A collection of short stories
Energy Savings Performance Contracting
VRA – Community Investment Workshop Series2
Energy Savings Performance Contracting
EnergySavingsPotential
High
Med
Low
HighMedLow
FacilityUpgrades
Capital PC
HighNeed/Large
Savings
VRA – Community Investment Workshop Series3
Savings Chart
Roanoke CountyCost (Before & After ECMs)
$227,202
$272,643
$218,114 $204,482
$102,233
$112,457
$103,786$95,588
$68,435$90,264
$27,921
$34,901
$29,666
$29,666
$-
$50,000
$100,000
$150,000
$200,000
$250,000
$300,000
$350,000
$400,000
$450,000
Present Cost Rate Increase After ECM's(Conservative)
After ECM's(Aggressive)
Ele
ctri
city
, Fu
el a
nd
Wat
er A
nn
ual
$
Electricity Fuel Water Savings
VRA – Community Investment Workshop Series4
(Metric tons of CO2)
Greenhouse Gas Emissions
0
500
1000
1500
2000
2500
Your Facilities - Now Your Facilities - After PC
VRA – Community Investment Workshop Series5
• Improvements are made to generate energy (and other) savings and to further the customer’s mission.
• Municipal Lease for project funding is available from VRA
• Guaranteed Energy savings pays for part or all of the municipal lease
• Legislated in Commonwealth of Virginia, process spelled out by DGS, local flexibility
How Does Performance Contracting Work?
VRA – Community Investment Workshop Series6
A Type of Procurement
• Stretches taxpayer dollars
• Often no new capital dollars required
• Collaborative process between owner and partner
• Faster implementation, lower costs
• Build projects around good stewardship components, making the owner “GREEN”.
VRA – Community Investment Workshop Series7
Two Short Stories
• Wise County
Courthouse
• Wise County Public
Schools
VRA – Community Investment Workshop Series8
Once Upon a Time at Wise County…
The judge says “If
you do not fix the
comfort in this
building (the
courthouse), we are
going to lock up the
County Administrator
(Ed Sealover)”
VRA – Community Investment Workshop Series9
The Solution
• Guaranteed energy
savings of $17,337
annually, or 26% of
existing utility bill.
• Entire building receiving
infrastructure renovation
• Chiller replacement
VRA – Community Investment Workshop Series10
The Solution
• Variable Air Volume box replacement
• Controls upgrade
• Steam system repairs
• Lighting retrofit
VRA – Community Investment Workshop Series11
A Happy Ending
• Savings helped pay for the $476,000 in improvements
• Building comfort and working environment significantly improved due to consistent temperatures and quality lighting.
• Savings exceeding guarantee by over $5,000 annually
VRA – Community Investment Workshop Series12
Once Upon a Time at Wise County Public Schools…
“Parents are complaining about the indoor air quality in two of our schools.
The architects have estimated each school will cost $2 million to renovate, but we only have the money to renovate one school.
Which should we fix?”
VRA – Community Investment Workshop Series13
The Solution
• System improvements made to five schools to generate enough savings to pay for the upgrade of the “second” school.
• LF Addington and Powell Valley Primary School received new mechanical systems
VRA – Community Investment Workshop Series14
A Happy Ending
• Significant improvements to the learning environment
• Reduced maintenance repair part cost by over $5,000 annually.
• The guaranteed savings have been exceeded by $53,658 after three years.
• Wise County Public Schools Phase II performance contract is almost complete, addressing 6 more schools
VRA – Community Investment Workshop Series15
Stewardship of Taxpayer Dollars
VRA – Community Investment Workshop Series16
Energy Awareness
VRA – Community Investment Workshop Series17
Teamwork
VRA – Community Investment Workshop Series18
Teamwork
• 738 Trane employees in Virginia
• 9 Professional Engineers (PEs)
• 30+ LEED Accredited Professionals
• 10 Certified Energy Managers (CEMs)
• 284 Service Technicians
VRA – Community Investment Workshop Series19
Review of the Process
• Improvements are made to generate energy savings and to further the customer’s mission.
• Municipal Lease available from VRA
• Guaranteed Energy savings pays for part or all of the municipal lease
• Legislated in Commonwealth, process spelled out by DGS, local flexibility
VRA – Community Investment Workshop Series20
Your Next Step
• Commonwealth website http://www.dgs.state.va.us (Energy and Building Contracts, then Energy Performance Contracting)
• Steps of Process– Back of the Envelope Audit (BOE)– Detailed Study– Contract (Financing)
• Contact peers