Alcatel BSS
Activate E-GPRS on a BSS
MFS Document
Reconfiguration Method
Release B9
3BK 17422 1191 RJZZA Ed.05
-
7/29/2019 Activate E-GPRS on a BSS B9
2/21
Status RELEASED
Short title MPI119 / MDR1
All rights reserved. Passing on and copying of this document, useand communication of its contents not permitted without writtenauthorization from Alcatel/Evolium.
BLANK PAGE BREAK
2 / 21 3BK 17422 1191 RJZZA Ed.05
-
7/29/2019 Activate E-GPRS on a BSS B9
3/21
Contents
Contents
Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
1.1 Presentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81.1.1 Cases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81.1.2 Options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81.1.3 Restrictions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91.1.4 Grouped Task Sequence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
1.2 Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91.2.1 Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91.2.2 Site Specific Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101.2.3 External Tasks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
1.3 Scheduling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 111.4 Telecom/Supervision Outage and Operating Impact . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 121.5 Resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
1.5.1 Tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
1.5.2 Supplies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 131.5.3 Applicable Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
2 Scenario . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
2.1 Before Going On-Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 162.2 Before You Start . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
2.2.1 Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 162.2.2 Required Knowledge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
2.3 Scenario Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 172.3.1 Initial Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 172.3.2 Modify NExtraAbisTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 172.3.3 Modify Radio Interface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 182.3.4 Call Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
2.3.5 Final Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 192.3.6 Final Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
2.4 Reverse Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
3BK 17422 1191 RJZZA Ed.05 3 / 21
-
7/29/2019 Activate E-GPRS on a BSS B9
4/21
Figures
Figures
Figure 1: E-GPRS Activation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
4 / 21 3BK 17422 1191 RJZZA Ed.05
-
7/29/2019 Activate E-GPRS on a BSS B9
5/21
Preface
Preface
Purpose The purpose of this document is to describe how to activate E-GPRS and/orCS3/CS4 on a BSS.
Whats New In Edition 05
3BKA20FBR164398 Restriction about the change of NB_TS_MPDCHparameter was removed in section Modify Radio Interface (Section 2.3.3).
In Edition 04
3BKA20FBR164398 Restriction about the change of NB_TS_MPDCHparameter was added in section Modify Radio Interface (Section 2.3.3).
In Edition 03
Restriction on LCS introduced in Restrictions (Section 1.1.3)
In Edition 02
Update due to "A-bis Dynamic Allocation" in section Modify NExtraAbisTS(Section 2.3.2)
In Edition 01
Update due to "Synchronization of PRC with SC modifications" in sectionModify Radio Interface (Section 2.3.3)
Audience This document is intended for:
Field service technicians
Specialists
Project managers
Foremen.
3BK 17422 1191 RJZZA Ed.05 5 / 21
-
7/29/2019 Activate E-GPRS on a BSS B9
6/21
Preface
Assumed Knowledge You must have a basic understanding of the following:
For planning purposes:
Network architecture and reshuffling principles
Scheduling.
For realization purposes:
Alcatel operations and maintenance concepts for BSS
GPRS concepts
Alcatel 1353-RA OMC-R operation
Basic UNIX knowledge
6 / 21 3BK 17422 1191 RJZZA Ed.05
-
7/29/2019 Activate E-GPRS on a BSS B9
7/21
1 Overview
1 Overview
This Overview gives information needed by project managers and foremen, forpresentation to the customer and for site planning.
3BK 17422 1191 RJZZA Ed.05 7 / 21
-
7/29/2019 Activate E-GPRS on a BSS B9
8/21
1 Overview
1.1 Presentation
The purpose of this method is to activate E-GPRS on a per BSS basis. Froma radio interface point of view, E-GPRS means the introduction on the radiointerface of new modulation and coding schema which will improve the datathroughput for packet-switched traffic.
In the following table the new modulation and coding schema are listed with thecorresponding throughput:
Schema Modulation Maximum Rate [kbps]per Radio TS
MCS-1 GMSK 8.8
MCS-2 GMSK 11.2
MCS-3 GMSK 14.8
MCS-4 GMSK 17.6
MCS-5 8-PSK 22.4
MCS-6 8-PSK 29.6
MCS-7 8-PSK 44.8
MCS-8 8-PSK 54.4
MCS-9 8-PSK 59.2
To improve GPRS traffic on the radio interface, two new coding schemaswere introduced:
Schema Maximum Rate [kbps] per RadioTS
CS3 14.4
CS4 20
These two new optional features are available from the OMC-R only if theOperator bought them.
1.1.1 Cases
The following case applies:
C1: Multi GPU BSS.
1.1.2 Options
The following option applies:
O1: Modify the coding scheme on the radio interface for GPRS(Max_GPRS_CS)
8 / 21 3BK 17422 1191 RJZZA Ed.05
-
7/29/2019 Activate E-GPRS on a BSS B9
9/21
1 Overview
1.1.3 Restrictions
LCS feature is on hold. It will be available only after decision at project level.
1.1.4 Grouped Task Sequence
The following figure shows the task sequence for E-GPRS activation on a BSS.
Inital Checks
Modify Radio Interface
OMCR BTS Client
Final Checks
Figure 1: E-GPRS Activation
1.2 Preparation
1.2.1 Prerequisites
The following prerequisites apply:
The MFS and the BSC are already associated
The link between the OMC-R and MFS is available in both directions
The BSS and the MFS are in service
The Ater Mux interface is already configured to support GPRS
The Gb interface is configured
The hardware supporting HSDS is already deployed (G4 TREs and SUMA
board for secondary Abis)In all the cells where you want to activate E-GPRS, there is at least one
G4 TRE (inside A9100 BTS or inside A9110-E)
The NExtraAbisTS is correctly set for each BTS. If NExtraAbisTS is not
already defined, during this scenario it is mandatory to define it.
3BK 17422 1191 RJZZA Ed.05 9 / 21
-
7/29/2019 Activate E-GPRS on a BSS B9
10/21
1 Overview
1.2.2 Site Specific Information
The following site-specific information (input) is needed to complete thescenario:
Availability of a workstation at OMC-R site
Servers UserName and Password
Cases and options to perform
NExtraAbisTS, if necessary
For radio interface reconfiguration:
List of impacted cells
List of cell parameters to modify: Max_PDCH,
Min_PDCH, NB_TS_MPDCH, Max_Pdch_High_Load, and
En_fast_initial_GPRS_access, Max_EGPRS_MCS and PS_ PREF_
BCCH_ TRX
BSS/BSC parameters to modify (for example EN_IR)
List of cells where GPRS is not configured, but on which the operator
wants to add E-GPRS.
1.2.3 External Tasks
None.
10 / 21 3BK 17422 1191 RJZZA Ed.05
-
7/29/2019 Activate E-GPRS on a BSS B9
11/21
1 Overview
1.3 Scheduling
Time based on technical constraintsThe number of resources shown in the table below does not take into accountindividual customer or safety requirements.
Grouped TaskMSC/SGSN BTS BSC TC MFS OMC-R Time/Task
Initial Checks - - - - - 1 ope. (25min.)
25 min.
Modify NExtraAbisTS - - - - - 1 ope ( 7 min+ 6 minxnb.impactedTSU)
1 ope ( 7min + 6minxnb.impacted
TSU)
Modify Radio Interface - - - - - 1 ope. (31min.)
31 min.
Final Checks - 1 ope.(10min.)
- - - 1 ope. (39min.)
39 min.
TOTAL TIME - 10 min. - - - 1 hour 42min.+ 6min x nb.impacted
TSU
3BK 17422 1191 RJZZA Ed.05 11 / 21
-
7/29/2019 Activate E-GPRS on a BSS B9
12/21
1 Overview
1.4 Telecom/Supervision Outage and Operating Impact
The following table describes the traffic outage and loss of supervision causedby the concerned Grouped tasks.
Out.Ref.
Grouped Task Tel. / GPRSOut
Tel. /GPRSRed
Sup.Out
Oper.Impact
Impacts ...
- Initial Checks - - - - None.
- Modify NExtraAbisTS +3 min. percell/ +3 min.per cell
- - - (3) Telecom and GPRSoutage
- Modify Radio Interface 4 min. percell / 4 min.per cell
- - - (1) Telecom and GPRSoutage due to mappingbetween TRE and TRX
(depending on the numberof TRX).
- Final Checks -/4 sec. (2)per cell
- - - (2) GPRS outage: Only inC1, during cell reshuffling.
TOTAL 4 min. percell(1), 3min per cell(3) / 4 min.per cell(1),4 sec. percell (2), 3min per cell(3)
-/- - - (1), (3) Telecom andGPRS outage
(2) GPRS outage
12 / 21 3BK 17422 1191 RJZZA Ed.05
-
7/29/2019 Activate E-GPRS on a BSS B9
13/21
1 Overview
1.5 Resources
1.5.1 Tools
The following tables describe the necessary hardware tools, software tools,
and forms.
1.5.1.1 Hardware Tools
Item Part Number Use at...
None. - BTS
1.5.1.2 Software Tools
Item Part Number Use at ...
Customer documentation CD with the version associatedto the current document edition. Note that the documentyou are reading cannot be used as a paper version.It is an on-line document with hypertext links towardsapplicable documents (all these are supported on thesame CD-ROM).
BTS, OMC
1.5.1.3 Forms
None.
1.5.2 Supplies
The following table describes the supplies for E-GPRS activation.
Item Part Number Contents Use at...
None. - - -
1.5.3 Applicable Documents
The following documents are needed to complete this scenario:
B9 BSS Methods Handbook
BSS Configuration Handbook
BSS Surveillance Handbook
Network Reconfiguration Recommendations.
3BK 17422 1191 RJZZA Ed.05 13 / 21
-
7/29/2019 Activate E-GPRS on a BSS B9
14/21
1 Overview
14 / 21 3BK 17422 1191 RJZZA Ed.05
-
7/29/2019 Activate E-GPRS on a BSS B9
15/21
2 Scenario
2 Scenario
This Scenario presents all checks needed before beginning the scenario, andall detailed tasks to be performed on each site.
3BK 17422 1191 RJZZA Ed.05 15 / 21
-
7/29/2019 Activate E-GPRS on a BSS B9
16/21
2 Scenario
2.1 Before Going On-Site
Before going on-site, you must check that the following information andsupplies are available.
All Prerequisites (Section 1.2.1) are fulfilled
The customer has been informed of the
Date
Time
Site name
Site address
Purpose of operation.
Personnel are available and ready for operation (Refer to Scheduling
(Section 1.3))
Site Specific Information (Section 1.2.2) is available and ready for operation
Tools (Section 1.5.1) are available and ready for operation
Supplies (Section 1.5.2) are available and ready for operation
Documentation is available and ready for operation.
Ensure that the technical release level of the delivered board is in accordancewith the BSS hardware technical release document.
Ensure that the method used at the BSS site is at the same level as at theOMC-R.
2.2 Before You Start
2.2.1 Checks
Perform the following operations:
Check that all Prerequisites (Section 1.2.1) are fulfilled
Check the availability of all necessary tools and materials
Inform the operator.
Among the cases described in Cases (Section 1.1.1) and the options describedin Options (Section 1.1.2), identify which cases and options apply to you.
16 / 21 3BK 17422 1191 RJZZA Ed.05
-
7/29/2019 Activate E-GPRS on a BSS B9
17/21
2 Scenario
2.2.2 Required Knowledge
You must be familiar with the following:
Safety Rules and Precautions
Telecom/Supervision Outage and Operating Impact (Section 1.4)
Reverse Procedure
Grouped Task Sequence (Section 1.1.4)
Operating Hints
How to document Faults and Anomalies.
2.3 Scenario Description
The detailed tasks for GPRS logical configuration are described in this section.
2.3.1 Initial Checks
Note Task Description Site To do Outage
- Perform an Audit Alarm State on the BSS. OMC-R 10 min. None.
- View Status of Managed Objects and Alarms (TC,BSC) and print them.
OMC-R 10 min. None.
- Display MFS Reportand print it. OMC-R 5 min. None.
2.3.2 Modify NExtraAbisTS
If neccessary perform this task for each impacted BTSs.
Note Task Description Site To do Outage
OMC-R 2min+6 min xn
Start 3End3- Modify BTS Characteristics, to modifyNExtraAbisTS for the impacted BTS.
Where n is the number of impacted TSU.
If NExtraAbisTS is changed 3min/cell GSM andGPRS outage can occurr during the programmingtransmission.
- Re-synchronize GPRS, on eachimpacted cell.
OMC-R 5 min None
3BK 17422 1191 RJZZA Ed.05 17 / 21
-
7/29/2019 Activate E-GPRS on a BSS B9
18/21
2 Scenario
2.3.3 Modify Radio Interface
Note Task Description Site To do Outage
- Create PRC (working PRC). OMC-R 1 min. None.
- Copy OMC Cells to PRC (impacted cells fromSupervised Configuration into working PRC).
OMC-R 3-5 min. None.
- Create PRC (backup PRC) in restricted mode,to save the current configuration for the reverseprocedure.
OMC-R 1 min. None.
- Copy OMC Cells to PRC(all cells from working PRCinto backup PRC).
OMC-R 3-5 min. None.
- Check PRC (backup PRC) without forcing celladministrative state.
OMC-R 3-5 min. None.
- Close PRC (backup PRC). OMC-R 30 sec. None.
OMC-R 5 min. None.- Set BSS Telecom Parameters in working PRC toupdate BSS parameters if needed (for exampleEN_IR). This task includes the modification of CAEdata specific to the MFS.
Note: The duration depends on thenumber of parameters to modify. Here10 parameters in different windows wereassumed.
OMC-R 2 min. None.O1: Set Cell Telecom Parameters in working PRC, inorder to add E-GPRS on cells or to modify default
E-GPRS parameters.If the operator wants to set the same value for someparameters in more than one cell, then Edit n Cells.
Max_PDCH must be different from 0 to have GPRS,E-GPRS or LCS on cell.
The operator can also modify Min_PDCH,NB_TS_MPDCH, Max_Pdch_High_Load, andEn_fast_initial_GPRS_access, Max_EGPRS_MCSor PS_ PREF_ BCCH_ TRX parameters.
Set Max_GPRS_CS to CS3 or CS4.
Note1: To have E-GPRS on cell setEN_EGPRS to Enable.
Note2: To have GPRS or E-GPRSon the cell, TRX Pref.mark must be 0.To modify it for a block of TRX, useSet/Update Circuit/Packet PreferenceMark Configuration Using Script.
- Synchronize PRC with SC. OMC-R 3 min. None.
- Check PRC (Check all without forcing celladministrative state).
OMC-R 3 min. None.
18 / 21 3BK 17422 1191 RJZZA Ed.05
-
7/29/2019 Activate E-GPRS on a BSS B9
19/21
2 Scenario
Note Task Description Site To do Outage
OMC-R 5 min. START1
END1
Note1: The outage is about 4 min. percell, depending on the number of TRX.
- Activate PRC with cell clean-up (in queued mode,without forcing cell administrative state).
Display Pending Activations List to see when the
activation is finished.
Note2: The duration depends on thenumber of cells in the PRC.
- Close PRC (working PRC). OMC-R 1 min. None.
2.3.4 Call Tests
Note Task Description Site To do Outage
BTS 15 min. None.- If there is very little traffic on the modified cellssupporting E-GPRS, then perform E-GPRS callsusing a mobile. Note: This task is optional.
- Using an E-GPRS-capable mobile, perform apacket-switched call. If this call is not successful,perform the Reverse Procedure.
BTS 10 min. None.
- Display USD Detailed Cell Information to besure there is traffic on the cells.
OMC-R 2 min. None.
2.3.5 Final Checks
Note Task Description Site To do Outage
- Perform an Audit Alarm State on BSS andcompare the result with the audit performedduring the preparation task.
OMC-R 10 min. None.
- View Status of Managed Objects and Alarms
(TC, BSC) and print them. Compare with valuesprinted in the preparation task.
OMC-R 10 min. None.
- Display MFS Reportand compare with thereport printed during the preparation task.
OMC-R 5 min. None.
3BK 17422 1191 RJZZA Ed.05 19 / 21
-
7/29/2019 Activate E-GPRS on a BSS B9
20/21
2 Scenario
2.3.6 Final Operations
Note Task Description Site To do Outage
C1 Only in case of multi GPU, Reshuffle Cell/GPU
Mapping.
OMC-R 1 min. 4 sec. for
each cellremapped onanother GPU.Data trafficoutage only.
- Delete PRC(working PRC and backup PRC) ifthere are no problems.
OMC-R 1 min. None.
20 / 21 3BK 17422 1191 RJZZA Ed.05
-
7/29/2019 Activate E-GPRS on a BSS B9
21/21
2 Scenario
2.4 Reverse Procedure
Use this procedure to reverse the network modification described in thisscenario.
Note Task Description Site To do Outage
- Open PRC(backup PRC). OMC-R 1 min. -
- Activate PRC (in queued mode, without forcingcell administrative state and without cell clean-up).
Display Pending Activations List to see when theactivation is finished.
OMC-R 4 min. -
- Close PRC (backup PRC). OMC-R 1 min. -