Engineering Foundations: Principles and Communications 100
Semester 1, 2013 Weekly Progress Report
A copy of this report is to be uploaded prior to your project meeting and a printed copy presented to your manager in class.
WEEKLY PROGRESS REPORT
COMPANY NAME: Laterico inc DATE: 27-03-2013
ACTIVITY LOG: Lists what each team member was responsible for, hours worked and percentage complete.Team Member: Wesley Taylor
Sketches for final plan of bridge 3 hours ~90%
Drawings for final submission 2 hours ~30%
Finished final design for logo 1 hours Done
Team Member: Jenni Kelly
Costing list 1 hours ~75%
Editing criteria and checklist for final copy of bridge design 2 hours Done
Agenda for meeting 3 0.5 hours Done
Team Member: Sam Lee
Specification for building bridge truss 2 hours ~80%
Working model for truss of bridge 0.75 hours Done
Team Member: Declan Roberts
Waste management brainstorm on road surfaces 1 hours Done
Waste management plan on road surfaces 0.25 hours Done
Waste management good copy on road surfaces 1.5hours ~70%
Team Member: Rohan Pandit
Waste management draft for pop sticks 2.5 hours ~90%
Team Member: Bradley DSeuza
Research about possible adhesive that could be used 1 hours Done
Plan on adhesives waste management 0.75 hours Done
Final copy of Waste management for adhesives 0.75 hours `90%
A-14
-
7/27/2019 A-14 Weekly Progress Report 2 Final Copy
2/3
GOALS:A detailed list of what each team member is responsible for next week and when it will be done.
Team Member: Wesley Taylor
Complete sketch for final bridge plan 29March
Complete drawings for the final bridge design submission 29 March
Write a personal reflection on stage one 31 March
Team Member: Jenni Kelly
Finish costing list 29 March
Collaborate all documents to do with stage 1 into documents, edit them, format them,
add contents pages, add cover pages and turn all documents into PDF format.
30 March
Write a personal reflection on stage one 31 March
Write agenda for next meeting 2 April
Team Member: Sam Lee
Finish plan and final copy for specifications 29 March
Write a personal reflection on stage one 31 March
Team Member: Declan Roberts
Complete Waste managent final copy for road surfaces 29 March
Write a personal reflection on stage one 31 March
Team Member: Rohan Pandit
Finish waste management plan for pop sticks 29 March
Finish final copy of waste management for pop sticks 29 March
Write a personal reflection on stage one 31 March
Team Member: Bradley DSeuza
Finish final copy for the Waste management of the adhesive 29 March
Write a personal reflection on stage one 31 March
QUESTIONS FOR MANAGERS:
Questions for your managers are to be listed here. Listing them here demonstrates that you are thinking
about how to best manage the project. They may be questions about problems in your team, what needs to
be done, potential future issues Questions where the answers are in the Unit Outline or client briefs are
very poor questions. They show that you are NOT planning or thinking.
Is it true that someone else builds the car we designed? (SIMPLE QUESTION) What happens if our bridge is overweight? (GOOD QUESTION)
Team member X is going to Bali in week 4 for 2 weeks what should we do? (GREAT QUESTION)
-
7/27/2019 A-14 Weekly Progress Report 2 Final Copy
3/3
How much is Stage 1 Design submission worth? (VERY POOR QUESTION)
TEAMWORK DYNAMICS:
Tick or highlightALL the problems your team has had this week. Dont be afraid ofdoing this as every team
has problems. Having a small professional disagreement now will avoid a massive argument later in the
project.
Team member sick
Team member not completing allocated tasks
Imbalance in task allocations
Non-responsive team member
Team member trying to do all the work
Team member having to do all the work
Mismatch of expectations amongst team
Mismatch of ambition amongst team
members
Team member unhappy with team
performance
Other
Other