  • 7/29/2019 Activate E-GPRS on a BSS B9

    1/21

    Alcatel BSS

    Activate E-GPRS on a BSS

    MFS Document

    Reconfiguration Method

    Release B9

    3BK 17422 1191 RJZZA Ed.05

  • 7/29/2019 Activate E-GPRS on a BSS B9

    2/21

    Status RELEASED

    Short title MPI119 / MDR1

    All rights reserved. Passing on and copying of this document, useand communication of its contents not permitted without writtenauthorization from Alcatel/Evolium.

    BLANK PAGE BREAK

    2 / 21 3BK 17422 1191 RJZZA Ed.05

  • 7/29/2019 Activate E-GPRS on a BSS B9

    3/21

    Contents

    Contents

    Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

    1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

    1.1 Presentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81.1.1 Cases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81.1.2 Options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81.1.3 Restrictions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91.1.4 Grouped Task Sequence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

    1.2 Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91.2.1 Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91.2.2 Site Specific Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101.2.3 External Tasks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10

    1.3 Scheduling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 111.4 Telecom/Supervision Outage and Operating Impact . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 121.5 Resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

    1.5.1 Tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

    1.5.2 Supplies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 131.5.3 Applicable Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

    2 Scenario . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

    2.1 Before Going On-Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 162.2 Before You Start . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16

    2.2.1 Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 162.2.2 Required Knowledge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17

    2.3 Scenario Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 172.3.1 Initial Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 172.3.2 Modify NExtraAbisTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 172.3.3 Modify Radio Interface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 182.3.4 Call Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19

    2.3.5 Final Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 192.3.6 Final Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20

    2.4 Reverse Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21

    3BK 17422 1191 RJZZA Ed.05 3 / 21

  • 7/29/2019 Activate E-GPRS on a BSS B9

    4/21

    Figures

    Figures

    Figure 1: E-GPRS Activation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

    4 / 21 3BK 17422 1191 RJZZA Ed.05

  • 7/29/2019 Activate E-GPRS on a BSS B9

    5/21

    Preface

    Preface

    Purpose The purpose of this document is to describe how to activate E-GPRS and/orCS3/CS4 on a BSS.

    Whats New In Edition 05

    3BKA20FBR164398 Restriction about the change of NB_TS_MPDCHparameter was removed in section Modify Radio Interface (Section 2.3.3).

    In Edition 04

    3BKA20FBR164398 Restriction about the change of NB_TS_MPDCHparameter was added in section Modify Radio Interface (Section 2.3.3).

    In Edition 03

    Restriction on LCS introduced in Restrictions (Section 1.1.3)

    In Edition 02

    Update due to "A-bis Dynamic Allocation" in section Modify NExtraAbisTS(Section 2.3.2)

    In Edition 01

    Update due to "Synchronization of PRC with SC modifications" in sectionModify Radio Interface (Section 2.3.3)

    Audience This document is intended for:

    Field service technicians

    Specialists

    Project managers

    Foremen.

    3BK 17422 1191 RJZZA Ed.05 5 / 21

  • 7/29/2019 Activate E-GPRS on a BSS B9

    6/21

    Preface

    Assumed Knowledge You must have a basic understanding of the following:

    For planning purposes:

    Network architecture and reshuffling principles

    Scheduling.

    For realization purposes:

    Alcatel operations and maintenance concepts for BSS

    GPRS concepts

    Alcatel 1353-RA OMC-R operation

    Basic UNIX knowledge

    6 / 21 3BK 17422 1191 RJZZA Ed.05

  • 7/29/2019 Activate E-GPRS on a BSS B9

    7/21

    1 Overview

    1 Overview

    This Overview gives information needed by project managers and foremen, forpresentation to the customer and for site planning.

    3BK 17422 1191 RJZZA Ed.05 7 / 21

  • 7/29/2019 Activate E-GPRS on a BSS B9

    8/21

    1 Overview

    1.1 Presentation

    The purpose of this method is to activate E-GPRS on a per BSS basis. Froma radio interface point of view, E-GPRS means the introduction on the radiointerface of new modulation and coding schema which will improve the datathroughput for packet-switched traffic.

    In the following table the new modulation and coding schema are listed with thecorresponding throughput:

    Schema Modulation Maximum Rate [kbps]per Radio TS

    MCS-1 GMSK 8.8

    MCS-2 GMSK 11.2

    MCS-3 GMSK 14.8

    MCS-4 GMSK 17.6

    MCS-5 8-PSK 22.4

    MCS-6 8-PSK 29.6

    MCS-7 8-PSK 44.8

    MCS-8 8-PSK 54.4

    MCS-9 8-PSK 59.2

    To improve GPRS traffic on the radio interface, two new coding schemaswere introduced:

    Schema Maximum Rate [kbps] per RadioTS

    CS3 14.4

    CS4 20

    These two new optional features are available from the OMC-R only if theOperator bought them.

    1.1.1 Cases

    The following case applies:

    C1: Multi GPU BSS.

    1.1.2 Options

    The following option applies:

    O1: Modify the coding scheme on the radio interface for GPRS(Max_GPRS_CS)

    8 / 21 3BK 17422 1191 RJZZA Ed.05

  • 7/29/2019 Activate E-GPRS on a BSS B9

    9/21

    1 Overview

    1.1.3 Restrictions

    LCS feature is on hold. It will be available only after decision at project level.

    1.1.4 Grouped Task Sequence

    The following figure shows the task sequence for E-GPRS activation on a BSS.

    Inital Checks

    Modify Radio Interface

    OMCR BTS Client

    Final Checks

    Figure 1: E-GPRS Activation

    1.2 Preparation

    1.2.1 Prerequisites

    The following prerequisites apply:

    The MFS and the BSC are already associated

    The link between the OMC-R and MFS is available in both directions

    The BSS and the MFS are in service

    The Ater Mux interface is already configured to support GPRS

    The Gb interface is configured

    The hardware supporting HSDS is already deployed (G4 TREs and SUMA

    board for secondary Abis)In all the cells where you want to activate E-GPRS, there is at least one

    G4 TRE (inside A9100 BTS or inside A9110-E)

    The NExtraAbisTS is correctly set for each BTS. If NExtraAbisTS is not

    already defined, during this scenario it is mandatory to define it.

    3BK 17422 1191 RJZZA Ed.05 9 / 21

  • 7/29/2019 Activate E-GPRS on a BSS B9

    10/21

    1 Overview

    1.2.2 Site Specific Information

    The following site-specific information (input) is needed to complete thescenario:

    Availability of a workstation at OMC-R site

    Servers UserName and Password

    Cases and options to perform

    NExtraAbisTS, if necessary

    For radio interface reconfiguration:

    List of impacted cells

    List of cell parameters to modify: Max_PDCH,

    Min_PDCH, NB_TS_MPDCH, Max_Pdch_High_Load, and

    En_fast_initial_GPRS_access, Max_EGPRS_MCS and PS_ PREF_

    BCCH_ TRX

    BSS/BSC parameters to modify (for example EN_IR)

    List of cells where GPRS is not configured, but on which the operator

    wants to add E-GPRS.

    1.2.3 External Tasks

    None.

    10 / 21 3BK 17422 1191 RJZZA Ed.05

  • 7/29/2019 Activate E-GPRS on a BSS B9

    11/21

    1 Overview

    1.3 Scheduling

    Time based on technical constraintsThe number of resources shown in the table below does not take into accountindividual customer or safety requirements.

    Grouped TaskMSC/SGSN BTS BSC TC MFS OMC-R Time/Task

    Initial Checks - - - - - 1 ope. (25min.)

    25 min.

    Modify NExtraAbisTS - - - - - 1 ope ( 7 min+ 6 minxnb.impactedTSU)

    1 ope ( 7min + 6minxnb.impacted

    TSU)

    Modify Radio Interface - - - - - 1 ope. (31min.)

    31 min.

    Final Checks - 1 ope.(10min.)

    - - - 1 ope. (39min.)

    39 min.

    TOTAL TIME - 10 min. - - - 1 hour 42min.+ 6min x nb.impacted

    TSU

    3BK 17422 1191 RJZZA Ed.05 11 / 21

  • 7/29/2019 Activate E-GPRS on a BSS B9

    12/21

    1 Overview

    1.4 Telecom/Supervision Outage and Operating Impact

    The following table describes the traffic outage and loss of supervision causedby the concerned Grouped tasks.

    Out.Ref.

    Grouped Task Tel. / GPRSOut

    Tel. /GPRSRed

    Sup.Out

    Oper.Impact

    Impacts ...

    - Initial Checks - - - - None.

    - Modify NExtraAbisTS +3 min. percell/ +3 min.per cell

    - - - (3) Telecom and GPRSoutage

    - Modify Radio Interface 4 min. percell / 4 min.per cell

    - - - (1) Telecom and GPRSoutage due to mappingbetween TRE and TRX

    (depending on the numberof TRX).

    - Final Checks -/4 sec. (2)per cell

    - - - (2) GPRS outage: Only inC1, during cell reshuffling.

    TOTAL 4 min. percell(1), 3min per cell(3) / 4 min.per cell(1),4 sec. percell (2), 3min per cell(3)

    -/- - - (1), (3) Telecom andGPRS outage

    (2) GPRS outage

    12 / 21 3BK 17422 1191 RJZZA Ed.05

  • 7/29/2019 Activate E-GPRS on a BSS B9

    13/21

    1 Overview

    1.5 Resources

    1.5.1 Tools

    The following tables describe the necessary hardware tools, software tools,

    and forms.

    1.5.1.1 Hardware Tools

    Item Part Number Use at...

    None. - BTS

    1.5.1.2 Software Tools

    Item Part Number Use at ...

    Customer documentation CD with the version associatedto the current document edition. Note that the documentyou are reading cannot be used as a paper version.It is an on-line document with hypertext links towardsapplicable documents (all these are supported on thesame CD-ROM).

    BTS, OMC

    1.5.1.3 Forms

    None.

    1.5.2 Supplies

    The following table describes the supplies for E-GPRS activation.

    Item Part Number Contents Use at...

    None. - - -

    1.5.3 Applicable Documents

    The following documents are needed to complete this scenario:

    B9 BSS Methods Handbook

    BSS Configuration Handbook

    BSS Surveillance Handbook

    Network Reconfiguration Recommendations.

    3BK 17422 1191 RJZZA Ed.05 13 / 21

  • 7/29/2019 Activate E-GPRS on a BSS B9

    14/21

    1 Overview

    14 / 21 3BK 17422 1191 RJZZA Ed.05

  • 7/29/2019 Activate E-GPRS on a BSS B9

    15/21

    2 Scenario

    2 Scenario

    This Scenario presents all checks needed before beginning the scenario, andall detailed tasks to be performed on each site.

    3BK 17422 1191 RJZZA Ed.05 15 / 21

  • 7/29/2019 Activate E-GPRS on a BSS B9

    16/21

    2 Scenario

    2.1 Before Going On-Site

    Before going on-site, you must check that the following information andsupplies are available.

    All Prerequisites (Section 1.2.1) are fulfilled

    The customer has been informed of the

    Date

    Time

    Site name

    Site address

    Purpose of operation.

    Personnel are available and ready for operation (Refer to Scheduling

    (Section 1.3))

    Site Specific Information (Section 1.2.2) is available and ready for operation

    Tools (Section 1.5.1) are available and ready for operation

    Supplies (Section 1.5.2) are available and ready for operation

    Documentation is available and ready for operation.

    Ensure that the technical release level of the delivered board is in accordancewith the BSS hardware technical release document.

    Ensure that the method used at the BSS site is at the same level as at theOMC-R.

    2.2 Before You Start

    2.2.1 Checks

    Perform the following operations:

    Check that all Prerequisites (Section 1.2.1) are fulfilled

    Check the availability of all necessary tools and materials

    Inform the operator.

    Among the cases described in Cases (Section 1.1.1) and the options describedin Options (Section 1.1.2), identify which cases and options apply to you.

    16 / 21 3BK 17422 1191 RJZZA Ed.05

  • 7/29/2019 Activate E-GPRS on a BSS B9

    17/21

    2 Scenario

    2.2.2 Required Knowledge

    You must be familiar with the following:

    Safety Rules and Precautions

    Telecom/Supervision Outage and Operating Impact (Section 1.4)

    Reverse Procedure

    Grouped Task Sequence (Section 1.1.4)

    Operating Hints

    How to document Faults and Anomalies.

    2.3 Scenario Description

    The detailed tasks for GPRS logical configuration are described in this section.

    2.3.1 Initial Checks

    Note Task Description Site To do Outage

    - Perform an Audit Alarm State on the BSS. OMC-R 10 min. None.

    - View Status of Managed Objects and Alarms (TC,BSC) and print them.

    OMC-R 10 min. None.

    - Display MFS Reportand print it. OMC-R 5 min. None.

    2.3.2 Modify NExtraAbisTS

    If neccessary perform this task for each impacted BTSs.

    Note Task Description Site To do Outage

    OMC-R 2min+6 min xn

    Start 3End3- Modify BTS Characteristics, to modifyNExtraAbisTS for the impacted BTS.

    Where n is the number of impacted TSU.

    If NExtraAbisTS is changed 3min/cell GSM andGPRS outage can occurr during the programmingtransmission.

    - Re-synchronize GPRS, on eachimpacted cell.

    OMC-R 5 min None

    3BK 17422 1191 RJZZA Ed.05 17 / 21

  • 7/29/2019 Activate E-GPRS on a BSS B9

    18/21

    2 Scenario

    2.3.3 Modify Radio Interface

    Note Task Description Site To do Outage

    - Create PRC (working PRC). OMC-R 1 min. None.

    - Copy OMC Cells to PRC (impacted cells fromSupervised Configuration into working PRC).

    OMC-R 3-5 min. None.

    - Create PRC (backup PRC) in restricted mode,to save the current configuration for the reverseprocedure.

    OMC-R 1 min. None.

    - Copy OMC Cells to PRC(all cells from working PRCinto backup PRC).

    OMC-R 3-5 min. None.

    - Check PRC (backup PRC) without forcing celladministrative state.

    OMC-R 3-5 min. None.

    - Close PRC (backup PRC). OMC-R 30 sec. None.

    OMC-R 5 min. None.- Set BSS Telecom Parameters in working PRC toupdate BSS parameters if needed (for exampleEN_IR). This task includes the modification of CAEdata specific to the MFS.

    Note: The duration depends on thenumber of parameters to modify. Here10 parameters in different windows wereassumed.

    OMC-R 2 min. None.O1: Set Cell Telecom Parameters in working PRC, inorder to add E-GPRS on cells or to modify default

    E-GPRS parameters.If the operator wants to set the same value for someparameters in more than one cell, then Edit n Cells.

    Max_PDCH must be different from 0 to have GPRS,E-GPRS or LCS on cell.

    The operator can also modify Min_PDCH,NB_TS_MPDCH, Max_Pdch_High_Load, andEn_fast_initial_GPRS_access, Max_EGPRS_MCSor PS_ PREF_ BCCH_ TRX parameters.

    Set Max_GPRS_CS to CS3 or CS4.

    Note1: To have E-GPRS on cell setEN_EGPRS to Enable.

    Note2: To have GPRS or E-GPRSon the cell, TRX Pref.mark must be 0.To modify it for a block of TRX, useSet/Update Circuit/Packet PreferenceMark Configuration Using Script.

    - Synchronize PRC with SC. OMC-R 3 min. None.

    - Check PRC (Check all without forcing celladministrative state).

    OMC-R 3 min. None.

    18 / 21 3BK 17422 1191 RJZZA Ed.05

  • 7/29/2019 Activate E-GPRS on a BSS B9

    19/21

    2 Scenario

    Note Task Description Site To do Outage

    OMC-R 5 min. START1

    END1

    Note1: The outage is about 4 min. percell, depending on the number of TRX.

    - Activate PRC with cell clean-up (in queued mode,without forcing cell administrative state).

    Display Pending Activations List to see when the

    activation is finished.

    Note2: The duration depends on thenumber of cells in the PRC.

    - Close PRC (working PRC). OMC-R 1 min. None.

    2.3.4 Call Tests

    Note Task Description Site To do Outage

    BTS 15 min. None.- If there is very little traffic on the modified cellssupporting E-GPRS, then perform E-GPRS callsusing a mobile. Note: This task is optional.

    - Using an E-GPRS-capable mobile, perform apacket-switched call. If this call is not successful,perform the Reverse Procedure.

    BTS 10 min. None.

    - Display USD Detailed Cell Information to besure there is traffic on the cells.

    OMC-R 2 min. None.

    2.3.5 Final Checks

    Note Task Description Site To do Outage

    - Perform an Audit Alarm State on BSS andcompare the result with the audit performedduring the preparation task.

    OMC-R 10 min. None.

    - View Status of Managed Objects and Alarms

    (TC, BSC) and print them. Compare with valuesprinted in the preparation task.

    OMC-R 10 min. None.

    - Display MFS Reportand compare with thereport printed during the preparation task.

    OMC-R 5 min. None.

    3BK 17422 1191 RJZZA Ed.05 19 / 21

  • 7/29/2019 Activate E-GPRS on a BSS B9

    20/21

    2 Scenario

    2.3.6 Final Operations

    Note Task Description Site To do Outage

    C1 Only in case of multi GPU, Reshuffle Cell/GPU

    Mapping.

    OMC-R 1 min. 4 sec. for

    each cellremapped onanother GPU.Data trafficoutage only.

    - Delete PRC(working PRC and backup PRC) ifthere are no problems.

    OMC-R 1 min. None.

    20 / 21 3BK 17422 1191 RJZZA Ed.05

  • 7/29/2019 Activate E-GPRS on a BSS B9

    21/21

    2 Scenario

    2.4 Reverse Procedure

    Use this procedure to reverse the network modification described in thisscenario.

    Note Task Description Site To do Outage

    - Open PRC(backup PRC). OMC-R 1 min. -

    - Activate PRC (in queued mode, without forcingcell administrative state and without cell clean-up).

    Display Pending Activations List to see when theactivation is finished.

    OMC-R 4 min. -

    - Close PRC (backup PRC). OMC-R 1 min. -