August 2017

A2 Bean and Ebbsfleet junction improvementsPreferred route announcement

Scheme location

32

A2 Bean gyratory north

M25 junction 2 and A2

A2 Bean gyratory south

A296 Roman Road and Bean Lane roundabout

A2 Ebbsfleet gyratory west

B259 Southfleet Road and A2260 Ebbsfleet gateway roundabout

A2 Pepperhill junction

A2 Ebbsfleet gyratory east

IntroductionWe are proposing to improve the A2 junctions at Bean and Ebbsfleet. The improvements are committed within the Road Investment Strategy, subject to other financial contributions from local developers. The improvements are considered necessary to support the level of development proposed for Kent Thameside.

Why is the scheme needed?Without improvements to these junctions, significant future traffic congestion will result, which will have an adverse impact on the A2 and will constrain economic development and housing growth in the area.

The scheme’s benefits � Support economic development including

jobs and housing growth in North Kent.

� Increases capacity on the road network to accommodate future growth.

� Smooths traffic and improves journey times at both junctions.

� Increases capacity for all road users without endangering safety.

� Improves safety for all road users.

� Provides better facilities for non-motorised users such as cyclists, pedestrians and equestrians.

� Provides better access to public transport.

� Minimise environmental impact.

Public consultationWe held a pubic consultation between 18 January 2017 and 1 March 2017 to gather feedback on our proposals. The consultation involved public exhibitions and presentations around Dartford and Gravesend, a website with information about the project, and information delivered to over 74,000 homes in the area. The consultation materials and the supporting technical reports set out the rationale for having one proposal for each junction.

We held 5 public events for local residents and stakeholders. Members of the public and organisations were invited to comment on a variety of aspects of the project, including the junction improvements at Bean, the junction improvements at Ebbsfleet, and the scheme overall.

Responses to public consultation

A total of 169 responses to the consultation were received. The majority of people agreed with the need to improve the junctions and supported our proposals. One of the most common concerns expressed at the public consultation was that the consultation included only one proposal at each junction. However, our assessments have shown that only Option 5 at Bean and Option 1 at Ebbsfleet can deliver the objectives and provide the best value for money within the scheme budget.

Comments from stakeholders

Stakeholders reiterated the concerns expressed during the public consultation and commented on the use of traffic lights at the roundabouts. As a result, we will continue to review the use of traffic lights as the scheme progresses.

There were concerns that The London Resort development (formerly known as London Paramount) was excluded from our scheme assessments. The London Resort still needs to go through the statutory planning process and we will continue to collaborate with the developers, the London Resort Company Holdings, on the development of the entertainment centre.

The preferred route

The options presented at consultation will be taken forward as the preferred route. Our assessments show that the scheme will improve journey times, improve safety and support local economic growth.

Options Development Construction

1Option

identification

2Option

selection

3Preliminary

design

4Statutory

procedures & powers

5Construction preparation

6Construction

commissioning & handover

7Close out

Project initiated

Options for public

consultation

Community consultation & application for development

consent

Examination by Planning Inspectorate & decision by Secretary of

StateCommitment to construct

2020

Road opened

Close outPreferred route announcement summer 2017

Next stepsThe timeline below shows what will happen at each stage of the scheme. We are currently at the end of stage 2. Following the announcement of the preferred route, we will carry out surveys and investigations to allow us to design the scheme in more detail.

There will be another opportunity for you to have your say on the designs and plans for this project with a second public consultation planned for early next year.

We currently expect work to start on site no later than March 2020.

A 2

Und

Ward Bdy

feD

Prospect

Darenth Wood

1

2

Black Horse

ETL

55.8m

11

2

Place

28a

16

35

House

Denehole

13

1

Pond

6

Cottage

1614

2

15

Stone

30

35

Stone

BEAN LANE

18

48.2m

36

69.1m10

70.2m

BEACON DRIVE

7

Gardens

40

LB

14

7

46

Cottage

Bean Farm

LB

Watling

55.5m

Stone

1

Darenth Wood

13

28b

StoneDenehole

1

Brickfield

Cottages

Ashwood Place

16

1

Earth

wor

k

Denehole

1

New

Ightham Cottages

46.9m

11

8Hope Cottages

11

5

Stone

Thrift

ETL

6

Track

71.4m

A 296

Oakwood

Allotment

Bean House

DRUDGEO

N WAY

FOXW

OO

D ROAD

8

22

Shellbank

Playing Field

Stone

23

29

Clisha

28

Lodge

Path (um)

Stone

Pond

Earthwork

TURNER R

OAD

ROMAN ROAD

Stone

Shopping Centre

WIN

TERGARDEN C

RESCENT

BLUEWATER PARKWAY

46.3m

A 296

Lake

Tunnels

B 25

5

Earthwork

Bluewater

LIME TREE AVENUE

East Village

43.1m

Ramp

El Sub Sta

ETL

53.3m

Rose Gallery

Bus Station

Ramp

Ramp

40

2

House

29

Cottage

5

Hop

per

52.7m

Playground

21

28

7

Woodbine

62.5m

Flint

77.1m

53

21

63

Conveyors

Caravan

DO

OWYAL

C

22

58

1

59

1

105

31

Blue

57

Oakdene

Barnfield

11

32 69.1mBlue House

Bean

18

Stone

55

39

73

10

ETL

12

31

The Thrift

Cottages40

33

22

85.4m

1

House

PAGE CLOSE

14

(covered)

SCHOOL LANE

Merry Chest

Con

veyo

r

69

El Sub Sta

47

20

Stone

71

85

DRUDGEO

N WAY

81

Tank

BEACO

N D

RIVE

58.2m

57

48

22

15

52

93

ROAD

113

STO

NE

LANE

FB

19

Pond

61

13

68

Timber Yard

LB1

SANDY

Subway

(PH)

13

26

49

AVENUE

Pond

Hopper

Cottages

ETL

52

Tanks

A 2

67

LAN

E

The

Con

veyo

r

07

44

73

1

9

Reservoir

47

7

2

63

Surgery

59

2

4

41

ROMAN

Cottage

3

53El Sub Sta

WO

OD

Pond

Royal Oak

Mast

Stonewood

1

Site

62

50

25

Drain

39

42

64

75

1

Tanks

7

52

65

Cottage

46

123

36

53

30

27

Path

(um

)

27

31

97

4539

BRAMBLE

2

37

26

46

45

Drain

109

50

34

2

TCB

7779

57

8

Pond

Pond

Pond

Tank

Pond

Pond

Drain

Tank

Pond

Con

veyo

r

Pond

niarD

Works

Pond

Weighbridge

Lodg

e

Rotterdam

Hazelw

ood

Conveyor

Con

veyo

r

Drain

Gantrys

Gantrys

Gantrys

Mast

6

127

StonewoodCottages

1

4

Old Stable Yard

Playground

A 2

A 2

A 2

A 2

Gantry

Gantry

Communication Mast

Mast (Telecommunication)

Trac

k

Con

veyo

rs Con

veyo

r

Gantry

Gantry

Water

Track

Gantry Post

Pump

ED & Ward BdyDef

BS

BS

BS

Def

ED &

War

d Bd

y

CR ED & Ward Bdy

ED & Ward Bdy

Def

Def

ED & Ward Bdy

Und

Def

BS

Thames Walk

6

N

Improved road

Key

Existing sign and signal gantry retained

New sign and signal gantry

Existing sign and signal gantry removed

© Crown copyright and database rights 2017 OS 100030649 54

A296

B25

5

Traffic signal control on

roundabout

Properties and land required

New bridge for southbound

traffic

Traffic signal control on

roundabout

Existing bridge retained

Additional slip road for

eastbound traffic

Hard shoulder removed to provide

narrow lanes

Slip road closed to direct traffic to B255

The majority of people agreed with our proposals to improve the Bean junction.

Concerns were raised relating to the removal of the slip road from the B255 to the A296. As a result, we will reconsider the link between the B255 and the A296 during the preliminary design.

Preferred route: A2 Bean junction

ETL

Northfleet West Grid Sub Station

Track

32.0m

33.8m

Pond

ETL

WATLING STREET

ROMAN ROAD

Path (um)

(course of)

Shaft

ETL

ETL

PARK

COR

NER

ROAD

Trac

k

Water Works

Northfleet West

ETL

Grid Sub Station

Track

Path (um)

Disman

tled R

ailway

Lyndhurst

VAGNIACAE

(site of)

Springhead

27.3m

ROMAN SETTLEMENT

WATLING STREET

Springhead House

ETL

ETL

Cottage

17.5m

ROMAN TEMPLES

(course of)

Centre

Path

A 2

(site of)

ETL

Helinside

ROMAN ROAD

STATION ROAD

13.8m

21.5m

ETLTrac

k

Vagniac

Ebbsfleet

The

25.4m

Nurseries

Garden

Northfleet West

29.0m

El

Ebbs

fleet

30.7m

Path

(um

)

Sludge Lagoons

Path (um)

Grid Sub Station

Tanks

Sewage Works

Pumping

Sub Sta

SOU

THFLEET R

OAD

ETL

Station

Dismantled Railw

ay

Sloping masonry

Drain Sewage

A1

J9

Enterprise

H3

Park

El Sub Sta

J1E

C3

H1

V3

J1F

R

D1

Springhead

B2

D4

I3

V2

S

V1

El Sub Sta

C6

A2

C4

LB

C2

J1K

G1

J2

E2

I1

D9

G3

A3

C1

B4

F4

V4

B3

Depot

W

Orchard House

J6

B1

D5

E1

J1A

H6

H4

F6

F3

F1

C5

ROMANBURIAL GROUND

PEPPERHILL LA

NE

47

HALL

ROAD

NEW

BAR

N R

OAD

(site of)

20.6m

Tank

ROMAN TEMPLE

19.0m

Northfleet East Grid Sub Station

El Sub Sta

Pond

THAMES WAY

Silo

FB

Silo

FB

Track

Drain

Drain

Drain

Tank

El Sub Sta

El Sub Sta

El Sub Sta

Gantry

Gantry

Pond

Gantry

Tanks

Mast

Tunnel

B 262

Mast

Tunnel

A 2

A 2

A 2

A 2

The Observatory

SL

SL

SL

Lighting TowerLighting Tower

Gantry

Trac

k

Gantry

Shelter

Playground

9

Playground

FLEMING COURT

1

22 to 32

34 to 52

SPRINGHEAD PARKWAY

BONHAM W

AY

2 to 20

27 to 45

Gantry

Gantry

Transfer Station

Waste

A 2

1

6

LISTER DRIVE

7

1

14

2

FOXHOUNDS LANE

A 2260

El Sub Sta

El Sub Sta

El Sub Sta

11

1

1

5 2

8

13

54 to 72

74 to 90

92 to 108

14

110 to 126

18

30

56 to 72

21

to16

32

4325

to 4

147

38 to 48

1

13

52

2620

2 to

18

El Sub Sta

DefED & Ward BdyUnd

CO

CS

Def

Und

Def

Co Const, CP & ED Bdy

ED & Ward Bdy

Def

COCS

Co

Con

st, C

P, a

nd E

D B

dy

Def

COCS

Def

War

d Bd

yCR

Ward Bdy

Ward Bdy

Def

ED & Ward Bdy

Co C

onst, CP & ED

Bdy

Def

TYLER CLOSE

SPRINGHEAD PARKWAY

DAR

WIN

RIS

E

WEL

LESL

EY C

OR

NER 14

2

2325

272919

14

2

166

19

8

154

2

174

Ps

TOURTEL YARD

FIELDEN TERRACE

128 to 152

6

PlayArea

1

J7

Ps

WELLS COURT

16 to

32

El Sub Sta

29

11

13

176

190

1

19

HINDMARSH CRESCENT

11to27

2to 12

Path (um)

Shelter

Mast

12

3

2933

17

4

Line Of Posts

Filling Station

THAC

KERA

Y DR

IVE

El Sub Sta

Eastgate

141

(Hall)

Improved road

Key

Existing sign and signal gantry retained

New sign and signal gantry

Existing sign and signal gantry removed

76

More respondents agreed with the scheme at Ebbsfleet Junction than disagreed. Given that there is currently less traffic congestion experienced at Ebbsfleet than Bean, the public are less convinced by the need to improve the Ebbsfleet junction. However, the predicted traffic flows are such that improvements will be necessary due to the proposed housing development in the area.

© Crown copyright and database rights 2017 OS 100030649

B259

A2260

Traffic signal control on

roundabout

Eastbound on slip road widened

Road between roundabouts widened to dual carriageway

Existing roundabout enlarged

Off slip roads retained

Traffic signal control on roundabout

On slip road widened

Existing roundabout enlarged

Preferred route: A2 Ebbsfleet junction

© Crown copyright 2017.You may re-use this information (not including logos) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence: visit www.nationalarchives.gov.uk/doc/open-government-licence/write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or email [email protected].

This document is also available on our website at www.gov.uk/highways

If you have any enquiries about this publication email [email protected] or call 0300 123 5000*. Please quote the Highways England publications code PR59/17.

Highways England Creative S170201

*Calls to 03 numbers cost no more than a national rate call to an 01 or 02 number and must count towards any inclusive minutes in the same way as 01 and 02 calls. These rules apply to calls from any type of line including mobile, BT, other fixed line or payphone. Calls may be recorded or monitored.

Printed on paper from well-managed forests and other controlled sources.

Registered office Bridge House, 1 Walnut Tree Close, Guildford GU1 4LZHighways England Company Limited registered in England and Wales number 09346363

If you need help accessing this or any other Highways England information,please call 0300 123 5000 and we will help you.

Further informationInformation about the project, and to receive updates about the scheme via our newsletter, are available online at:

www.highways.gov.uk/a2be

You can let us know your views or questions by contacting the project team using the following email and address:

� email: [email protected]

� write to: Freepost A2 Bean & Ebbsfleet junction improvements

� call: 0300 123 5000 (24 hours)

� website: www.highways.gov.uk/a2be