a first look at the effects of the ebone shutdown

23
1 Henk Uijterwaal . RIPE 42 , July 4, 2022, Amsterdam . http://www.ripe.net/test-traffic/ A first look at the effects of the Ebone shutdown Henk Uijterwaal and René Wilhelm RIPE NCC July 4, 2022

Upload: alka

Post on 11-Jan-2016

24 views

Category:

Documents


1 download

DESCRIPTION

A first look at the effects of the Ebone shutdown. Henk Uijterwaal and René Wilhelm RIPE NCC 24 September 2014. KPNQwest. Build a network of fibers in Europe Including take-overs and mergers Ebone network Typical dot com Huge debts Few paying customers Creative bookkeeping - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: A first look at the effects  of the Ebone shutdown

1

Henk Uijterwaal . RIPE 42 , April 21, 2023, Amsterdam . http://www.ripe.net/test-traffic/

A first look at the effects of the Ebone shutdown

Henk Uijterwaal and René Wilhelm

RIPE NCC

April 21, 2023

Page 2: A first look at the effects  of the Ebone shutdown

Henk Uijterwaal . RIPE 42 , April 21, 2023, Amsterdam . http://www.ripe.net/test-traffic/2

KPNQwest

• Build a network of fibers in Europe– Including take-overs and mergers– Ebone network

• Typical dot com– Huge debts– Few paying customers– Creative bookkeeping

• Filed for bankruptcy on May 31• Former Ebone network to be shut down first

– July 2, in the morning

• Next major shutdown planned for July 19

Page 3: A first look at the effects  of the Ebone shutdown

Henk Uijterwaal . RIPE 42 , April 21, 2023, Amsterdam . http://www.ripe.net/test-traffic/3

RIPE NCC Test-Traffic Measurements

• RIPE NCC Service to measure one-way delays and losses

• Measurement stations all over the world• Full mesh• Some 2,000 paths that might include the

Ebone network

Page 4: A first look at the effects  of the Ebone shutdown

Henk Uijterwaal . RIPE 42 , April 21, 2023, Amsterdam . http://www.ripe.net/test-traffic/4

TTM data

• Network alarms– Monitors incoming delays– 2 averages: Long (30 days) and short (15 minutes)– Warns operator (and us) if recent delays are

outside the expected range

• Delay and Loss plots

Page 5: A first look at the effects  of the Ebone shutdown

Henk Uijterwaal . RIPE 42 , April 21, 2023, Amsterdam . http://www.ripe.net/test-traffic/5

Delay and Loss plots, format

Page 6: A first look at the effects  of the Ebone shutdown

Henk Uijterwaal . RIPE 42 , April 21, 2023, Amsterdam . http://www.ripe.net/test-traffic/6

Delay and Loss plots, format

• Delay– Top left– X-axis: Time of day (July 02 0:00 – July 03 0:00, GMT)– Y-axis and black dots: Delay in ms for individual packets– Red dots: #hops times 10

• Delay distribution– Top right

• Loss– Bottom right– X-axis: Time of day– Y-axis: % of packets that arrived over 15 minutes = 100%-

loss

Page 7: A first look at the effects  of the Ebone shutdown

Henk Uijterwaal . RIPE 42 , April 21, 2023, Amsterdam . http://www.ripe.net/test-traffic/7

Number of alarms per day

0

100

200

300

400

500

600

700

28-Jun 29-Jun 30-Jun 1-Jul 2-Jul 3-Jul 4-Jul 5-Jul 6-Jul 7-Jul

Alarm SET Alarm CLEARED

Page 8: A first look at the effects  of the Ebone shutdown

Henk Uijterwaal . RIPE 42 , April 21, 2023, Amsterdam . http://www.ripe.net/test-traffic/8

Number of alarms per hour

0

5

10

15

20

25

30

35

7:10 8:10 9:10 10:10 11:10 12:10 13:10 14:10 15:10 16:10 17:10

July 02 Daily Average

Page 9: A first look at the effects  of the Ebone shutdown

Henk Uijterwaal . RIPE 42 , April 21, 2023, Amsterdam . http://www.ripe.net/test-traffic/9

Individual connections

• “Is the Internet still working?”• Expect:

– No connection– Rerouting– Other effects

• Went through all plots for that day

Page 10: A first look at the effects  of the Ebone shutdown

Henk Uijterwaal . RIPE 42 , April 21, 2023, Amsterdam . http://www.ripe.net/test-traffic/10

No connection

Page 11: A first look at the effects  of the Ebone shutdown

Henk Uijterwaal . RIPE 42 , April 21, 2023, Amsterdam . http://www.ripe.net/test-traffic/11

No connection (2)

Page 12: A first look at the effects  of the Ebone shutdown

Henk Uijterwaal . RIPE 42 , April 21, 2023, Amsterdam . http://www.ripe.net/test-traffic/12

No connection (3)

Page 13: A first look at the effects  of the Ebone shutdown

Henk Uijterwaal . RIPE 42 , April 21, 2023, Amsterdam . http://www.ripe.net/test-traffic/13

Major re-routing

Page 14: A first look at the effects  of the Ebone shutdown

Henk Uijterwaal . RIPE 42 , April 21, 2023, Amsterdam . http://www.ripe.net/test-traffic/14

Major re-routingMunich-New York

Page 15: A first look at the effects  of the Ebone shutdown

Henk Uijterwaal . RIPE 42 , April 21, 2023, Amsterdam . http://www.ripe.net/test-traffic/15

Major re-routingMunich – San Jose – New York

Page 16: A first look at the effects  of the Ebone shutdown

Henk Uijterwaal . RIPE 42 , April 21, 2023, Amsterdam . http://www.ripe.net/test-traffic/16

Shutdown of the wrong line

Page 17: A first look at the effects  of the Ebone shutdown

Henk Uijterwaal . RIPE 42 , April 21, 2023, Amsterdam . http://www.ripe.net/test-traffic/17

The network is getting slower

Page 18: A first look at the effects  of the Ebone shutdown

Henk Uijterwaal . RIPE 42 , April 21, 2023, Amsterdam . http://www.ripe.net/test-traffic/18

The network is getting slower (2)

Page 19: A first look at the effects  of the Ebone shutdown

Henk Uijterwaal . RIPE 42 , April 21, 2023, Amsterdam . http://www.ripe.net/test-traffic/19

Overloading of old equipment

Page 20: A first look at the effects  of the Ebone shutdown

Henk Uijterwaal . RIPE 42 , April 21, 2023, Amsterdam . http://www.ripe.net/test-traffic/20

Overloading of old equipment

Page 21: A first look at the effects  of the Ebone shutdown

Henk Uijterwaal . RIPE 42 , April 21, 2023, Amsterdam . http://www.ripe.net/test-traffic/21

Is everybody unhappy then?No, better backup path

Page 22: A first look at the effects  of the Ebone shutdown

Henk Uijterwaal . RIPE 42 , April 21, 2023, Amsterdam . http://www.ripe.net/test-traffic/22

Summary

• “The Internet is still working!”• Not as good as before though

– Connection lost on 1 path out of 2116– Lots of re-routing

• Unstable routes for 30 to 150 minutes• Sub-optimal paths afterwards

– Lots of connections became slower

• Business opportunity for 400 M€• More fun expected this Friday

Page 23: A first look at the effects  of the Ebone shutdown

Henk Uijterwaal . RIPE 42 , April 21, 2023, Amsterdam . http://www.ripe.net/test-traffic/23

Questions, Discussion