Final Coordination Meeting and study visit to UB (06.09-08.09.2015)Final Coordination Meeting and study visit to UB (06.09-08.09.2015)
MANAGEMENT
Coordination meetings in 2015
• Coordination Meeting and Study Visit to Faculty of Mechanical Engineering University of Ljubljana (05-07
February 2015)
• Final coordination meeting and study visit to Faculty of Mechanical engineering University of Belgrade (06-08
September 2015)
Final Coordination Meeting and study visit to UB (05.02-07.02.2015)Final Coordination Meeting and study visit to UB (05.02-07.02.2015)
• Feedback to NTO visit in RS 30.06.2015
• Feedback to NTO and EACEA visit to UME 12.05.2015
Final Coordination Meeting and study visit to UB (06.09-08.09..2015)Final Coordination Meeting and study visit to UB (06.09-08.09..2015)
DISSEMINATIONWorkshop at University of Montenegro,
Podgorica (27.03.2015)“International projects at University of
Montenegro”
Presentation ENERESE project
Final Coordination Meeting and study visit to UB (06.09-08.09.2015)Final Coordination Meeting and study visit to UB (06.09-08.09.2015)
Inter-coaching meeting at Jahorina, Eastern Sarajevo, Bosnia and Herzegovina, December, 8th December, 2014
530194-2012 Tempus JPCR “Energy Efficiency, Renewable Energy Sources and Environmental Impacts – master study ENERESE”
&SDTRAIN 530530-TEMPUS-1-2012-1-SE-TEMPUS-JPHES "Training
Courses for Public Services in Sustainable Infrastructure Development in Western Balkans"
In the framework of workshop “Development of sustainable energy infrastructures”
Final Coordination Meeting and study visit to UB (05.02-07.02.2015)Final Coordination Meeting and study visit to UB (05.02-07.02.2015)
Inter‐project Coaching Meeting at FTM, UB, February, 12th 2015
544364-2013 Tempus-JPHES International Joint Master Program on Material and Energy Flow Management MEM
&
530194-2012 Tempus JPCR Energy Efficiency, Renewable Energy Sources and Environmental Impacts – master study ENERESE
Final Coordination Meeting and study visit to UB (06.09-08.09.2015)Final Coordination Meeting and study visit to UB (06.09-08.09.2015)
Final Coordination Meeting and study visit to UB (06.09-08.09.2015)Final Coordination Meeting and study visit to UB (06.09-08.09.2015)
Round table: “The needs and opportunities in education experts of energy efficiency and renewable energy” Convener and host: Chamber of Economy of Sarajevo Canton, Sarajevo, BA. 8th June 2015 at 10 am.
10.05-10.15
" DUNP activities on educating staff from EE and RES through international projects"
Prof. C. Dolicanin
10.15-10.30
" Project ENERESE implementation in RS and ME" Prof. B. Stanic
10.30-10.40
" Project ENERESE implementation of the of Civil Engineering, University of Sarajevo"
Prof. S. Dolarevic
10.40-10.50
" Chamber of Commerce of Sarajevo Canton activities in the field of EE and the needs of companies for knowledge and skills in this sector"
Mrs R. Mandic
10.50-11.00
"ENERESE in light of the needs for managers in the field of EE and RES in the region"
MSc B. Kovacic
11.00-11.45
Discussion and Conclusion
REALIZATION OF STUDY PROGRAMS
• At SUNP 17 enrolled
• At UME 15 students finished the first year of study with very good results
Final Coordination Meeting and study visit to UB (06.09-08.09..2015)Final Coordination Meeting and study visit to UB (06.09-08.09..2015)
Final Coordination Meeting and study visit to UB (06.09-08.09.2015)Final Coordination Meeting and study visit to UB (06.09-08.09.2015)
Lectures given by EU university partners
University of Montenegro, Faculty of Civil Engineering, Podgorica, Montenegro (May-June 2015)
Covered period
Arrival 24.05 Departure 27.05.2015
Arrival 27.05 Departure 30.05.2015
Arrival 31.05 Departure 03.06.2015
Arrival 07.06 Departure 10.06.2015
Lectures time
25-26 May 28-29 May 1-2 June 8-9 June
Lectures time
UNIZA UL AUTh TUBF
MOBILITY
Dr Edin Dolicanin, lecturerPeriod: 19.10.2014. –26.10.2014. Place: TU Bergakademie Freiberg , Germany
Supervisor: Prof. Jan Clements Bongarets
MSc Tamara Bajc, assistantPeriod: 23.02.2015. –23.03.2015. Place: Aristotle University of Thessaloniki, Greece
Supervisor: Prof. Agis Papadopoulos
Projected visits for 1 lecturer, 2 assistants and 1 student
Final Coordination Meeting and study visit to UB (06.09-08.09.2015)Final Coordination Meeting and study visit to UB (06.09-08.09.2015)
EQUIPMENTTenders
UME (October 2014 – 24.04.2015)UNSA (December 2014 – 03.06.2015) SUNP (December 2014 -10.07.2015)UB (December 2014 -10.07.2015)UN (December 2014-10.07.2015)UNIBL (December 2014 – 14.08.2015)
Final Coordination Meeting and study visit to UB (05.02-07.02.2015)Final Coordination Meeting and study visit to UB (05.02-07.02.2015)
QA reports
PEER REVIEW, January 2015
(has to be completed)
External report by external expert 10.06.2015
Final Coordination Meeting and study visit to UB (06.09-08.09..2015)Final Coordination Meeting and study visit to UB (06.09-08.09..2015)
• SUNP Request for the second instalment of 30% of Project budget (sent 04.06.2015)
• EACEA Reply: Request to confirm change of legal representative and bank account (30.07.2015)
• SUNP request for the extension of project duration for the next three months (24.08.2015)
• EACEA reply: Require an Appendix to Request for 2nd instalment and project extension for the next 3 months (31.08.2015)
• Second installment approved (02.09.2015)
• Project extension approved ( ???)
Final Coordination Meeting and study visit to UB (06.09-08.09.2015)Final Coordination Meeting and study visit to UB (06.09-08.09.2015)
TEMPUS IV - Fifth Call for proposals, 23 February 2012
Please ensure that the information you provide in this worksheet is consistent with Part F of your eForm
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
DEV 1.1
1.21.31.4
DEV 2.12.22.32.4
DEV 3.13.23.3 Upgrading labs and libraries at WB partners 8 X X
DEV 4.14.2 Selectedlectures for students by EU experts 6 O O4.34.4 Practice for the best students at EU partners 6 XOXO
QPLN 5.15.2 Peer review of teaching materialsby EU partners 6 O O5.35.4
DISS 6.1 Design and maintatnence of project's WEB site 4 X X6.2 Marketing activities regarding new new master program 3 X X X6.3 Round table on impacts of ENERESE on RUE in WBC 2 X6.4
EXP 7.17.27.3 Enhansing universities & enterprices links in WB 6 X X
MNGT 8.1 Monitoring of MNGT activities 8 X X X8.28.3 Follow up of project expences 8 X X X
To add (a) row(s), click a cell INSIDE the table, then on the upper Insert menu click "Row".
WP Type
Deliverable /
Activity Ref. N°
Activities (as indicated in the LFM)
The same reference and sub-reference numbers used in the logical framework matrix must be assigned to each deliverable and related activity. The first month of the project must be marked 1. Please use the following symbols: - Activity carried out in the EU or Candidate Country: O- Activity carried out in the Partner Country: X
Dura- tion
(weeks)
Month
WORKPLAN & WORKPACKAGES
Final Coordination Meeting and study visit to UB (06.09-08.09..2015)Final Coordination Meeting and study visit to UB (06.09-08.09..2015)
•Preparation corresponding documents and reports
•We need summery report related to the each partner’s contributions to ENERESE project
Thank you for your attention
Final Coordination Meeting and study visit to UB (06.09-08.09..2015)Final Coordination Meeting and study visit to UB (06.09-08.09..2015)
Joint study program ENERESE realized at SUNP
dr Edin Dolićanin, lecturer
Final Coordination Meeting and study visit to UB (06.09-08.09.2015)Final Coordination Meeting and study visit to UB (06.09-08.09.2015)
Final Coordination Meeting and study visit to UB (06.09-08.09..2015)Final Coordination Meeting and study visit to UB (06.09-08.09..2015)
• Number of enrolled students
• Structure of students
• Accredited by CAQA
• All students passed all exams and 2 thesis completed
• Number of students less then planned
• Marketing has to be more intensive