a campaign quality army with a joint expeditionary mindset · a campaign quality army with a joint...

17
Army Budget Office Army FY06/07Budget Overview Army FY06/07Budget Overview A Campaign Quality Army with a Joint Expeditionary Mindset Our Army at War…Relevant and Ready MG Edgar E. Stanton III Director of the Army Budget

Upload: others

Post on 27-May-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: A Campaign Quality Army with a Joint Expeditionary Mindset · A Campaign Quality Army with a Joint Expeditionary Mindset Our Army at War…Relevant and Ready MG Edgar E. Stanton III

Army Budget Office

Army FY06/07Budget OverviewArmy FY06/07Budget Overview

A Campaign Quality Army with a Joint Expeditionary Mindset

Our Army at War…Relevant and Ready

MG Edgar E. Stanton IIIDirector of the Army Budget

Page 2: A Campaign Quality Army with a Joint Expeditionary Mindset · A Campaign Quality Army with a Joint Expeditionary Mindset Our Army at War…Relevant and Ready MG Edgar E. Stanton III

Army Budget Office

Your ArmyYour Army

STRATEGIC GOAL……..Remain Relevant and Ready today and tomorrow to Accomplish our mission in an uncertain 21st Century Security Environment

MISSION…..Provide necessary Forces and Capabilities to the Combatant Commanders in Support of the National Security and Defense Strategies.

Page 3: A Campaign Quality Army with a Joint Expeditionary Mindset · A Campaign Quality Army with a Joint Expeditionary Mindset Our Army at War…Relevant and Ready MG Edgar E. Stanton III

Army Budget Office

Army FY 06/07 Budget ThemesArmy FY 06/07 Budget Themes

Transform and improve Army capabilitiesRestructure to a modular design.Rebalance active and reserve.Stabilize units.

Improve effectiveness and identify efficiencies.Recruit and retain the all-volunteer force.Accelerate promising technology to improve force protection and enhance fighting capability.Repair, reset and recapitalize equipment.

This budget expands Army capabilities and provides a force ready for deployment. It sets the foundation from which the Army will win the Global War on Terrorism. Supplemental appropriations will fund the cost of the war.

Page 4: A Campaign Quality Army with a Joint Expeditionary Mindset · A Campaign Quality Army with a Joint Expeditionary Mindset Our Army at War…Relevant and Ready MG Edgar E. Stanton III

Army Budget Office

Army Budget Authority Army Budget Authority ($B)($B)

FY04 FY05 FY05 FY06 FY07Category Actuals* Pres Bud AppnMILPERS $ 48.3 $ 39.4 $ 39.1 $ 41.4 $ 43.3O&M 62.0 32.6 31.7 31.8 33.1Procurement 14.5 10.4 13.0 11.8 13.5RDT&E 10.2 10.4 10.5 9.7 10.3MILCON 2.0 2.1 2.5 1.9 2.3AFH 1.4 1.6 1.6 1.4 1.1Other 1.7 0.7 0.5 0.6 6.4 **

Sub Total $ 140.1 $ 97.2 $ 98.9 $ 98.6 $ 110.0Chem Demil 1.4 0.0 1.4 1.4 1.4

Total $141.5 $97.2 $100.3 $100.0 $111.4

Pres Bud

MILPERS41%

O&M32%

Procurement12%

RDT&E10%

AFH1%

MILCON2%

Other1%

Chem Demil1%

*Includes Supplemental Funding** Includes $5B for Army Modular Force

Page 5: A Campaign Quality Army with a Joint Expeditionary Mindset · A Campaign Quality Army with a Joint Expeditionary Mindset Our Army at War…Relevant and Ready MG Edgar E. Stanton III

Army Budget Office

FYFY 06 Army Budget Request ($M)06 Army Budget Request ($M)

MILPERS $41,413.7Military Personnel, Army 31,105.3Reserve Personnel, Army 3,966.2National Guard Personnel, Army 6,342.2

OPERATIONS & MAINTENANCE $31,813.7O&M, Army 25,316.6O&M, Army Reserve 1,987.4O&M , Army National Guard 4,509.7

RDA $21,489.2Aircraft Procurement, Army 2,800.9Missile Procurement, Army 1,270.9Other Procurement, Army 4,302.6Procurement of Ammunition, Army 1,720.9Weapons & Tracked Combat Vehicles 1,660.1Research, Development, Test & Evaluation 9,733.8

Military Construction / Army Family Housing $3,275.6

Environmental Restoration, AWCF $608.2

TOTAL $98,600.4

Page 6: A Campaign Quality Army with a Joint Expeditionary Mindset · A Campaign Quality Army with a Joint Expeditionary Mindset Our Army at War…Relevant and Ready MG Edgar E. Stanton III

Army Budget Office

Military Personnel SummaryMilitary Personnel Summary

482.4482.4482.4480480480480480479484491491509

350350350350350350350350357362370370375

205205205205207 205213226241205205205208

150K

300K

450K

600K

FY95

FY96

FY97

FY98

FY99

FY00

FY01

FY02

FY03

FY04

FY05

FY06

FY07

Active ARNG USAR

Man the ForceFunds the Active Force to 482.4K End StrengthSupports the Reserve Component (RC) at 555K End StrengthReflects an average pay raise of 3.1% in FY 06Maintains zero out of pocket expenses for Housing Continues Residential Communities Initiative

Personnel End Strength FY95-FY07(000s) Approp. FY06 FY07

MPA Funding $28.4B $29.3BNGPA Funding $5.1B $5.6BRPA Funding $3.2B $3.5BRetiree Health Care $4.7B $5.0BMILPERS $41.4B $43.4B

Approp. FY06 FY07 MPA Funding $28.4B $29.3BNGPA Funding $5.1B $5.6BRPA Funding $3.2B $3.5BRetiree Health Care $4.7B $5.0BMILPERS $41.4B $43.4B

Page 7: A Campaign Quality Army with a Joint Expeditionary Mindset · A Campaign Quality Army with a Joint Expeditionary Mindset Our Army at War…Relevant and Ready MG Edgar E. Stanton III

Army Budget Office

Operation & Maintenance SummaryOperation & Maintenance Summary

20.7 20.922.9 23.8

26.730.6 31.1 32.6 31.8 33.1

FY98 FY99 FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07

Budget Request ($B)Supports Execution of the Combined Arms Training Strategy for Air & Ground OPTEMPOFunds Army’s Depot Maintenance Program Funds Base Support at 72% and Facilities Sustainment at 91%Supports Ongoing Kosovo Operations, But Relies On Supplemental For OIF/OEFSupports Modularity Through the Military-To-Civilian Conversions InitiativeTrains Soldiers, Units and Leaders to Succeed in the Current Operational Environment

Approp. FY06 FY07OMA $ 25.3B $ 26.1BOMNG $ 4.5B $ 4.8BOMAR $ 2.0B $ 2.2B

TOTAL $ 31.8B $ 33.1B

Approp. FY06 FY07OMA $ 25.3B $ 26.1BOMNG $ 4.5B $ 4.8BOMAR $ 2.0B $ 2.2B

TOTAL $ 31.8B $ 33.1B

Page 8: A Campaign Quality Army with a Joint Expeditionary Mindset · A Campaign Quality Army with a Joint Expeditionary Mindset Our Army at War…Relevant and Ready MG Edgar E. Stanton III

Army Budget Office

MissilesMissiles

• Program Highlights FY06 FY07 Funds Patriot Programs (PAC-3 & MODS) $567M $564MProcures High Mobility Artillery $175M $227M

Rocket System (HIMARS) Launcher Procures Guided Multiple Launch Rocket $125M $210M

System Rockets (GMLRS)Procures Hellfire $80M -Procures Javelin $72M $78M

0.8

1.2 1.21.4 1.3

1.91.6

1.41.3 1.3 1.4

FY97 FY98 FY99 FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07

Budget Request ($B)

Page 9: A Campaign Quality Army with a Joint Expeditionary Mindset · A Campaign Quality Army with a Joint Expeditionary Mindset Our Army at War…Relevant and Ready MG Edgar E. Stanton III

Army Budget Office

AmmunitionAmmunition

0.9 0.9 1.0 1.1 1.1 1.1 1.2 1.31.6

1.7 1.9

FY97 FY98 FY99 FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07

Budget Request ($B)

• Program Highlights FY06 FY07 Funds Overall training ammunition $1,317M $1,423M

to 82% in FY06 (Small Arms at 100%)Procures Modest War Reserves $227M $334MFunds Production Base $145M $163MTransportation, Testing $32M $30M

•Gradual increase due to current operations and

increased training requirements.

•Gradual increase due to current operations and

increased training requirements.

Page 10: A Campaign Quality Army with a Joint Expeditionary Mindset · A Campaign Quality Army with a Joint Expeditionary Mindset Our Army at War…Relevant and Ready MG Edgar E. Stanton III

Army Budget Office

Weapons/Tracked Combat VehiclesWeapons/Tracked Combat Vehicles

1.01.4

1.9

2.52.2 2.2

1.6 1.6 1.71.5

FY98 FY99 FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07

Budget Request ($B)

• Program Highlights FY06 FY07Procures 240 Strykers for SBCT 6, $875M $726M

fields SBCT 5, Sustains SBCT 4Funds M1 Abrams engine & other $443M $369M

Modifications Procures LW 155M Howitzer $47M $131MContinues small arms Mods/M240 $68M $34M

Page 11: A Campaign Quality Army with a Joint Expeditionary Mindset · A Campaign Quality Army with a Joint Expeditionary Mindset Our Army at War…Relevant and Ready MG Edgar E. Stanton III

Army Budget Office

Other Procurement, Army (OPA 1/3)Other Procurement, Army (OPA 1/3)((TacTac & Support & Support VehVeh)/ (Other Support Equip))/ (Other Support Equip)

2.6 2.53.2 3.4 3.8 4.0

5.24.2 4.2 4.3

5.1

FY97 FY98 FY99 FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07

Budget Request ($B)

• Program Highlights FY06 FY07Procures HMMWV (UAH & Hvy chassis) $224M $331M

Medium Tactical Vehicles $451M $634MHeavy Tactical Vehicles $207M $292MNon System Training Devices $184M $250M

Page 12: A Campaign Quality Army with a Joint Expeditionary Mindset · A Campaign Quality Army with a Joint Expeditionary Mindset Our Army at War…Relevant and Ready MG Edgar E. Stanton III

Army Budget Office

Other Procurement, Army (OPA2/4)Other Procurement, Army (OPA2/4)((CommsComms & Elect/Initial Spares)& Elect/Initial Spares)

2.6 2.53.2 3.4 3.8 4.0

5.24.2 4.2 4.3 5.1

FY97 FY99 FY01 FY03 FY05 FY07

Budget Request ($B)

• Program HighlightsFY06 FY07

Procures SINCGARS Radios $ 55.5MBuys Force XXI Battle Command Brigade $146.1M $137.4Mand Below (FBCB2) Buys Unmanned Aerial Vehicles (UAVs) $ 46.0M $ 56.2MFunds Warfighter Info Network –Tactical $122.4M $108.1M

(WIN-T)Procures Family of improved HF Radios $ 28.0M $ 14.9M

[MBITR (PRC-148) & PRC-150]

Page 13: A Campaign Quality Army with a Joint Expeditionary Mindset · A Campaign Quality Army with a Joint Expeditionary Mindset Our Army at War…Relevant and Ready MG Edgar E. Stanton III

Army Budget Office

AircraftAircraft

1.0 1.01.3 1.2 1.3

1.9 2.0 2.12.7 2.8

3.6

FY97 FY98 FY99 FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07

Budget Request ($B)

• Program Highlights FY06 FY07Funds Apache upgrades/conversions $684M $820MProcures 41 Black Hawk Aircraft $510M $666M

in FY06 & 45 in FY07Funds CH-47 Aircraft, “F” models & engines $651M $588MUtilizes funds from Comanche termination

• FY06 to FY07 Increase:•Ramp up Armed Recon Helo(ARH) $102M (Kiowa Warrior replacement) • Ramp up Light Utility Helo(LUH) $129M

• FY06 to FY07 Increase:•Ramp up Armed Recon Helo(ARH) $102M (Kiowa Warrior replacement) • Ramp up Light Utility Helo(LUH) $129M

Page 14: A Campaign Quality Army with a Joint Expeditionary Mindset · A Campaign Quality Army with a Joint Expeditionary Mindset Our Army at War…Relevant and Ready MG Edgar E. Stanton III

Army Budget Office

Research, Development, Test, and Research, Development, Test, and EvaluationEvaluation

Creates The Army Of The Future… Continues System Development & Demonstration For Future Combat SystemsSupports Future Non Line Of Sight (NLOS) Fires Continues Excalibur DesignSustains Science & Technology Funds Joint Tactical Radio System (JTRS restructure) Funds Warfighter Information Network-Tactical (WIN-T) developmentEnables Apache Block III Acquisition Strategy

4.5 4.8 4.4 5.26.7 6.8

9.1 9.3 9.7 10.3

FY98 FY99 FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07

Budget Request ($B)

Page 15: A Campaign Quality Army with a Joint Expeditionary Mindset · A Campaign Quality Army with a Joint Expeditionary Mindset Our Army at War…Relevant and Ready MG Edgar E. Stanton III

Army Budget Office

Military ConstructionMilitary Construction

Improves Facilities Across the Army… FY06 FY07Funds Top Priority - Whole Barracks Modernization $716M $726MFunds Facilities for Training, Maintenance, $763M $974M

Deployment, & Infrastructure RevitalizationFunds Reserve Component Readiness Facilities $433M $630MFunds Facilities for Stryker BCT (included above) [$221M] [$ 76M]

0.50.7

0.90.7

1.0

2.1

1.61.8

2.11.9

2.3

FY97FY98FY99FY00FY01FY02FY03FY04FY05FY06FY07

Budget Request ($B)

Page 16: A Campaign Quality Army with a Joint Expeditionary Mindset · A Campaign Quality Army with a Joint Expeditionary Mindset Our Army at War…Relevant and Ready MG Edgar E. Stanton III

Army Budget Office

Army Family HousingArmy Family Housing

FY06 FY07Upgrades 5,747 Family Housing Units

AFH Construction (1,821 units in FY06 / 1,945 in FY07) $394M $456MRCI Privatization (3,926 units in FY06 / 1,001 in FY07) $138M $ 22M

Operates and Maintains 58,000 Army controlled Family $813M $639MHousing units in U.S. and Overseas

1.3 1.31.2

1.1 1.1

1.4 1.4 1.41.6

1.4

1.1

FY97 FY98 FY99 FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07

Budget Request ($B)

Page 17: A Campaign Quality Army with a Joint Expeditionary Mindset · A Campaign Quality Army with a Joint Expeditionary Mindset Our Army at War…Relevant and Ready MG Edgar E. Stanton III

Army Budget Office

Army FY 06/07 Budget ThemesArmy FY 06/07 Budget Themes

Transform and improve Army capabilitiesRestructure to a modular design.Rebalance active and reserve.Stabilize units.

Improve effectiveness and identify efficiencies.Recruit and retain the all-volunteer force.Accelerate promising technology to improve force protection and enhance fighting capability.Repair, reset and recapitalize equipment.

This budget expands Army capabilities and provides a force ready for deployment. It sets the foundation from which the Army will win the Global War on Terrorism. Supplemental appropriations will fund the cost of the war.