AECOM

Bulla Bypass / Melbourne Airport Link Planning Study

22-Aug-2013 Prepared for – VicRoads – ABN: 61 760 960 480

Appendix A

2011 Detailed Modelling Results

AECOM

Bulla Bypass / Melbourne Airport Link Planning Study

22-Aug-2013 Prepared for – VicRoads – ABN: 61 760 960 480

a-1

Appendix A 2011 Detailed Modelling Results 2011 Base Year – Existing Conditions

The base year was modelled using the VITM strategic model, the key results of which are shown in the figure below. The numbers represent the morning peak (2 hour) one way traffic volumes and the colour coding corresponds to the ratio of volume to capacity (V/C). The V/C ratio is displayed for the morning peak only since the network is under greatest pressure during this time. As a result of this, outbound routes may be coloured considerably lower than their peak values occurring most likely in the evening peak.

The results of the strategic modelling show that for around 2km through Bulla, Sunbury Road is already at capacity in the peak eastbound direction under existing conditions.

Figure 30 – 2011 Base: AM Peak Weekday Forecasted Volumes and Capacity in VITM

AECOM

Bulla Bypass / Melbourne Airport Link Planning Study

22-Aug-2013 Prepared for – VicRoads – ABN: 61 760 960 480

Appendix B

2046 Detailed Modelling Results

AECOM

Bulla Bypass / Melbourne Airport Link Planning Study

22-Aug-2013 Prepared for – VicRoads – ABN: 61 760 960 480

b-1

Appendix B 2046 Detailed Modelling Results 2046 Results

Tests were conducted for 2046 as a future complete project year. All the options modelled include OMR and the upgrade of Sunbury Road to four lanes. Figure 31 shows the options modelled for 2046. Figure 31 2046 Option Tree

The results for the 2046 VITM Reference Case as well as the options shown above for 2046 are provided below.

AECOM

Bulla Bypass / Melbourne Airport Link Planning Study

22-Aug-2013 Prepared for – VicRoads – ABN: 61 760 960 480

b-2

2046 Project Reference Case

Figure 32 displays the 2046 project reference network lanes and volume capacity ratios. This includes the completion of OMR with no other improvements to the 2031 local road network in this area (as agreed with VicRoads). The speed limits are mostly at 100km/hr. Most local roads in the 2046 project reference case are over capacity with low speeds. The OMR however is free flowing.

Figure 32 2046 Morning Peak Period Volume Capacity Ratio and Speed

AECOM

Bulla Bypass / Melbourne Airport Link Planning Study

22-Aug-2013 Prepared for – VicRoads – ABN: 61 760 960 480

b-3

Figure 33 2046 Reference Case Morning Peak Period two hour Volumes

Figure 34 2046 Reference Case Daily two way Volumes

972

439

728

110063

113795

1644

94

3251

473

781

354

122

81 477

419

6209

641

82

1318

849

807

133780

0

2074

1508

65

1458

667

1767

521

1974

319

748

1152

2353

1520

2325

2861

2151

317

483

449

965

294

15451641

4206

95224

0

770

379

938

1123

1036

1665

1501

737

14931094

12792469

263

50

39542228

1108

1146

596

158

2745

10311487

57

1572

1597

12422130

1634

2978

3149

5879

1706

320

1176

404

774

3579

572

3435

2253

323

744

10822147

912232

12181

1185

1303

36002299

1195

792

1885

2168

1039

2106

14142514

191

3805

3830

145

436

365

4731

14191020

254

637

782

135

270

2225

1270

1216

2572

1600

1800

1213

533

765

1331

119

411

979

1463

954

1025

239

3308

1648

1214

1054

39181086

1422 727

343

150

1765

1584

10222203

1155

2042

519 547494338

833

872

334

766

1304

2101

847

355546

596

2151

449

365

91

521

1520

2225

737

4206

50

3435

1501

1597

1086

2232

323

404

1086

365

3918

2353

1974

1520

119

2228

667

119

3830

1123

319 1572

113

122

65

411774

4206

239

1644

728

439

1520

94

80

1176

383094

596

63

1216

3954

3918

2225

94

3830

294

1039

2225

1520

641

3579

744

3830

94

952

965

1501

795

263

3830

2225

3830

1520

2225

404

317

1501

6522

25

0

3830

1520

94

3251

294

596

2225

1463

3830

5879

4206

3830

81

12181

94

94

3918

0

1086

1641

2469

2225

1036

91

80

728

637

317

3830

449

1086

1520

94

365

82

596

5879

2225

57

941520

1885

1036

5879

2225

80

15768

1698

814

183

117553919

25359

2348

2

1750

21582

0

25453

9474

2544

2750515738

11031

8881

11770

17414

3674

10133

1509

86471 19

742

2095

4

5208

1758

6749

45455

140114908

659321

188

39965

22529

10418

13589

22662

14845

2364

1742

8829

14422

1428

1673

5628

2328

2 8354

47211

15825

5949

23348

1054

5

17286

1022

8

10489

11235

31745

12863

5462

18342

11019

32905

6400

37628

2494

6

153

26089

498

26194

45170

17790

2428

4

24455

15386

4563

4059

4410

1368

0

9166

9136

28653

1720

5

2773

0

8290

6793

22170

1181

8

27373

26340

34522

14454

1253

3590

3363

13104 2033

4

26560

8525

7473

23341

6477

1820

3

AECOM

Bulla Bypass / Melbourne Airport Link Planning Study

22-Aug-2013 Prepared for – VicRoads – ABN: 61 760 960 480

b-4

2046 Melbourne Airport Link without Bulla Bypass Option Results

Option 1 Results

Melbourne Airport Link (6 lanes divided) to OMR without Bulla Bypass with all movements at Sunbury Road/OMR interchange and Somerton Road interchange.

Option 1 shows congestion southbound on Airport link from Oaklands Road in the morning peak, by 2046. Traffic through Bulla appears to be well below capacity, as it has reduced traffic through Bulla by 2500veh (2hr) in the morning peak. Although the Airport to OMR link has improved travel times and induces traffic from other routes, it has also improved the operation of the local roads, such as Oaklands Road and Somerton Road.

Figure 35 2046 Option 1 Morning Peak Period Volume Capacity Ratio and Speed

AECOM

Bulla Bypass / Melbourne Airport Link Planning Study

22-Aug-2013 Prepared for – VicRoads – ABN: 61 760 960 480

b-5

Figure 36 2046 Option 1 Morning Peak Period two hour Volumes

Figure 37 2046 Option 1 Daily two way Volumes

3

980

292

123

1239

29

905

970

57

822

985

117

473

607383

1377

3051

2

152540

2099

1507

0

1671

548

431

829

637

3665

78

29252415

524

6070

229

779

376

942

71

13

1167

1854

1691

1043

1311

649

775

1428

294

85

40602340

145

5987

1382

1073

1760

1053

80 1331

10501569

2273

4339

3100

49 31

1593

325

927

2310

322

86

11569

691

1440

1130

402

2030

1138

59

36922400

827

1821

1200

1991

17812716

976

1783

272477

59

153

4249

870213

13501210 26

9

495

705

872 837

109

1858

106

673

68

2576

1692

1727

1260

1189

534

338

9382

359

16351644

1329

6483

811

2497

2141

4714

978

1340

727

948 1107

253422

3329

1256

8041

486

1241

1921

2643

4823

1417

1566

88

631

320

4757

131

151

3328

1835

591

3003

79

502

135

723

511

500

5105

2418

26781641

802254

612

1655

666

828

1933

448

430

471

260470

786

1207

1407

614

810

161

11654366

815

877

96

9236

754

1247

3118

11654

294

1247

6070

1043

3328

135

2643

1821

79

6070

11654

4714

322

79

57

6483

1329

3328

402

691

359

79

78

7759

2497

4714

71

1644

1858

96

96

2643

637

6483

133328

430

123

71

1256

2497

4060

422

1329

1189

59

430

78

1933

359

0

591

591

253

4714

591

815

3329

13

705

2340

2643

83

13

7759

9382

637

1641

13

1167

6070

431

723

1783

83

2678

13

1783

1329

68

135

80

448

6483

85

13

1783

591

691

430

811

1854

4823

3118

1329

359

1329

775

1329

7759

1635

59430

13

13

30

2643

811

0

810

402

2030

1569

292

591

905

93821329

3665

7759

3329

1340

1050

1329

13

3551

2778 12401

26118

2279

4

2365

22044

0

25706

34986

38067

33007

362

3006

5

2582

8

31484

3570

2657115739

3617

2933133297

13652

13544

13377

17127

3776

14352

3628330524

5449 1910

1

2199

4

3056

5618

1857

6869

43631

9377

5136

6144

12950

1955

9

42496

13978

10190

12741

24233

12759

2563

1840

8493

12054

5799

1490

1686

5337

2308

3 8340

12810

16134

26084

50178

2339

5

29811

2869

16689

2004

1

5211

2920

17202

16158

17632

10948

31237

6219

2493

9

106

47950

17397

2369

7

27329

15624

4213

3864

4107

3022

1316

3

8699

8837

29940

1685

4

2626

5

7690

6346

20558

1129

3

28512

32608

3040

9

14605

2578

9

3417

1371

3667

3114

13246 2020

6

8473

5655

7630

26092

6341

1874

5

AECOM

Bulla Bypass / Melbourne Airport Link Planning Study

22-Aug-2013 Prepared for – VicRoads – ABN: 61 760 960 480

b-6

Option 1 reduces traffic on Bulla Road through bulla by 2500 vehicles in the 2046 morning peak (2 hour) period. The below plot suggests that over 10,000 vehicles would use the airport to OMR link southbound in the morning peak, which puts it near capacity.

Figure 38 2046 Morning Peak Period Network Comparison of Option 1 against Reference Case

AECOM

Bulla Bypass / Melbourne Airport Link Planning Study

22-Aug-2013 Prepared for – VicRoads – ABN: 61 760 960 480

b-7

Option 2 Results

Melbourne Airport Link six lanes divided to OMR without Bulla Bypass. Includes southerly oriented movements only (half diamond) Sunbury Road/OMR interchange and all movements Somerton Road interchange.

Compared to Option 1, Option 2 forces additional traffic through Bulla, caused by removing the northern facing ramps of OMR at Sunbury Road. This has also caused additional traffic congestion on other local roads such as Somerton Road.

Figure 39 2046 Option 2 Morning Peak Period Volume Capacity Ratio and Speed

AECOM

Bulla Bypass / Melbourne Airport Link Planning Study

22-Aug-2013 Prepared for – VicRoads – ABN: 61 760 960 480

b-8

Figure 40 2046 Option 2 Morning Peak Period two hour Volumes

Figure 41 2046 Option 2 Daily two way Volumes

935

141

270

1177

950

967

840

980

385

187

597184

1348

208

433

528

1516

2115

1506

0

1661

687

545

282

896

642

4002

209

2016

2767

519

541

6104

230

788

942376

45

1182

1846

1685

1010

746

1287

309

89

38391861

145

6018

10671366

1665

1019

71 1498

1586

13162277

4952

49

1588

299

909

1116

86

653

2313

324

11726

701

1775

808

109

251

1987

1105

1140

50

1098

1955

3501

1194

798

1835

1972

18072732

989

1688

334577

56

350

144

4475

1187

222869

1335 272119

716

857 827

101

1621

68

15512381

1744

1229

1166

525

330

8773

359

1403

1477

1291

1663

2099

795

3151

955

1357

924

406242

12253298

1074

7513

1234

2448

31

54601814

1437

1574

609

322

5442

1120

776

3017

1831

1880

590

2315

1638

70

482

134

511

538

5778

2873

87

26931667

12

836

810253

879

1682

711

1672

1327

446

280

1412

1109

95

271

1144

471

1219

1283

610

824

148

11517362

817

853

8644

910

764

3102

590

1835

95

5901357

808

8773

5460

0

3017

270

134

2448

50

1987

109

70

4952

11517

5778

11517

4952

1621

1403

141

1291

68

45

7756

109

71

642

11726

817

1010

209

1291

7756

824

1291

1105

4952

5460

18461291

950

25124

48

1672

109

4952

5778

1688

7756

590

3017

134

6104

1807

590

1291

1667

324

251

1861

6104

6104

109

1688716

282

2448

590

2693

84

746

280

3151

1663

3298

406

910

701

1477

3017

1291

16633839

109

1291

446

3017

5460

3102

359

400250

359

1586

7756

3298

109

3151

2448

1291

687

109

0

280

4952

309

1182

359

134

1166

701

1688

1225

3151

109

8773

134

89

4216

19205

110694480

17062

27815

2273

2

2315

41972

8

28295

35454

38310

2839

1

2401

3

3525

2694215482

5574

1876224591

14358

12918

4402

13596

17080

4517

13699

2613519614

6728 1916

9

2057

6

5732

1473

6880

44346

4994

6098

1961

1

13283

37142

21923

10649

10092

14219

20587

1144

13352

2369

1456

8459

13937

1694

5149

2282

4 8329

10811

15580

5775

25850

43866

11040

2288

7

16626

1824

5

6412

30034

5089

17594

11010

31335

6209

2452

1

252

25687

500

25631

42041

17502

2370

9

27073

15248

4106

3919

27111

3854

1307

5

8770

8800

9090

1697

3

2631

8

7920

7060

20596

1136

9

26049

25654

32956

2167

0

14228

1675

3

1348

3620

3198

13200 1985

4

26257

8746

7594

6390

AECOM

Bulla Bypass / Melbourne Airport Link Planning Study

22-Aug-2013 Prepared for – VicRoads – ABN: 61 760 960 480

b-9

By removing the northern facing OMR ramps at Sunbury Road increases traffic through Bulla by 1200 vehicles in the morning peak 2 hours. It appears that this traffic in Option 1 would travel up Airport to OMR link and off at Sunbury in the morning peak. This would likely reverse directions in the evening peak. Figure 42 2046 Morning Peak Period Network Comparison of Option 2 against Reference Case

Figure 43 2046 Morning Peak Period Network Comparison of Option 2 against Option 1

AECOM

Bulla Bypass / Melbourne Airport Link Planning Study

22-Aug-2013 Prepared for – VicRoads – ABN: 61 760 960 480

b-10

2046 Melbourne Airport Link with Bulla Bypass Option Results

Option 3 Results

Melbourne Airport Link to OMR and Bulla Bypass (BB1, 2 or 3) both six lanes divided to OMR. This includes all movements at Sunbury Road/OMR interchange and all movements at Somerton Road interchange.

The addition of Bulla Bypass in Option 3 improves congestion through Bulla compared to the project reference case and Option 1, however the southern section of the Airport to OMR link (below Oaklands Road) remains congested. This option includes all proposed upgrades apart from the duplication of Oaklands Road. This option shows reduced VCR values to virtually free flow conditions through Bulla with large reductions both northbound and southbound.

Figure 44 2046 Option 3 Morning Peak Period Volume Capacity Ratio and Speed

AECOM

Bulla Bypass / Melbourne Airport Link Planning Study

22-Aug-2013 Prepared for – VicRoads – ABN: 61 760 960 480

b-11

Figure 45 2046 Option 3 Morning Peak Period two hour Volumes

Figure 46 2046 Option 3 Daily two way Volumes

118

303

86

12291010

2220

852

37

809

509

616682

1360

543

10661557

2104

1506

0

8

10831704

4118

541

456

754

5062

2754

1949

631

3599

2439

3004

515

6146

230

770

959376

79

15 1873

1837

1044

1013

739

14231281

294

2378

4159

148

6077

1386

1049

1710

43

1051

88 4055

10271748

60

2181

3623

2215

14

1609

895

312

69

653

2302

322

59

11628

730

1328

1125

780

424

27371956

2007

1127

66

740

2432

3785

1189

791

1829

2009

27711896

975

1733

259377

92

354

143

4206

1188

932228

1345 273

534

850 815

106

1876

67

16982580

1737

1221

1170

555

338

7488

360

15591714

1306

4522

2117

735

789

956

1348

141

951 1105

425242

3325

1216

7153

1238

2617

4696

341290

1429

57

787

323

4842

158

48

122629

3339

1953

590

2950

2504

87

587

137

120

511

527

4927

70

17522729

822254

574

1767

711

1985

444

454

98

375580

2065

1226

1407

612

807

166

11803

794

9943

1008

767

1256

3114

0

4251013

2378

1748

3339

631

69

3339

1985

2617

1733

322

74882950

2950

424

2950

4696 1752

1256

37

303

6146

4927

11803

1170

66

7792

1306

1985

98

1348

1306

43

590

590

534

11803

794

1216

1829

15

1733

43

87

852

15

4522

1306

4159

730

780

98

82

7792

137

2007

130677

92

11803

35994696

1714 2617

424

6146

120

66

740

79

43

3325

4696

590

2729

57

3339

15

4522

67

4927

15

739

1044

294

456

118

1306

454

1306

740 7488

7792

0

3339

1306

4522

15

444

1873

34

3114

2617

1559

740

360

360

454

15

8826

17

1306 0

2950

730

590

807

69

590

15

360

1733

6146

3325

4522

1027

360

137

15

3367

2615 12212

25731

2279

2

2376

02028

7

23942

37176

39137

17902

251

2997

2

2580

3

15360

3494

2663715270

4608

3116134744

13240

14903

3611

13425

17134

15733

2132614615

5143 1905

7

2251

8

1041

5454

2176 37782

346

6828

8115

43281

4651

6186

12661

1957

1

43557

727

13819

10183

12306

577

11470

24618

2092

2160

8554

10702

1790

1664

5370

2382

8 8360

12729

16061

27140

51479

5111

2352

2

16783

1901

2

43042

11363

1541

28079

13990

90

17652

10972

736

31278

6208

2521

9

148

37687

152

49164

17466

2367

4

28414

15655

4147

3908

3999

1311

2

8701

8909

383

30280

1693

6

2629

3

7884

6896

20572

1135

8

28773

30723

14662

1292

1390

3605

3207

13152 2055

2

13443

8971

6015

7631

6382

AECOM

Bulla Bypass / Melbourne Airport Link Planning Study

22-Aug-2013 Prepared for – VicRoads – ABN: 61 760 960 480

b-12

Option 3 shows little change in each direction on OMR after the Airport Link in the morning peak but increases traffic approaching it from both directions. Additionally, there is a significant shift from Bulla Road through Bulla to Bulla Bypass. By the addition of Bulla Bypass, Option 3 compared to Option 1 reduces traffic through Bulla and absorbs traffic which travels along the Airport to OMR link onto OMR (some of which goes to Sunbury). Figure 47 2046 Morning Peak Period Network Comparison of Option 3 against Reference Case

Figure 48 2046 Morning Peak Period Network Comparison of Option 3 against Option 1

AECOM

Bulla Bypass / Melbourne Airport Link Planning Study

22-Aug-2013 Prepared for – VicRoads – ABN: 61 760 960 480

b-13

Option 4 Results

Melbourne Airport Link to OMR and Bulla Bypass (BB1, 2 or 3) both six lanes divided to OMR. This includes southerly oriented movements only at Sunbury Road/OMR interchange and all movements at Somerton Road interchange.

As per Option 3, Option 4 also has issues southbound on OMR to Airport link from Somerton Road, this link possibly needs to be widened to 6 lanes with over 40,000 vehicles each way each day. The Bulla Bypass has improved the congestion seen in Option 8 by removing the northern facing ramps to OMR at Sunbury Road Interchange. Figure 49 2046 Option 4 Morning Peak Period Volume Capacity Ratio and Speed

AECOM

Bulla Bypass / Melbourne Airport Link Planning Study

22-Aug-2013 Prepared for – VicRoads – ABN: 61 760 960 480

b-14

Figure 50 2046 Option 4 Morning Peak Period two hour Volumes

Figure 51 2046 Option 4 Daily two way Volumes

961

203

87

1098

20

818

1248

37

830

607283

1339

1106

672

1540

2113

1494

0

1123

8

1685

4118

1205

457

804

5162

23052944

627

3775

43

29522204

503

5820

230

775

951377

50

15 1873

1021

1835

1023

757

14391255

292

40672095

147

5205

10781422

1686

1036

80 23464310

1002

1284

60

2206

4520

14

1619

909

310

663

2306

321

59

11603

734

1480

1144

785

425

23122928

2041

1145

57

835

37102169

1191

810

1841

2012

19192738

1708

111

283162

59

143

1164

908241

1361

269

476

101572

834 806

773

1564

108

67

2438

1648

1747

1249

1143

548

335

6715

365

15151542

1365

2149

802

942

140

934

419

3317

12391093

5705

2398

4944

1317

1573

58

649

324

3759

174

48

124

3228

1940

595

2500

2607

79

545

138

121

541

5256

2385

512

91

27011778

791254

677

1789

711

2045

448

455

343526

2343

1186

1367

610

707

180

11639360

827

881

97

9254

22

786

425131

07

544

3228

365

2041

3228

15

2500

241

11639

2500

1365

1361

4944

321138

5820

365

457

111

2500

11639

6259

1841

2500

43

4520

1778

121

595

5820

365

6259

734

595

4944

1515

627

1708

785

80

37

419

15

455

101

6259

3775

48

1542

1778

50

1239

448

2607

15

757

734

5256

79

0

1873

1778

0

4520835

3228

4944

1365

1002 15

835

818

1023

1365

835

3317

2398

2701

595

827

1021

1248

1365

48

1365

292

15

15

595

97

4520

15

67

57

335

425

1708

2095

1143

1365

57

595

83

6715

455

15

3107

2398

425

1708

2398

15

2398

97

6715

1365

11603

3228

2045

0

203

4067

707 58

20

6259

1361

455

4520

3317

1365

572

138

5686

15563

113642658

12250

26413

2298

8

2282

01982

5

25169

37832

39663

270

2666

7

2414

6

3356

2654915140

4977

3145634037

13501

14999

13467

17079

4072

15822

2142915595

5229 1917

9

2242

5

1039

5549

2034 41925

346

6855

43433

8582

4737

6069

12872

1961

5

41847

706

10559

10063

12945

555

23296

11668

12001

2159

2018

8441

1656

1681

5185

2357

5 8305

10243

15637

27238

49240

2202

7

16826

1857

3

47318

1691

28401

5082

17699

10953

718

31300

6183

2502

9

144

41869

152

47143

17509

2379

7

28506

15276

4218

3947

4074

1302

8

8815

8793

29302

9605

1698

5

2633

5

962

7839

6954

20614

1129

3

27965

31154

1922

9

14276

1308

1393

3573

3279

13223 2036

88887

6376

7672

6356

AECOM

Bulla Bypass / Melbourne Airport Link Planning Study

22-Aug-2013 Prepared for – VicRoads – ABN: 61 760 960 480

b-15

With Bulla Bypass in place in Options 2 and 4 there appears to be little use of the northern facing ramps to OMR at Sunbury Road interchange. The difference between Option 10 without the ramps and Option 9 which includes the ramps is around 500 additional vehicles on Bulla Bypass (northbound) and 400 additional vehicles through Bulla (southbound) in the morning peak (2 hour) period. Figure 52 2046 Morning Peak Period Network Comparison of Option 4 against Reference Case

Figure 53 2046 Morning Peak Period Network Comparison of Option 4 against Option 2

AECOM

Bulla Bypass / Melbourne Airport Link Planning Study

22-Aug-2013 Prepared for – VicRoads – ABN: 61 760 960 480

b-16

Option 5 Results

Melbourne Airport Link to OMR and Bulla Bypass (BB1, 2 or 3) both six lanes divided to OMR. This includes all movements at Sunbury Road/OMR interchange and all movements at Somerton Road interchange. Similar to Option 9 above with Oaklands Road four lane divided and connected to Sunbury Road.

Option 11 is a “Do everything” option which includes all infrastructure improvements within the area. This option highlights an issue southbound on the Airport Link from Oaklands Road and the potential need to widen Sunbury Road north of OMR. It also has few vehicles (<1000/day) travelling through Bulla on Sunbury Road.

Figure 54 2046 Option 5 Morning Peak Period Volume Capacity Ratio and Speed

AECOM

Bulla Bypass / Melbourne Airport Link Planning Study

22-Aug-2013 Prepared for – VicRoads – ABN: 61 760 960 480

b-17

Figure 55 2046 Option 5 Morning Peak Period two hour Volumes

Figure 56 2046 Option 5 Daily two way Volumes

546

10081247

20

875

37

820

799

622482

1357

3450

2

15441093

1110

2103

1508

0

8

1691

4118

533

450

2711

5061

1941

631

3681

43

2441

2981

519

6141

230

773

936376

15 1849

1826

1044

1014

759

14211289

290

2381

4135

147

6077

1376

1059

1739

85

1052

88 19813999

10341721

59

2183

3719

2232

14

1589

300

916

65

637

2293

322

11625

712

811

1299

1130

795

418

19472695

1998

1156

66

764

2436

3762

1191

1822

1983

27511914

995

1761

259175

87

370

148

4140

1196

909222

1343 272

564

854 819

758

106

1865

67

2578

1706

1731

1240

1173

549

342

7351

361

15591707

4596

2109

788

962

1348

140

951 1105

242406

3298

1238

6959

1237

2629

4694

1283

1434

58

810

321

4620

48

124919

2998

1952

588

2967

2466

87

560

137

120

512

4980

517

69

17742714

254800

540

1786

682

2015

445

448

96

351559

2056

1208

1415

604

831

166

11533

357

821

9755

1064

22

789

1261

3089

1288 588

588

137

564

11533

2629

1774

15

1761

7587

87

1761

137

15

11625

448

1034

87

2998

15 4596

418

2998

1721

1348

15

2629

1998

661044

34

4694

6141

2381

96

7351

7587

1288

15

1822

712

29980

1014

1288

712

821

1849

361

66

0

137

1288

361

4980

66

448

2967

0

1238

7587

1288

271426

29

67

15

445

322

120

15

9755

4135

588

37

406

2998

7587

120

85

1288

290

1288

22

450

96

1559

764

875

4596

6141

588

448

2967

1707

2629

11533

764

87

11533

4596

96

588

1288

6141

82

59

1761

1173

764

418

3681

030

89

1288

3298137

2967

795

546

88

631

759

15

361

12043

15

4694

3298

2015

7351

759 11533

4718

2600 12372

25783

2280

5

2367

42039

2

23904

37032

38735

17839

250

2888

2

2583

4

15489

3620

2673315303

6290

3085333606

13307

14917

13398

17240

3361

15734

2019714798

4886 1896

1

2262

3

1037

5409

2167 37799

346

6857

43342

8033

4756

6098

12637

1011119

351

43668

723

13844

12385

573

11448

24596

2231

2150

86

8489

10598

1785

1698

5455

2381

3 8290

12681

16070

27212

51598

11511

2344

4

16673

1893

5

42810

1646

28058

13974

5194

17541

10954

738

31049

6212

2531

2

37703

152

49291

17264

2359

4

28481

15606

4249

3927

4164

1306

7

8624

8840

442

30242

1672

8

2609

1

104

7746

6737

20361

1117

9

28711

30723

14577

1287

1388

3595

3591

13151 2070

1

13148

8748

6178

7600

6357

AECOM

Bulla Bypass / Melbourne Airport Link Planning Study

22-Aug-2013 Prepared for – VicRoads – ABN: 61 760 960 480

b-18

Option 5 is similar to Option 3 with the addition of widening Oaklands Road to 4 lanes. Figure 57 2046 Morning Peak Period Network Comparison of Option 5 against Reference Case

Figure 58 2046 Morning Peak Period Network Comparison of Option 5 against Option 3

AECOM

Bulla Bypass / Melbourne Airport Link Planning Study

22-Aug-2013 Prepared for – VicRoads – ABN: 61 760 960 480

b-19

2046 Results Summary

The following provides a summary of each of the modelled options, for 2046.

- Option 1 and 2 attract traffic onto the Airport to OMR link, from across the network, which reduces travel time for Airport trips. However by not providing a Bulla Bypass, there remains substantial traffic and congestion through Bulla. Because the northern facing ramps are not provided in Option 2, the traffic issues through Bulla are amplified further.

- Options 3 and 4 are similar to options 1 and 2 respectively but include Bulla Bypass (alignment 1, 2 or 3). Including the bypass in these options resolves the issues highlighted above of congestion through Bulla.

Due to additional traffic caused by providing this more direct route Options 1-4 show congestion on the Airport to OMR link south of Oaklands.

Option 3, 4 and 5 provide the most comprehensive solutions, however this is to be expected as they are “Do Everything” options.

AECOM

Bulla Bypass / Melbourne Airport Link Planning Study

22-Aug-2013 Prepared for – VicRoads – ABN: 61 760 960 480

b-20

Table 38 displays the traffic volume and volume capacity ratios for Sunbury Road through Bulla, Bulla Bypass and the Airport to OMR Link Road. For the AM peak blue cells represent Volume Capacity ratios (VCRs) less than 0.6, green cells represent VCRs between 0.6 and 0.8, orange cells represent VCRs between 0.8 and 1.0 and magenta cells represent VCRs greater than 1.0. This table reports on each options effectiveness at providing an alternative to traffic travelling through Bulla. In all options there appears to be no congestion on OMR.

Table 38 Volume through Bulla Screenline – Morning (2 Hour) Peak Coloured by Volume Capacity Ratio

2046 Morning (Peak 2 hr) Volume 2046 Daily (2-way) Volume

Bulla Road

Bulla Bypass

Airport to OMR Total Bulla

Road Bulla Bypass

Airport to OMR Total

Do Minimum

Project Reference Case

2,150 - - 2,150 26,090 - - 26,090

Airport to OMR

Option 1 650 - 9,380 10,030 2,870 - 66,810 69,680

Option 2 1,810 - 8,770 10,580 25,690 - 45,750 71,440

Option 3 60 2,750 7,490 10,300 730 37,780 35,940 74,450

Option 4 60 2,940 6,710 9,710 710 41,920 37,020 79,650

Option 5 60 2,710 7,350 10,120 720 37,800 37,100 75,620

Options 2 and 4 shows more overall volume then options 1 and 3 respectively because due to the closure of the northern orientated Sunbury Road Interchange Ramps Options 2 and 4 force traffic between Sunbury Road (north) and OMR (east) to use Bulla Bypass.

AECOM

Bulla Bypass / Melbourne Airport Link Planning Study

22-Aug-2013 Prepared for – VicRoads – ABN: 61 760 960 480

Appendix C

Limitations of Strategic Modelling

AECOM

Bulla Bypass / Melbourne Airport Link Planning Study

22-Aug-2013 Prepared for – VicRoads – ABN: 61 760 960 480

c-1

Appendix C Limitations of Strategic Modelling The Victorian Integrated Transport Model is a strategic multi-modal model used to estimate levels of transport demand for future transport corridors or for major transport infrastructure projects. The model estimates the demand response to changes in land use and changes in the transport supply. In doing so the model uses mathematical equations and assumptions, which are in part determined by the availability of data and computing constraints. To achieve a practical and workable model, a number the model simplifies some real life behaviour. It is important to understand the limitations of the model when making an assessment based on outputs from the model. Some of the key model limitations and implications of the limitations are discussed below.

Reliance and uncertainty of land use forecasts

VITM requires land use forecasts, such as population, employment, school enrolments, and retail locations, to be available at the transport zone level, covering the entire modelled area for each of the future modelled years. The land use forecasts have a direct impact on the model performance and changes in the magnitude or distribution of land use inputs can have a material impact on the network behaviour. There is significant growth forecast for Sunbury and the timing of when precisely the growth will occur has a high level of uncertainty being dependant on factors such as birth and death rates, overseas and interstate migration as well as economic growth.

Use of unconstrained public transport capacity

VITM can be operated in a way that provides constraints on public transport so that as public transport services become more crowed, they also become less attractive. This crowding constraint is used to prevent public transport services being modelled with over-capacity loadings. However, the implementation of this capacity constraint can considerable extend the model run time and adds a level of complexity to the model that needs to be carefully managed. Therefore, for the purpose of this assessment, to reduce model run times the public transport constraint was not utilised. A potential implication of this is that public transport services may operate at over capacity levels meaning that road traffic demand is under-estimated.

The use of fixed time period demand

The proportion of total daily travel that occurs in each of the modelled time periods is assumed to be constant when considering a particular mode and trip purpose. For example, of all daily car trips, the percentage journey to work trips that will occur in the two hour AM peak is the same for all modelled years and scenarios. In reality, if peak congestion increases to unacceptable levels, some trips may switch time periods to less congested conditions. This has the potential impact of overestimating demand in the peak periods.

Unlimited parking availability

The model applies some parking charges to car trips going to the CBD and some other inner suburbs. However, there is no cap on parking availability that limits the number of car trips to a particular destination. This may have some implications to how traffic is modelled to the Melbourne Airport with a possible over-estimation of car demand to the Airport, but it is unlikely to have a major impact for the remainder of the Bulla and Sunbury study area.

Intersection not explicitly modelled

VITM uses link based speed flow curves to calculate the vehicle travel times as a function of the level of traffic. These functions are based on the average observed behaviour of particular link types across the metropolitan area. In reality, each section of road will have a unique operational behaviour, which is generally largely determined by the operation of the intersection. VITM does not calculate different delays to different turning movements at intersections or the impact of queuing and blocking back from one intersection to another. It is recommended that more detailed operational models are applied to assess any operation implications of schemes that are taken forward from this assessment.

Fixed travel behaviour

The parameters and functions within VITM were calibrated against observed travel data and therefore represent current travel behaviour. It is possible that behaviour may change over time either increasing or decreasing the

demand for travel. It is recommended that travel behaviour is monitored, and model sensitivity test be undertaken if behavioural changes are observed.

AECOM

Bulla Bypass / Melbourne Airport Link Planning Study

22-Aug-2013 Prepared for – VicRoads – ABN: 61 760 960 480

Appendix D

Induced Demand Sensitivity Test

AECOM

Bulla Bypass / Melbourne Airport Link Planning Study

22-Aug-2013 Prepared for – VicRoads – ABN: 61 760 960 480

d-1

Appendix D Induced Demand Sensitivity Test Accessibility Induced Land Use Changes of Bulla Bypass

Improved accessibility due to additional capacity and connections in the transport network may lead to changes in land use distribution. This issue of induced demand was a key issue arising from previous studies. The VITM considers some elements of induced demand (in particular mode switching and suppressed demand) but not land use changes enabled by changes in relative accessibility. Table 39 lists the main elements of induced demand and how VITM deals with each of these. Consequently, ignoring any accessibility induced land use changes may underestimate the ‘true’ demand (including induced demand) for the Melbourne Airport link or the Bulla Bypass.

For the purpose of this study, we have quantified the accessibility induced land use changes that may be attributable to Bulla Bypass (Option 3).

Table 39 Elements of Induced Demand

Demand Response VITM treatment

Change route Highway and public transport assignment

Change time of journey Assumes changes of time of journey occur within the two hour AM peak and three hour PM peak periods

Travel to new destinations Destination choice model

Change mode Mode choice model

Switch from car passenger to car driver Not modelled

Changes in trip rates Trip rates are fixed by purpose and by location

Changes in land use Land use is calculated external to VITM

Elasticity of Land Use to Accessibility

To estimate any changes in land use that may be attributable to changes in accessibility, the elasticity of different land uses to changes in relative accessibility needs to be estimated. This is done by estimating the regression equations to obtain historical, statistically valid relationship between relative accessibility and different land uses.

In this study, we estimate free flow travel time matrices for each SLA in Melbourne Statistical Division (metropolitan Melbourne) for 1996, 2001, 2006 and 2011 using VITM. The accessibility of a SLA is the sum of the inverse of the travel time weighted with total destination trips. The total destination trips to each SLA is used as a proxy for that SLA’s ‘attractiveness’ / ‘importance’ in the economic geography of metropolitan Melbourne.

Relative accessibility was then derived with the SLA with highest absolute accessibility index (namely Melbourne (C) – Inner) was given a rating of 1 and lowest absolute accessibility index (namely Mornington Peninsula (S) – South for 1996, 2001 and 2006 and Yarra Ranges (S) – Central for 2011) given a rating of 0; and other SLAs were given a rating based on how well they faired relative to the most accessible SLA and the least accessible SLA.

The following figure shows the estimated change in relative accessibility between 1996-01, 2001-06 and 2006-11. This shows that the relative accessibility of North East, North West and Western suburbs improved significantly over the five years to 2001, principally due to the Western Ring Road and the CityLink.

Between 2001 and 2006, the northern and the south eastern suburbs experienced an improvement in the relative accessibility due to opening of Craigieburn Bypass and the Pakenham Bypass. Between 2006 and 2011, the Deer Park Bypass and the EastLink came online, which in turn led to the improvement in the relatively accessibility of the north east and south east suburbs and the outer western suburbs.

AECOM

Bulla Bypass / Melbourne Airport Link Planning Study

22-Aug-2013 Prepared for – VicRoads – ABN: 61 760 960 480

d-2

Figure 59 Percent Change in Relative Accessibility, 1996-01, 2001-06 and 2006-11

AECOM

Bulla Bypass / Melbourne Airport Link Planning Study

22-Aug-2013 Prepared for – VicRoads – ABN: 61 760 960 480

d-3

Based on the above estimated relative accessibility indices, we derive the regression equation to estimate the sensitivity of jobs and households in metropolitan Melbourne. Separate regressions for each of the 5 industry supergroups and households were derived.

The dependent variable for employment is the employment in each supergroup industry and SLA (sourced from ABS Census Journey to Work/ Place of Work (JTW/ PoW) data). The independent variables were:

- relative accessibility of each SLA.

Similarly, the dependent variable for households is households in each SLA (sourced from ABS Census). The independent variables are:

- share of metropolitan total employment in each SLA; and

- relative accessibility of each SLA.

The regression was derived using panel data regression. This allows to effectively capture the spatial (SLA) and the time dimensions to the data. The regression also allowed for SLA specific constants to take into account the “individuality” of each SLA by allowing the constant to vary for different SLAs.

Table 40 provides the summary results of the regression analysis.

Table 40 Results from regression to measure elasticity of land use to accessibility

Relative Accessibility Coefficient

t-Statistic Adjusted R-squared

Households 0.0133 4.0316 0.998

Primary Industry -0.0246 5.5256 0.893

Industrial 0.0157 2.9366 0.887

Professional Services 0.0324 1.5964 0.654

Other Services 0.0098 7.2950 0.989

Retail 0.0178 2.4175 0.968

The coefficients for relative accessibility indicate the magnitude of the effect that changes in relative accessibility has on the dependent variable. The t-statistics indicate whether the coefficients are statistically significant. The examination of the t-statistics suggests that all the variables are statistically significant at 85% level of confidence and all the regression equations have relatively high adjusted r-squared, indicating that the model can reasonably explain the variation in the distribution of employment and housing to variations in relative accessibility.

The coefficients suggests that if a SLAs relative accessibility improves from 0 (least accessible) to 1 (most accessible) then, relative to the base case, that SLA’s share of metropolitan household growth will increase by 1.3 percent points. Similarly, its share of metropolitan growth in:

- primary industry jobs will decline by 2.5 percent points;

- industrial jobs will increase by 1.6 percent points;

- professional services jobs will increase by 3.2 percent points;

- other services jobs will increase by 0.98 percent points; and

- retail jobs will increase by 1.8 percent points.

AECOM

Bulla Bypass / Melbourne Airport Link Planning Study

22-Aug-2013 Prepared for – VicRoads – ABN: 61 760 960 480

d-4

Land Use Changes due to Accessibility Improvements Attributable to Bulla Bypass

In order to estimate the land use changes that will be brought about by the accessibility improvements from Bulla Bypass (Option 3), free flow travel time matrices under the with and without Bulla Bypass option was estimated using VITM. Similar to the historical relative accessibility discussed above, the changes in relatively accessibility that will be brought about by the Bulla Bypass (Option 3) was estimated. The resultant changes in the relative accessibility for 2031 and 2046 is summarised in Table 41 and Table 42. The results are only shown for the three SLA’s that are in close proximity to the project. All other SLA’s in Melbourne have changes in population of less than ± 10 people.

The reported regression coefficients along with estimated changes in relative accessibility that will be brought about by the Bulla Bypass were used to determine the changes in land use. The analysis suggests that relative to the project reference case the Sunbury SLA will have an additional 59 households and 183 jobs in 2031. Craigieburn would have 21 additional households and 64 jobs. Broadmeadows only receives a very small increase in population and employment. The majority of other SLA’s have a small decrease in the population and employment as this shift to the Hume area. As the accessibility improves in this area the relative accessibility of other areas decreases and this drives the shift in population and employment from other areas of Melbourne to Hume. The changes in 2046 are similar in percentage terms and therefore lead to a larger amount of induced population and employment.

AECOM

Bulla Bypass / Melbourne Airport Link Planning Study

22-Aug-2013 Prepared for – VicRoads – ABN: 61 760 960 480

d-5

Table 41 Change in relative accessibility between 2031 Project Reference Case and 2031 Option 3

2031 Change in SLA's Share of Metropolitan Growth, Percent Point Forecast land use changes between 2031 Base and 2031 Option 3

SLA

Relative Access, 2031 Base

Relative Access, 2031 Option3

Change, 2031 Base to Option3

Households

Primary Industry Industrial Profession

al Services Other Services Retail Non-

Retail Population

Number of Households

All Employment

Hume (C) - Broadmeadows 0.5372 0.5382 0.0009 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 10 3 11 Hume (C) - Craigieburn 0.2847 0.2903 0.0056 0.01% -0.01% 0.01% 0.02% 0.01% 0.01% 0.02% 61 21 64 Hume (C) - Sunbury 0.2172 0.2331 0.0158 0.02% -0.04% 0.02% 0.05% 0.02% 0.03% 0.05% 168 59 183 Table 42 Change in relative accessibility between 2046 Project Reference Case and 2046 Option 3

2046 Change in SLA's Share of Metropolitan Growth, Percent Point Forecast land use changes between 2046 Base and 2046 Option 3

SLA

Relative Access, 2046 Base

Relative Access, 2046 Option 3

Change, 2046 Base to Option3

Households

Primary Industry Industrial Profession

al Services Other Services Retail Non-

Retail Population

Number of Households

All Employment

Hume (C) - Broadmeadows 0.5433 0.5445 0.0012 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 16 6 19 Hume (C) - Craigieburn 0.2949 0.3002 0.0053 0.01% -0.01% 0.01% 0.02% 0.01% 0.01% 0.02% 76 27 87 Hume (C) - Sunbury 0.2319 0.2479 0.0160 0.02% -0.04% 0.03% 0.05% 0.02% 0.03% 0.05% 231 81 262

AECOM

Bulla Bypass / Melbourne Airport Link Planning Study

22-Aug-2013 Prepared for – VicRoads – ABN: 61 760 960 480

d-6

The induced population and employment shown in Table 41 and Table 42 represent an immaterial increase in the population and employment from a transport modelling perspective. Table 43 shows the induced population and employment as a percentage of the total population and employment of the key SLA’s. This tiny change in population and employment when factored into the transport model would not produce a measurable impact on congestion or travel times.

Under this methodology the results suggest that the project would not result in a change in accessibility large enough to cause significant land use changes.

Table 43 Induced population and employment in 2031

SLA Population of SLA

Induced Population Increase

% Increase in Population

Employment of SLA

Induced Employment Increase

% Increase in Employment

Hume (C) - Broadmeadows 80,047 10 0.023% 67,595 11 0.027% Hume (C) - Craigieburn 220,676 61 0.038% 46,509 64 0.179% Hume (C) - Sunbury 107,173 168 0.233% 28,133 183 0.886%

AECOM

Bulla Bypass / Melbourne Airport Link Planning Study

22-Aug-2013 Prepared for – VicRoads – ABN: 61 760 960 480

Appendix E

Client Brief

Page 1

PS1 Copy No.

Contract No.

Q25-03685

Specification for:

Quotation Contract– Detailed Transport Modelling and Economic Analysis for Melbourne Airport Link to Outer Metropolitan Ring/Bulla Bypass Business Area:

Network and Asset Planning

Page 2

CONTRACT NO. Q25-03685

CONTENTS SECTION II SCHEDULES

Schedule 1 Schedule of Fees Schedule 2 Rate for Variation Purpose Schedule 6 Statement of Conformance Schedule 28 Key Personnel Schedule 32 Schedule of Methods

SECTION III PROFESSIONAL SERVICES AGREEMENT

Terms of Engagement Annexure The Assignment

SECTION IV PROVIDER REQUIREMENTS OCCUPATIONAL HEALTH AND SAFETY APPENDIX A - SAFE WORK METHOD STATEMENT DECLARATION APPENDIX B - VICROADS CONTRACTOR SAFE WORK METHOD STATEMENT

CHECKLIST ADDITIONAL Post Tender Pre Award Correspondence DOCUMENTATION Schedule 7 Receipt of Addenda and Clarifications

Page 3

SECTION II – SCHEDULES

Page 4

SECTION III - PROFESSIONAL SERVICES AGREEMENT

Page 5

TERMS OF ENGAGEMENT 1. This Agreement shall be governed by Victorian law and the parties shall submit to the Victorian Courts. The parties shall

explore Alternative Dispute Resolution alternatives prior to entering into litigation.

2. Any written notice or instructions to be served on the Provider under this Agreement shall be deemed to have been served when handed to the Provider or its Nominated Principal or posted to or left at the Provider's Business Address in the Form of Tender or subsequent address notified by the Provider to the Corporation in writing.

3. The Provider shall from the Commencement Date perform the services required:

(a) in accordance with sound practice employing due professional skill care and diligence; and

(b) in accordance with all Australian and Victorian statutes, by laws, rules regulations and practices in respect of the assignment; and

(c) carry out the assignment under principles and practices of quality management as specified or of relevant Australian and/or international standards where not otherwise specified or agreed; and

(d) ensure that, having due regard to the assumptions that a competent provider can reasonably be expected to make in accordance with sound professional practice:

(i) all information and data it is required to produce is accurate and correct; and

(ii) the Provider's services will have been carried out in accordance with sound practice employing due professional skill, care and diligence in accordance with the Project Brief and delivered by the Completion Date.

The Provider shall comply with and require all its principals, servants and agents to comply with the Occupational Health and Safety Act 2004 and regulations or similar laws and incorporate into the quality plan where one is appropriate an element covering the management of occupational health and safety.

The Superintendent shall be the officer nominated in the Annexure.

4. The Provider shall liaise with the Superintendent and keep the Superintendent informed as to the program, progress and outcomes of the assignment. If the Provider is delayed in performing the assignment by any act, omission or breach of this Agreement by the Corporation or its servant or agents or any cause (except any act, omission or breach by or on behalf of the Provider), the Provider if it desires to claim an extension of time for completing this assignment, may not later than 28 days after the cause of delay arose, give to the Superintendent a written notice of claim together with detailed statement of facts on which the claim is based. The Superintendent will act reasonably in assessing any claims for an extension of time.

The Superintendent may at any time and at the Superintendent's option, notwithstanding that the Provider has not made a claim for an extension, extend the time for completion by notifying the Provider of the later Completion Date.

The Corporation will not pay any costs incurred by the Provider in respect of any extensions of time granted unless such costs were incurred as a result of any breach of this Agreement or by any other act or omissions on the part of the Corporation or its servants or agents.

5. The Provider shall not subcontract any part of the assignment without the prior written consent of the Superintendent. Approval by the Superintendent of any assignment shall not relieve the Provider of any liabilities under this Agreement: the Provider shall be responsible for the acts, defaults or neglects of any subcontractor as if they were the Provider's own acts, defaults or neglects.

6. The Provider shall not vary the execution of the assignment without the written approval of the Superintendent obtained beforehand.

7. The Superintendent may direct the Provider to perform additional work or to delete work from the assignment and the Provider shall comply with such directions. Work in addition to or in deletion from the assignment shall be paid for or deducted on the basis of charges that have been agreed in writing prior to the changes being directed by the Superintendent. The Superintendent shall act honestly and reasonably in assessing extensions of time, measuring work and calculating payments.

8. Provided the Provider performs the work under the Agreement as specified or subsequently required, the Corporation shall pay to the Provider the total sum specified in the Form of Tender or subsequently agreed in writing. VicRoads shall make payment within 28 days of receipt of a valid tax invoice.

Page 6

9. The Provider shall indemnify and keep indemnified the Corporation in respect of any legally enforceable claims, demands actions, suits or proceedings, costs and expenses whatsoever which may have been instituted against the Corporation arising out of any breach of contract or wilful or negligent acts or omissions by the Provider in any way connected with the Provider's work under this Agreement. The Provider shall during the course of the assignment and for the period afterwards set out in the annexure carry and maintain the various insurances to the levels as set out in the Annexure. Any excesses applicable to the policy shall be to the account of and payable by the Provider and not by the Corporation.

The indemnity clauses in this Agreement are not intended to and do not extinguish the rights in law provided under the Victorian Wrongs (Amendment) Act 2000. The Provider shall not be liable for any liability of loss to the extent that it is the fault of the Corporation. Where negligence is found to have been contributory, each party shall bear responsibility in accordance with that party’s fault.

10. The Provider and its servants, agents and subcontractors shall keep confidential this Agreement, together with all information provided by the Corporation or generated by the Corporation or the Provider in the course of this Agreement and shall not disclose to any person this assignment or any information related thereto. If required by the Corporation the Provider shall arrange for its employees, agents and/or subcontractors to give written confidentiality undertakings in a form approved by the Corporation.

The Provider agrees in respect of Personal Information held in connection with this Agreement:

(a) that it shall be bound by the Information Privacy Principles and any applicable Code of Practice with respect to any act done or practice engaged in by the Provider for the purpose of this Agreement, in the same way and to the same extent as VicRoads would have been bound by the Information Privacy Principles and any applicable Code of Practice in respect of that act or practice had it been directly done or engaged in by VicRoads; and

(b) to immediately notify the Superintendent where it becomes aware of a breach of (a) above, by it or any of its agents or employees (past or present).

In this clause:

"Code of Practice" means a code of practice as defined in, and approved under, the Information Privacy Act (Vic) 2000;

"Information Privacy Principles" means the principles so identified and set out in the Information Privacy Act (Vic) 2000;

"Personal Information" means information or an opinion (including information or an opinion forming part of a database) that is recorded in any form and whether true or not, about an individual whose identity is apparent, or can be reasonably ascertained, from the information or opinion.

This Clause 10 shall continue to have effect after the termination or expiration of this Agreement.

11. The Provider warrants that as at the date of this Agreement no conflict of interest exists or is likely to arise during the course of this Agreement. If a conflict of interest or risk of conflict of interests arises, the Provider shall notify the Corporation immediately of the conflict or risk.

12. Any intellectual property arising in the course of or out of the provision of services under this Agreement shall upon creation vest exclusively in the Corporation. Where the assignment involves ideas which were the Provider's own ideas created prior to the assignment and not created in the course of it, the Provider may use those ideas freely, without obligation to the Corporation, in the course of the Provider's practice.

In performing the work under this assignment the Provider shall not infringe any other person's intellectual property, and shall ensure in respect of systems and outcomes that no royalties or fees are payable by the Corporation to any third persons. The Provider shall indemnify the Corporation against any suit or claim, together with associated costs and damages, whether arising directly or indirectly by reason of any infringement by the Provider of any intellectual property by the Provider or supplied by the Provider for the purposes of this Agreement.

The Corporation shall be entitled as it sees fit and at no cost either directly or through any other Provider or otherwise to make use of any ideas, designs, data, reports or other products or outcomes used or developed by the Provider in conjunction with this assignment which are not subject to royalties or patent rights for carrying out additional or similar work. The Provider shall not be liable to the Corporation or third parties in any way for such use of these outcomes or products.

13. The Provider warrants that:

(a) it has obtained valid consents from all relevant authors in the creation of any copyright work under this Agreement so that the use by the Corporation or its assignees of such work will not infringe any copyright, including any author's moral rights under the Copyright Act 1968; and

Page 7

(b) the consents permit the Corporation in its absolute discretion, reproducing, publishing, copying, adapting, performing, communicating to the public, materially distorting or in any other way changing or using the work (or a substantial part of adaptation of it) –

(i) with or without attribution of authorship;

(ii) with no title, the same title or any other title; and

(iii) in any way it sees fit.

The Provider indemnifies the Corporation and agrees to keep the Corporation indemnified in respect of any actual or threatened breach of any of the above warranties.

14. If the Provider fails to either:

(a) perform the work under this Agreement as required; or

(b) comply with a direction of the Superintendent; or

(c) proceed continuously and diligently with the carrying out of work under this Agreement and complete it by the Completion Date or any extension of time granted; or

(d) comply with any of the conditions of Agreement; or

if the Provider becomes insolvent or enters into an Agreement with creditors or goes into liquidation or has a receiver and manager or administrator appointed whether voluntarily or compulsorily then without prejudice to any other remedies or rights the Corporation may have under this Agreement or at common law the Corporation may without prior notice to the Provider by written notice signed by its Director Contract Services and served upon the Provider determine this Agreement. From and after proven receipt of such notice this Agreement shall be terminated in which event the Provider shall deliver up all documents relating to this assignment which it has in its possession or control. Any costs or expenses incurred or damage sustained by the Corporation in remedying such breach or in any way arising out of the Provider's default shall become a debt due and payable to the Corporation by the Provider and may be recoverable from the Provider by deduction from any moneys held on account of the Provider or by action at law.

If the Corporation defaults in payment of any monies due and payable to the Provider under this Agreement and that default continues for 14 days, the Provider may give the Corporation written notice specifying the default and requesting its rectification within a period of not less than 14 days from the date of service of the notice. If the Corporation fails to rectify the breach within the period specified in the notice, the Provider may, without further notice, forthwith suspend or terminate this Agreement.

15. The Corporation agrees to pay the relevant GST on receipt of a valid tax invoice. The Corporation will be required to apply withholding tax from payments to suppliers who do not provide an Australian Business Number.

PROFESSIONAL SERVICES ASSIGNMENT

Page 1

1

DETAILED TRANSPORT MODELLING AND ECONOMIC ANALYSIS CONSULTANT TASK BRIEF

Melbourne Airport Link to OMR and Bulla Bypass Detailed Transport Modelling and Economic Analysis

Page 2

2

THE ASSIGNMENT Detailed Transport Modelling and Economic Analysis –Melbourne Airport Link to OMR and Bulla Bypass 1. PURPOSE OF THE ASSIGNMENT The purpose of this Assignment is to undertake a detailed assessment of projected future travel demand and transport conditions and conduct an economic analysis for alignment options for the Melbourne Airport Link to OMR/Bulla Bypass Planning Study. 2. BACKGROUND 2.1 Project Details The Melbourne Airport Link to OMR/Bulla Bypass Planning Study has two components, provision of a freeway link from the future Outer Metropolitan Ring Reservation to Melbourne Airport and a route to bypass Bulla. One of the objectives of the Outer Metropolitan Ring (OMR) / E6 Reservation is to better link key international transport hubs, such as Melbourne Airport, Avalon Airport and the Port of Geelong. The Melbourne Airport Link to OMR would provide that link as well as linking proposed future major intermodal freight activities to the north and south west of Melbourne with the airport and provide better access to the airport from existing and proposed residential development to the north and west. The objective of the Bulla Bypass is to resolve congestion and safety issues on Sunbury Road / Bulla Road associated with a narrow bridge across Deep Creek, sharp curves and very steep grades. Congestion is likely to increase through the township of Bulla as Sunbury develops as it is anticipated that people will continue to access jobs in the vicinity of Melbourne Airport and the industrial areas in Melbourne’s north. 2.2 Planning Study Area Description Bulla lies in the City of Hume. Melbourne Airport is to the south of Bulla and west of Tullamarine Freeway. Woodlands Historic Park lies to the north of the freeway and east of Oaklands Road. Moonee Ponds Creek follows the park boundary. Sunbury is about 7 km to the north west. The topography of the area is flat plains incised by deep gullies, including Deep Creek. The township of Bulla is situated to the north of Deep Creek, centred about Bulla Road. There is low density rural residential out to Somerton Road in the green wedge zone, with parkland and recreational facilities between Bulla and Somerton (Green Street) Roads. The immediate study area is shown in Figure 1. Urban Development This planning project is to facilitate the future development of Sunbury and surrounding areas covered by the expansion of the Urban Growth Boundary around Sunbury as outlined in the recently published draft Growth Corridor Plans titled ‘The Melbourne North Growth Corridor Plan’ and ‘The Sunbury Growth Corridor Plan’. More information is available from the Growth Areas Authority’s website (http://www.gaa.vic.gov.au/growth_corridor_planning/). The wider study area will need to take into account these proposals. 2.3 Planning History Melbourne Airport Link to OMR and OMR/E6 Reservation The planning for the OMR/E6 Reservation identified a study area for consideration of a link between the OMR / E6 Reservation and Melbourne Airport, which was published as part of documentation associated with Amendment VC68 to the Wyndham, Melton, Hume, Mitchell and Whittlesea Planning Schemes. The Public Acquisition Overlay which set aside the land for the OMR/E6 reservation was gazetted in 2010. The study area covered a wide area to the north and south of Bulla.

Page 3

3

Bulla Bypass In addition to developing the Melbourne Airport Link to OMR, preliminary work was undertaken in 2010/11 to investigate three corridors for the bypass of Bulla; a southern corridor, inner Bulla corridor and a northern corridor. As a result of desktop studies and assessment of environmental, economic and technical constraints and opportunities, VicRoads refined the number of corridors. This resulted in the elimination of the southern and inner Bulla corridors, with the northern corridor taken forward for further investigation. Northern Corridor Options Figure 1 also illustrates the Melbourne Airport Link to OMR and the Bulla Bypass Corridor with its variants BB1, BB2, BB3 and BB4. Melbourne Airport Link to OMR This alignment begins at the end of Tullamarine Freeway (east of Melbourne Airport). It then travels northwards towards Somerton Road. After Somerton Road, this alignment then heads north to north west and connects into the future proposed OMR. The alignment is about 8,000 metres in length. This link will be an ultimate six lane freeway standard facility with a freeway to freeway interchange with the OMR. Two ramps would be provided in each direction. The ultimate configuration for the OMR would be eight lanes with two auxiliary lanes from the Sunbury Road Interchange. Bulla Bypass This 6 lane ultimate arterial road begins at the end of Tullamarine Freeway (east of Melbourne Airport). It then travels north to Somerton Road, before it turns westwards and travels along the various alignments along/in the vicinity of Somerton Road. It then continues on and crosses Deep Creek and connects in with Sunbury Road. All alignments (ie, BB1, BB2, BB3 and BB4), are about 11,500 metres long. All alignment options with the exception of BB4 will connect to the OMR via an interchange at Sunbury Road. This interchange is likely to provide southerly orientated ramps only (ie in direction of Calder Freeway) once the OMR is constructed. In the interim, the route may link into Sunbury Road along its existing alignment. This route may be staged constructed as a 4 lane arterial road and link to a duplicated (4 lane arterial) Oaklands Road between Somerton Road and Sunbury Road or along the proposed alignment of the Melbourne Airport Link to OMR. 2.4 Summary of Previous Consultation The Preliminary Traffic Analysis was conducted by VicRoads. VicRoads has had preliminary discussions regarding the model outcomes with the following stakeholders:

- Hume City Council; - Melbourne Airport; - Growth Areas Authority; - Department of Transport

The outcomes of these discussions will be provided during the inception meeting. 2.5 Additional Information Preliminary Traffic Analysis The Preliminary Traffic Analysis completed in 2011 has indicated that both a Bulla Bypass and the OMR link would be required in the longer term ie 2046. The analysis indicated that the two routes would perform different functions. The Melbourne Airport Link to OMR would cater for longer distance (ie north to south travel), to the Airport, while the Bulla Bypass would provide an east-west route from Sunbury to the Airport and to the industrial suburbs of North Melbourne. Both would provide for travel demand to the CBD via the Tullamarine Freeway.

Page 4

4

The Calder Freeway is the current preferred route to the CBD from Sunbury. The preliminary analysis indicated that construction of a Bulla Bypass would result in a significant shift of traffic from the Calder Freeway to the Bypass. Consideration will need to be given to the impacts of widening of the Calder and Tullamarine Freeways on travel demand and timing of construction VITM Model The VITM model has been calibrated to take account of the latest (2011) possible transport and transport infrastructure projects for bus and rail including regional rail links, road network updates and current Victoria in future data supporting the Growth Areas Authority Growth Corridor Plans in relation to land use, population and employment. 3. AGREEMENT OBJECTIVES The objectives of this Assignment, by which the performance of this contract will be assessed in addition to the other requirements outlined within the Professional Services Agreement and Brief, are defined as follows:

1. Validate and calibrate VITM for the planning study area; 2. Assess each option and its impact on the surrounding road network;

3. Provide current and forecast traffic volumes and traffic conditions for an average weekday in 2011, 2026 and

2046 for each alignment shown in Figure 2’;

4. Undertake an economic assessment of each option;

5. Provide a fully functional copy of the transport model (including OD matrices, highway networks and highway assignment component) for the base year and future options (Cube platform);

6. Provide induced benefits; and

7. Provide a fully functional copy of electronic spreadsheet(s) with a full listing of assumptions and justifications

and input files used for economic assessment. 4. ASSIGNMENT SCOPE 4.1 General 4.1.1 Methods Conduct the Assignment in accordance with the method submitted to and approved by the Superintendent (using Schedule 32), prior to the commencement of the works. 4.1.2 Health and Safety The Provider is responsible for the safety of all persons engaged in the Detailed Transport Modelling and Economic Analysis and shall undertake all things necessary to ensure their safety including (without limitation) complying with the requirements of any Act or Ordinance in Victoria relating to safety.

Page 5

5

4.1.3 Meetings The Consultant shall attend the following meetings:

Meeting Location Duration Date Inception Meeting Camberwell Office 2 hour

approx To be advised

Interim Meeting Camberwell Office 2 hour approx

To be advised

Draft report feedback Meeting

Camberwell Office 2 hour approx

To be advised

2nd Draft report feedback meeting (task 6)

Camberwell Office 2 hour approx

To be advised

Final Meeting Camberwell Office 2 hour approx

To be advised

This clause is not intended to refer to or include any meetings the Consultant may have with other stakeholders during the course of undertaking the assignment. Where the Superintendent directs the Consultant to attend additional meetings, payments for additional meetings shall be in accordance with the rates submitted in Schedule 2, Rates for Variation. Technical Reference Group (TRG) workshop During the first quarter of 2012 the Provider will be required to attend a Technical Reference Group (TRG) workshop. Allow one day for this. Where the Superintendent directs the Consultant to attend the TRG workshop, payment for attendance for the first day will be in accordance with the Provision Quantity Item 11 in Schedule 1 and shall include all preparation work, attendance and all overhead allowances and profit associated with the work. Payment for attendance at days in addition to the first day will be at the rates submitted in item 3, Schedule 2, and shall include any preparation work, attendance and all overhead allowances and profit associated with the work. Panel Hearing Where directed to attend a panel hearing by the Superintend, the consultant shall:

- Include an experienced witness, with a suitable level of experience who will present findings at a Panel hearing. That person shall take an active role in the study;

- Review submissions received during/after the exhibition and prepare appropriate responses, in consultation with VicRoads and its legal adviser;

- Prepare a written Panel hearing submission and presentation on the Detailed Transport Modelling and Economic Analysis aspects of the project, including the submissions received on the Planning Scheme Amendment;

- Submit these notes and presentation for review by VicRoads and its legal adviser and revise as agreed; - Attend one day of the Panel hearing as requested by VicRoads; - Provide a written and oral submission to the Panel on the project’s Detailed Transport Modelling and Economic

Analysis and the performance against Detailed Transport Modelling and Economic Analysis objectives and on the submissions received during and after the exhibition period;

- Review the submissions on Detailed Transport Modelling and Economic Analysis matters that are made during the Panel hearing itself, and provide advice to VicRoads and its legal adviser on how a suitable response may be presented in VicRoads’ closing statement.

Similar to the TRG workshops, where the Superintendent directs the Consultant to attend a Planning Panel Hearing, payment for attendance for the first day will be in accordance with the Provision Quantity Item 10 in Schedule 1 and shall include all preparation work, attendance and all overhead allowances and profit associated with the work. Payment for attendance at days in addition to the first day will be at the rates submitted in item 2, Schedule 2 and shall include any preparation work, attendance and all overhead allowances and profit associated with the work.

Page 6

6

4.2 Information to be Provided by the Superintendant to the Provider To assist the Consultant in the assignment, the following information will be provided by VicRoads:

- The Superintendent will provide aerial photos (if required), and plans showing the proposed alignments; - 2011 traffic survey data in the study area (including traffic volumes and travel time); - Map-based identification of options with possible intersections / interchanges; - Construction and other costs for each option, as required for economic assessment.

The Consultant will be responsible for obtaining any other data considered appropriate to the Study, the costs of which are to be indicated in the Consultant’s submission. 5. TASK DESCRIPTION 5.1 General Information The Provider shall use the VITM transport model together with Cube Voyager software or VISUM software for macro modelling and VISSIM for micro modelling. The modelling services will include:

1. Refinement of the Victorian Integrated Transport Model (VITM) for the Melbourne Airport Link to OMR/Bulla Bypass. This refinement is expected to include:

a. checking of model’s highway network in the study area; the consultant would define the study area for the model, subject to VicRoads’ approval;

b. calibration / validation of modelled traffic volumes and travel times for competing parallel routes, where data is available to do so, or can be collected without impacting on the delivery date;

2. Assessing the impact of the options separately and combined. (refer below for more information). 3. Documentation of results in a detailed report with summary of findings. 4. Select link analysis at selected locations specified in this brief. 5. To take into account induced benefits, modelling should be carried out according to the method specified

in: a. the National Guidelines for Transport System Management in Australia, Volume 4, Urban

Transport (Australian Transport Council 2006), or b. Economic evaluation manual, Volume 1 (NZ Transport Agency 2010).

This means the full 4-step process needs to be run for each of the alignment options, as well as any matrix calculation or cross-assignments required to estimate the induced benefits.

5.2 Detailed Task Descriptions The consultant shall undertake the following tasks: Task 1 Review of background information Review of preliminary traffic analysis and traffic survey report completed to date. This is to be provided by VicRoads. Task 2 Calibration and validation of base case Transport modelling is to be based on a road network and traffic zoning system suitable to address the Planning Study objectives. A validation of model results against baseline conditions for 2011 is to be conducted for the Melbourne Airport Link to OMR/Bulla Bypass for each time period 2011, 2026, 2046. The validation is to include directional traffic volume and travel time comparisons for the AM peak period, where data is available, or where the collection of the required data will not affect the delivery date. Validation targets and convergence criteria will be in accordance with. VicRoads Modelling Validation and Calibration Guidelines.

Page 7

7

The Provider shall require VicRoads signoff on transport data to be used for model calibration versus model validation. A detailed Model Calibration and Validation Report documenting the process and outcomes are to be submitted to VicRoads Superintendent for approval, prior to commencement of the modelling of options. If matrix estimation is used to satisfy the validation criteria, the consultant shall document the criteria used in the matrix estimation process in the report. The consultant shall justify how the adjustment be made to future year matrices, bearing in mind that the matrices for the options can be quite different from those for the base. Task 3 Conduct modelling of options The Provider is required to allow for modelling:

- Current-year base run (2011) i.e. existing conditions; - Future-year base run(s) (2026 and 2046); - Options to be modelled. These are shown in Figure 2:

Melbourne Airport Link to OMR without Bulla Bypass:

1. with all movements at Sunbury Road/OMR interchange, all movements at Somerton Road interchange. 2. with southerly oriented movements only at Sunbury Road/OMR interchange, all movements at Somerton

Road interchange.

Melbourne Airport Link to OMR with Bulla Bypass: 3. Encompasses (BB1, 2 & 3) - with all movements at Sunbury Road/OMR interchange, all movements at

Somerton Road interchange. 4. Encompasses (BB1, 2 & 3) - with southerly oriented movements only at Sunbury Road/OMR interchange,

all movements at Somerton Road interchange. 5. No OMR connection to Bulla Bypass (BB4), with all movements at Sunbury Road/OMR interchange, all

movements at Somerton Road interchange.

Bulla Bypass without Melbourne Airport Link to OMR: 6. Encompasses (BB1, 2 and 3) - with roundabout at intersection of bypass with Sunbury Road/ Bulla

Diggers Rest Road/ Bulla Road, to existing intersection with Oaklands Road, and existing intersection at Oaklands Road/ Sunbury Road.

7. BB4 - with roundabout at intersection of bypass with Sunbury Road/ Bulla Diggers Rest Road/ Bulla Road, to existing intersection with Oaklands Road, and existing intersection at Oaklands Road/ Sunbury Road.

8. Encompasses (BB1,2 and 3) – with roundabout at intersection of bypass with Sunbury Road/ Bulla Diggers Rest Road/Bulla Road, intersection in Somerton Road with new alignment following proposed Melbourne Airport Link to OMR alignment.

9. BB4 – with roundabout at intersection of bypass with Sunbury Road/ Bulla Diggers Rest Road/Bulla Road, intersection in Somerton Road with new alignment following proposed Melbourne Airport Link to OMR alignment.

- The Melbourne Airport Link to OMR is to be considered as a freeway with 6 lanes divided in all options. - The Bulla Bypass is to be considered as an arterial road, 4 lanes divided for options 6-9 and 6 lanes

divided for options 3-5 and 8-9. - Modelling is required for all four time periods (AM, IP, PM, OP) for economic evaluation. However,

only AM (7-9am) Peak and 24-hour results need to be presented in reports. - Year(s) to be Modelled include:2011, 2026 and 2046.

Page 8

8

- Assess the impact of widening the Calder Freeway at a time to be agreed on one option of the Bulla Bypass.

Specific activities that the Provider is required to undertake in fulfilling the technical requirements of the Assignment include, but are not limited to:

- Prepare plots of the study area showing the modelled volume/capacity ratios, volumes and other required attributes (e.g. average vehicle speed, freight volumes etc.) for the base year scenario and future year scenarios (ie 2026, 2046) for the options above. The modelling shall consider seasonal and weekday/weekend traffic variations, including tourist and recreational traffic (where applicable) and its impact on the road network.

- Provide all results in a GIS format agreed with VicRoads Superintendent

For each modelled year and option, the scenario-modelling report must include the following in the study area:

- Plots of road networks (number of lanes and speed limits) - Plots of traffic volumes for all vehicles and trucks (7-9am 1-way and 24-hour 2-way). The 24-hour volumes

should be derived from the full period of the model;

- Plots of traffic volume/capacity ratios (7-9am peak direction);

- Plots of change in volumes (increases and reductions) between base and option (7-9am 1-way);

- Select link plots (7-9am peak direction) – Sunbury Road immediately south of connection to Bulla Bypass and north of OMR Link. – details to be discussed.

Note the following hold points for the project:

- Study area: the study area must be approved by the Project Manager prior to the commencement of model calibration and validation.

- Model calibration and validation: the Model Validation Report and associated model must be approved by the

Project Manager prior to development of the road networks for alignment options. - Plots of road networks: plots of road networks for the different alignment options and forecast years must be

approved prior to the commencement of scenario modelling. Task 4 Detailed economic analysis Prior to undertaking Task 4, there will be a hold point. The length of this hold point will be advised by the Superintendent. The Provider must undertake a detailed economic analysis of Options, Melbourne Airport Link to OMR, Bulla Bypass BB1, BB2, BB3 considered as one option and BB4 and/or variants of them. Should there be sufficient variation in cost between BB1, BB2 and BB3 these may be considered separately at a later date. This will include an assessment of the effect of staged development opportunities, taking into account key section links, link speed, interchanges, accident savings, road user costs and benefits. The methodology employed for the analysis will consider induced benefits and take account of the documents listed in 5.1 General Information. The analysis will:

1. include an assessment of how well each proposed corridor option would meet future traffic demands, improve travel time and reduce road accidents;

2. produce outputs for each corridor option including: Discounted Project (road agency)Cost, Net Present Value (NPV) and Benefit/Cost Ratios (BCRs). The analysis should be presented so that costs can be refined and BCR’s and NPV’s etc. modified by VicRoads at a later stage;

Page 9

9

3. provide a detailed project summary of yearly costs for capital expenditure, yearly estimates of fuel

consumption maintenance, travel time, vehicle operation, greenhouse gas savings and accident savings for each proposed route option;

4. the benefits should be derived from the full period (AM, IP, PM, OP) of the model, rather than factoring up the AM results.

5. use the existing Sunbury/Bulla Roads within the Study Area as the base case for the analysis; 6. include a full assessment of diversion of traffic from the existing highway and local roads to the proposed

[corridors/route options]; 7. adopt a discount rate of 7% for an examination period of 30 years, with sensitivity analysis carried out at

both 4% and 10%; 8. in addition to sensitivity analysis in relation to the discount rate, conduct other sensitivity analysis including

project costs (up to 20% increase), and construction time change (no more than 5 years) 9. assume a construction time table as provided by VicRoads 10. The economic evaluation should be for a period of 30 years. As the forecast years for the traffic model are

2026 and 2046, the benefits and costs for other years in the evaluation period may be obtained by interpolation.

A clearly documented electronic copy of the calculations shall be provided to VicRoads with a full listing of assumptions and justifications. Task 5 Assessment of Options The Superintendent is using an Objective Based Evaluation Matrix (OBEM) to help assess the performance of each of the options. The Superintendent will collate the assessments of all specialist consultants into an evaluation matrix, which will be used to facilitate discussion with the community and in formal statutory processes to obtain environmental and planning approvals. Project Objectives The “Project Objectives” for the project as a whole will be supplied by the Superintendent separately. The Provider shall examine these objectives and nominate the one (or more) objective which is relevant to this Assignment. Sub-objectives At the start of the Assignment the Provider shall propose “Sub-objectives” for each “Project Objective”. These “Sub-objectives” will generally be derived from legislation, national, State and local policy and planning schemes. Assessment Criteria The Provider shall also propose the “Assessment Criteria” to be used for each “Sub-objective” and nominate the verifiable data which would be used to support the assessments. For example, a flora and fauna consultant might nominate “hectares of habitat to be removed” to support an assessment of a sub-objective dealing with impacts on certain endangered species. Hold Point: The Superintendent will reach agreement with the Provider on the relevant “Project Objective(s)”, the “Sub-objectives” and their related “Assessment Criteria” to be used for this Assignment. Assessment The Provider shall then provide an assessment of the extent to which the existing route and each proposed option meets each nominated project objective. The Provider shall use the sub-objectives, assessment criteria and also provide verifiable data to support this assessment. The assessment shall be in the form of an answer to the question “How well does the proposal meet each nominated project objective?” To ensure consistency, the following scale should be used:

Page 10

10

Rating Defined Values Colour Very Well Best practice, strong level of compliance,

major positive impact Very Well

Well Improved practice, good policy compliance, positive impact

Well

Moderately Well Partial policy compliance, no distinct positive or negative impact

Moderately Well

Poor Policy non-compliance and negative impact Poor Very Poor Major policy non-compliance and major

negative impact Very Poor

Consideration of proposed mitigations Where the Provider has recommended measures to mitigate the impacts of each proposed alignment option, the Provider shall provide two assessments:

- with the proposed mitigation - without the proposed mitigation

Task 6 Report A report must be completed covering the outputs from the tasks listed above, including:

- any constraints and major concerns with the proposed options from a transport and economic perspective, - suggested modifications to the proposed options from a transport and economic perspective, - the identification of measures to mitigate the impacts of each proposed options. - Any plans of model outputs attached must be legible, ie with key roads named on plans, traffic volumes

readable, appropriate title and legend on each page and in a format suitable for printing. The structure and format of the report are further detailed in Section 6. Inception Report The Provider shall submit an Inception report to the Superintendence within one (1) week of the Inception meeting. The Inception Report shall:

1. confirm the study requirements including management, responsible consultancy personnel (by task) and reporting protocol;

2. Detail the compilation process for other data required for model establishment; 3. Detail the calibration and validation methodology for the transport modelling, including proposed

acceptance criteria/guidelines for model goodness-of-fit and methods for improving goodness-of-fit; and 4. Present the detailed project plan for the study, indicating achievable dates and resource allocation for the

delivery of milestones. Model Calibration and Validation Report A draft report on the model establishment, calibration and validation is to be completed within four (4) weeks of approval of the inception report. Moreover, a full working model for the Study Area is to be provided for review by Vicroads, concurrently with the model establishment and validation report. The Model Calibration and Validation Report and associated model must be approved by the Superitendent prior to commencement of subsequent tasks.

Page 11

11

Interim Transport Modelling Report A draft Interim Transport Modelling report showing the modelling outcomes for the options as outlined in task 3 above is to be provided within seven (7) weeks of the approval of the Model Calibration and Validation Report. Moreover, a full working model for the Study Area is to be provided for review by VicRoads. Final Study Report A draft Final Study report on the assessment of options, including economic assessment, is to be provided within four (4) weeks after the hold point is to be provided for review by VicRoads. The Provider shall notify the Superintendent immediately on the discovery of any significant issues which arise as a result of the investigations and to notify the superintendent immediately of any other issues that VicRoads should be made aware of. 6. Deliverables 6.1 Timing of Reports Step Timing Details 1. Provider to submit Draft Inception Report

Within one weeks of Inception meeting

The inception report shall confirm the study requirements and reporting protocols, details the compilation process for the data required for the model establishment, detail the calibration and validation methodology for the transport modelling and present a detailed project plan.

Hold Point The provider shall not proceed to the model calibration and validation until the inception report is approved by the Superintendent

2. Provider to submit Model Calibration and Validation Report

Within four weeks after completion of task 1.

The provider is to provide a report on the model establishment, calibration and validation. A full working model for the Study is to be provided for review by the Superintendent.

Hold Point The provider shall not proceed to the traffic analysis until the calibration and validation report is approved by the Superintendent

3. Provider to submit Draft Report Traffic Analysis

Within seven weeks after completion of Task 2.

A draft report will be required for the Superintendent to review within 7weeks after completion of Task 2. An electronic copy of the completed draft report is to be provided to the Superintendent in Microsoft Word format (Doc), along with electronic copies of all maps, drawings and photos in the format agreed with the Superintendent. The report shall also have provision of the full working model incorporating each option modelled. If the report is incomplete or inappropriately structured, the Superintendent may request the draft to be revised prior to reviewing.

4. VicRoads to review Draft Report

Two weeks after receiving Draft Report

The Provider may be requested to consider changes based on the reviewers comments before the report is finalised. VicRoads will collate comments from the Technical Working Group. Where the Provider has concerns about any review comments, there are to be discussed with VicRoads prior to the finalisation of the report.

Technical Reference Group to review report

Four weeks after receiving Draft Report, while be reviewed by VicRoads

Hold Point The provider shall not proceed to the economic analysis until the traffic modelling is approved by the Superintendent

5. Provider to submit Draft Report on Economic Analysis

Within four weeks of agreement to Traffic Analysis draft report

A draft report will be required for the Superintendent to review within 4 weeks after completion of Task 2. An electronic copy of the completed draft report is to be provided to the Superintendent in Microsoft Word format (Doc), along with electronic copies of all maps, drawings and photos in the format

Page 12

12

Step Timing Details agreed with the Superintendent. The report shall also have provision of the full working model incorporating each option modelled. If the report is incomplete or inappropriately structured, the Superintendent may request the draft to be revised prior to reviewing.

6. VicRoads to review Draft Report

Two weeks after receiving Draft Report

The Provider may be requested to consider changes based on the reviewers comments before the report is finalised. VicRoads will collate comments from the Technical Working Group. Where the Provider has concerns about any review comments, there are to be discussed with VicRoads prior to the finalisation of the report.

Technical Reference Group to review report

Four weeks after receiving Draft Report, while be reviewed by VicRoads

5. Provider to submit final Traffic and Economic Analysis Report

No more than two weeks after receipt of VicRoads comments on draft final Traffic and Economic Analysis report.

An electronic copy of the final report should be provided to VicRoads in a secured Adobe Portable Document File (PDF) format as well as a Word Format. A digital copy should also be provided in a format agreed with VicRoads. One unbound and three bound copies of the final report (including colour figures and plates), should be presented to VicRoads including the full working model with options incorporating any modification required from VicRoads review.

Superintendent’s acceptance of final report

The final report will only be accepted after all changes required by VicRoads, and agreed by the Provider, have been completed.

6.2 Report Structure Subject to any specific modifications required for this Assignment, it is expected that the report will have the following chapter headings:

- Executive summary - Introduction/background - Methodology - Results - Discussion - Objective Based Evaluation Matrix (remove if not applicable) - Conclusions - Recommendations including mitigation - Glossary of terms - References - A copy of this Assignment brief as Appendix 1 - Other Appendices, as required

It is also expected that the report will contain:

- A Cover Page with the Project name, type of consultancy, author’s name and date - A Table of Contents with a list of maps, drawings, tables and Appendices - Footers on each page including the date and version number (for both hard copy and electronic files) - Numbering of all pages, and - Text that is readable and not less than 10 point Verdana, or approved equivalent - Acknowledgements for persons and organisations that have contributed to the report

Page 13

13

6.3 Format of Reports All reports shall conform to the following requirements:

• Margins: o Binding margin: 25mm o Open margin: 10mm (NB. In practical terms, provide the 25mm margin on both sides of each page so

that VicRoads can produce double-sided documents.) o Top margin: 10mm o Bottom margin: 10mm

• Fonts: o Fonts to be generally no smaller than 12 point.

• Layout: o Start each section on the right hand page. o Start Chapter 1 on the right hand page. Start all other chapters as they occur. o First page of Chapter 1 is Page 1. o All preceding pages to be in Roman numerals. o Odd numbered pages to be right hand pages.

• Content: o Colour figures (including plans) should be capable of being reproduced in black and white. o Supply clean artwork (not photography). o Supply unfolded plans if greater than A4 size. o Supply loose photographic prints. o Where continuous corridor drawings are broken down to A3 size drawings, all annotation and

text shown on the continuous corridor drawings must be self-contained within each A3 drawing. It is also expected that the report will contain:

- The version number (for both hard copy and electronic files) - Numbering of all pages.

6.4 Format of Electric Versions of Maps, Drawings and Photos Maps are to be produced using GIS software. GIS data should be provided in ESRI Shapefile format. GPS locations should be provided on GDA94 Lat/Long datum to at least and accuracy of 1m, or another similar standard agreed with the Superintendent prior to the assignment being awarded]. Drawings should be provided in a CADD file Microstation Version 8 or dxf, (coordinates in MGA, zone 54) or another similar standard agreed with the Superintendent prior to the agreement being awarded]. Photos are to be in jpeg format and taken with at least a 5 megapixel camera or another similar standard agreed with the Superintendent prior the agreement being awarded. The consultant must ensure they adhere to the appropriate colour requirements specified by Department of Planning and Community Developments document titled ‘Communicating data with Colour’ (April 2011) Guidelines. 6.5 Web Accessibility As provided within Appendix C, the Provider must ensure that the draft and final reports submitted to the Superintendent conforms to the VicRoads Accessibility Requirements for contracted work.