Grid Substations:

1. Kulaura 132/33 kV grid Substation, Capacity 2x25/41 MVA2. Sherpur 132/33 kV grid Substation, Capacity 2x35/50 MVA3. Satmasjid 132/33 kV grid Substation, Capacity 2x80/120 MVA

Transmission Line:

1. Old Airport-Sajmasjid 132 kV (U/G) double circuit transmission line: 16.588 circuit kilometer

2. Fenchuganj – Kulaura 132 kV double circuit transmission line: 50 circuit kilometer3. Jamalpur – Sherpur 132 kV double circuit transmission line: 40 circuit kilometer

Grid Substations Capacity Up-gradation:

1. Four substations capacity upgrade: 225 MVA

B. Will be Add -

Grid Substations:

1. Barisal 230/132 kV grid Substation, Capacity 2x225/300 MVA

Transmission Line:

1. Barisal – Bhola 230 kV double circuit transmission line: 125 circuit kilometer

Summary:1. Substation-

a. 230/132 kV Substation Capacity Addition : 600 MVAb. 132/33 kV Substation Capacity Addition : 422 MVA

c. 132/33 kV Substation Capacity up-gradation : 225 MVA

2. Transmission Line-

a. 230 kV transmission line: 125 circuit kilometer

b. 132 kV transmission line: 106 circuit kilometer