    Part III Priced Bid

    D:\Backup D\dk\PAP\price bid pap art.doc

    SCHEDULE OF RATES PERCETAGE RATE TEDER

    ame of Work :-Acid Proof Lining work at PAP inside RCF

    Trombay Factory.

    Sr.No. DESCRIPTION QUANTITY UNIT

    RATE

    (Rs./Unit) AMOUNT (Rs.)

    1

    Removing existing Acid resistant brick /Tiles from the position including beddingmortar & underneath layers to exposethe surface area as directed transportingthe bricks / tile to RCF store or other sitecarting away the unserviceable materialas directed.

    100.00 m2

    89.19 8919.02

    2Providing & applying Bitumen Masticuniformly formulating the consistentcomposition as specified, 12 mm thick.

    600.00 m3

    312.17 187299.32

    Providing and laying acid resistant tilesof size 230 x 114 x 38 mm thick with

    potassium silicate bedding and bondingmortar about 6 mm thick to the unitsurface keeping the joint width 3 to 4mm within the adjacent bricks & properlyset removing the mortar from the joint tofull size and to a depth of 20 mm and

    jointing with following particular type ofchemical resistant mortar as permanufacturer's Specification and asdirected.

    3

    Furan Resin Mortar 350.00 m3

    1204.07 421423.47

    5

    Providing & Jointing the spoilt, damagedjoint of the existing acid resistant bricks /tiles after removing the mortar from the

    joints to full side cleaning the sameincluding preparation of surface withparticular type of chemical resistantmortar as mentioned below :Furan / Phenolic resin mortar

    300.00 m2

    312.17 93649.66

    6

    Laying acid / alkali resistant bricks / tilessupplied by RCF after cleaning oldstains of mortar, pointing, beddingmortar as per procedure mentioned inthe item no. 3

    7 Furan Resin Mortar 50.00 m2

    713.52 35676.06

    Supplying of manpower with tools andtackles for attending misc. jobs for 8hours per day

    a Semi Skilled 10.00 Nos 217.62 2176.20

    b Unskilled 10.00 Nos. 210.77 2107.70

    TOTAL (```.) Excluding Tax 751251.43

    (B.K. Joshi)

    CE (C)

  • 8/4/2019 Acid Bricks Lining_BID

    2/2

    Part III Priced Bid

    D:\Backup D\dk\PAP\price bid pap art.doc

    ote :

    1) For all above items specifications BMC FMRS 2009 shall be considered.2) Contractor shall bring material by making proper entry at RCF gate No:2 through

    CISF.

    PART : B

    The following taxes shall be payable extra:

    VAT under Composition @ 8.00 % On All above Items

    Service Tax under Composition @ 4.12 % On All above Items

    (B.K. Joshi)CE (Civil)

    PART : C

    Our Quoted Rates are . % above / below the rates specifiedin PART A

    Contractors Signature with Seal & Date