Name of work Carriageway width Intermediate lane Classification of road MDR Design life 15 Initial traffic (A) (in both direction) (CVD) 1402 Traffic growth rate 5 Year of traffic census 2014 Terrain Hilly Current year 2015 Construction period 1 Yes 9.1,8.2,8.51,9.2 80th Percentile CBR 8.31 Whether subgrade to be replace with borrow material No CBR of select sub grade (borrow material) Whether stage construction involved Yes If yes, life of bituminous layers 5 Years Grade of Bitumen for wearing course and binder course VG40 Flexible Pavement Design - Base Data CBR Values of subgrade used for calculcation of 80th Percentile CBR Calcuation TNHD_Pave_V 3.1 1/6 Released in - Jul.2015

Upload: chandeshwor-shah

Post on 27-Jan-2016

225 views

Category:

Documents


6 download

DESCRIPTION

yuuiu

TRANSCRIPT

Page 1: ABC

Name of work

Carriageway width Intermediate lane

Classification of road MDR

Design life 15

Initial traffic (A) (in both direction)

(CVD)

1402

Traffic growth rate 5

Year of traffic census 2014

Terrain Hilly

Current year 2015

Construction period 1

Yes

9.1,8.2,8.51,9.2

80th Percentile CBR 8.31

Whether subgrade to be replace

with borrow material

No

CBR of select sub grade (borrow

material)

Whether stage construction

involved

Yes

If yes, life of bituminous layers 5 Years

Grade of Bitumen for wearing

course and binder course

VG40

Flexible Pavement Design - Base Data

CBR Values of subgrade used for

calculcation of 80th Percentile

CBR Calcuation

TNHD_Pave_V 3.1 1/6 Released in - Jul.2015

Page 2: ABC

Flexible Pavement Design - Base DataInitial Traffic after completion of

construction

=1402x(1+5%)^(2015-2014+1)x1

1546 CVD

Whether Axle Load Survey

conducted?

No

If yes, VDF value from Axle Load

Survey

0

Vehicle Damage Factor used for

design traffic

2.5

Lane Distribution Factor 1

Design Traffic =365 * ( (1+r)^n - 1) * A * D * F )/ r

For 15 Years =365x1546x((1+0.05)^15-1)x1x2.5/0.05/1000000

30.44 MSa

For 5 Years =365x1546x((1+0.05)^5-1)x1x2.5/0.05/1000000

7.80 MSa

% volume of air voids (Va) to be

adopted in DBM

4.5

% volume of bitumen (Vb) to be

adopted in DBM

11.5

Type of Binder Course Adopted DBM

Stage construction can be

adopted

Rs. 6125.00

Rate of DBM used for cost

analysis

Rs. 7467.00

Note:

On the basis of economic analysis BM can be adopted upto 60 mm

Stage construction can be adopted

TNHD_Pave_V 3.1 2/6 Released in - Jul.2015

Page 3: ABC

Entered CBR Values

90 8.232757865

90 8.232757865 8.232757865 90

80 8.309250961

80 8.309250961 8.309250961 80

Equation of the CBR graph is y = -343.43x3 + 8906.5x2 - 76980x + 221815

a b c d

-343.43 +8906.5 -76980 + 221815

90.00003133

79.99940513

CBR values for 90 80

8.23 8.31

80th and 90th percentile CBR values

CBR ---->

9.1,8.2,8.51,9.2

Pe

rce

nti

le -

--->

y = -343.43x3 + 8906.5x2 - 76980x + 221815

0

20

40

60

80

100

120

0 2 4 6 8 10

TNHD_Pave_V 3.1 3 of 6 Released in - Jul.2015

Page 4: ABC

CBR = 8.31

Poisons ratio for cemented layers 0.25

Poisons ratio for all the other layers 0.35

Assumed Layer thickness for 1.Granular Base and Granular Subbase

BC = 10 20 Thickness of BC & DBM

DBM = 10

WMM = 150 550 Thickness of GSB + WMM

GSB = 400

570

MSA 7.80 Bitumen layer IITPAVE to be run for 3 layer analysis

30.44 Granular layer

5 Yrs = 7.80

10 Yrs = 17.74

15yrs = 30.44

Resilient modulus (M)

M Subgrade = 10*CBR For CBR <= 5

= 17.6*(CBR) 0.64 For CBR > 5

M Subgrade = 68.24

M Granular = 0.2 x E subgrade x h^0.45

= 233.470613

M Granular = 233

DBM

For BM

2300 VG10 Temp 20oC

500 2000 VG10 Temp 25oC

M Bitumen = 1700 700 1700 VG30 Temp 35oC

3000 VG40 Temp 35oC

MR of Bituminous layers

Table 7.1 of IRC 37-2012 (For DBM)

Design of flexible pavement - strain check0

TNHD_Pave_V 3.1 46 Released in - Jul. 2015

Page 5: ABC

Horizontal Tensile Strain at the bottom of the bituminous layers

Calculation of Tensile strain

Nf = 2.21 x 10^ - 4 x {1/εt}^3.89 x [1/MR]^0.854 for 80 % reliability

Nf = 0.5161 x C x 10^ - 4 x {1/εt}^3.89 x [1/MR]^0.854 for 90 % reliability

Where C = 10^M, M=(4.84x (Vb /(Va+Vb)-0.69))

Va = 4.5 Vb = 11.5

1/εt = 2634.48394 #VALUE!

εt = 379.58E-06 Allowable Tensile strain

εtHorizontal Tensile Strain at the bottom of the cemented base

N = RF x [ (113000/E0.804+191) / εt ]12 RF = 1 if >1500 CVD and 2 if <1500 CVD

N = N/A

1/εt = N/A

εt = N/A in microstrain

εt = 000.00E+00 Allowable Tensile strain

Vertical Compresive Strain at the bottom of the Granular sub base

Calculation of Vertical strain

N = 4.1656*10^-8*(1/εv)^4.5337 for 80 % reliability

N = 1.41*10^-8*(1/εv)^4.5337 for 90 % reliability

1/εv = (30440000/(1.41*10^-8))^(1/4.5337)

1/εv = 2411.43846

εv = 414.69E-06 Allowable Vertical strain

Allowable Actual

Tensile strain at the bottom of bituminous layers 380 micro Strain 55 micro Strain

0 micro Strain 0 micro Strain

Vertical compressive strain at the top of Sub grade 415 micro Strain 440 micro Strain

The bituminous layer is safe in tensile strain check

The section is unsafe in compression at top of subgrade

Comparison of allowable strain with actual strain(from IITPAVE)

Not Applicable

Values given below are micro strain

Allowable Strain Calculation

TNHD_Pave_V 3.1 56 Released in - Jul. 2015

Page 6: ABC

IITPAVE Result

No. of layers 3

E values (MPa) 1700.00 233.00 68.24

Mu values 0.350.350.35

thicknesses (mm) 20.00 550.00

single wheel load (N) 20500.00

tyre pressure (MPa) 0.56

Dual Wheel

Z R SigmaZ SigmaT SigmaR TaoRZ DispZ epZ epT epR

20.00 0.00-0.5622E0.1481E0.1288E0.5772E-02 0.6955E0.2737E-03 0.5513E-04 0.7049E-04

20.00L 0.00-0.5622E0.2815E0.2789E0.5772E-02 0.6955E0.1571E-02 0.5513E-04 0.7048E-04

20.00 155.00-0.3692E-01-0.3160E0.9275E0.9819E-01 0.5460E 0.2343E-03 0.1266E-04-0.4729E-03

20.00L 155.00-0.3693E-01-0.6047E-01-0.1443E0.9819E-01 0.5460E 0.1491E-03 0.1266E-04-0.4729E-03

570.00 0.00-0.2739E-01 0.4241E-01 0.3619E-01-0.4669E-02 0.3395E0.2356E-03 0.1688E-03 0.1328E-03

570.00L 0.00-0.2664E-01 0.2253E-02 0.1857E-03-0.4678E-02 0.3397E0.4029E-03 0.1687E-03 0.1278E-03

570.00 155.00-0.2881E-01 0.4586E-01 0.4064E-01-0.7035E-02 0.3503E0.2536E-03 0.1790E-03 0.1488E-03

570.00L 155.00-0.2881E-01 0.2466E-02 0.9252E-03-0.6873E-02 0.3503E0.4396E-03 0.1792E-03 0.1487E-03