907 - 915 9th Avenue SE Calgary, Inglewood Open House Presentation GAIRWILLIAMSONARCHITECTS
907- 915 9th Avenue Se9th Avenue CAlgAry in inglewood
907- 915 9th Avenue Se
907 - 915 9th Avenue SE Calgary, Inglewood Open House Presentation GAIRWILLIAMSONARCHITECTS
we would like to share a bit about our values and our experience with you.
IntroductIonHungerford ProPerTIeS
Gair Williamson architects
Gair Williamson Architects was founded in 2002 and has since been focused on urban densification and a concern for the city as a repository of cultural memory.
The firm been featured in many publications and awarded numerous awards for their projects including Heritage Vancouver Awards, City of Vancouver Urban Design Awards, and Lieutenant Governor’s Awards.
Their reputation for contemporary work that respects the heritage fabric has led them to working as the prime consultant with the City of Calgary on a number of heritage conservation projects.
Hungerford Properties has been active in Calgary’s real estate market for the past seven years, specializing in industrial, commercial and retail. Our goal is to create homes and neighbourhoods that bring joy to their residents and make communities proud.
We are customer-committed and devoted to making the purchase of every single home satisfying and rewarding. We put together best-in-class teams of consultants, trades, and suppliers to deliver the finest products, and we strive to make every development exceed purchaser expectations.
THe sTAbLes bOWmAn LOfTsLieutenant Governor Award (for historical preservation)
Heritage Vancouver Award
ALTiTUDe THe Link
95 WesT HAsTinGs
mACPHersOn WALkAward Winning Development
We are astute investors, proud builders, and passionate creators of legacy-inspired developments. Ambition, Diligence, Creativity, relationships, and Community are the heart of our culture and what make us resilient in the communities we build.
AmbiTiOnWe are driven to achieve. We set high professional standards and ambitious goals as individuals and as a team. Visionary leadership, tenacity, and determination fuel our success and elevate our organization to global standards.
DiLiGenCeWe approach real estate investment, management, and development with rigorous systems, proven processes, and operational excellence. Our disciplined approach manages risk, builds confidence, and creates value for our stakeholders.
CreATiViTYWe are creative visionaries who work together, innovate, and imagine trailblazing possibilities. We value cross-collaboration to explore, challenge the norm, and develop new concepts that spur successful, inspiring, and award-winning developments.
reLATiOnsHiPsWe seek lasting and collaborative partnerships with our team and stakeholders. We cultivate relationships by communicating openly, being accountable and transparent, and seeking win-win. relationships of integrity and trust are hallmarks of our long-term success.
COmmUniTYWe see our impact in a broader context; thinking of others. The result is lasting and positive on our stakeholders and the communities in which we invest.
Hungerford ProPerTIeS - our VALueS
AMBITION DILIGENCE CREATIVITY RELATIO
NSHIP
S
CO
MMUNITY
907 - 915 9th Avenue SE Calgary, Inglewood Open House Presentation GAIRWILLIAMSONARCHITECTS
907-915 9TH AVesUbjeCT siTe
DOWnTOWn
rAmsAY
eAsT ViLLAGe
inGLeWOOD
ViCTOriA PArk
bOW riVer
eLb
OW r
iVer
eAsT ViCTOriA CrOssinG
The site is beautifully nestled between the elbow and bow rivers in the charming historic inglewood community just east of downtown Calgary.
The site’s prominence renders it a gateway to the historic main street, and 9th Avenue, placing it in close proximity to retail / services, and public amenities such as the Alexandra Centre and the riverside recreational pathways.
WesT VieW TO DOWnTOWn
nOrTH VieW TO bOW riVer
sOUTH VieW TO resiDenTiAL AreA
eAsT VieW TO inGLeWOOD COmmUniTY
SIte LocatIon
921 9TH AVe(HisTOriC PreserVATiOn)
located in the heart of inglewood.
907 - 915 9th Avenue SE Calgary, Inglewood Open House Presentation GAIRWILLIAMSONARCHITECTS
a front door to the communIty the site has been identified by the city as a front door between downtown calgary and inglewood.
sCOTiAbAnk sADDLeDOmeTHe bOW inGLeWOOD briDGe
PrOPOseD bUiLDinG
ATLAnTiC AVenUe ArT bLOCk
TeLUs skYsUnCOr enerGY CenTre
sCOTiA CenTre
bAnkers HALL
CALGArY TOWer
jAmiesOn PLACe
doWntoWn caLGary
“front door” to
InGLeWood
InGLeWood
Project GoaLS
907 - 915 9th Avenue SE Calgary, Inglewood Open House Presentation GAIRWILLIAMSONARCHITECTS
we aim to build a project of lasting relevance that strengthens the community and local economy, and provides housing that enhances wellbeing.
PUbLiC reALm & AmeniTies ACTiVe TrAnsPOrTATiOn COnneCTiViTY / mObiLiTY
Provide high quality urban design and architecture on an iconic corner of inglewood. Appropriate massing and orientation to respect the surrounding features, context and neighbouring buildings.
enhance the pedestrian realm and streetscape by providing plaza and courtyard which respect the historical fabric of inglewood and provides opportunities for local art, outdoor activities and seasonal events.
encourage community and economic vitality through a mix of uses and density that will promote neighbouring businesses, support new retail, and service employment opportunities.
The site currently consists of a surface parking lot and a 2-storey cinder block building situated at the entry point of inglewood at 9th Avenue and 8th street.
integrate the development into the existing and proposed transit network and infrastructure. encourage active means of transportation.
enhance connectivity and pedestrian movement through and around the site for convenient access to existing amenities and infrastructure.
mix Of UsesCUrrenT siTe COnDiTiOns bUiLDinG mAssinG & OrienTATiOn
PLannInG context
907 - 915 9th Avenue SE Calgary, Inglewood Open House Presentation GAIRWILLIAMSONARCHITECTS
9TH AVe briDGe PrOPOsAL
OUTWesT PArk reGenerATiOn
fOrT CALGArY HisTOriC PArk
riVerWALk
jACk LOnG PArk PrOPOsAL
10 AVe se
12 sT se
11 sT se
10 AVe se
9 sT se8 sT se
9TH AVe briDGe
eLbOW riVer TrAVerse
11 sT se
7 sT se
ADeLAiDe sT se
8 sT se
10 AVe se
11 AVe se
9 AVe se
9 AVe se
8 AVe se
8 AVe se
7 AVe se
sUbjeCT siTe
Green Line LrT
inGLeWOOD/rAmsAY sTATiOn
Source: Fort Calgary Make History Project
Source: City of Calgary
Source: City of Calgary
Source: City of Calgary
Source: City of Calgary Source: City of CalgarySource: Google Earth; City of Calgary Source: City of Calgary
9TH AVe se reViTALizATiOn
a number of beautification and transportation initiatives recently completed or currently in progress.
POssibLe 8 sT se rAiL CLOsUre
921 9TH AVe(HisTOriC PreserVATiOn)
11 sT se
nOrTH
tranSPortatIon & amenItIeS
907 - 915 9th Avenue SE Calgary, Inglewood Open House Presentation GAIRWILLIAMSONARCHITECTS
Green Line LrT
inGLeWOOD briDGe
eLbOW riVer TrAVerse
jACk LOnG
PArk
OUT WesT
PArk
fOrT CALGArY HisTOriC PArk
11 st se
10 AVe se
9 st se
8 st se
7 st se
ADeLAIDe st se
8 st se
10 AVe se
9 AVe se
9 AVe se
8 AVe se
8 AVe se
7 AVe se
11 st se
south bank (under construction)
Atlantic Avenue Art block
AVLi on Atlantic (under construction)
inglewood / ramsay station
Proposed 9th Ave bridge
Proposed Courtyard(precedent image)
Pedestrian / bike Connection
Proposed Plaza(precedent image)
Subject Site
Heritage-Preservedby Hungerford (921 9th Avenue)
5 min wAlk
10 min wAlk
4 min wAlk
3 min wAlk
3 min wAlk
3 min wAlk
many amenities are within a 5 minute walk of the site, and it is conveniently near the new green line lrt.LeGenD
bUs sTOP
WALkinG minUTes frOm siTe
WALkinG rOUTe
Green Line LrT
exisTinG TrAiLs
TrAnsPOrT Links
subject site is within:
• 10 min walk to inglewood / ramsay LrT station
• 10 min walk to 4 street se LrT station
• 15 min transit to downtown
• 1 hr transit to airport
4TH sT. se.
LrT sTATiOn inGLeWOOD / rAmsAY Green
Line LrT sTATiOn
(12TH sT se / ADeLAiDe sT se)
62
Map 8 | Transit Network
59
Map 7 | Pedestrian and Cycling Network
38m (124.7’) Height
5.0 fAr
Primary Transit network
Province of Alberta High speed rail
regional Commuter rail
LrT Alignment
LrT station
major Pedestrian
regional Pathway
Cycling
Community High Density
9th Avenue Policy Area
LrT Alignment
LrT station
Subject Site
Subject Site
Subject Site
Subject Site
Subject Site
9
The figure below provides a brief description of what each building block calls for. The Developed Areas Guidebook contains policy that is applied in conjunction with the policies of this Area Redevelopment Plan. It provides the basic building blocks for neighbourhood and community development. This Plan describes how those building blocks are arranged to support neighbourhoods and communities. Combined, they provide the policy for community growth.
In some cases, there may be no additional policy in this Plan for a particular item. In such cases, the Developed Areas Guidebook, the Municipal Development Plan or other relevant City policies apply. However, this Plan takes precedence in the event of any conflict between policies.
Figure 4: Building Blocks within the Developed Areas Guidebook
9
The figure below provides a brief description of what each building block calls for. The Developed Areas Guidebook contains policy that is applied in conjunction with the policies of this Area Redevelopment Plan. It provides the basic building blocks for neighbourhood and community development. This Plan describes how those building blocks are arranged to support neighbourhoods and communities. Combined, they provide the policy for community growth.
In some cases, there may be no additional policy in this Plan for a particular item. In such cases, the Developed Areas Guidebook, the Municipal Development Plan or other relevant City policies apply. However, this Plan takes precedence in the event of any conflict between policies.
Figure 4: Building Blocks within the Developed Areas Guidebook
907 - 915 9th Avenue SE Calgary, Inglewood Open House Presentation GAIRWILLIAMSONARCHITECTS
PLannInG context
Source: City of Calgary Source: City of Calgary
Source: City of Calgary Source: City of Calgary
DensiTY
TrAnsiT COnneCTiOns WALkinG AnD CYCLinG COnneCTiOns
mAximUm fLOOr AreA rATiO
bUiLDinG HeiGHT
• 9th Avenue Policy Area
• Community High-Density Area (10+ storeys; High-rise mixed-Use & Apartments; Large scale mid-rise) • Heritage Density Transfer to be determined
• Heritage Density Transfer to be determined
• On City’s Primary Transit network
• Within 600m radius from the future LrT station (10min walking distance)
• bus stop out front of subject site
• On major Pedestrian Connection
• in close proximity to regional Pathway and Cycling network
• “Prominently locate amenity spaces and establish connections to the pedestrian and cycle network” - Calgary ArP
the proposed development follows the framework outlined in the city’s proposed area redevelopment plan.
PLannInG context: PoLIcIeS & zonInG
c-cOR1
c-cOR2f2.8h12
c-cOR2f2.8h12
i-c
S-cRi
c-cOR1f3.0h20
9 Av Se
8 St
Se
Dc1Z93Site 2
Dc1Z93Site 4
i-cDc81D2010
R-c2
m-h1h21
S-SPR
R-c2
R-c2
S-cSS-R
Dc24Z94Site 2
existing zones
subject site (907-915)
Historic Preservation (921)
907 - 915 9th Avenue SE Calgary, Inglewood Open House Presentation GAIRWILLIAMSONARCHITECTS
zOninG bY-LAW
existing Land-Use• c-cOR2 f2.8 h12 (Commercial Corridor 2) / i-c (industrial Commercial)
• i-C maximum fAr 1.0 / max building height 12m
Proposed Land-Use• mu-2 f5 h37.5 (mixed Use - Active frontage District, fAr 5.0, Height 37.5m)
• Historic Preservation of 921 9th Avenue
• Proposed zone emphasizes promoting active frontage and active transportation
APPLiCAbLe CiTY Of CALGArY POLiCies AnD sTUDies sUmmArY
in developing the proposal, the following municipal documents have been taken into consideration. The concept and schematic design has been developed in line with the key objectives of the urban design guidelines and inglewood Area Development Plan.
• Historic east Calgary ArP (Draft)
• inglewood Area redevelopment Plan (ArP) retail and Commercial study
• 9th Ave se streetscape master Plan
• main street study - 9 Ave se (mDP)
• Transit Oriented Development (TOD) Policy Guidelines
• jack Long Park redevelopment
• improving Calgary’s entranceways
• Development next to freight rail Corridors Policy and implementation Guide
the proposed development follows the framework outlined in the city’s existing and proposed planning policies and urban design guidelines.
18-00320952
9 Avenue S.E.
Replacing the bridge
Construction access
9 Avenue S.E. will remain open during construction. A temporary road and bridge
will be provided before work begins on the new bridge.
Legend
7 Street S.E. is temporarily closing for
the duration of construction for the
project. The City is currently reviewing its
permanent closure, based on the future
road network in the area
Vehicle access will be provided across the
temporary bridge, to 8 Street S.E.,
along 9 Avenue S.E., and to Deane House
and Fort Calgary
Walking and cycling access will be
provided on pathways, sidewalks and
the north bridge (Elbow River Traverse)
Proposed detour road
Proposed detour bridge
Construction activities
We know that construction can be disruptive, so we are working to mitigate
the issues below:
Trees: In order to build the temporary bridge and new road, we will need to remove
some trees and vegetation during construction. After construction of the new bridge
is completed we will replace the trees within the area. Any trees that will be removed
for construction work will be signed for removal two weeks prior to being removed.
We are working on a landscaping plan for the riverbed and area. It will show where
new trees and vegetation will be planted. Once finalized, the landscaping plan will
be available on Calgary.ca/9avebridge
Noise: Construction is noisy, so we’re working to determine when the best time to do
the noisiest work is, to lessen the impact to the neighbourhood.
Vibration: With bridge construction comes work , such as piling, that creates vibrations.
We will do our best to lessen the impacts to the neighbourhood from vibrations
caused by construction work.
1
Draft of The Historic East Calgary
Area Redevelopment Plan
May 1, 2018
hIStorIcaL StreetScaPe & herItaGe tranSfer
907 - 915 9th Avenue SE Calgary, Inglewood Open House Presentation GAIRWILLIAMSONARCHITECTS
HeriTAGe DensiTY TrAnsfer
Under the City of Calgary Area redevelopment plan, a development project (‘receiver site’, in this case 907- 915 Avenue se) may increase density by transferring unused, residual density from a heritage resource (‘Donor site’, sibley block, 921 9th st se).
This Density Transfer will occur at the time of Land Use Application Approval and will be reflected on the Land Title.
The Fraser Block
Immediate Context
Alexandra School (1905)
Immediate Context
9th Ave South Elevation - 8th St / 10th StThe Burn Block
The National Hotel (1910)
Fire Station No. 3 (no date)
HisTOriCAL COnTexT
The history of inglewood is what has made the neighborhood rich in character, and we aim to build a project that recognizes and celebrates this history. To do so, we have performed numerous studies of the architectural character of the neighbourhood, heavily referenced archival documents, and drew from our own experience working in historically sensitive areas.
The story begins in the 1880’s when the City developed the main street, and Atlantic Avenue into a residential, commercial, and industrial neighbourhood. in recognition of its historic architecture, the City declared inglewood a special Heritage Character Area in 1991, leading to a joint Alberta main street Programme and inglewood business revitalization zone restoration initiative.
Image sources: City of Calgary Archives
we believe it is important to preserve the historic fabric of inglewood.
921 9th Ave se (‘Donor site’)
name sibley block (907 - 915 9th Ave)
Construction Year 1911
Original Use Type mixed Use (Commercial & residential)
Architectural style edwardian Commercial
significance summary (Excerpts from City of Calgary Website)
[...the Sibley Block has been an integral component of the retail and commercial activity which made 9th Avenue S.E. East Calgary’s high street, and one of Calgary’s historic principle commercial thoroughfares. (Activity Value, Community significance)
The Sibley Block is an attractive and relatively intact Edwardian Commercial commercial-residential building, with a lower façade design which is distinctive for the 9th Avenue commercial street. The symmetrical red-brick façade features brick voussoirs over the large central display window and entrance, and distinctive corbelled brick cornices. (Style Value, Community significance)
The Sibley Block’s architectural character makes it an important contributor to 9th Avenue’s historical and highly intact streetscape. (Style Value, Community significance)...]
Character Defining elements (Excerpts from City of Calgary Website)
- Form, scale and massing (two-storey, rectangular plan with narrow façade); - Flat roof with plain brick parapet with corbelled brick detailing; - Woodframe construction with original red-brick cladding with stretcher bond pattern; - Fenestration pattern on all façades; large central display window; large multi-pane upper windows with radiating voussoirs; brick sills; radiating voussoirs on rear and side elevations;
- ...Exterior details [ie: decorative brick detailing...]; two-leaf entry door with transom and radiating voussoirs above and 2nd wide entry (currently brick fill); location for sign band between lower brick banding and upper window sills; brick piers; painted ghost sign and sign bands [...on the north and east façades];
- ...Front setback aligned with adjacent buildings [without front setback]...
Source: Discover Historic Calgary Resources, City of Calgary
Sibley Block, ca.1996, City of Calgary Sibley Block,current, Google Earth sibley block921 9th Ave
Proposed Development907-915 9th Avenue se
‘Donor site’ ‘receiver site’
fAr
907 - 915 9th Avenue SE Calgary, Inglewood Open House Presentation GAIRWILLIAMSONARCHITECTS
sTreeT CHArACTer
ArCHiTeCTUrAL LAnGUAGe rOOTeD in HisTOriCAL nArrATiVe
11th st se 9th st se10th st se
kan
e’s
Har
ley
Din
er
bur
n b
lock
seab
lom
blo
ck
fras
er b
lock
Aul
l blo
ck
sibl
ey b
lock
921
9th
Ave
se
Out
wes
t Par
k
8th st se
Historical preservation by Hungerford
Conceptual massing of Proposed Development907 - 915 9th Ave se
Gar
ry T
heat
re
Atl
antic
Ave
nue
Art
blo
ck
a study of the neighbourhood and archival documents informed our understanding of the heritage and our design concept.
sibley block, 921 9th Ave se fire station no. 3
9th Ave se is home to many beautiful historic buildings which use brick and stone facades design aesthetic punctuated by regular window openings, strong piers, limestone accents, and a cornice - a classical tripartite hierarchy. A similar design aesthetic was used in our proposal, consisting of windows on a grid that are animated by arches, and the use of facade materials that celebrate the neighbourhood’s heritage.
The Historical Walking Tour document seen below provides a charming overview of the neighbourhood and is where the story of fire station no. 3, once the community center in inglewood, was discovered. A facade study revealed the strength of its arches in providing an architectural identity.
A study of Hungerford’s neighbouring property, sibley block, also revealed several historical design elements. These elements informed the material of our proposal, the portions of the facade grid, and the architectural language of arches, found referenced in 921 9th Ave se’s windows and fire station no.3’s fire truck bays - rather than fire trucks, the openings created by the arches are re purposed to provide large shop front windows.
The following architectural expressions inspired our design (i.e. brick, concrete, and metal cladding).
note: Detailed design will be confirmed at the Development Permit stage.
Street character and hIStorIcaL narratIve
HisTOriCALinsPirATiOn
fAr
907 - 915 9th Avenue SE Calgary, Inglewood Open House Presentation GAIRWILLIAMSONARCHITECTS
beginning with the City of Calgary’s stipulated maximum height.1 Stepping down to respect the neighborhood scale to the east
and the city to the west, splitting volumes to reduce mass. The building form is narrow, minimizing shadow cast on open spaces.
2 Setting back with planting at multiple levels to minimize the visual impact from the street, increase daylight to areas to the north, and to make sidewalks more pedestrian friendly.
3
907-915 9th Ave se123’ 37.4m (11 storey equivalent)
Atlantic Avenue Art block75’ / 22.8m (6 storey equivalent)
southbank(6 storey equivalent)
AVLi(7 storey equivalent)
~ 123’ / 37.4m (11 storeys)~ 95’ / 30m (9 storeys)
~ 66’ / 20m (6 storeys)
Atlantic Avenue Art block75’ / 22.8m (6 storey equivalent)
southbank(6 storey equivalent)
AVLi(7 storey equivalent)
8th St SE
9th St SE
9th Ave SE
8th St SE
9th St SE
9th Ave SE
8th St SE
9th St SE
9th Ave SE
deSIGn ratIonaLe dIaGramSthe building’s massing has been shaped to address sunlight penetration and inglewood’s neighbourhood scale.
~ Up to 38m (124.7’)
maximum Height
Planting at building setbacksstepping building HeightHistoric Area redevelopment Plan (ArP) Heritage Density Transfer
~ 20m (66’)
~ 30m (95’)
~ 37.4m (123’)
VAnCOUVer bC
exTensiVe PLAnTinG
sibley block921 9th Ave
Proposed Development907-915 9th Avenue se
‘Donor site’ ‘receiver site’
907 - 915 9th Avenue SE Calgary, Inglewood Open House Presentation GAIRWILLIAMSONARCHITECTS
brick for facades closest to inglewood
Concrete panels for middle volume and cast-in-place arches
metal for facades closest to the City
8th St SE
9th St SE9th Ave SE
8th St SE
9th St SE9th Ave SE
LOnDOn
bUs sTOP COnCePT TOrOnTO
CiTY Of CALGArYPLAn fOr jACk LOnG PArk
memPHis, Tennessee
inGLeWOOD COnTexT eAsT CALGArY COnTexT
GArrY THeATre AnD frAser bLOCk
fire sTATiOnnO. 3
CenTrAL LibrArY
DiCk bLOCkCiTY Of CALGArY9TH AVe reDeVeLOPmenT
deSIGn ratIonaLe dIaGramSthe building’s massing has been shaped to address sunlight penetration and inglewood’s neighbourhood scale.
“Pedestrian plazas that facilitate pedestrian safety through the introduction of expanded sidewalks, landscaping, signage and textural patterns” - Calgary ArP
carving out public spaces and providing bus shelter to existing stop.4 Animating public realm by providing amenities and tying public spaces to City of Calgary inglewood Area redevelopment Plan, and 9th Avenue streetscape Plan, and existing / proposed park and trail network.
5 Adopting a material and architectural language that is driven by neighbourhood context so the building stands “quietly” - the material and arches grounds the building in a neighborhood vernacular.
“if located at an intersection, address both streets with architectural or massing elements including entrances, windows and other facade features” - Calgary ArP
6
8th St SE
9th St SE
9th Ave SE
bus stop
Courtyard
Plaza
907 - 915 9th Avenue SE Calgary, Inglewood Open House Presentation GAIRWILLIAMSONARCHITECTS
vIeW to the WeSt
Ground Level - Design details animate space
London GermanyLondon London
East Volume - Brick (colour to fit neighborhood)
COnCePT skeTCHes
EARLY SCHEMATIC DESIGNS REFERENCE MATERIALS AND FORM WHICH RELATE TO INGLEWOOD.
907 - 915 9th Avenue SE Calgary, Inglewood Open House Presentation GAIRWILLIAMSONARCHITECTS
view to the east
West Volume - Light metal claddingMiddle Volume - Precast concrete panels
London Zurich New York Chicago
CoNCept SketCheS
EARLY SCHEMATIC DESIGNS BLEND THE BUILDING INTO THE SKY AND LANDSCAPE.
Shadow StudieS
Spring8am - EnroutE to School / Play 8am - EnroutE to School / Play 8am - EnroutE to School / Play
12Pm - lunchtimE 12Pm - lunchtimE 12Pm - lunchtimE
4Pm - aftEr School / Play 4Pm - aftEr School / Play 4Pm - aftEr School / Play
Summer winter
Southbank
art Block
aVli Southbank
art Block
aVli Southbank
art Block
aVli
Southbank
art Block
aVli Southbank
art Block
aVli
Southbank
art Block
aVli Southbank
art Block
aVli Southbank
art Block
aVli
Southbank
art Block
aVli
lEgEnd
907 - 915 Property line
Shadows cast by existing context buildings
outline of existing 2 storey building on site
Shadow cast by existing 2 storey building on site
outline of proposed 907 - 915 building
Shadow cast of proposed 907 - 915 building
future Jack long
Park
future Jack long
Park
future Jack long
Park
future Jack long
Park
future Jack long
Park
future Jack long
Park
future Jack long
Park
future Jack long
Park
future Jack long
Park
907 - 915 9th Avenue SE Calgary, Inglewood Open House Presentation GAIRWILLIAMSONARCHITECTS
during the winter given the low sun angle, the existing 2 storey cinder block building on the site, and the existing buildings in the direct vicinity cast their shadow over the future Jack long Park, both in the morning and late afternoon (refer to winter 8am and winter 4pm images to the far right).
9TH AVENUE
Alexandra Centre Society
8TH
STRE
ET
Deane House
Outwest Sculpture Park
Jack Long Park
Dick Block
SHEET NO.
PROJECT NO.
SCALE:
DRAWN:
SHEET NAME:
REVISION:
PROJECT:
NOTES:
COPYRIGHT:
This drawing and all copyright herein are the sole and exclusive propertyof Gair Williamson Architects. Reproduction or use of this drawing inwhole or in part, by any means, in any way whatsoever without the priorwritten consent of Gair Williamson Architects is strictly prohibited.
REVIEWED:
All Drawings in this set to be read in conjunction with each other.Any errors or discrepancies to be reported to the Architect beforecommencing work.All Dimensions to be confirmed on site
Contractors are responsible to ensure that all work is executed to therequirements of the appropriate Building Code Authority.
1402
235 - 209 CARRALL STREET VANCOUVER BC V6B 2J2 CANADAT 604 648 2626 W www.gwarchitects.ca
GAIRWILLIAMSONARCHITECTS
1/16" = 1'-0"
907-915 9th Avenue SE
A0.07b
Author
Site Plan Roof Level
Checker
907-915 9th Avenue SECalgary, AB
Hungerford Properties
# SUBMISSION DATE
Community BenefitS
gathEring nodE
gathEring / Working SPacE
rEtail SPill-out PEdEStrian linkS
PuBlic art oPPortunitiES
SEaSonal EVEnt oPPortunitiES
EnhancEd and intEgratEd BuS Waiting arEa
EmPloymEnt oPPortunitiES
Property line
Pro
pert
y li
ne
Parkadeaccess
n
907 - 915 9th Avenue SE Calgary, Inglewood Open House Presentation GAIRWILLIAMSONARCHITECTS
our goal is to provide public spaces that complement the adjacent parks, and provide amenities that strengthen the local economy.
SHEET NO.
PROJECT NO.
SCALE:
DRAWN:
SHEET NAME:
REVISION:
PROJECT:
NOTES:
COPYRIGHT:
This drawing and all copyright herein are the sole and exclusive propertyof Gair Williamson Architects. Reproduction or use of this drawing inwhole or in part, by any means, in any way whatsoever without the priorwritten consent of Gair Williamson Architects is strictly prohibited.
REVIEWED:
All Drawings in this set to be read in conjunction with each other.Any errors or discrepancies to be reported to the Architect beforecommencing work.All Dimensions to be confirmed on site
Contractors are responsible to ensure that all work is executed to therequirements of the appropriate Building Code Authority.
1402
235 - 209 CARRALL STREET VANCOUVER BC V6B 2J2 CANADAT 604 648 2626 W www.gwarchitects.ca
GAIRWILLIAMSONARCHITECTS
3/32" = 1'-0"
907-915 9th Avenue SE
A2.13
Author
10th Level Plan
Checker
907-915 9th Avenue SECalgary, AB
Hungerford Properties
# SUBMISSION DATE
TYPICAL FLOOR PLAN: L10
54 36 18 9274565
SHEET NO.
PROJECT NO.
SCALE:
DRAWN:
SHEET NAME:
REVISION:
PROJECT:
NOTES:
COPYRIGHT:
This drawing and all copyright herein are the sole and exclusive propertyof Gair Williamson Architects. Reproduction or use of this drawing inwhole or in part, by any means, in any way whatsoever without the priorwritten consent of Gair Williamson Architects is strictly prohibited.
REVIEWED:
All Drawings in this set to be read in conjunction with each other.Any errors or discrepancies to be reported to the Architect beforecommencing work.All Dimensions to be confirmed on site
Contractors are responsible to ensure that all work is executed to therequirements of the appropriate Building Code Authority.
1402
235 - 209 CARRALL STREET VANCOUVER BC V6B 2J2 CANADAT 604 648 2626 W www.gwarchitects.ca
GAIRWILLIAMSONARCHITECTS
3/32" = 1'-0"
907-915 9th Avenue SE
A2.02
Author
P1 Parkade Level Plan
Checker
907-915 9th Avenue SECalgary, AB
Hungerford Properties
# SUBMISSION DATE
20'
TYPICAL FLOOR PLAN: P2 - P1
SHEET NO.
PROJECT NO.
SCALE:
DRAWN:
SHEET NAME:
REVISION:
PROJECT:
NOTES:
COPYRIGHT:
This drawing and all copyright herein are the sole and exclusive propertyof Gair Williamson Architects. Reproduction or use of this drawing inwhole or in part, by any means, in any way whatsoever without the priorwritten consent of Gair Williamson Architects is strictly prohibited.
REVIEWED:
All Drawings in this set to be read in conjunction with each other.Any errors or discrepancies to be reported to the Architect beforecommencing work.All Dimensions to be confirmed on site
Contractors are responsible to ensure that all work is executed to therequirements of the appropriate Building Code Authority.
1402
235 - 209 CARRALL STREET VANCOUVER BC V6B 2J2 CANADAT 604 648 2626 W www.gwarchitects.ca
GAIRWILLIAMSONARCHITECTS
3/32" = 1'-0"
907-915 9th Avenue SE
A2.10
Author
7th Level Plan
Checker
907-915 9th Avenue SECalgary, AB
Hungerford Properties
# SUBMISSION DATE
TYPICAL FLOOR PLAN: L7-L9
9TH AVENUE
8TH
STRE
ET
SHEET NO.
PROJECT NO.
SCALE:
DRAWN:
SHEET NAME:
REVISION:
PROJECT:
NOTES:
COPYRIGHT:
This drawing and all copyright herein are the sole and exclusive propertyof Gair Williamson Architects. Reproduction or use of this drawing inwhole or in part, by any means, in any way whatsoever without the priorwritten consent of Gair Williamson Architects is strictly prohibited.
REVIEWED:
All Drawings in this set to be read in conjunction with each other.Any errors or discrepancies to be reported to the Architect beforecommencing work.All Dimensions to be confirmed on site
Contractors are responsible to ensure that all work is executed to therequirements of the appropriate Building Code Authority.
1402
235 - 209 CARRALL STREET VANCOUVER BC V6B 2J2 CANADAT 604 648 2626 W www.gwarchitects.ca
GAIRWILLIAMSONARCHITECTS
3/32" = 1'-0"
907-915 9th Avenue SE
A2.03
Author
Ground Floor Level Plan
Checker
907-915 9th Avenue SECalgary, AB
Hungerford Properties
# SUBMISSION DATE
TYPICAL FLOOR PLAN: L1
SHEET NO.
PROJECT NO.
SCALE:
DRAWN:
SHEET NAME:
REVISION:
PROJECT:
NOTES:
COPYRIGHT:
This drawing and all copyright herein are the sole and exclusive propertyof Gair Williamson Architects. Reproduction or use of this drawing inwhole or in part, by any means, in any way whatsoever without the priorwritten consent of Gair Williamson Architects is strictly prohibited.
REVIEWED:
All Drawings in this set to be read in conjunction with each other.Any errors or discrepancies to be reported to the Architect beforecommencing work.All Dimensions to be confirmed on site
Contractors are responsible to ensure that all work is executed to therequirements of the appropriate Building Code Authority.
1402
235 - 209 CARRALL STREET VANCOUVER BC V6B 2J2 CANADAT 604 648 2626 W www.gwarchitects.ca
GAIRWILLIAMSONARCHITECTS
3/32" = 1'-0"
907-915 9th Avenue SE
A2.14
Author
11th Level Plan
Checker
907-915 9th Avenue SECalgary, AB
Hungerford Properties
# SUBMISSION DATE
TYPICAL FLOOR PLAN: L11
SHEET NO.
PROJECT NO.
SCALE:
DRAWN:
SHEET NAME:
REVISION:
PROJECT:
NOTES:
COPYRIGHT:
This drawing and all copyright herein are the sole and exclusive propertyof Gair Williamson Architects. Reproduction or use of this drawing inwhole or in part, by any means, in any way whatsoever without the priorwritten consent of Gair Williamson Architects is strictly prohibited.
REVIEWED:
All Drawings in this set to be read in conjunction with each other.Any errors or discrepancies to be reported to the Architect beforecommencing work.All Dimensions to be confirmed on site
Contractors are responsible to ensure that all work is executed to therequirements of the appropriate Building Code Authority.
1402
235 - 209 CARRALL STREET VANCOUVER BC V6B 2J2 CANADAT 604 648 2626 W www.gwarchitects.ca
GAIRWILLIAMSONARCHITECTS
3/32" = 1'-0"
907-915 9th Avenue SE
A2.05
Author
2nd Level Plan
Checker
907-915 9th Avenue SECalgary, AB
Hungerford Properties
# SUBMISSION DATE
TYPICAL FLOOR PLAN: L2-L6
907 - 915 9th Avenue SE Calgary, Inglewood Open House Presentation GAIRWILLIAMSONARCHITECTS
0 20’ 40’
l1 floor Plan
l2 - l6 typical floor Plan
Parkade access
StatiStiCSSitE arEa 26,770 sf (2,487 m2)
far 5.0
hEight 123’ (37.5m)
* numbers are approximate.
LeveL Use ProPosed
P2-P1 res. Parking +/- 80 stalls
P2-P1 res. Bike +/- 130 stalls
l1 com. / Visitor Parking 7 stalls
l1 loading 1
l1 commercial 5 units
l2-l11 residential total +/- 115 units
type target1 Bed Jr. 7%1 Bed 45%2 Bed 48%
l10 amenity 3,400 sf (316 m2)
* unit mix will be confirmed at the development Permit stage.
lEgEnd
Property line
commercial
residential
amenity
terrace
Plaza / courtyard
preliminary t ypiCal floor planSl7 - l9 typical floor Plan
l10 floor Plan
l11 floor Plan
P2 - P1 typical floor Plan
9th ave SE8t
h St
SE
907 - 915 9th Avenue SE Calgary, Inglewood Open House Presentation GAIRWILLIAMSONARCHITECTS
projeCt timeline
projeCt evolution
Key city of calgarypolicy updates
2016 - Initial Concepts - Pre-Application Enquiry to City
- Feedback: Planning supportive of the higher density land use redesignation.
Apr. 2017 - Pre Application Assessment by City - Feedback: Incorporate further pockets of public spaces, setbacks. Identified site as a key gateway to the community.
Mid 2017 - Rail Assessment - Feedback: Structural enhancements required to meet minimum life safety requirements, wide utility right-of-way needed at rear of property (reduces floor plate depths).
Sept. to Nov. 2017 - Design Development with City - Feedback: City direction to make west tallest volume and step the building height down towards Inglewood, illustrate further contribution to public streetscape.
Dec. 2017 - Review by City - Feedback: Further refinement, create retail promenade, integrate bus stop.
2017 - Green Line LRT Document - Studied potential closure of 8 St SE south of 9th Ave SE - First draft of Area Redevelopment Plans (ARP) - Public engagement (ARP issue identification)
2019 - Area Redevelopment Plan engagement
2026 - Stage 1 Green Line LRT completed (includes Inglewood / Ramsay Station)
2018 - 9th Avenue S.E. Streetscape Master Plan Workshop #3 - Draft Inglewood Area Redevelopment Plan (ARP) - Development next to freight rail corridors policy
Jan. 2018 - Draft Urban Design Review Panel (UDRP) - - Feedback: Scheme should demonstrate how it enhances Inglewood’s character, avoids large glass expanses, and creates new public spaces that tie into the streetscape plan.
Feb. 2018 - Workshop with City - City’s Transportation and Public Realm Master Plan Information Session.
Jul. 2018 - Development on Freight Rail Corridor Approval - Identified no requirement for a crash wall.
Nov. 2018 - Land Use Application - Change the land use to allow retail at grade and housing mix; shadow studies performed throughout seasons to show how the design responds to sunlight and shadow on the park.
- Stepped building of 5,9,11 storeys at FAR 5.0 with setbacks and massing articulation at street level.
Dec. 2018 - Public Engagement - Meeting with neighbours.
Jan. 2019 Public open house - Purpose: Solicit feedback / engage with public - scheme: 5,9,11 storeys at far 5.0 with setbacks and massing articulations; public realm animated through courtyard and plaza; beginning to develop architectural language.
Feb. 2019 - Open House Feedback to City - Purpose: Present learnings from January’s Public Open House to the City of Calgary.
- Outcome: To be determined.
Next Steps - City-led Approval process - Detailed staff review - CPAG recommendations and CPC report - Council public hearing - Land use application approval - Heritage density transfer and registration on title
Development Permit Application
Urban Design Review Panel
Public Open House
Development Permit Approval
Building Permit Application
Early 2019 - Public Engagement - Meeting with the Inglewood Business Association - Meeting with the Inglewood Community Association
2017 2018 2019 2020 +
Outlined BelOW are tHe StePS taKen tO get Here, and tHe StePS We HaVe gOing FOrWard.
We are here!
thank you for your attendanCe
we would appreciate your written feedback - forms are located near the entry
Questions about the project?Visit: www.hungerfordpropertiesinglewood.comemail: [email protected]
907 - 915 9th Avenue SE Calgary, Inglewood Open House Presentation GAIRWILLIAMSONARCHITECTS