a-01 › downloadfile › final pdf- tc(m... · print sheet : a'3' size 3. read this...

18

Upload: others

Post on 10-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: A-01 › downloadfile › FINAL PDF- Tc(M... · Print Sheet : A'3' Size 3. Read this drawing along with other related drawings and other services drawings. unless otherwise indicated
Page 2: A-01 › downloadfile › FINAL PDF- Tc(M... · Print Sheet : A'3' Size 3. Read this drawing along with other related drawings and other services drawings. unless otherwise indicated
Page 3: A-01 › downloadfile › FINAL PDF- Tc(M... · Print Sheet : A'3' Size 3. Read this drawing along with other related drawings and other services drawings. unless otherwise indicated

A-01Date : September, 2016

Mr. H.B. Gurung

Mr. A.S. Tamang

Ms. M. Rana

Sub-Consultant:

Joint Venture with

Project Title:

Department Of EducationSanothimi, Bhaktapur, Nepal

Government Of Nepal

Japan InternationalCooperation Agency

Emergency School Reconstruction Project

Mr. Tomoki Miyano

Mr. Hisafumi MichikawaMr. Wong Kuok Hung

Donor :

ORIENTAL CONSULTANTS GLOBALGlobal Consulting for sustainable Development

Type Design :

Sheet Title :

1 COMBINE MEDIUM TOILET BLOCK

Sheet No.FLOOR PLAN, ELEVATIONS

Tc(M)& SECTION

Print Sheet : A'3' Size0 1M 2M 3M 4M

5M

1:100

3. Read this drawing along with other related drawings

and other services drawings.

unless otherwise indicated.

2. Drawing are not to be directly measured.reported to the consultant or concerned engineer.

1. Any discrepancy in the drawing to be immediately

and coordinate with Structural, Electrical, Plumbing

5. Provide threshold at all exterior doors as per details,

4. Refer doors & windows schedule/elevations for sizeof doors & windows

NOTES:

6. The location of ramps to be adjusted as per site condition.

FOR MALE & FEMALE

Page 4: A-01 › downloadfile › FINAL PDF- Tc(M... · Print Sheet : A'3' Size 3. Read this drawing along with other related drawings and other services drawings. unless otherwise indicated

A-02Date : September, 2016

Mr. H.B. Gurung

Mr. A.S. Tamang

Ms. M. Rana

Sub-Consultant:

Joint Venture with

Project Title:

Department Of EducationSanothimi, Bhaktapur, Nepal

Government Of Nepal

Japan InternationalCooperation Agency

Emergency School Reconstruction Project

Mr. Tomoki Miyano

Mr. Hisafumi MichikawaMr. Wong Kuok Hung

Donor :

ORIENTAL CONSULTANTS GLOBALGlobal Consulting for sustainable Development

Type Design :

Sheet Title :

1 COMBINE MEDIUM TOILET BLOCK

Sheet No.WALL SECTION & RAMP

Tc(M)

Print Sheet : A'3' Size

3. Read this drawing along with other related drawings

and other services drawings.

unless otherwise indicated.

2. Drawing are not to be directly measured.reported to the consultant or concerned engineer.

1. Any discrepancy in the drawing to be immediately

and coordinate with Structural, Electrical, Plumbing

5. Provide threshold at all exterior doors as per details,

4. Refer doors & windows schedule/elevations for sizeof doors & windows

NOTES:

6. The location of ramps to be adjusted as per site condition.

FOR MALE & FEMALE

0 0.4M 0.8M 1.2M 1.6M2M

1:40

SECTION DETAIL

Page 5: A-01 › downloadfile › FINAL PDF- Tc(M... · Print Sheet : A'3' Size 3. Read this drawing along with other related drawings and other services drawings. unless otherwise indicated

A-03Date : September, 2016

Mr. H.B. Gurung

Mr. A.S. Tamang

Ms. M. Rana

Sub-Consultant:

Joint Venture with

Project Title:

Department Of EducationSanothimi, Bhaktapur, Nepal

Government Of Nepal

Japan InternationalCooperation Agency

Emergency School Reconstruction Project

Mr. Tomoki Miyano

Mr. Hisafumi MichikawaMr. Wong Kuok Hung

Donor :

ORIENTAL CONSULTANTS GLOBALGlobal Consulting for sustainable Development

Type Design :

Sheet Title :

1 COMBINE MEDIUM TOILET BLOCK

Sheet No.FLOOR PLAN BLOW UP

Tc(M)

Print Sheet : A'3' Size

3. Read this drawing along with other related drawings

and other services drawings.

unless otherwise indicated.

2. Drawing are not to be directly measured.reported to the consultant or concerned engineer.

1. Any discrepancy in the drawing to be immediately

and coordinate with Structural, Electrical, Plumbing

5. Provide threshold at all exterior doors as per details,

4. Refer doors & windows schedule/elevations for sizeof doors & windows

NOTES:

6. The location of ramps to be adjusted as per site condition.

FOR MALE & FEMALE

0 500 MM 1M 1.5M 2M2.5M

1:50

Page 6: A-01 › downloadfile › FINAL PDF- Tc(M... · Print Sheet : A'3' Size 3. Read this drawing along with other related drawings and other services drawings. unless otherwise indicated

A-04Date : September, 2016

Mr. H.B. Gurung

Mr. A.S. Tamang

Ms. M. Rana

Sub-Consultant:

Joint Venture with

Project Title:

Department Of EducationSanothimi, Bhaktapur, Nepal

Government Of Nepal

Japan InternationalCooperation Agency

Emergency School Reconstruction Project

Mr. Tomoki Miyano

Mr. Hisafumi MichikawaMr. Wong Kuok Hung

Donor :

ORIENTAL CONSULTANTS GLOBALGlobal Consulting for sustainable Development

Type Design :

Sheet Title :

1 COMBINE MEDIUM TOILET BLOCK

Sheet No.FALSE CEILING PLAN

Tc(M)

Print Sheet : A'3' Size

3. Read this drawing along with other related drawings

and other services drawings.

unless otherwise indicated.

2. Drawing are not to be directly measured.reported to the consultant or concerned engineer.

1. Any discrepancy in the drawing to be immediately

and coordinate with Structural, Electrical, Plumbing

5. Provide threshold at all exterior doors as per details,

4. Refer doors & windows schedule/elevations for sizeof doors & windows

NOTES:

6. The location of ramps to be adjusted as per site condition.

FOR MALE & FEMALE

0 500 MM 1M 1.5M 2M2.5M

1:50

Page 7: A-01 › downloadfile › FINAL PDF- Tc(M... · Print Sheet : A'3' Size 3. Read this drawing along with other related drawings and other services drawings. unless otherwise indicated

A-05Date : September, 2016

Mr. H.B. Gurung

Mr. A.S. Tamang

Ms. M. Rana

Sub-Consultant:

Joint Venture with

Project Title:

Department Of EducationSanothimi, Bhaktapur, Nepal

Government Of Nepal

Japan InternationalCooperation Agency

Emergency School Reconstruction Project

Mr. Tomoki Miyano

Mr. Hisafumi MichikawaMr. Wong Kuok Hung

Donor :

ORIENTAL CONSULTANTS GLOBALGlobal Consulting for sustainable Development

Type Design :

Sheet Title :

1 COMBINE MEDIUM TOILET BLOCK

Sheet No.DOOR WINDOW DETAILS

Tc(M)

Print Sheet : A'3' Size

3. Read this drawing along with other related drawings

and other services drawings.

unless otherwise indicated.

2. Drawing are not to be directly measured.reported to the consultant or concerned engineer.

1. Any discrepancy in the drawing to be immediately

and coordinate with Structural, Electrical, Plumbing

5. Provide threshold at all exterior doors as per details,

4. Refer doors & windows schedule/elevations for sizeof doors & windows

NOTES:

6. The location of ramps to be adjusted as per site condition.

FOR MALE & FEMALE

0 250 MM 500MM 750MM 1M1.25M

1:25

Page 8: A-01 › downloadfile › FINAL PDF- Tc(M... · Print Sheet : A'3' Size 3. Read this drawing along with other related drawings and other services drawings. unless otherwise indicated

3. Read this drawing along with other related drawings

and other services drawings.

unless otherwise indicated.

2. Drawing are not to be directly measured.reported to the consultant or concerned engineer.

1. Any discrepancy in the drawing to be immediately

and coordinate with Structural, Electrical, Plumbing

5. Provide threshold at all exterior doors as per details,

4. Refer doors & windows schedule/elevations for sizeof doors & windows

NOTES:

Mr. H.B. Gurung

Mr. A.S. Tamang

Sub-Consultant:

Joint Venture with

Project Title:

Department Of EducationSanothimi, Bhaktapur, Nepal

Government Of Nepal

Japan InternationalCooperation Agency

Emergency School Reconstruction Project

Mr. Tomoki Miyano

Mr. Hisafumi MichikawaMr. Wong Kuok Hung

Donor :

ORIENTAL CONSULTANTS GLOBALGlobal Consulting for sustainable Development

Type Design :

Sheet Title : Sheet No.

Mr. S. Malla

1 COMBINE MEDIUM TOILET BLOCKFOR MALE AND FEMALE

Print Sheet : A'3' Size S-00Date : September,2016

GENERAL NOTES &TYPICAL DETAILS

Page 9: A-01 › downloadfile › FINAL PDF- Tc(M... · Print Sheet : A'3' Size 3. Read this drawing along with other related drawings and other services drawings. unless otherwise indicated

3. Read this drawing along with other related drawings

and other services drawings.

unless otherwise indicated.

2. Drawing are not to be directly measured.reported to the consultant or concerned engineer.

1. Any discrepancy in the drawing to be immediately

and coordinate with Structural, Electrical, Plumbing

5. Provide threshold at all exterior doors as per details,

4. Refer doors & windows schedule/elevations for sizeof doors & windows

NOTES:

S-01Date : September,2016

Mr. H.B. Gurung

Mr. A.S. Tamang

Mr. S. Malla

Sub-Consultant:

Joint Venture with

Project Title:

Department Of EducationSanothimi, Bhaktapur, Nepal

Government Of Nepal

Japan InternationalCooperation Agency

Emergency School Reconstruction Project

Mr. Tomoki Miyano

Mr. Hisafumi MichikawaMr. Wong Kuok Hung

Donor :

ORIENTAL CONSULTANTS GLOBALGlobal Consulting for sustainable Development

Type Design :

Sheet Title : Sheet No.

0 1M 2M 3M 4M5M

1:100

TRENCH PLAN,TIE BEAM DETAIL &

0 200MM 400MM 600MM 800MM1M

1:20

Print Sheet : A'3' Size

1 COMBINE MEDIUM TOILET BLOCKFOR MALE AND FEMALE

WALL FOUNDATION DETAIL

Page 10: A-01 › downloadfile › FINAL PDF- Tc(M... · Print Sheet : A'3' Size 3. Read this drawing along with other related drawings and other services drawings. unless otherwise indicated

3. Read this drawing along with other related drawings

and other services drawings.

unless otherwise indicated.

2. Drawing are not to be directly measured.reported to the consultant or concerned engineer.

1. Any discrepancy in the drawing to be immediately

and coordinate with Structural, Electrical, Plumbing

5. Provide threshold at all exterior doors as per details,

4. Refer doors & windows schedule/elevations for sizeof doors & windows

NOTES:

S-02Date : September,2016

Mr. H.B. Gurung

Mr. A.S. Tamang

Mr. S. Malla

Sub-Consultant:

Joint Venture with

Project Title:

Department Of EducationSanothimi, Bhaktapur, Nepal

Government Of Nepal

Japan InternationalCooperation Agency

Emergency School Reconstruction Project

Mr. Tomoki Miyano

Mr. Hisafumi MichikawaMr. Wong Kuok Hung

Donor :

ORIENTAL CONSULTANTS GLOBALGlobal Consulting for sustainable Development

Type Design :

Sheet Title : Sheet No.FOOTING PLAN & SECTION,TIE BEAM DETAIL &

0 200MM 400MM 600MM 800MM1M

1:20 Print Sheet : A'3' Size

1 COMBINE MEDIUM TOILET BLOCKFOR MALE AND FEMALE

WALL FOUNDATION DETAIL

Page 11: A-01 › downloadfile › FINAL PDF- Tc(M... · Print Sheet : A'3' Size 3. Read this drawing along with other related drawings and other services drawings. unless otherwise indicated

3. Read this drawing along with other related drawings

and other services drawings.

unless otherwise indicated.

2. Drawing are not to be directly measured.reported to the consultant or concerned engineer.

1. Any discrepancy in the drawing to be immediately

and coordinate with Structural, Electrical, Plumbing

5. Provide threshold at all exterior doors as per details,

4. Refer doors & windows schedule/elevations for sizeof doors & windows

NOTES:

S-03Date : September,2016

Mr. H.B. Gurung

Mr. A.S. Tamang

Mr. S. Malla

Sub-Consultant:

Joint Venture with

Project Title:

Department Of EducationSanothimi, Bhaktapur, Nepal

Government Of Nepal

Japan InternationalCooperation Agency

Emergency School Reconstruction Project

Mr. Tomoki Miyano

Mr. Hisafumi MichikawaMr. Wong Kuok Hung

Donor :

ORIENTAL CONSULTANTS GLOBALGlobal Consulting for sustainable Development

Type Design :

Sheet Title : Sheet No.

0 1M 2M 3M 4M5M

1:100

COLUMN PLAN & DETAILS,

Print Sheet : A'3' Size

1 COMBINE MEDIUM TOILET BLOCKFOR MALE AND FEMALE

0 250MM 500MM 750MM 1M1.25M

1:25

SILL & LINTEL DETAILS

Page 12: A-01 › downloadfile › FINAL PDF- Tc(M... · Print Sheet : A'3' Size 3. Read this drawing along with other related drawings and other services drawings. unless otherwise indicated

3. Read this drawing along with other related drawings

and other services drawings.

unless otherwise indicated.

2. Drawing are not to be directly measured.reported to the consultant or concerned engineer.

1. Any discrepancy in the drawing to be immediately

and coordinate with Structural, Electrical, Plumbing

5. Provide threshold at all exterior doors as per details,

4. Refer doors & windows schedule/elevations for sizeof doors & windows

NOTES:

S-04Date : September,2016

Mr. H.B. Gurung

Mr. A.S. Tamang

Mr. S. Malla

Sub-Consultant:

Joint Venture with

Project Title:

Department Of EducationSanothimi, Bhaktapur, Nepal

Government Of Nepal

Japan InternationalCooperation Agency

Emergency School Reconstruction Project

Mr. Tomoki Miyano

Mr. Hisafumi MichikawaMr. Wong Kuok Hung

Donor :

ORIENTAL CONSULTANTS GLOBALGlobal Consulting for sustainable Development

Type Design :

Sheet Title : Sheet No.

0 500MM 1M 1.5M 2M2.5M

1:50

BEAM PLAN & DETAILS0 250MM 500MM 750MM 1M

1.25M

1:25

0 1M 2M 3M 4M5M

1:100 Print Sheet : A'3' Size

1 COMBINE MEDIUM TOILET BLOCKFOR MALE AND FEMALE

Page 13: A-01 › downloadfile › FINAL PDF- Tc(M... · Print Sheet : A'3' Size 3. Read this drawing along with other related drawings and other services drawings. unless otherwise indicated

3. Read this drawing along with other related drawings

and other services drawings.

unless otherwise indicated.

2. Drawing are not to be directly measured.reported to the consultant or concerned engineer.

1. Any discrepancy in the drawing to be immediately

and coordinate with Structural, Electrical, Plumbing

5. Provide threshold at all exterior doors as per details,

4. Refer doors & windows schedule/elevations for sizeof doors & windows

NOTES:

S-05Date : September,2016

Mr. H.B. Gurung

Mr. A.S. Tamang

Mr. S. Malla

Sub-Consultant:

Joint Venture with

Project Title:

Department Of EducationSanothimi, Bhaktapur, Nepal

Government Of Nepal

Japan InternationalCooperation Agency

Emergency School Reconstruction Project

Mr. Tomoki Miyano

Mr. Hisafumi MichikawaMr. Wong Kuok Hung

Donor :

ORIENTAL CONSULTANTS GLOBALGlobal Consulting for sustainable Development

Type Design :

Sheet Title : Sheet No.

0 400MM 800MM 1.2M 1.6M2M

1:40

SLAB PLAN & SECTION

0 1M 2M 3M 4M5M

1:100 Print Sheet : A'3' Size

1 COMBINE MEDIUM TOILET BLOCKFOR MALE AND FEMALE

TRUSS PLAN & SECTION0 300MM 600MM 900MM 1.2M

1.5M

1:30

Page 14: A-01 › downloadfile › FINAL PDF- Tc(M... · Print Sheet : A'3' Size 3. Read this drawing along with other related drawings and other services drawings. unless otherwise indicated

3. Read this drawing along with other related drawings

and other services drawings.

unless otherwise indicated.

2. Drawing are not to be directly measured.reported to the consultant or concerned engineer.

1. Any discrepancy in the drawing to be immediately

and coordinate with Structural, Electrical, Plumbing

5. Provide threshold at all exterior doors as per details,

4. Refer doors & windows schedule/elevations for sizeof doors & windows

NOTES:

S-06Date : September,2016

Mr. H.B. Gurung

Mr. A.S. Tamang

Mr. S. Malla

Sub-Consultant:

Joint Venture with

Project Title:

Department Of EducationSanothimi, Bhaktapur, Nepal

Government Of Nepal

Japan InternationalCooperation Agency

Emergency School Reconstruction Project

Mr. Tomoki Miyano

Mr. Hisafumi MichikawaMr. Wong Kuok Hung

Donor :

ORIENTAL CONSULTANTS GLOBALGlobal Consulting for sustainable Development

Type Design :

Sheet Title : Sheet No.TRUSS DETAILS

0 100MM 200MM 300MM 400MM500MM

1:10

0 50MM 100MM 150MM 200MM250MM

1:5

Print Sheet : A'3' Size

1 COMBINE MEDIUM TOILET BLOCKFOR MALE AND FEMALE

Page 15: A-01 › downloadfile › FINAL PDF- Tc(M... · Print Sheet : A'3' Size 3. Read this drawing along with other related drawings and other services drawings. unless otherwise indicated

3. Read this drawing along with other related drawings

and other services drawings.

unless otherwise indicated.

2. Drawing are not to be directly measured.reported to the consultant or concerned engineer.

1. Any discrepancy in the drawing to be immediately

and coordinate with Structural, Electrical, Plumbing

5. Provide threshold at all exterior doors as per details,

4. Refer doors & windows schedule/elevations for sizeof doors & windows

NOTES:

S-07Date : September,2016

Mr. H.B. Gurung

Mr. A.S. Tamang

Mr. S. Malla

Sub-Consultant:

Joint Venture with

Project Title:

Department Of EducationSanothimi, Bhaktapur, Nepal

Government Of Nepal

Japan InternationalCooperation Agency

Emergency School Reconstruction Project

Mr. Tomoki Miyano

Mr. Hisafumi MichikawaMr. Wong Kuok Hung

Donor :

ORIENTAL CONSULTANTS GLOBALGlobal Consulting for sustainable Development

Type Design :

Sheet Title : Sheet No.

Print Sheet : A'3' Size

1 COMBINE MEDIUM TOILET BLOCKFOR MALE AND FEMALE

WATER TROUGH DETAILS

0 250MM 500MM 750MM 1M1.25M

1:25

Page 16: A-01 › downloadfile › FINAL PDF- Tc(M... · Print Sheet : A'3' Size 3. Read this drawing along with other related drawings and other services drawings. unless otherwise indicated

Mr. H.B. Gurung

Mr. A.S. Tamang

Sub-Consultant:

Joint Venture with

Project Title:

Department Of EducationSanothimi, Bhaktapur, Nepal

Government Of Nepal

Japan InternationalCooperation Agency

Emergency School Reconstruction Project

Mr. Tomoki Miyano

Mr. Hisafumi MichikawaMr. Wong Kuok Hung

Donor :

ORIENTAL CONSULTANTS GLOBALGlobal Consulting for sustainable Development

Type Design :

Sheet Title : Sheet No.

0 1M 2M 3M 4M5M

1:100

3. Read this drawing along with other related drawings

and other services drawings.

unless otherwise indicated.

2. Drawing are not to be directly measured.reported to the consultant or concerned engineer.

1. Any discrepancy in the drawing to be immediately

and coordinate with Structural, Electrical, Plumbing

5. Provide threshold at all exterior doors as per details,

4. Refer doors & windows schedule/elevations for sizeof doors & windows

NOTES:

6. The location of ramps to be adjusted as per site condition.

E-01Date : September, 2016

Print Sheet : A'3' Size

1 COMBINE MEDIUM TOILET BLOCK

LIGHT, POWER AND DB

Tc(M)LAYOUT PLAN

FOR MALE AND FEMALE

(GROUND FLOOR)

Mr. A.K. Dhungana

Page 17: A-01 › downloadfile › FINAL PDF- Tc(M... · Print Sheet : A'3' Size 3. Read this drawing along with other related drawings and other services drawings. unless otherwise indicated

Mr. H.B. Gurung

Mr. A.S. Tamang

Sub-Consultant:

Joint Venture with

Project Title:

Department Of EducationSanothimi, Bhaktapur, Nepal

Government Of Nepal

Japan InternationalCooperation Agency

Emergency School Reconstruction Project

Mr. Tomoki Miyano

Mr. Hisafumi MichikawaMr. Wong Kuok Hung

Donor :

ORIENTAL CONSULTANTS GLOBALGlobal Consulting for sustainable Development

Type Design :

Sheet Title : Sheet No.

3. Read this drawing along with other related drawings

and other services drawings.

unless otherwise indicated.

2. Drawing are not to be directly measured.reported to the consultant or concerned engineer.

1. Any discrepancy in the drawing to be immediately

and coordinate with Structural, Electrical, Plumbing

5. Provide threshold at all exterior doors as per details,

4. Refer doors & windows schedule/elevations for sizeof doors & windows

NOTES:

6. The location of ramps to be adjusted as per site condition.

P-01Date :September, 2016

Mr. R.K. Karkee

1 COMBINE MEDIUM TOILET BLOCK

SOIL & WASTE WATER &

Tc (M)WATER SUPPLY PIPELINE

Print Sheet : A'3' Size

FOR MALE & FEMALE

0 750MM 1.5M 2.25M 3M3.75M

1:75

Page 18: A-01 › downloadfile › FINAL PDF- Tc(M... · Print Sheet : A'3' Size 3. Read this drawing along with other related drawings and other services drawings. unless otherwise indicated

Mr. H.B. Gurung

Mr. A.S. Tamang

Sub-Consultant:

Joint Venture with

Project Title:

Department Of EducationSanothimi, Bhaktapur, Nepal

Government Of Nepal

Japan InternationalCooperation Agency

Emergency School Reconstruction Project

Mr. Tomoki Miyano

Mr. Hisafumi MichikawaMr. Wong Kuok Hung

Donor :

ORIENTAL CONSULTANTS GLOBALGlobal Consulting for sustainable Development

Type Design :

Sheet Title : Sheet No.

3. Read this drawing along with other related drawings

and other services drawings.

unless otherwise indicated.

2. Drawing are not to be directly measured.reported to the consultant or concerned engineer.

1. Any discrepancy in the drawing to be immediately

and coordinate with Structural, Electrical, Plumbing

5. Provide threshold at all exterior doors as per details,

4. Refer doors & windows schedule/elevations for sizeof doors & windows

NOTES:

6. The location of ramps to be adjusted as per site condition.

P-02

Mr. R.K. Karkee

1 COMBINE MEDIUM TOILET BLOCK

Tc(M)

Print Sheet : A'3' Size

FOR MALE & FEMALE

0 750MM 1.5M 2.25M 3M3.75M

1:75

WATER SUPPLY PIPELINELAYOUT & SECTIONALDIAGRAM (MALE & FEMALE)

Date :September, 2016