active target multistatic receiver preliminary design review
DESCRIPTION
Active Target Multistatic Receiver Preliminary Design Review. Group D: Sam Buchanan Haiji Wang Robby Willer. System analysis. ATMR calibration mode diagram (Level 0). System analysis. ATMR bistatic receiver mode diagram (Level 0). System analysis. ATMR system diagram (Level 1). - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Active Target Multistatic Receiver Preliminary Design Review](https://reader036.vdocument.in/reader036/viewer/2022062315/568165bc550346895dd8b8f0/html5/thumbnails/1.jpg)
Project Renovatio
Joshua FraserAlastair FraserRuofei FuChao JiangCheng ZhenDacheng ZhengTien Truong
![Page 2: Active Target Multistatic Receiver Preliminary Design Review](https://reader036.vdocument.in/reader036/viewer/2022062315/568165bc550346895dd8b8f0/html5/thumbnails/2.jpg)
System-Level Schematic
![Page 3: Active Target Multistatic Receiver Preliminary Design Review](https://reader036.vdocument.in/reader036/viewer/2022062315/568165bc550346895dd8b8f0/html5/thumbnails/3.jpg)
WBS: System Decomposition
![Page 4: Active Target Multistatic Receiver Preliminary Design Review](https://reader036.vdocument.in/reader036/viewer/2022062315/568165bc550346895dd8b8f0/html5/thumbnails/4.jpg)
WBS: System Decomposition
![Page 5: Active Target Multistatic Receiver Preliminary Design Review](https://reader036.vdocument.in/reader036/viewer/2022062315/568165bc550346895dd8b8f0/html5/thumbnails/5.jpg)
WBS: System Decomposition
![Page 6: Active Target Multistatic Receiver Preliminary Design Review](https://reader036.vdocument.in/reader036/viewer/2022062315/568165bc550346895dd8b8f0/html5/thumbnails/6.jpg)
Testing PlansPower (Current/Volt meter & Management systems)
-Battery discharge and recharge rate and duration-Verify power conversion efficiencies
Motor (G sensors, GPS, Speedometer and/or Dynamometer)-Top speed, acceleration, duration, etc.
-Acceleration/Speed sustainability
Heat (Temperature sensors and IR Camera)-Max temperature of motor and charger-Water/coolant temperature-Temperature range of batteries
![Page 7: Active Target Multistatic Receiver Preliminary Design Review](https://reader036.vdocument.in/reader036/viewer/2022062315/568165bc550346895dd8b8f0/html5/thumbnails/7.jpg)
Testing PlansWater/Rain Susceptibility (Hose or Sprinkler)
-Power/battery systems are water tight-Wiring is properly insulated-No large potential differences between chassis and ground
Safety Shutoffs (Crash, Ground Fault, and Hand Switches)-Crash sensor works properly
-GFI’s properly detect current imbalances and shut off power-Hand switches properly disconnect power systems
![Page 8: Active Target Multistatic Receiver Preliminary Design Review](https://reader036.vdocument.in/reader036/viewer/2022062315/568165bc550346895dd8b8f0/html5/thumbnails/8.jpg)
Component Specifications
![Page 9: Active Target Multistatic Receiver Preliminary Design Review](https://reader036.vdocument.in/reader036/viewer/2022062315/568165bc550346895dd8b8f0/html5/thumbnails/9.jpg)
Risk Mitigation Plan
![Page 10: Active Target Multistatic Receiver Preliminary Design Review](https://reader036.vdocument.in/reader036/viewer/2022062315/568165bc550346895dd8b8f0/html5/thumbnails/10.jpg)
WBS: Project Organization
![Page 11: Active Target Multistatic Receiver Preliminary Design Review](https://reader036.vdocument.in/reader036/viewer/2022062315/568165bc550346895dd8b8f0/html5/thumbnails/11.jpg)
Organization Chart
![Page 12: Active Target Multistatic Receiver Preliminary Design Review](https://reader036.vdocument.in/reader036/viewer/2022062315/568165bc550346895dd8b8f0/html5/thumbnails/12.jpg)
Project Schedule
![Page 13: Active Target Multistatic Receiver Preliminary Design Review](https://reader036.vdocument.in/reader036/viewer/2022062315/568165bc550346895dd8b8f0/html5/thumbnails/13.jpg)
Questions?● Project Site:
o project-renovatio.bitballoon.com