a novel approach to capitalize witsml data in geospatial … · 2016-05-10 · mud logging/mwd/ lwd...
TRANSCRIPT
A Novel Approach to Capitalize WITSML Data in Geospatial Platform for Realtime Monitoring and Risk
Assessment
April 28th, 2016
Dr. Sethupathi Arumugam PhDPrincipal Consultant
Biswa Ranjan PatraPrincipal Consultant
Shebi RajanProject Lead
Sanjay GuptaIndustrial Principal Consultant
Agenda2
Problem Statement2
WITSML Schema & Spatial Components3
Geospatial Component in Real-time Drilling Systems
Monitor Rig Activity5
Realtime Drilling Performance Indicators6
4
2
Risk Object & Risk Assessment7
Business Benefits8
About Infosys1
Infosys – Fuelling Oil & Gas Enterprises Globally
Client Credentials
4 of the top 5 Integrated Oil and Gas Majors, worldwide5 of the top 5 Oil Field Services Companies, worldwide
8 of the top 10 Independent Upstream Companies, worldwide
years since the formation of a
practice dedicated to the
Industry
17+professionals dedicated to practice
4900+
domain experts300+
million in revenues (approx.) / year
$460M+
strategic relationships - oil & gas majors, oil
field services, pipeline majors ,
EPC and Chemical
companies
100+
17+
100+
$460+
4900+
300+
3 of the top 5 Pipeline Companies, worldwide
3
Realtime Drilling systems uses - WITSML, WITS & OPC for drilling efficiency, reduce NPT, etc.
WITSML / WITS data has spatial components which is not being utilized for any geospatial
analysis and are restricted within WITSML servers.
Geospatial Platform supports in well planning & execution stages.
WITSML-Geospatial
Interact with
Realtime Systems Bird’s
Eye View
Rig Activity
PerformanceIndicators
Assess Risk
Share Past Exp
Problem Statement
4
An open Information Transfer Standard,Supports drilling workflows. Well, Wellbore, Risk, Formation Markers, Log objects are utilized. Each object has one or more spatial attributes- Lat/ Long, Depth,
Azimuth & Inclination. CoordinatesRefSys & WellCRS objects carries coordinate information.
• Log, Mud Log• Cement Job, Risk• Formation Marker
Message / Report
• Well, Wellbore, Rig• Coordinate Ref Sys• Tubular, Trajectory, Wellbore Geometry
General / Contextual Objects
• Message• Fluids Report• Drilling Report
Subsurface
WITSML Schema & Spatial Components
5
ArcGIS Server
Mud Logging/MWD/LWD
Cementing Wireline
WITSML Data Server
SDE Data Server
Real Time Monitoring App Geologist/SME
Stores Well Data
Map Service
WITSML Connector
Web Services
Receive Data
Process Data
Send Data
WITSML Server willbe integrated withArc SDE usingWITSML Connector.
Spatial objects suchwell, wellbore,trajectory, risk,formation markerswill be stored atArcSDE.
Time and depthindexed log data willnot be duplicated.
Geospatial Component in Real time Drilling Systems
6
StationaryRotary Drill
Sliding
In Slips
Reaming
Trip In
Trip OutRun In, Pump In
Run In, Rotate
Pull Up, Pump
Pull Up, Rotate
Cement
Pressure Test
Rig Activity
Monitor Rig Activity5 Day Planner Report
7
Realtime Drilling Performance Indicators
Wellbore StabilityNumber of Openhole was OpenedFluid Deviation - Planned Vs Actual Mud Volume
Gains & LossesLoss Risk Fracture Gradient Vs ECDGain Risk Pore Pressure Vs MWCasing Running
Drag Chart WOH Vs PlannedTrip Schedule Avg Trip in/out speed
Hole CleaningHole Status Hole Cleaning status
Rig ActivityBOPDrilling / Reaming / Sliding /Connection
Casing RunningCementingPressure Test
ROP Optimization
Bearing Seal Life Bit Life / Revolution / Energy
Vibration Alert Lateral / Axial / SlipRisk Alert Risk w.r.t DepthROP Opt Drilling Efficiency
CementingNumber of Stages, Planned Vs Actual Volume
BOPBOP Health Hydraulic / Electric statusBOP Test Status / Last Test Date
Pressure TestCasing / Line Test Status / DateNegative Pressure Test Status / Date
Each workflow monitors the well using various performance indicators. Realtime drilling workflow outcomes will be represented as non-spatial
attributes of the well. Non-Spatial attributes would be displayed in real-time based on change in
time or depth index.8
Performance Indicator Value UnitGains & LossesGains Risk Green StatusLoss Risk Green StringWellbore StabilityOpenhole Opened 10 DayFluid Deviation Green StatusROP OptBit Life 50 DayBit Revolution 100KCasing RunningTrip Schedule Green StatusPressure TestLast Test Date 4/12/16 DateStatus Pass StatusBOP HealthHydraulic Green StatusElectric Green Status
Well profile will be rendered with trajectory stations. Current Bit depth will be rendered on the well profile. Movement of bit
depth will be updated based on the realtime status. On the offset profile the formation markers and risk will be rendered.
Realtime Drilling Performance Indicators
9
Risk is tied with formation Markers,depth range and Hole section.Each Risk is characterized by its Types,
Category, Subcategory, Ext. Category,Severity, Probability, Affected Personnel& Mitigation.4-5 offset wells & 100 risks may be
considered during well planning.
Poor Hole Cleaning Wellbore Geometry
1. Differential Sticking 2. Faulted Zone 3. Under gauge Hole 4. Unconsolidated Zone
1 2 3 4
Risk ObjectRisk Object<?xml version="1.0" encoding="utf-8" ?> - <risk uidWell="TestWell" uidWellbore="TestWB" uid="TestID"> <name>Losses</name> <type>risk</type> <category>hydraulics</category> <subCategory>loss circulation</subCategory> <extendCategory>loss circulation
</extendCategory><mdHoleStart uom="m">2578</mdHoleStart> <mdHoleEnd uom="m">3345</mdHoleEnd> <tvdHoleStart uom="m">2578</tvdHoleStart> <tvdHoleEnd uom="m">3345</tvdHoleEnd> <severityLevel>0</severityLevel> <probabilityLevel>0</probabilityLevel> <summary>Issue with losses</summary> <identification>Drilling~</identification> <mitigation>Issue with losses</mitigation>
</risk> </risks
10
Run Spatial Analysis & Density Analysis to identify Risk based on HoleSize and Rig Activity.
Display Risk ,consequence and mitigation steps. Alert users when bit is approaching the risk.
Risk AssessmentSubsurface
Bit BallingMD – 625 – 1065 ft
CarvingsMD – 1092– 1773 ft
Stick SlipMD – 2399 – 2444 ft
LossesMD – 2578– 3345 ft
DrillingPoor Hole CleaningCause - Long open holeConsequence – Stuck PipeSwab, SurgeCause – Tripping SpeedConsequence – WBS IssuesWellbore Stability IssuesCause – LossesConsequence – Carvings
Risk Assessment – 23” Hole Size
Upcoming forecasted Risk : LossesMD Start Depth – 9 – MD End Depth - 512 ftCurrent Bit Depth – 500 ftMitigation : Get in touch with Fluid team, Increase mud weight
11
Support both well planning and well execution stages
Offer live map to monitor realtime drilling operations across the globe.
Renders both realtime and future rig acgtivity ot well status.
Not intended to replace any existing industry specific drilling and G&G
apps.
Useful for beginner to expert level personnel.
Enable collaboration between experts.
Business Benefits
12
THANK YOU
www.infosys.com
The contents of this document are proprietary and confidential to Infosys Limited and may not be disclosed in whole or in part at any time, to any third party without the prior written consent of Infosys Limited.
© 2011 Infosys Limited. All rights reserved. Copyright in the whole and any part of this document belongs to Infosys Limited. This work may not be used, sold, transferred, adapted, abridged, copied or reproduced in
whole or in part, in any manner or form, or in any media, without the prior written consent of Infosys Limited.