Reviews

    5/36

    2001 ConceptFlow 4

    Project Reviews

    Single, concise formatcomplex business problems

    How:

    Use standard template

    Project Champions, Black Belts, Business Managers and ProcessOwners in attendance

    10 uninterrupted minutes for presentation5 minute questions &

    answers

    Strict time discipline ensures continued participant involvement

  • 7/27/2019 8 Project Reviews

    6/36

    2001 ConceptFlow 5

    Project Reviews

    What:

    Method to assess the project progress and team engagement

    Method to learn Six Sigma through participation

    Way to provide visible support

    Way to recognize and energize the teams

    Way to leverage best practices

    The project review demonstrating significant progress

  • 7/27/2019 8 Project Reviews

    7/36 2001 ConceptFlow 6

    Elimination of Unnecessary Steps - Lean

  • 7/27/2019 8 Project Reviews

    8/36 2001 ConceptFlow 7

    Elimination of Unnecessary Steps - Lean

    Streamlined Processes

    The method of reducing unnecessary steps to reduce rework, save time,save cost, and extend capacity of valuable resources

    Lean

    Identifying waste and making it visible is the first step

  • 7/27/2019 8 Project Reviews

    9/36 2001 ConceptFlow 8

    Portfolio Reviews Project Overview

    Problem Statement

    The process for portfolio reviews varies in depth and time to prepare from 1 day to 8days, but the elapsed time can extend to almost 40 days from first contact to execution.

    Project Objective Statement

    To understand what steps are non-value added and eliminate those steps.

    Financial Benefits Revenue Increase $7.0M

    Other Cost Savings $0.5M

    Total Benefits $7.5M

    Client Benefit

    Executing a consistent portfolio review process with only value added steps willreduce the time from when the Advisor and Client identify the need for a sessionand the point when the session is able to be conducted.

    Employee Benefit

    Advisors, call centers and service teams will be able to manage client reviews in amore organized fashion with only work important to the client being accomplished.

  • 7/27/2019 8 Project Reviews

    10/36 2001 ConceptFlow 9

    Step 1 -Map the As-IsValue Stream

    As-Is Process

    Cycl e Time:

    E/T = 249 Hrs

    W/T = 18.08 Hrs

    VA/T = 6.63 Hrs

    E/T = Elapsed Tim e

    W/T = Work Time

    VA/T = Value-Ad ded Tim e

    Portfolio Review Duration

  • 7/27/2019 8 Project Reviews

    11/36 2001 ConceptFlow 10

    Step 2 - Prio rit ize Waste /Defect Opp ortun i t ies

    As-Is Process

    Cycl e Time:

    Cross Functional Team Prioritizes Opportunities

    Red Greatest Potential Benefit

    Yellow Worthwh i le Opportun ity E/T = 249 Hrs

    W/T = 18.08 Hrs

    VA/T = 6.63 Hrs

  • 7/27/2019 8 Project Reviews

    12/36 2001 ConceptFlow 11

    Step 3 - Ident i fy Lean Method s and Ass ign Act ion Items

    Waste Opportun i ty Imp act Ease Prior i ty Six Sigma / Lean Method

    Conduct Portfolio Analysis

    Develop Financial Strategy

    Present Solution to Client

    Execute Strategy

    5 2 1

    5 3 2

    3 3 3

    4 5 4

    Provide Client a simple checksheet of

    information needed call centers work as

    Concierge for this feature

    Using call centers in meeting with advisors,

    information is directly typed into website for

    immediate information flow to servicesBased on reduced variation, client return meeting

    is scheduled with confidence during first visit

    Work variation reduction project to

    understand how to get the client to yes

    at greater percentages at presentation

    Process Blitz Action Items

    During Process Blitz the cross functional team identified

    standardization and technological solutions to waste issues. Team recommended

    only those technology solutions that were available, but not currently activated.

  • 7/27/2019 8 Project Reviews

    13/36

    2001 ConceptFlow 12

    Step 4 - Future State Map

    Future Process

    Cycl e Time:

    E/T = 146 Hrs

    W/T = 15.92 Hrs

    VA/T = 6.63 Hrs

    Future State Map

    Red Greatest Potential Benefit

    Yellow Worthwh i le Opportun ity

    Previous ProcessCycle Time:

    E/T = 249 Hrs

    W/T = 18.08 Hrs

    VA/T = 6.63 Hrs

  • 7/27/2019 8 Project Reviews

    14/36

    2001 ConceptFlow 13

    Variation Reduction DMAIC

  • 7/27/2019 8 Project Reviews

    15/36

    2001 ConceptFlow 14

    Variation Reduction - DMAIC

    A few input variables typically have extraordinary influence on the output

    Managing Process Inputs

    The basic premise of variation reduction is that sources of variationcan be:

    Identified

    Quantified

    Eliminated or Controlled

    DMAIC

  • 7/27/2019 8 Project Reviews

    16/36

    2001 ConceptFlow 15

    Opportunities for Six Sigma Projects Page Space Utilization - Logos, Margins, Name -Phase I

    Standardize/Reformat the Display of Individual Sections - Phase II

    Paper Redesign - Phase III

    Eliminate Redundant Information - Daily Activity

    Presort Statements Statement Production Cycle Time

    Convert IRA Accounts to Quarterly

    Alternate Delivery Medium - On Line, Email, CD Rom

    Reduce Number of Duplicate Copy Statements

    Duplicate Statements - Household and On Line Delivery Convert Growth to Portrait Format

    Reduce Error and Correction Statements

    Reduce/Eliminate Low Balance/No Activity Accounts

    Statement Efficiency TeamUSPC Landscape Client Statement

  • 7/27/2019 8 Project Reviews

    17/36

    2001 ConceptFlow 16

    Statement Efficiency TeamUSPC Landscape Client Statement

  • 7/27/2019 8 Project Reviews

    18/36

    2001 ConceptFlow 17

    Product Overview

    Client Statement Background - April 2001Monthly Annualized

    Statement Volume 3,700,000 44,800,000

    Page Volume 54,000,000 650,000,000

    Postage Expense $2,750,000 $33,000,000Supplies & Print $ 440,000 $ 5,300,000

    Sub-total Direct $4,190,000 $38,300,000

    Labor, Maint. Space $1,500,000 $18,000,000

    Full MLPT Expense $5,690,000 $56,300,000

    Average Length per Client Statement - 14.5 Pages

    Monthly Production Cycle - 7 days

  • 7/27/2019 8 Project Reviews

    19/36

    2001 ConceptFlow 18

    Define Phase

    Problem Statement:

    The current USPC landscape statements are

    long in length which has a direct impact on

    cost and service.

    Defect Definition:

    The defects include: Top margin requirement of a minimum of 2.25

    inches before any client specific information

    can appear

    Fixed information in Sections within the

    statement used to display client information

    Spacing inconsistencies within a statement

    Initial Sigma Statistics for Process

    2.2 Sigma Level - Page Space Usage

    77% Effective Page Space Use

    2.2 Sigma Level - Defective Lines

    78% Effective Line Display

    Highlights

    1.25 2.00 .75 4.508.50

    minimum clear space left at bottom of imageclear space at top of page for name, preprint, etc.height of headernet space available for statement data per image

    Page Utilization

    0 100 200

    Length Delivery Ease

    Negative

    Comments

  • 7/27/2019 8 Project Reviews

    20/36

    2001 ConceptFlow 19

    Measure Phase

    Length

    of stmt

    Statement Summary

    Current Portfolio

    Section

    Daily Activity Section

    Bottom Margin

    Monthly Activity

    Section

    Tax InformationSection

    Top Margin

    Regulatory

    information

    Headers

    Footnote

    Not within sectionToo many lines

    Headers

    Consolidate 4 lines to 3

    Line Spacing

    No linesskipped

    between titleand columnheaders

    Spacing forfirst categorytitle

    Inconsistent spacing

    Headers

    Different headers for

    different categories

    Spacing forfirst categorytitle

    Inconsistent spacing

    Pre-printon paper

    Size of logo shade box

    Location ofname (pg 2+)

    Inconsistent start

    Size of

    main logo

    Logos

    Size andlocation ofsecondarylogo

    Rules onsections

    Inconsistentend

    Income Information

    Cash Flow

    ELS Page

    Account Summary

    Realized Gain & Loss

    Fish Bone Diagram

  • 7/27/2019 8 Project Reviews

    21/36

    2001 ConceptFlow 20

    Analysis Phase

    Line Reduction Projections

    Impact per Opportunity Impact on Different Stmt Lengths

    0

    0.5

    1

    1.5

    2

    2.5

    3

    3.5

    4

    4.5

    5

    Impact per Opportunity0

    20

    40

    60

    80

    100

    120

    140

    10 Page 20 Page 40 Page

    Logo & Name Current Portfolio Monthly Activity

    Daily Activity Customer Service Cash Flow

    Bank Dep Cap Gain Tax Info

    Visa Misc

  • 7/27/2019 8 Project Reviews

    22/36

    2001 ConceptFlow 21

    Improve Phase

    High

    Medium

    Low

    High

    Medium

    Low

    Phase 1 Phase 2 Phase 3

  • 7/27/2019 8 Project Reviews

    23/36

    2001 ConceptFlow 22

    Solution Validation

    Tested in replicated statement environment

    Statistical analysis to quantify page savings

    Ensure project goal alignment

    Pre-Project

    Statement

    Volumes by Page

    Count

    Post-Project

    Statement Volumes

    by Page Count

    Impact of Opportunity Calculations

    Reduction

    by Page

    Count

    Stmt

    Efficiency

    Phase I

    avg CP

    occ

    avg MA

    occ

    avg DA

    occ

    avg

    Accts

    CP Lines

    saved

    MA

    Lines

    saved

    DA

    Lines

    saved

    CS

    Lines

    saved

    CF

    Lines

    saved

    BD

    Lines

    saved

    RCG

    Lines

    saved

    TIS

    Lines

    saved

    Visa

    Lines

    saved

    Misc

    Lines

    saved

    Pages Stmts pages images 3.00 0.00 1.00 2.00 2.50 2.00 2.00 5.00 1.00 2.00

    2 207,413 414,826 829,652 0. 89 0. 52 0. 39 1.00 2. 67 0. 00 1.39 2.00 2.50 2.00 2.00 5.00 1.00 2.00

    3 812, 863 2, 438, 589 4, 877, 178 1. 54 1. 06 0. 62 1. 00 4. 62 0. 00 1. 62 2. 00 2. 50 2. 00 2. 00 5. 00 1. 00 2. 004 806, 200 3, 224, 800 6, 449, 600 2. 75 1. 37 0. 77 1. 01 8. 26 0. 00 1. 77 2. 03 2. 52 2. 01 2. 01 5. 00 1. 00 2. 03

    5 4 39, 171 2, 229, 528 4, 459, 056 3. 75 1. 77 1. 25 1. 03 11. 26 0. 00 2. 25 2. 06 2. 54 2. 02 2. 02 5. 00 1. 00 2. 06

    6 2 88, 036 1, 685, 210 3, 370, 419 4. 60 2. 20 1. 42 1. 17 13. 81 0. 00 2. 42 2. 34 2. 71 2. 11 2. 11 5. 00 1. 00 2. 34

    7 1 86, 746 1, 325, 344 2, 650, 687 5. 15 2. 55 1. 83 1. 42 15. 46 0. 00 2. 83 2. 84 3. 02 2. 28 2. 28 5. 00 1. 00 2. 84

    8 1 38, 473 1, 123, 209 2, 246, 419 5. 93 2. 97 2. 04 1. 65 17. 79 0. 00 3. 04 3. 30 3. 31 2. 43 2. 43 5. 00 1. 00 3. 30

    9 1 10, 387 1, 000, 120 2, 000, 240 6. 81 3. 44 2. 22 1. 87 20. 43 0. 00 3. 22 3. 73 3. 58 2. 57 2. 57 5. 00 1. 00 3. 73

    10 92,716 913,175 1,826,349 7. 86 4. 01 2. 43 2.12 23. 57 0. 00 3.43 4.24 3.90 2.74 2.74 5.00 1.00 4.24

    11 75,459 836,706 1,673,412 8. 88 4. 39 2. 48 2.37 26. 65 0. 00 3.48 4.74 4.21 2.90 2.90 5.00 1.00 4.74

    12 60,860 757,953 1,515,907 9. 35 4. 89 2. 78 2.64 28. 05 0. 00 3.78 5.28 4.55 3.08 3.08 5.00 1.00 5.28

    13 51, 522 696, 923 1, 393, 845 10. 14 5. 56 2. 98 2. 85 30. 42 0. 00 3. 98 5. 70 4. 81 3. 22 3. 22 5. 00 1. 00 5. 70

    14 43, 111 631, 790 1, 263, 580 11. 27 6. 22 3. 25 2. 92 33. 81 0. 00 4. 25 5. 84 4. 90 3. 27 3. 27 5. 00 1. 00 5. 84

    15 35, 061 557, 259 1, 114, 518 11. 93 6. 77 3. 38 3. 13 35. 80 0. 00 4. 38 6. 25 5. 16 3. 40 3. 40 5. 00 1. 00 6. 25

    total

    lines

    saved

    Images

    reduced

    redux 1

    pg

    redux 2

    pg

    un

    affected

    stmts

    Stmt

    Efficiency

    Phase II

    41.00 1 2 Stmts pages images

    20.56 0.50 207,413 414,826 829,652

    22.75 0.55 812,863 2,438,589 4,877,17826.63 0.65 968,021 3,872,082 7,744,164

    30.21 0.74 161,821 0 277,350 396,261 1,981,303 3,962,606

    33.85 0.83 118,910 0 169,126 254,614 1,527,684 3,055,368

    37.54 0.92 85,488 0 101,258 171,490 1,200,430 2,400,860

    41.59 1 .01 70,232 0 68,241 129,945 1,039,559 2,079,118

    45.84 1 .12 61 ,704 0 48,683 106,167 955,505 1,911,010

    50. 84 1. 24 5 7, 484 0 35, 232 86, 435 864, 352 1, 728, 705

    55. 64 1. 36 5 1, 204 0 24, 255 68, 124 749, 367 1, 498, 733

    59. 11 1. 44 4 3, 869 0 16, 991 56, 614 679, 368 1, 358, 735

    63. 06 1. 54 3 9, 623 0 11, 899 47, 208 613, 707 1, 227, 414

    67. 16 1. 64 35, 309 0 7, 802 38, 007 532, 097 1, 064, 195

    70. 64 1.72 30,205 0 4, 856 32, 589 488, 836 977, 673

  • 7/27/2019 8 Project Reviews

    24/36

    2001 ConceptFlow 23

    Revised Statement Page

  • 7/27/2019 8 Project Reviews

    25/36

    2001 ConceptFlow 24

    Accomplishments

    Average Length per Client Statement - 11.8 Pages

    Monthly Production Cycle - 5.9 days

    Phase I - Top Margin - August 2001 Page Reduction 6% Savings $1.1 Million

    Phase II - Header Consolidation - November 2001 Page Reduction 10% Savings $1.3 Million

    Phase III - Modify Paper - March 2002

    Page Reduction 5% Savings $600,000

  • 7/27/2019 8 Project Reviews

    26/36

    2001 ConceptFlow 25

    Growth Design for Six Sigma

  • 7/27/2019 8 Project Reviews

    27/36

    2001 ConceptFlow 26

    Growth - Design For Six Sigma

    DFSS

    Integrate client and business needs and wants

    before launching products and services

    Know client requirements

    Design products, services, and processes that satisfy bothclient and business needs at Six Sigma quality

    Approach for understanding and translating client requirements fornew products and services

    Client is involved at each stage

    Avoid developing products with no market

  • 7/27/2019 8 Project Reviews

    28/36

    2001 ConceptFlow 27

    Marketing Proposal ProcessIdentify Phase Overview

    Problem Statement

    Currently there doesnt exist a repeatable process to develop a marketing proposalon any of the 45 major products (major products sell for $9000 or higher andhave volume sufficient to provide at least $1Million in revenue).

    Project Objective Statement

    To create a repeatable process that takes into consideration the needs of theClients.

    Financial Benefits

    Revenue Increase $2.0M

    Other Cost Savings $0.3M

    Total Benefits $2.3

    Client BenefitCreating a systemic repeatable proposal process will allow the Client to have arepeatable proposal process which should simplify the sourcing function at theClient.

    Employee Benefit

    The current frustration of not having a process to follow is placing undue stress on

    the support team and the proposal leaders.

  • 7/27/2019 8 Project Reviews

    29/36

    2001 ConceptFlow 28

    CTQ Identification

    The CTQs will be identified during the QFD process, but it appearsthat Win rate at a particular margin is appropriate, delivery of theproposal on time, and repeatability / reproducibility are criticalcomponents.

    Cost of Poor Quality

    Estimated at 5% of the deals lost ($75Million) 3.75 M Rev

    Lost Productivity of Team 0.3 M Cost

    Lost Productivity of Sales Force 1.0 M Rev

    Project Overview

  • 7/27/2019 8 Project Reviews

    30/36

    2001 ConceptFlow 29

    Preliminary Baseline Metrics

    Variation of cost between similar products

    Costs BCosts A

    10500

    9500

    8500

    Boxplots of Costs A and Costs B

    (means are indicated by solid circles)

    The evidence showed there was anissue that went beyond wasteelimination or even variance reduction.

    Four Proposal Leaders were asked to

    write down the process that they followto prepare a proposal as expected,it was painful and the processes werevery different between the proposalleaders.

    Was one the entitlement? Reviewingthe winning proposals and noting thatthe 20% win rate was scatteredamong the 4 proposal leaders - weidentified no difference in proportions.

    AnalyzeMeasure Improve ControlDefine M I CD A

    DFSS

    Yes

    Is the

    Improvement

    a new or

    redesigned

    process or

    service?

    NoDoes the

    process/

    product

    exist?

    No No

    YesWillachieving

    entitlement

    accomplish

    goals?

    Yes

  • 7/27/2019 8 Project Reviews

    31/36

    2001 ConceptFlow 30

    Key Actions

    1.Completed SIPOC to determine true stakeholdersdeveloped plan tomake sure that only appropriate Clients received proposals

    2.Redesigned the proposal process to a 7 step tollgate process withelectronic templates for each step

    3. Developed a stakeholder meeting team that acted as tollgate reviewers

    4.Sign-in and metric validation for each RFQ

    5. Validated Clients and developed a link to Client contact / history

    6.Created pivot tables / access queries to pull latest cost information fromlegacy systems

    7.Trained Proposal Leaders and created templates on Margin Analysis,NPV, IRR, and other specific financial calculations needed determine

    the stakeholders CTQs8. Created templates for all Cost and Price Waterfalls to ensure that the

    Client and company addressed each issue surrounding title transferand risk of loss

    9. Implemented the process and simulated proposals to ensure low

    variation among the proposal leaders

  • 7/27/2019 8 Project Reviews

    32/36

    2001 ConceptFlow 31

    SIPOC / QFD & Tollgate

    Proposal Process

    Determine NPV

    Gather data

    Match requirements

    To opportunities

    Validate supply chain

    Can support the deal

    Sign off the deal

    Requirements

    Inputs Outputs Clients

    InputBoundary OutputBoundary

    ProcessSuppliers

    Requirements

    Proposal signed

    And returned by

    Due date

    Shareholders

    Sales Force

    Manager

    External Clients

    General Manager

    Signed documents

    Cost SystemSystem entry

    Client Requirements

    External Clients

    Operating Business

    Supply Chain

    Financial Analysts

  • 7/27/2019 8 Project Reviews

    33/36

    2001 ConceptFlow 32

    Win rate actually have a metric (trending up)

    Frustration reduced at Client / selling team Revenue increase up $5m CM $ increase $2.2m CM percentage stable

    Achievements / Validation

    New Costs BNew Costs A

    9700

    9600

    9500

    9400

    9300

    9200

    9100

    9000

    8900

    8800

    C5

    C4

    Boxplots of C4 by C5(means are indicated by solid circles)

    Costs A Costs B

    8500

    9500

    10500

    Boxplots of Costs A and Costs B(means are indicated by solid circles)

    Note scale difference

    Visually and statistically there is a difference between the original set of costs,

    while after the implementation there is no visual nor statistical difference

  • 7/27/2019 8 Project Reviews

    34/36

    2001 ConceptFlow 33

    Project Reviews Key Points

    Ensure that the Process Owners attend the reviews

    Be an active participant these projects impact the performance ofthe business

    If projects are not progressing, find and address the issues

    Confer frequently with Black Belts:

    Outside of formal project reviews

    Early in a project

    Black Belt success is ultimately the responsibility of the

    Project Champion & Process Owner

  • 7/27/2019 8 Project Reviews

    35/36

    2001 ConceptFlow 34

    Module Learning Objectives

    Understand that the projects will streamline processes utilizing oneor more of the 3 elements of Six Sigma

    Discuss the Black Belt Project Reviews particulars

    Recognize that Project Reviews ensure consistency and timing of

    project completion Provide project examples to demonstrate Six Sigma methodologies

  • 7/27/2019 8 Project Reviews

    36/36

    Trademarks and Service Marks

    Six Sigma is a federally registered trademark of Motorola, Inc.

    Breakthrough Strategy is a federally registered trademark of Six Sigma Academy.

    VISION. FOR A MORE PERFECT WORLD is a federally registered trademark of Six Sigma Academy.

    ESSENTEQ is a trademark of Six Sigma Academy.

    FASTART is a trademark of Six Sigma Academy.

    Breakthrough Design is a trademark of Six Sigma Academy.

    Breakthrough Lean is a trademark of Six Sigma Academy.

    Design with the Power of Six Sigma is a trademark of Six Sigma Academy.

    Legal Lean is a trademark of Six Sigma Academy.

    SSA Navigator is a trademark of Six Sigma Academy.

    SigmaCALC is a trademark of Six Sigma Academy.

    SigmaFlowis a trademark of Compass Partners, Inc.

    SigmaTRAC is a trademark of DuPont.

    MINITAB is a trademark of Minitab, Inc.