a-01 › downloadfile › final pdf- tc(m... · print sheet : a'3' size 3. read this...
TRANSCRIPT
![Page 1: A-01 › downloadfile › FINAL PDF- Tc(M... · Print Sheet : A'3' Size 3. Read this drawing along with other related drawings and other services drawings. unless otherwise indicated](https://reader034.vdocument.in/reader034/viewer/2022042316/5f04a0277e708231d40ee68c/html5/thumbnails/1.jpg)
![Page 2: A-01 › downloadfile › FINAL PDF- Tc(M... · Print Sheet : A'3' Size 3. Read this drawing along with other related drawings and other services drawings. unless otherwise indicated](https://reader034.vdocument.in/reader034/viewer/2022042316/5f04a0277e708231d40ee68c/html5/thumbnails/2.jpg)
![Page 3: A-01 › downloadfile › FINAL PDF- Tc(M... · Print Sheet : A'3' Size 3. Read this drawing along with other related drawings and other services drawings. unless otherwise indicated](https://reader034.vdocument.in/reader034/viewer/2022042316/5f04a0277e708231d40ee68c/html5/thumbnails/3.jpg)
A-01Date : September, 2016
Mr. H.B. Gurung
Mr. A.S. Tamang
Ms. M. Rana
Sub-Consultant:
Joint Venture with
Project Title:
Department Of EducationSanothimi, Bhaktapur, Nepal
Government Of Nepal
Japan InternationalCooperation Agency
Emergency School Reconstruction Project
Mr. Tomoki Miyano
Mr. Hisafumi MichikawaMr. Wong Kuok Hung
Donor :
ORIENTAL CONSULTANTS GLOBALGlobal Consulting for sustainable Development
Type Design :
Sheet Title :
1 COMBINE MEDIUM TOILET BLOCK
Sheet No.FLOOR PLAN, ELEVATIONS
Tc(M)& SECTION
Print Sheet : A'3' Size0 1M 2M 3M 4M
5M
1:100
3. Read this drawing along with other related drawings
and other services drawings.
unless otherwise indicated.
2. Drawing are not to be directly measured.reported to the consultant or concerned engineer.
1. Any discrepancy in the drawing to be immediately
and coordinate with Structural, Electrical, Plumbing
5. Provide threshold at all exterior doors as per details,
4. Refer doors & windows schedule/elevations for sizeof doors & windows
NOTES:
6. The location of ramps to be adjusted as per site condition.
FOR MALE & FEMALE
![Page 4: A-01 › downloadfile › FINAL PDF- Tc(M... · Print Sheet : A'3' Size 3. Read this drawing along with other related drawings and other services drawings. unless otherwise indicated](https://reader034.vdocument.in/reader034/viewer/2022042316/5f04a0277e708231d40ee68c/html5/thumbnails/4.jpg)
A-02Date : September, 2016
Mr. H.B. Gurung
Mr. A.S. Tamang
Ms. M. Rana
Sub-Consultant:
Joint Venture with
Project Title:
Department Of EducationSanothimi, Bhaktapur, Nepal
Government Of Nepal
Japan InternationalCooperation Agency
Emergency School Reconstruction Project
Mr. Tomoki Miyano
Mr. Hisafumi MichikawaMr. Wong Kuok Hung
Donor :
ORIENTAL CONSULTANTS GLOBALGlobal Consulting for sustainable Development
Type Design :
Sheet Title :
1 COMBINE MEDIUM TOILET BLOCK
Sheet No.WALL SECTION & RAMP
Tc(M)
Print Sheet : A'3' Size
3. Read this drawing along with other related drawings
and other services drawings.
unless otherwise indicated.
2. Drawing are not to be directly measured.reported to the consultant or concerned engineer.
1. Any discrepancy in the drawing to be immediately
and coordinate with Structural, Electrical, Plumbing
5. Provide threshold at all exterior doors as per details,
4. Refer doors & windows schedule/elevations for sizeof doors & windows
NOTES:
6. The location of ramps to be adjusted as per site condition.
FOR MALE & FEMALE
0 0.4M 0.8M 1.2M 1.6M2M
1:40
SECTION DETAIL
![Page 5: A-01 › downloadfile › FINAL PDF- Tc(M... · Print Sheet : A'3' Size 3. Read this drawing along with other related drawings and other services drawings. unless otherwise indicated](https://reader034.vdocument.in/reader034/viewer/2022042316/5f04a0277e708231d40ee68c/html5/thumbnails/5.jpg)
A-03Date : September, 2016
Mr. H.B. Gurung
Mr. A.S. Tamang
Ms. M. Rana
Sub-Consultant:
Joint Venture with
Project Title:
Department Of EducationSanothimi, Bhaktapur, Nepal
Government Of Nepal
Japan InternationalCooperation Agency
Emergency School Reconstruction Project
Mr. Tomoki Miyano
Mr. Hisafumi MichikawaMr. Wong Kuok Hung
Donor :
ORIENTAL CONSULTANTS GLOBALGlobal Consulting for sustainable Development
Type Design :
Sheet Title :
1 COMBINE MEDIUM TOILET BLOCK
Sheet No.FLOOR PLAN BLOW UP
Tc(M)
Print Sheet : A'3' Size
3. Read this drawing along with other related drawings
and other services drawings.
unless otherwise indicated.
2. Drawing are not to be directly measured.reported to the consultant or concerned engineer.
1. Any discrepancy in the drawing to be immediately
and coordinate with Structural, Electrical, Plumbing
5. Provide threshold at all exterior doors as per details,
4. Refer doors & windows schedule/elevations for sizeof doors & windows
NOTES:
6. The location of ramps to be adjusted as per site condition.
FOR MALE & FEMALE
0 500 MM 1M 1.5M 2M2.5M
1:50
![Page 6: A-01 › downloadfile › FINAL PDF- Tc(M... · Print Sheet : A'3' Size 3. Read this drawing along with other related drawings and other services drawings. unless otherwise indicated](https://reader034.vdocument.in/reader034/viewer/2022042316/5f04a0277e708231d40ee68c/html5/thumbnails/6.jpg)
A-04Date : September, 2016
Mr. H.B. Gurung
Mr. A.S. Tamang
Ms. M. Rana
Sub-Consultant:
Joint Venture with
Project Title:
Department Of EducationSanothimi, Bhaktapur, Nepal
Government Of Nepal
Japan InternationalCooperation Agency
Emergency School Reconstruction Project
Mr. Tomoki Miyano
Mr. Hisafumi MichikawaMr. Wong Kuok Hung
Donor :
ORIENTAL CONSULTANTS GLOBALGlobal Consulting for sustainable Development
Type Design :
Sheet Title :
1 COMBINE MEDIUM TOILET BLOCK
Sheet No.FALSE CEILING PLAN
Tc(M)
Print Sheet : A'3' Size
3. Read this drawing along with other related drawings
and other services drawings.
unless otherwise indicated.
2. Drawing are not to be directly measured.reported to the consultant or concerned engineer.
1. Any discrepancy in the drawing to be immediately
and coordinate with Structural, Electrical, Plumbing
5. Provide threshold at all exterior doors as per details,
4. Refer doors & windows schedule/elevations for sizeof doors & windows
NOTES:
6. The location of ramps to be adjusted as per site condition.
FOR MALE & FEMALE
0 500 MM 1M 1.5M 2M2.5M
1:50
![Page 7: A-01 › downloadfile › FINAL PDF- Tc(M... · Print Sheet : A'3' Size 3. Read this drawing along with other related drawings and other services drawings. unless otherwise indicated](https://reader034.vdocument.in/reader034/viewer/2022042316/5f04a0277e708231d40ee68c/html5/thumbnails/7.jpg)
A-05Date : September, 2016
Mr. H.B. Gurung
Mr. A.S. Tamang
Ms. M. Rana
Sub-Consultant:
Joint Venture with
Project Title:
Department Of EducationSanothimi, Bhaktapur, Nepal
Government Of Nepal
Japan InternationalCooperation Agency
Emergency School Reconstruction Project
Mr. Tomoki Miyano
Mr. Hisafumi MichikawaMr. Wong Kuok Hung
Donor :
ORIENTAL CONSULTANTS GLOBALGlobal Consulting for sustainable Development
Type Design :
Sheet Title :
1 COMBINE MEDIUM TOILET BLOCK
Sheet No.DOOR WINDOW DETAILS
Tc(M)
Print Sheet : A'3' Size
3. Read this drawing along with other related drawings
and other services drawings.
unless otherwise indicated.
2. Drawing are not to be directly measured.reported to the consultant or concerned engineer.
1. Any discrepancy in the drawing to be immediately
and coordinate with Structural, Electrical, Plumbing
5. Provide threshold at all exterior doors as per details,
4. Refer doors & windows schedule/elevations for sizeof doors & windows
NOTES:
6. The location of ramps to be adjusted as per site condition.
FOR MALE & FEMALE
0 250 MM 500MM 750MM 1M1.25M
1:25
![Page 8: A-01 › downloadfile › FINAL PDF- Tc(M... · Print Sheet : A'3' Size 3. Read this drawing along with other related drawings and other services drawings. unless otherwise indicated](https://reader034.vdocument.in/reader034/viewer/2022042316/5f04a0277e708231d40ee68c/html5/thumbnails/8.jpg)
3. Read this drawing along with other related drawings
and other services drawings.
unless otherwise indicated.
2. Drawing are not to be directly measured.reported to the consultant or concerned engineer.
1. Any discrepancy in the drawing to be immediately
and coordinate with Structural, Electrical, Plumbing
5. Provide threshold at all exterior doors as per details,
4. Refer doors & windows schedule/elevations for sizeof doors & windows
NOTES:
Mr. H.B. Gurung
Mr. A.S. Tamang
Sub-Consultant:
Joint Venture with
Project Title:
Department Of EducationSanothimi, Bhaktapur, Nepal
Government Of Nepal
Japan InternationalCooperation Agency
Emergency School Reconstruction Project
Mr. Tomoki Miyano
Mr. Hisafumi MichikawaMr. Wong Kuok Hung
Donor :
ORIENTAL CONSULTANTS GLOBALGlobal Consulting for sustainable Development
Type Design :
Sheet Title : Sheet No.
Mr. S. Malla
1 COMBINE MEDIUM TOILET BLOCKFOR MALE AND FEMALE
Print Sheet : A'3' Size S-00Date : September,2016
GENERAL NOTES &TYPICAL DETAILS
![Page 9: A-01 › downloadfile › FINAL PDF- Tc(M... · Print Sheet : A'3' Size 3. Read this drawing along with other related drawings and other services drawings. unless otherwise indicated](https://reader034.vdocument.in/reader034/viewer/2022042316/5f04a0277e708231d40ee68c/html5/thumbnails/9.jpg)
3. Read this drawing along with other related drawings
and other services drawings.
unless otherwise indicated.
2. Drawing are not to be directly measured.reported to the consultant or concerned engineer.
1. Any discrepancy in the drawing to be immediately
and coordinate with Structural, Electrical, Plumbing
5. Provide threshold at all exterior doors as per details,
4. Refer doors & windows schedule/elevations for sizeof doors & windows
NOTES:
S-01Date : September,2016
Mr. H.B. Gurung
Mr. A.S. Tamang
Mr. S. Malla
Sub-Consultant:
Joint Venture with
Project Title:
Department Of EducationSanothimi, Bhaktapur, Nepal
Government Of Nepal
Japan InternationalCooperation Agency
Emergency School Reconstruction Project
Mr. Tomoki Miyano
Mr. Hisafumi MichikawaMr. Wong Kuok Hung
Donor :
ORIENTAL CONSULTANTS GLOBALGlobal Consulting for sustainable Development
Type Design :
Sheet Title : Sheet No.
0 1M 2M 3M 4M5M
1:100
TRENCH PLAN,TIE BEAM DETAIL &
0 200MM 400MM 600MM 800MM1M
1:20
Print Sheet : A'3' Size
1 COMBINE MEDIUM TOILET BLOCKFOR MALE AND FEMALE
WALL FOUNDATION DETAIL
![Page 10: A-01 › downloadfile › FINAL PDF- Tc(M... · Print Sheet : A'3' Size 3. Read this drawing along with other related drawings and other services drawings. unless otherwise indicated](https://reader034.vdocument.in/reader034/viewer/2022042316/5f04a0277e708231d40ee68c/html5/thumbnails/10.jpg)
3. Read this drawing along with other related drawings
and other services drawings.
unless otherwise indicated.
2. Drawing are not to be directly measured.reported to the consultant or concerned engineer.
1. Any discrepancy in the drawing to be immediately
and coordinate with Structural, Electrical, Plumbing
5. Provide threshold at all exterior doors as per details,
4. Refer doors & windows schedule/elevations for sizeof doors & windows
NOTES:
S-02Date : September,2016
Mr. H.B. Gurung
Mr. A.S. Tamang
Mr. S. Malla
Sub-Consultant:
Joint Venture with
Project Title:
Department Of EducationSanothimi, Bhaktapur, Nepal
Government Of Nepal
Japan InternationalCooperation Agency
Emergency School Reconstruction Project
Mr. Tomoki Miyano
Mr. Hisafumi MichikawaMr. Wong Kuok Hung
Donor :
ORIENTAL CONSULTANTS GLOBALGlobal Consulting for sustainable Development
Type Design :
Sheet Title : Sheet No.FOOTING PLAN & SECTION,TIE BEAM DETAIL &
0 200MM 400MM 600MM 800MM1M
1:20 Print Sheet : A'3' Size
1 COMBINE MEDIUM TOILET BLOCKFOR MALE AND FEMALE
WALL FOUNDATION DETAIL
![Page 11: A-01 › downloadfile › FINAL PDF- Tc(M... · Print Sheet : A'3' Size 3. Read this drawing along with other related drawings and other services drawings. unless otherwise indicated](https://reader034.vdocument.in/reader034/viewer/2022042316/5f04a0277e708231d40ee68c/html5/thumbnails/11.jpg)
3. Read this drawing along with other related drawings
and other services drawings.
unless otherwise indicated.
2. Drawing are not to be directly measured.reported to the consultant or concerned engineer.
1. Any discrepancy in the drawing to be immediately
and coordinate with Structural, Electrical, Plumbing
5. Provide threshold at all exterior doors as per details,
4. Refer doors & windows schedule/elevations for sizeof doors & windows
NOTES:
S-03Date : September,2016
Mr. H.B. Gurung
Mr. A.S. Tamang
Mr. S. Malla
Sub-Consultant:
Joint Venture with
Project Title:
Department Of EducationSanothimi, Bhaktapur, Nepal
Government Of Nepal
Japan InternationalCooperation Agency
Emergency School Reconstruction Project
Mr. Tomoki Miyano
Mr. Hisafumi MichikawaMr. Wong Kuok Hung
Donor :
ORIENTAL CONSULTANTS GLOBALGlobal Consulting for sustainable Development
Type Design :
Sheet Title : Sheet No.
0 1M 2M 3M 4M5M
1:100
COLUMN PLAN & DETAILS,
Print Sheet : A'3' Size
1 COMBINE MEDIUM TOILET BLOCKFOR MALE AND FEMALE
0 250MM 500MM 750MM 1M1.25M
1:25
SILL & LINTEL DETAILS
![Page 12: A-01 › downloadfile › FINAL PDF- Tc(M... · Print Sheet : A'3' Size 3. Read this drawing along with other related drawings and other services drawings. unless otherwise indicated](https://reader034.vdocument.in/reader034/viewer/2022042316/5f04a0277e708231d40ee68c/html5/thumbnails/12.jpg)
3. Read this drawing along with other related drawings
and other services drawings.
unless otherwise indicated.
2. Drawing are not to be directly measured.reported to the consultant or concerned engineer.
1. Any discrepancy in the drawing to be immediately
and coordinate with Structural, Electrical, Plumbing
5. Provide threshold at all exterior doors as per details,
4. Refer doors & windows schedule/elevations for sizeof doors & windows
NOTES:
S-04Date : September,2016
Mr. H.B. Gurung
Mr. A.S. Tamang
Mr. S. Malla
Sub-Consultant:
Joint Venture with
Project Title:
Department Of EducationSanothimi, Bhaktapur, Nepal
Government Of Nepal
Japan InternationalCooperation Agency
Emergency School Reconstruction Project
Mr. Tomoki Miyano
Mr. Hisafumi MichikawaMr. Wong Kuok Hung
Donor :
ORIENTAL CONSULTANTS GLOBALGlobal Consulting for sustainable Development
Type Design :
Sheet Title : Sheet No.
0 500MM 1M 1.5M 2M2.5M
1:50
BEAM PLAN & DETAILS0 250MM 500MM 750MM 1M
1.25M
1:25
0 1M 2M 3M 4M5M
1:100 Print Sheet : A'3' Size
1 COMBINE MEDIUM TOILET BLOCKFOR MALE AND FEMALE
![Page 13: A-01 › downloadfile › FINAL PDF- Tc(M... · Print Sheet : A'3' Size 3. Read this drawing along with other related drawings and other services drawings. unless otherwise indicated](https://reader034.vdocument.in/reader034/viewer/2022042316/5f04a0277e708231d40ee68c/html5/thumbnails/13.jpg)
3. Read this drawing along with other related drawings
and other services drawings.
unless otherwise indicated.
2. Drawing are not to be directly measured.reported to the consultant or concerned engineer.
1. Any discrepancy in the drawing to be immediately
and coordinate with Structural, Electrical, Plumbing
5. Provide threshold at all exterior doors as per details,
4. Refer doors & windows schedule/elevations for sizeof doors & windows
NOTES:
S-05Date : September,2016
Mr. H.B. Gurung
Mr. A.S. Tamang
Mr. S. Malla
Sub-Consultant:
Joint Venture with
Project Title:
Department Of EducationSanothimi, Bhaktapur, Nepal
Government Of Nepal
Japan InternationalCooperation Agency
Emergency School Reconstruction Project
Mr. Tomoki Miyano
Mr. Hisafumi MichikawaMr. Wong Kuok Hung
Donor :
ORIENTAL CONSULTANTS GLOBALGlobal Consulting for sustainable Development
Type Design :
Sheet Title : Sheet No.
0 400MM 800MM 1.2M 1.6M2M
1:40
SLAB PLAN & SECTION
0 1M 2M 3M 4M5M
1:100 Print Sheet : A'3' Size
1 COMBINE MEDIUM TOILET BLOCKFOR MALE AND FEMALE
TRUSS PLAN & SECTION0 300MM 600MM 900MM 1.2M
1.5M
1:30
![Page 14: A-01 › downloadfile › FINAL PDF- Tc(M... · Print Sheet : A'3' Size 3. Read this drawing along with other related drawings and other services drawings. unless otherwise indicated](https://reader034.vdocument.in/reader034/viewer/2022042316/5f04a0277e708231d40ee68c/html5/thumbnails/14.jpg)
3. Read this drawing along with other related drawings
and other services drawings.
unless otherwise indicated.
2. Drawing are not to be directly measured.reported to the consultant or concerned engineer.
1. Any discrepancy in the drawing to be immediately
and coordinate with Structural, Electrical, Plumbing
5. Provide threshold at all exterior doors as per details,
4. Refer doors & windows schedule/elevations for sizeof doors & windows
NOTES:
S-06Date : September,2016
Mr. H.B. Gurung
Mr. A.S. Tamang
Mr. S. Malla
Sub-Consultant:
Joint Venture with
Project Title:
Department Of EducationSanothimi, Bhaktapur, Nepal
Government Of Nepal
Japan InternationalCooperation Agency
Emergency School Reconstruction Project
Mr. Tomoki Miyano
Mr. Hisafumi MichikawaMr. Wong Kuok Hung
Donor :
ORIENTAL CONSULTANTS GLOBALGlobal Consulting for sustainable Development
Type Design :
Sheet Title : Sheet No.TRUSS DETAILS
0 100MM 200MM 300MM 400MM500MM
1:10
0 50MM 100MM 150MM 200MM250MM
1:5
Print Sheet : A'3' Size
1 COMBINE MEDIUM TOILET BLOCKFOR MALE AND FEMALE
![Page 15: A-01 › downloadfile › FINAL PDF- Tc(M... · Print Sheet : A'3' Size 3. Read this drawing along with other related drawings and other services drawings. unless otherwise indicated](https://reader034.vdocument.in/reader034/viewer/2022042316/5f04a0277e708231d40ee68c/html5/thumbnails/15.jpg)
3. Read this drawing along with other related drawings
and other services drawings.
unless otherwise indicated.
2. Drawing are not to be directly measured.reported to the consultant or concerned engineer.
1. Any discrepancy in the drawing to be immediately
and coordinate with Structural, Electrical, Plumbing
5. Provide threshold at all exterior doors as per details,
4. Refer doors & windows schedule/elevations for sizeof doors & windows
NOTES:
S-07Date : September,2016
Mr. H.B. Gurung
Mr. A.S. Tamang
Mr. S. Malla
Sub-Consultant:
Joint Venture with
Project Title:
Department Of EducationSanothimi, Bhaktapur, Nepal
Government Of Nepal
Japan InternationalCooperation Agency
Emergency School Reconstruction Project
Mr. Tomoki Miyano
Mr. Hisafumi MichikawaMr. Wong Kuok Hung
Donor :
ORIENTAL CONSULTANTS GLOBALGlobal Consulting for sustainable Development
Type Design :
Sheet Title : Sheet No.
Print Sheet : A'3' Size
1 COMBINE MEDIUM TOILET BLOCKFOR MALE AND FEMALE
WATER TROUGH DETAILS
0 250MM 500MM 750MM 1M1.25M
1:25
![Page 16: A-01 › downloadfile › FINAL PDF- Tc(M... · Print Sheet : A'3' Size 3. Read this drawing along with other related drawings and other services drawings. unless otherwise indicated](https://reader034.vdocument.in/reader034/viewer/2022042316/5f04a0277e708231d40ee68c/html5/thumbnails/16.jpg)
Mr. H.B. Gurung
Mr. A.S. Tamang
Sub-Consultant:
Joint Venture with
Project Title:
Department Of EducationSanothimi, Bhaktapur, Nepal
Government Of Nepal
Japan InternationalCooperation Agency
Emergency School Reconstruction Project
Mr. Tomoki Miyano
Mr. Hisafumi MichikawaMr. Wong Kuok Hung
Donor :
ORIENTAL CONSULTANTS GLOBALGlobal Consulting for sustainable Development
Type Design :
Sheet Title : Sheet No.
0 1M 2M 3M 4M5M
1:100
3. Read this drawing along with other related drawings
and other services drawings.
unless otherwise indicated.
2. Drawing are not to be directly measured.reported to the consultant or concerned engineer.
1. Any discrepancy in the drawing to be immediately
and coordinate with Structural, Electrical, Plumbing
5. Provide threshold at all exterior doors as per details,
4. Refer doors & windows schedule/elevations for sizeof doors & windows
NOTES:
6. The location of ramps to be adjusted as per site condition.
E-01Date : September, 2016
Print Sheet : A'3' Size
1 COMBINE MEDIUM TOILET BLOCK
LIGHT, POWER AND DB
Tc(M)LAYOUT PLAN
FOR MALE AND FEMALE
(GROUND FLOOR)
Mr. A.K. Dhungana
![Page 17: A-01 › downloadfile › FINAL PDF- Tc(M... · Print Sheet : A'3' Size 3. Read this drawing along with other related drawings and other services drawings. unless otherwise indicated](https://reader034.vdocument.in/reader034/viewer/2022042316/5f04a0277e708231d40ee68c/html5/thumbnails/17.jpg)
Mr. H.B. Gurung
Mr. A.S. Tamang
Sub-Consultant:
Joint Venture with
Project Title:
Department Of EducationSanothimi, Bhaktapur, Nepal
Government Of Nepal
Japan InternationalCooperation Agency
Emergency School Reconstruction Project
Mr. Tomoki Miyano
Mr. Hisafumi MichikawaMr. Wong Kuok Hung
Donor :
ORIENTAL CONSULTANTS GLOBALGlobal Consulting for sustainable Development
Type Design :
Sheet Title : Sheet No.
3. Read this drawing along with other related drawings
and other services drawings.
unless otherwise indicated.
2. Drawing are not to be directly measured.reported to the consultant or concerned engineer.
1. Any discrepancy in the drawing to be immediately
and coordinate with Structural, Electrical, Plumbing
5. Provide threshold at all exterior doors as per details,
4. Refer doors & windows schedule/elevations for sizeof doors & windows
NOTES:
6. The location of ramps to be adjusted as per site condition.
P-01Date :September, 2016
Mr. R.K. Karkee
1 COMBINE MEDIUM TOILET BLOCK
SOIL & WASTE WATER &
Tc (M)WATER SUPPLY PIPELINE
Print Sheet : A'3' Size
FOR MALE & FEMALE
0 750MM 1.5M 2.25M 3M3.75M
1:75
![Page 18: A-01 › downloadfile › FINAL PDF- Tc(M... · Print Sheet : A'3' Size 3. Read this drawing along with other related drawings and other services drawings. unless otherwise indicated](https://reader034.vdocument.in/reader034/viewer/2022042316/5f04a0277e708231d40ee68c/html5/thumbnails/18.jpg)
Mr. H.B. Gurung
Mr. A.S. Tamang
Sub-Consultant:
Joint Venture with
Project Title:
Department Of EducationSanothimi, Bhaktapur, Nepal
Government Of Nepal
Japan InternationalCooperation Agency
Emergency School Reconstruction Project
Mr. Tomoki Miyano
Mr. Hisafumi MichikawaMr. Wong Kuok Hung
Donor :
ORIENTAL CONSULTANTS GLOBALGlobal Consulting for sustainable Development
Type Design :
Sheet Title : Sheet No.
3. Read this drawing along with other related drawings
and other services drawings.
unless otherwise indicated.
2. Drawing are not to be directly measured.reported to the consultant or concerned engineer.
1. Any discrepancy in the drawing to be immediately
and coordinate with Structural, Electrical, Plumbing
5. Provide threshold at all exterior doors as per details,
4. Refer doors & windows schedule/elevations for sizeof doors & windows
NOTES:
6. The location of ramps to be adjusted as per site condition.
P-02
Mr. R.K. Karkee
1 COMBINE MEDIUM TOILET BLOCK
Tc(M)
Print Sheet : A'3' Size
FOR MALE & FEMALE
0 750MM 1.5M 2.25M 3M3.75M
1:75
WATER SUPPLY PIPELINELAYOUT & SECTIONALDIAGRAM (MALE & FEMALE)
Date :September, 2016