abington senior high school construction update€¦ · 9/19/2019 · abington senior high school...
TRANSCRIPT
Abington Senior High SchoolConstruction Update
Abington Senior High School
Back-to-School
September 19, 2019
Additions and Renovations to Abington Senior High School
• Interdisciplinary Wing and Library• The contractors completed their work on Wednesday, August 28, 2019
• The moving company, contracted by the District, moved furniture back into the classrooms on Thursday, August 29, 2019
• The Library shelves, furniture and books were in place by Saturday, August 31, 2019
• District staff arranged and cleaned furniture on Saturday, August 31, 2019
• Classes resumed on schedule Tuesday, September 3, 2019
• Lockers arrived and were put in place Tuesday evening, with installation completed Wednesday evening, September 4, 2019
Library Interior
Library Interior
Temporary Nurse’s Suite Room 162
Classroom Interior
Corridor
Corridors With No Floor Finish
• Removed Flooring
Corridors With No Ceilings
• Removed Ceilings
Main Corridor – September 5, 2019
Areas Being Renovated
• Administration
• January 2020
• Auditorium Lobby
• January 2020
• Audion and Nurse Suite
• January 2020
Additions and Renovations to Abington Senior High School
• Classroom Addition• The next section of structural steel started to be erected on Tuesday,
September 3, 2019
• Interior block walls are continuing
• Administration and Career Center Wing• Footings and foundations are continuing
• Underground sanitary and storm water piping is being installed
Structural Steel
Interior Block Installation
Administration and Guidance
Inspections
• Prior to the start of the school year following inspections were performed:
• Township Code Inspector for above ceiling inspections
• Township Fire Marshal for above ceiling inspections
• Township Code Inspector and Fire Marshal for occupancy inspections
• Montgomery County Health Department safety inspection
• During construction, occupied space indoor air quality testing is being performed
• Results can be found on the Facilities section of the Abington School District’s website
Facilities Notifications on ASD Website
• Resources related to annual notifications and results of water and air quality testing across District facilities can be found on the Facilities page of the ASD website
• AHERA (Asbestos Hazard Emergency Response Act) Notification
• Pesticide Notification
• Drinking Water Tests
• Construction Updates• Additions and Renovations to Abington Senior High School
• Occupied Space Indoor Air Quality Testing
• https://www.abington.k12.pa.us/administration/facilities/
Estimated Completion Dates
Classroom Addition
Fall 2020
Administration &
Guidance Addition
Winter 2020
Auxiliary Gym
Addition
Summer 2020
Cafeteria & Gym
Entrance Addition
Spring 2021Hig
hla
nd A
venue
Auxiliary Gymnasium Construction
New Traffic Patterns Starting
Early November 2019
Weekdays 6:30 AM – 2:30 PM:
The hill between the Gym and Stadium
will be closed to all traffic.
All other times:
The hill will be one-way only, with traffic flowing
toward Susquehanna Avenue. Construction
scaffolding will be erected on the roadway.
Construction Area:
The construction area will be enclosed
with fencing.