9.1 General HSE
1. Goal: zero harm to people and environment in regard of the
assets and operation
2. HSE performance measured based on internal and external set
of standard with ISO 14000 certified
PHASE 9 HSE AND SUSTAINABLE DEVELOPMENT
HSE Policy & Strategic
ObjectivesOrganization Arrangements
Risk Management
Planning & Procedures
Implementation & Performance
Monitoring
![Page 2: 9.1 General HSE 1.Goal: zero harm to people and environment in regard of the assets and operation 2.HSE performance measured based on internal and external](https://reader035.vdocument.in/reader035/viewer/2022071807/56649e2c5503460f94b1acdb/html5/thumbnails/2.jpg)
Company Logo
9.2 HSE Management System (HSEMS)
Provides the standard safety procedures and guidelines to be
performed and adopted
Mandatory and applied to all parties that undertaking the scope
of work under the projects
Specific job specification, industry guidelines, standards and
codes under the Malaysian statutory requirement has to be
followed
Any deviation or non-compliance should be justified and formally
approve by relevant parties
www.themegallery.com
![Page 3: 9.1 General HSE 1.Goal: zero harm to people and environment in regard of the assets and operation 2.HSE performance measured based on internal and external](https://reader035.vdocument.in/reader035/viewer/2022071807/56649e2c5503460f94b1acdb/html5/thumbnails/3.jpg)
Company Logo
9.3 Safety and Risk Management
Should be applied for all the activities throughout the operation,
including the contractor or third parties
All identified concerned risk on chemicals should be listed in the
Material Safety Data Sheet (MSDS) and operation safety in the
Hazards Effect Register (HER)
www.themegallery.com
Business Process and Activity
Identify Hazards associated with
consumables/operation
HSE Risk Assessment
HSE Plan defining. Control & Recovery
measures
Performance Monitoring
Dissemination and Implementation of
Plan
Implement Control Measure
Implement Recovery Measure
HSE Audit and Review
![Page 4: 9.1 General HSE 1.Goal: zero harm to people and environment in regard of the assets and operation 2.HSE performance measured based on internal and external](https://reader035.vdocument.in/reader035/viewer/2022071807/56649e2c5503460f94b1acdb/html5/thumbnails/4.jpg)
Company Logo
9.4 HSE Line of Authority
General Manager
Operation Managers
Project Managers
Head of Procurement and Logistics
HSE managers
Head of Departments
Superintendents/ Supervisors
Employees and Contractors
www.themegallery.com
![Page 5: 9.1 General HSE 1.Goal: zero harm to people and environment in regard of the assets and operation 2.HSE performance measured based on internal and external](https://reader035.vdocument.in/reader035/viewer/2022071807/56649e2c5503460f94b1acdb/html5/thumbnails/5.jpg)
Company Logo
9.5 Quality Management The approaches that have been adopted to improve the
compliance
1. Project and contractor team to foster proactive approach to project management and Quality Assurance (QA) awareness
2. Identify and apply project resources in prioritized manner to continually respond to areas of greater quality concerns
Project team shall have pre-planned operation with contractor to:
1. Ensure contractor provide qualified and adequate QA personnel and also develop and implement effective Quality Management System (QMS)
2. Ensure sub-contractors implement effective QMS
3. Perform QA audits on contractor’s team
www.themegallery.com
![Page 6: 9.1 General HSE 1.Goal: zero harm to people and environment in regard of the assets and operation 2.HSE performance measured based on internal and external](https://reader035.vdocument.in/reader035/viewer/2022071807/56649e2c5503460f94b1acdb/html5/thumbnails/6.jpg)
Company Logo
9.6 Occupational Health Management
The potential health risk during operation controlled by
procedures such as:
1. Job Safety Analysis (JSA)
2. Permit to Work (PTW)
3. Toolbox meeting before operation
4. Material Safety Data Sheets (MSDS)
5. Hazards Effect Registers (HER)
www.themegallery.com
![Page 7: 9.1 General HSE 1.Goal: zero harm to people and environment in regard of the assets and operation 2.HSE performance measured based on internal and external](https://reader035.vdocument.in/reader035/viewer/2022071807/56649e2c5503460f94b1acdb/html5/thumbnails/7.jpg)
Company Logo
The guideline to provide guidance for personnel on effective
medical and health care services in works place has been issued
in the HSEM 4.03-1 in 2001.
The facilities shall be designed in accordance with standard
requirement to project personnel and equipment and facilities.
The Offshore Safety Passport system is to ensure that each and
all the personnel working offshore are fit to work
www.themegallery.com
![Page 8: 9.1 General HSE 1.Goal: zero harm to people and environment in regard of the assets and operation 2.HSE performance measured based on internal and external](https://reader035.vdocument.in/reader035/viewer/2022071807/56649e2c5503460f94b1acdb/html5/thumbnails/8.jpg)
Company Logo
9.7 Environmental Management Environment Waste Management
1. Solid waste will be limited by recycling and reuse
2. Strict control measurement to ensure adequate dilution and dispersion
3. Prediction on aqueous discharges from drilling and production to be only limited
Environment Impact Assessment (EIA)
1. Prepared in parallel with detailed technical studies of the overall project feasibility
2. Helps on assess potential environmental impacts of the project option
3. Provide mitigation measurement
www.themegallery.com
![Page 9: 9.1 General HSE 1.Goal: zero harm to people and environment in regard of the assets and operation 2.HSE performance measured based on internal and external](https://reader035.vdocument.in/reader035/viewer/2022071807/56649e2c5503460f94b1acdb/html5/thumbnails/9.jpg)
Company Logo
9. 8 Sustainable Development
Reservoir Management
- Shall be ready in place before field is handed to operation team
Production Technology
- Operations team will maintain active and close communication
with the RM team and supply various operating limits and
updates
Drilling and Completion Implementation Plan
- Ensure the drilling operations does not exceed the time limit
and trajectory are close as pre-planned
www.themegallery.com
![Page 10: 9.1 General HSE 1.Goal: zero harm to people and environment in regard of the assets and operation 2.HSE performance measured based on internal and external](https://reader035.vdocument.in/reader035/viewer/2022071807/56649e2c5503460f94b1acdb/html5/thumbnails/10.jpg)
Company Logo
Facilities and Operations
- Aim to provide storage and energy capacities of surface
facilities required to cater for possible higher production
- Keep operation pressure at optimal level
Abandonment Options
- Comprises of wellbore plugging and trees removal
- Platform structure shall be designed so that it can be
disintegrated easily and safely
- Pipeline and flowline shall be cleaned and capped
www.themegallery.com
![Page 11: 9.1 General HSE 1.Goal: zero harm to people and environment in regard of the assets and operation 2.HSE performance measured based on internal and external](https://reader035.vdocument.in/reader035/viewer/2022071807/56649e2c5503460f94b1acdb/html5/thumbnails/11.jpg)
Company Logo
9.9 Quality Assurance
The project shall adopt a quality management system and strive
to complete on time, within allowable budget and to comply in
accordance to the specific requirements.
The project team, contractor team and asset team shall be in
close communication to optimize process flow and meeting of
various requirement
The team shall at all time internalize the 5 PETRONAS Quality
Principles in every stage of the project