*97282* work instructions
TRANSCRIPT
Page 1 of 6 01/20/2015F409-4 Work Instruction Template
Work InstructionsJob 97282-1 Rev. A*97282*
Job Information
Customer Name: Rivian Automotive Validation:
Containment: InHouse Released: Aug 26 2021 12:36PM by Surajit Halder
Part Number(s): PT00031577 D - PT00031577 D
Work Summary
Change the fuses as per the PDF shown
Setup and Tools
Customer Contact: Singh, Jag
Safety:
Additional Items: Boots, Earplugs, Face Mask, Face Shield, Gloves, Safety Glasses
NOTE: These items are not to be used during inspection process and are only allowed in designated areas identified by the customer/facility. Always follow facility rules with regard to cell phone use, smoking, etc.
Reference Procedure: PCD- 10091
Tool/Gauge & Owner: snip tool n/a
Marker(s): n/a
Data Recording Form(s): Atco
Label(s): atco Audits per Shift: 0
Reject/Rework Types
Description Type Code
Put new fuses on that REWORK A
Packaging
Acceptable Parts Rejected Parts
Quantity/Box: TBD Reject Type: All
# of Layers: TBD Location: Reject Bin
Boxes/Layer TBD
Parts/Pallet: TBD
Ship Partials: NO
Comments:
Relabel to C1
Generic Instructions• Place current job instruction and training records on the job board or in the job book, along with any applicable quality alerts, pictures, charts, etc. in the job file.
• Note: Personnel cannot begin the job if their name is not on the training log at the current revision level.
• It is the responsibility of the operators to request parts and packaging when the job is being set up.
• Upon receipt of new job products, verify that:
◦ There is no shipping damage to the container.
◦ Verify the shipping label has correct part number.
• Do not sign or prepare any labels until box (or part) is ready for labeling.
• All parts must be identified as pass, reject, waiting for inspection, waiting for future operations or "other" (other must be defined below)
• Place rejected parts to reject location immediately upon detection.
• Do not touch any production or inspection equipment or tooling unless the work instruction specifically states to use it.
• Do not process any part numbers that are not on a work instruction. Contact the supervisor if this causes any conflicts.
• Where applicable when using test equipment, equipment parameters must be captured/documented in the Work Instruction. Any calibration requirements must be identified on Test Equipment Requirement Checklist and captured/documented in the Work Instruction.
• Stay at work and on task at your assigned work area, and do not talk with customer personnel outside the scope of your assigned job.
Page 2 of 6 01/20/2015F409-4 Work Instruction Template
Work InstructionsJob 97282-1 Rev. A*97282*
Step by Step Work Instructions
3 Step Training Process Performed on all InspectorsSTEP 1: Read the Work Instruction carefully along with the Inspector before beginning the process. Ask questions to ensure the Inspector understands how to conduct the project. STEP 2: Demonstrate the Process by walking through the steps, demonstrating the correct method step by step to the Inspector and encourage them to ask questions or provide feedback as you go. STEP 3: Give the Inspector the opportunity to walk through each step of the Work Instruction with you there to observe, correct, and answer any questions that may come up. Correct mistakes or mishandling by explaining again, why it is important to follow the Work Instruction. Once the Project Coordinator and the Inspector are confident that the job can be done exactly as described in the Work Instruction, the inspector will be added to the training log.
InHouse Data RecordingUse form F410-16 to record the following information:Part NumberWork Order NumberSerial NumberRejectsReason for RejectionTotal Inspected
PPE (Personal Protection Equipment)Per ATCO standard Steel-Toed boots or shoes are required. Also please wear kevlar gloves while working with metal parts
ReworkUse the PDF provide by Jay to do the rework
Page 3 of 6 01/20/2015F409-4 Work Instruction Template
Work InstructionsJob 97282-1 Rev. A*97282*
Work Instruction History Log
Reason For Change Author Revision Date/Level
Initial release Surajit Halder 08/26/2021 - Level A
Training Log
Trainer Trainee Entry
Surajit Halder Mary Woods 8/26/2021 12:47 PM
Surajit Halder Ivy Vidrios 8/26/2021 12:48 PM
Surajit Halder Lex McBurney 8/26/2021 3:58 PM
Cortland Simmons Ardell Robertson 8/27/2021 2:50 PM
Cortland Simmons Robert Rhymes 9/9/2021 3:29 PM
Cortland Simmons Carvel Claggett 9/9/2021 3:29 PM
Cortland Simmons Kamaria McNeal 9/9/2021 3:31 PM
Cortland Simmons Chermane Smith 9/9/2021 4:26 PM
Cortland Simmons Selena Jones 9/9/2021 4:34 PM
Brian Dowell Amelia Lyons 9/18/2021 9:05 AM
Brian Dowell Ashley Van Etten 9/18/2021 9:06 AM
Brian Dowell Marcus Williams 9/18/2021 9:06 AM
Brian Dowell John Pycior 9/18/2021 9:06 AM
Ardell Robertson Michelle Montgomery 9/20/2021 6:03 PM
Ardell Robertson Maria Vargas 9/21/2021 9:36 AM
Keosha Swift Ardell Robertson 9/22/2021 1:11 PM
Stephen Perschall Sean Harris-Walker 9/22/2021 4:44 PM
Ibrahim Mahadik Merrel Bowers 9/22/2021 5:29 PM
Keosha Swift GEORGE CAMERON 9/22/2021 9:22 PM
Surajit Halder Jermaine Taylor 9/25/2021 2:53 PM
Surajit Halder Cristian Otto 9/25/2021 5:27 PM
Surajit Halder AARON RIGGS 9/26/2021 9:54 AM
Surajit Halder Logan Lynn 10/7/2021 5:54 PM
Stephen Perschall Andra Pace Jr. 10/23/2021 3:58 PM
Customer Approval
Name: Singh, Jag
Title:
Sign/Date: 9/10/2021 2:24 PM
Comments:
As a duly authorized representative of Rivian Automotive, by signing above, I authorize the use of the process outlined in this document.
OEM Approval
Name: Yeager, Mark
Title: Senior Manager - Supplier Quality
Sign/Date:
Page 4 of 6 01/20/2015F409-4 Work Instruction Template
Work InstructionsJob 97282-1 Rev. A*97282*
Comments:
Page 5 of 6 01/20/2015F409-4 Work Instruction Template
Work InstructionsJob 97282-1 Rev. A*97282*
Work Instruction Audit
Audit Question Response
Are all required supplies (safety PPE or other) precisely identified? Yes
Are all part numbers and names listed and correct? Yes
Are all inspection/rework steps identified? Yes
If applicable, is the process flow defined? Yes
Are all required reject/rework codes identified? Yes
Are all customer owned tools and or gages identified? Yes
Are all supplies required for the job listed? Yes
Is there a picture identifying each tool/gage being used? Yes
Where applicable/available is there a picture showing each potential defect type? Yes
If applicable, is the labeling of outgoing containers clearly described? Yes
Is the method of packing accepted parts described? Yes
If applicable, is the method of marking parts clearly defined? Yes
Is the process for handling nonconforming parts described? Yes
If applicable, are backfill requirements described? Yes
Is distinction between what is considered an acceptable vs. bad part defined? Yes
If applicable, are customer specific data collection requirements defined? Yes
Is the method of recording data listed (ATCO data collection sheet/customer specific form)? Yes
If applicable, do the inspection criteria match the written requirements provided by the customer? Yes
If applicable, has a gage calibration or validation method/frequency requirement been established? Yes
If applicable, has a gage storage/retrieval location been identified? Yes
If applicable, is a step by step part gaging process clearly described? Yes
If making a revision, were all other steps reviewed to make sure they remain applicable/accurate to the project? Yes
Page 6 of 6 01/20/2015F409-4 Work Instruction Template
Work InstructionsJob 97282-1 Rev. A*97282*