A. Already Added-
Grid Substations:
1. Kulaura 132/33 kV grid Substation, Capacity 2x25/41 MVA2. Sherpur 132/33 kV grid Substation, Capacity 2x35/50 MVA3. Satmasjid 132/33 kV grid Substation, Capacity 2x80/120 MVA
Transmission Line:
1. Old Airport-Sajmasjid 132 kV (U/G) double circuit transmission line: 16.588 circuit kilometer
2. Fenchuganj – Kulaura 132 kV double circuit transmission line: 50 circuit kilometer3. Jamalpur – Sherpur 132 kV double circuit transmission line: 40 circuit kilometer
Grid Substations Capacity Up-gradation:
1. Four substations capacity upgrade: 225 MVA
B. Will be Add -
Grid Substations:
1. Barisal 230/132 kV grid Substation, Capacity 2x225/300 MVA
Transmission Line:
1. Barisal – Bhola 230 kV double circuit transmission line: 125 circuit kilometer
Summary:1. Substation-
a. 230/132 kV Substation Capacity Addition : 600 MVAb. 132/33 kV Substation Capacity Addition : 422 MVA
c. 132/33 kV Substation Capacity up-gradation : 225 MVA
2. Transmission Line-
a. 230 kV transmission line: 125 circuit kilometer
b. 132 kV transmission line: 106 circuit kilometer