CV Fernando Ratto Actual Position: OPERATIONS MANAGER LATAM & CARIBBEAN CONSTRUCTIONS MANAGER Tocumen International Airport Expansion Name of Company: Aeroports du Paris Ingénierie ADPI / CPMTS Name: FERNANDO RATTO Date of Birth: 03/14/1955 Nationalities: Argentinean / Italian Contact: [email protected] / [email protected] Education & other: Title Institution Year Expert in Airport Infrastructures Management & Operations Escuela Superior de Ingenieros Aeronáuticos - Universidad Politécnica de Madrid, Spain 2006 Master in Airport Systems Escuela Superior de Ingenieros Aeronáuticos - Universidad Politécnica de Madrid, Spain 2006 Architect – Urbanism Specialist Universidad de Morón, Argentina 1980 Actually Vicecomodoro (R) (Lieutenant colonel retired) Argentinian Air Force 1982/2010 Membership of Professional Associations: Institution: Professional Council of Architecture and Urbanism in Buenos Aires, Argentina Registration number: 14.633 Membership date: 01/07/1986 Institution: President of the Latin American and Caribbean Association of Airfield Pavements, ALACPA www.alacpa.org Countries of Work Experience: Argentina, Spain, Peru, Ecuador, Uruguay, Haiti, Costa Rica, Somalia and Panama. Other Trainings & Technical Participations Title Institution Year TRB Transportation Research Bureau – AV070 Committee Meeting – 99 th TBR 2020. (Speaker) TRB Transportation Research Bureau 2020 7th Latin America Airport & Aviation Expansion Summit, Panama. (Speaker) Lnoppen 2019 4th Annual Central America & The Caribbean Capital Projects & Infraestructure Summit, Panama. (Speaker) Markets Group 2016 IV to XV Seminars ALACPA on Airport Pavements, FAA Workshops and Short Courses on Airport Pavement Maintenance. (Peru, Mexico, Brazil, Argentina, Colombia, Ecuador, USA, Chile, Panama, Costa Rica) (Speaker) Latin American and Caribbean Association of Airfield Pavements 2007/2019 Lighted visual aids for the air navigation Aeronautical Department, Engineering School Universidad Nacional de La Plata 2005 Government inspector of aerodromes Argentine Air Force - Aeronautical 2004

Upload: others

Post on 08-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Actual Position OPERATIONS MANAGER LATAM & CARIBBEAN ...alacpa.org/CV-Eng-FERNANDO RATTO-Feb-2020.pdf · CV Fernando Ratto Actual Position: OPERATIONS MANAGER LATAM & CARIBBEAN CONSTRUCTIONS

CV Fernando Ratto

Actual Position: OPERATIONS MANAGER LATAM & CARIBBEAN CONSTRUCTIONS MANAGER Tocumen International Airport Expansion Name of Company: Aeroports du Paris Ingénierie ADPI / CPMTS Name: FERNANDO RATTO Date of Birth: 03/14/1955 Nationalities: Argentinean / Italian Contact: [email protected] / [email protected] Education & other:

Title Institution Year

Expert in Airport Infrastructures Management & Operations

Escuela Superior de Ingenieros Aeronáuticos - Universidad Politécnica de Madrid, Spain

2006

Master in Airport Systems Escuela Superior de Ingenieros Aeronáuticos - Universidad Politécnica de Madrid, Spain

2006

Architect – Urbanism Specialist Universidad de Morón, Argentina 1980

Actually Vicecomodoro (R) (Lieutenant colonel retired)

Argentinian Air Force 1982/2010

Membership of Professional Associations: Institution: Professional Council of Architecture and Urbanism in Buenos Aires, Argentina Registration number: 14.633 Membership date: 01/07/1986 Institution: President of the Latin American and Caribbean Association of Airfield

Pavements, ALACPA www.alacpa.org Countries of Work Experience: Argentina, Spain, Peru, Ecuador, Uruguay, Haiti, Costa Rica, Somalia and Panama. Other Trainings & Technical Participations

Title Institution Year

TRB Transportation Research Bureau – AV070 Committee Meeting – 99th TBR 2020. (Speaker)

TRB Transportation Research Bureau 2020

7th Latin America Airport & Aviation Expansion Summit, Panama. (Speaker)

Lnoppen 2019

4th Annual Central America & The Caribbean Capital Projects & Infraestructure Summit, Panama. (Speaker)

Markets Group 2016

IV to XV Seminars ALACPA on Airport Pavements, FAA Workshops and Short Courses on Airport Pavement Maintenance. (Peru, Mexico, Brazil, Argentina, Colombia, Ecuador, USA, Chile, Panama, Costa Rica) (Speaker)

Latin American and Caribbean Association of Airfield Pavements

2007/2019

Lighted visual aids for the air navigation Aeronautical Department, Engineering School Universidad Nacional de La Plata

2005

Government inspector of aerodromes Argentine Air Force - Aeronautical 2004

Page 2: Actual Position OPERATIONS MANAGER LATAM & CARIBBEAN ...alacpa.org/CV-Eng-FERNANDO RATTO-Feb-2020.pdf · CV Fernando Ratto Actual Position: OPERATIONS MANAGER LATAM & CARIBBEAN CONSTRUCTIONS

CV Fernando Ratto

Authority

Specialization Course “Environmental Techniques in airports”

Universidad Nacional de la Plata, Argentina

2003

III Conferences on Civil Aviation Security Argentine Air Force - Aeronautical Authority

2001

PF40 – Airports – Maintenance of Airside Pavements

WTI Training Group, UK. 1998

Airport Public Services Concession Airport National System and National Institute of Aeronautics and Space Law, Argentina.

1997

Airport Planning Airports Council International ACI & Aéroports de Paris Institute of International Aeronautics Training, Argentina.

2005

Employments: From: 2014 To: present

Employer: ADP Ingénierie

Positions held: Operations Manager, Latin-American and Caribbean Office Panama & Construction Manager to Consortium PM Terminal Sur S.A.

From: 2013 To: to 2014 Employer: THE LOUIS BERGER GROUP, INC. Panamá Office. Positions held: Architecture and Planning Manager, Latin-American and Caribbean Office. From: 2009 To: 2012 Employer: THE LOUIS BERGER GROUP, INC. Aviation Division, USA. Positions held: Supervision Manager of the Design and Construction of the New Quito International

Airport in Equator. From: 2007 To: 2008 Employer: TYPSA, Técnica y Proyectos S.A. (Spain-Peru) Positions held: Expert in Terminal Buildings and Airport Infrastructure, design review and work control,

Lima International Airport. From: 2003 To: 2004 Employer: INECO (Spain) Positions held Spanish Airports Design and technical documentation Review From: 1982 To: February 2010 Employer: Infrastructure Management, Aeronautical Authority of Civil Aviation in Argentina,

belongs to Argentine Air Force. Positions held: Head of the Department of Architecture, Infrastructure Management. Head of Airport Infrastructure, Air Traffic Management, Argentinean Air Force. Specialist in Terminal Buildings for Passengers and Cargo

Capacities

Leadership of the consultant´s staff. Knowledge aerodrome regulatory requirements and standards including ICAO, FAA, ACI and IATA. Professional advisor to the Client on all aspects of the airports development, Master Plan, process of design, design review, construction control, procurement of operational items, testing and commissioning, Operational Safety, Retail Master Plan, Operational Readiness and Airport Transfer (ORAT), and the initial support in operations.

Page 3: Actual Position OPERATIONS MANAGER LATAM & CARIBBEAN ...alacpa.org/CV-Eng-FERNANDO RATTO-Feb-2020.pdf · CV Fernando Ratto Actual Position: OPERATIONS MANAGER LATAM & CARIBBEAN CONSTRUCTIONS

CV Fernando Ratto

M.Sc. Fernando Ratto, has a wide experience of more than 35 years in projects and works Planning, Design, Construction and Supervision, in airports and other specialties. He is also a System Airport Master, and Specialist in Airport Infrastructure Management and Operations. He works how team leader in the design review process and control construction of airports, mainly in Argentina, Spain, Peru, Haiti, Costa Rica, Uruguay, Ecuador, Somalia and Panamá. He has participated in all airport projects phases and has total knowledge of their construction process. He is currently the Construction Manager of the expansion project of the Tocumen International Airport, Panama, with an estimated value of US$ 1.2 billion. To date in his career he has participated in multiple projects that total more than US $ 2.1 billion and has led projects with more than 1.7 million manpower hours. In the Argentine Air Force (Aeronautical Authority), he was engaged, among others, as the Leader in the Architecture department, Leader in the Airport Infrastructure department, Aerodrome Government Inspector, member of GREPECAS from OACI and Delegate for the Permanent Inter- Ministerial Commission Air Transport Facilitation in Argentina. Today is Lieutenant Colonel (R) of Argentine Air Force. He has been engaged as Supervision Manager in design and construction of the new International Airport of Quito in Ecuador (construction amount: US$ 440.7 millions). He has also been hired as Main Specialist in airport terminals and airport infrastructure in the Technical Supervision of the works execution in the International Airport Jorge Chávez in Lima (construction amount: US$ 85.739,251 millions). He is highly trained in all related to ICAO international Standards, FAA Advisory Circulars and Operation Safety aspects. He is President of the Latin American and Caribbean Association of Airfield Pavements, ALACPA, acquiring expertise on airport pavement specialty. He is an expert of the Technical Cooperation Bureau of ICAO, he carries out technical consultancies, as an example of his latest works, Design of the ACC Air Traffic Control Center of Somalia, State Inspection of the Pavement of the APRON in the San José International Airport of Costa Rica, and the Substantial Works Inspection to Radar Tower, Carrasco International Airport, Uruguay. Currently, he is ADPI Operations Manager in Latin and Caribbean, and Manager Construction of Consortium PM Terminal Sur S.A. to expansion International Airport of Tocumen, Panama.

Languages:

Language Speaking Reading Writing

English Good Good Good

Portugues Good Good Regular

Spanish Mother Tongue Mother Tongue Mother Tongue

Page 4: Actual Position OPERATIONS MANAGER LATAM & CARIBBEAN ...alacpa.org/CV-Eng-FERNANDO RATTO-Feb-2020.pdf · CV Fernando Ratto Actual Position: OPERATIONS MANAGER LATAM & CARIBBEAN CONSTRUCTIONS

CV Fernando Ratto

Name of assignment or project: Review Design and Construction Supervision of the New Passenger Terminal Building & other infrastructures - Tocumen International Airport (PTY)

Year: 2014 – today Location: Tocumen, Panama Client: Aeropuerto Internacional de Tocumen S.A. Company: ADPI Main project features: Review Design (Norman Foster) and Construction of a new terminal whose main

components are, airfield facilities, land side facilities, Chiller Plant, etc, Passenger Terminal Building (4 levels, 116.000 m2, 20 Contact Gates), taxiways and APRON, additional buildings, infrastructure network, Electrical Substation 115KVA, Backup GEN 20MG, etc.

Construction Amount: US$ 1.2 billion. Positions held: Construction Manager Activities performed: He leading the activities specified in the contract and manage relationship with

the client. The Project Management include the services of preliminary and final design

review, as well as the construction supervision management and the operations process. The contract main supervision activities were, among others: - Review of the complete planning of the construction project - Design review & Construction supervision - Quality assurance - Technology Transfer - Work delivery process - Master Plan - SMS, OSS (One Stop Security), Testing and Commissioning, and ORAT

Page 5: Actual Position OPERATIONS MANAGER LATAM & CARIBBEAN ...alacpa.org/CV-Eng-FERNANDO RATTO-Feb-2020.pdf · CV Fernando Ratto Actual Position: OPERATIONS MANAGER LATAM & CARIBBEAN CONSTRUCTIONS

CV Fernando Ratto

Name of assignment or project: Review Design and Control Construction of the Fase 1 of the Logistic Area

(Free Zone) Tocumen International Airport (PTY)

Year: 2017 – today Location: Tocumen, Panama Client: Aeropuerto Internacional de Tocumen S.A. Company: ADPI Main project features: Review Design and Construction of a new free zone whose main components

are, urban facilities, landscaping, Plots, Access, Fire Protection, etc. 3 Phases with 35 Ha. Phase 1, Surface 8 Ha.

Construction Amount: US$ 20 million. Positions held: Design Review Manager and Support of Control Construction Activities performed: He collaborate in the activities specified in the contract and manage relationship

with the client.

Name of assignment or project: Design Review and Construction Supervision of the New Quito

International Airport (NAIQ)

Page 6: Actual Position OPERATIONS MANAGER LATAM & CARIBBEAN ...alacpa.org/CV-Eng-FERNANDO RATTO-Feb-2020.pdf · CV Fernando Ratto Actual Position: OPERATIONS MANAGER LATAM & CARIBBEAN CONSTRUCTIONS

CV Fernando Ratto

Year: 2009 – 2012 Location: Quito, Equator Client: CORPAQ Company: Louis Berger Group Inc. Main project features: Total Design and Construction of a new airport whose main components are:

runway 18-36 (4100 x 45 m.), Parallel Taxiway (4100 x 23 m.), Three rapid-exit taxiways, Aircraft apron (130.000 m2), Air Traffic Control Tower (h= 41 m.), Passenger Terminal Building (4 levels, 40.000 m2), horizontal and vertical signals, Approach Lighting System CATI, ILS CAT I, Lighting of runways, taxiways and apron, Fire Fighting Services (Cat. 9), Cargo Terminal Building, Hangars, General Aviation Terminal, additional buildings, infrastructure network, etc.

Construction Amount: US$ 441 million. Positions held: Manager of design review and control construction Activities performed: He lead over 20 professionals for the activities specified in the contract.

The scope of the Management Program included the services of preliminary and final design review, as well as the construction supervision management.

Name of assignment or project: Airfield Certification and Delivery Process to the aeronautical authority. Year: 2008-2009 Location: Buenos Aires, Argentina Company: Air Traffic Management Administration, Argentine Air Force. Main project features: Several airport projects. He participated in the delivery process to the

aeronautical authority. Aeronautical authority Transfer Program, Air Force to the ANAC (National Administration of Civil Aviation)

Positions held: Head of the department of Airport Infrastructure Activities performed: Airport projects review in Argentina, development of the infrastructure

component in the delivery process to the aeronautical authority.

Page 7: Actual Position OPERATIONS MANAGER LATAM & CARIBBEAN ...alacpa.org/CV-Eng-FERNANDO RATTO-Feb-2020.pdf · CV Fernando Ratto Actual Position: OPERATIONS MANAGER LATAM & CARIBBEAN CONSTRUCTIONS

CV Fernando Ratto

Name of assignment or project: Technical Supervision of the improvement execution of Jorge

Chávez International Airport. Phase II

Year: 2007-2008 Location: Lima, Peru Client: Lima Airport Partners Company: TYPSA, Técnica y Proyectos S.A. (Spain) Main project features: Technical supervision in the improvement execution of Jorge Chávez

International Airport, Phase II, City of Lima, Peru. Terminal expansion, APRON, security stripes treatment, expansion and modification of networks and security systems, airfield lighting systems, horizontal signs, etc.

Construction Amount: US$ 86 millions Positions held: Expert in Terminal Buildings and Airport Infrastructure Activities performed: Design Review and construction supervision.

Name of assignment or project: Verification of the Project Courier Building, Air Cargo Terminal, Ezeiza

International Airport Year: 2005 Location: Ezeiza, Buenos Aires, Argentina Company: Infrastructure Division, Civil Aviation Authority, Argentina, belongs to the

Argentine Air Force Main project features: Verification and Supervision of the Project for the Courier cargo building in the

Air Cargo Terminal, TCA, 3000 m2. Construction Amount: US$ 4.5 millions Positions held: Head of Department of Architecture, Infrastructure Division / specialist on

Passenger and Cargo Terminal Buildings Activities performed: He also participated in studies and Project supervision

Page 8: Actual Position OPERATIONS MANAGER LATAM & CARIBBEAN ...alacpa.org/CV-Eng-FERNANDO RATTO-Feb-2020.pdf · CV Fernando Ratto Actual Position: OPERATIONS MANAGER LATAM & CARIBBEAN CONSTRUCTIONS

CV Fernando Ratto

Name of assignment or project: Review of Master Plan, Air Cargo Terminal, Ezeiza, Minister Pistarini

International Airport Year: 2005 Location: Ezeiza, Buenos Aires, Argentina Company: Infrastructure Division, Civil Aviation Airport Authority, belongs to the Air

Force. Main project features: Supervision of the integration project, import and export sectors, Air

Cargo Terminal TCA. Construction Amount: US$ 10.5 millions Positions held: Head of Department of Architecture, Infrastructure Division Activities performed: Project studies and supervision, as a specialist in passenger and cargo

terminal buildings.

Name of assignment or project: N/A Year: 2003-2006 Location: Argentina Company: Infrastructure Division, Civil Aviation Authority, Argentina Positions held: Head of Department of Architecture Activities performed: Planning, design, documentation, management, etc. of airport projects

and other buildings. Coordinator and teacher of Course on Airport Infrastructures (40 hours) in the Centre of Instruction, Development and Research, C.I.P.E., Ezeiza, with ICAO support.

Name of assignment or project: Modification and Extension of Menorca International Airport Year: 2003-2004 Location: Spain Company: INECO Main project features: Project Supervision of Modification and Extension of Menorca

International Airport and baggage handling building in Fuerteventura Airport.

Positions held: Technical contributor. Activities performed: Design review and technical documentation.

Name of assignment or project: Phase I verification of the Project of Extension of Terminal “A” passenger

building of Ezeiza International Airport, Minister Pistarini Year: 2002 Location: Buenos Aires, Argentina Company: Infrastructure Division, Civil Aviation Airport Authority, belongs to the Air

Force. Main project features: Verification and supervision of the Project of Extension and adjustment

of Terminal “A” passenger building, Step 1, surface: 47.000 m2. Construction Amount: US$ 9 millions Positions held: Head of the Department of Architecture of Infrastructure Management.

Activities performed: Specialist on Passenger and Cargo Terminal Buildings. Name of assignment or project: N/A Year: 2001-2002 Location: Argentina Company: Infrastructure Division of Argentine Air Force Main project features: Development of activities as the attention of Equipment and programs

employed in the organization, internal rules elaboration, determination of hardware and software use standards, network design, etc.

Positions held: Head of IT department of Infrastructure Management.

Page 9: Actual Position OPERATIONS MANAGER LATAM & CARIBBEAN ...alacpa.org/CV-Eng-FERNANDO RATTO-Feb-2020.pdf · CV Fernando Ratto Actual Position: OPERATIONS MANAGER LATAM & CARIBBEAN CONSTRUCTIONS

CV Fernando Ratto

Activities performed: Coordinator and teacher of course of Introduction to Airport Infrastructure. In the Centre of Instruction, Development and Research, C.I.P.E., Air Force, Ezeiza (20 hours) with ICAO support.

Name of assignment or project: N/A Year: 2000-2002 Location: Argentina Company: Infrastructure Division of Argentinean Air Force Positions held: Head of Architecture Department Activities performed: Technical documentation. Head of the Department.

Coordination, control and supervision of the different projects, for example Air Traffic Control Center ACC, in Ezeiza, among others.

Name of assignment or project: N/A Year: 1998-1999 Location: Argentina Company: Infrastructure Division of Argentinean Air Force Main project features: Development of construction for Category III in the Minister Pistarini

Airport, in Ezeiza. There were made official different documents corresponding to the airports in the country, concerning airside and landside, for the process of concession. He actively participated in the planning and execution of the Air Navigation Regional Third Meeting for the Caribbean and South America, organized by ICAO in Buenos Aires, an event of international scope.

Positions held: Head of Department of Technical Documentation of the Infrastructure Division of Argentine Air Force

Activities performed: Technical Documentation Performance.

Name of assignment or project: N/A Year: 1997 Location: Argentina Company: Infrastructure Division of Argentine Air Force Main project features: see activities performed Positions held: Head of Department of Technical Documentation and head of the

Department of Architecture of Infrastructure Management

Activities performed: He managed the coordination of the main infrastructure projects developed in the Argentine Air Force. He participated on the adaptation of Minister Pistarini Airport to obtain Category III ILS. He attended, in commission, the Ministry of Defense in the Radar National Project.

Name of assignment or project: N/A Year: 1993-1996 Location: Argentina Company: Infrastructure Division of Argentine Air Force Main project features: Assistant in the Department of Architecture. Being responsible for the

Legal Clauses preparation and the final tender arrangement for the call for bids. Verification and supervision of the project of extension and adaptation of the Airlift sector in the passenger terminal building, Jorge Newbery Airport, Buenos Aires.

Positions held: Head of Department of Infrastructure Management Technical Documentations

Page 10: Actual Position OPERATIONS MANAGER LATAM & CARIBBEAN ...alacpa.org/CV-Eng-FERNANDO RATTO-Feb-2020.pdf · CV Fernando Ratto Actual Position: OPERATIONS MANAGER LATAM & CARIBBEAN CONSTRUCTIONS

CV Fernando Ratto

Activities performed: Coordinator in Infrastructure area for the “Radar National Plan”. Legal clauses preparation and final arrangement of tender for Public Works biddings.

Name of assignment or project: Project of movement area and passenger airterminal widening of the

International Airport Cataratas de Iguazú, Province of Misiones, Argentina.

Year: 1992 Location: Buenos Aires, Argentina Company: Infrastructure division, Civil Aviation Authority, belongs to the Air Force.

Main project features: Platform widening and taxiway construction, horizontal signs and

lighting. Extension of boarding gates and restricted areas of passenger terminal.

Construction Amount: US$ 6.85 millions Positions held: Head of the Department of Architecture of Infrastructure Management Activities performed: Within his activities, he participated on Project studies and supervision

as a Specialist on passenger and cargo terminal buildings.

Name of assignment or project: Project Final Study of the widening of the movement area and passenger

terminal of the International Airport S.C. de Bariloche, Argentina. Year: 1992 Location: Buenos Aires, Argentina Company: Infrastructure division, Civil Aviation Authority, belongs to the Air Force.

Main project features: Project of extension of movement area and passenger terminal,

passenger terminal building modernization and increasing of the airfield capacity.

Construction Amount: US$ 7.6 million Positions held: Head of the Department of Architecture of Infrastructure Management

Activities performed: Within his activities he participated on Project studies and supervision as

a Specialist on passenger and cargo terminal buildings.

Name of assignment or project: Project of passenger terminal and movement area widening, El Plumerillo

International Airport, Mendoza, Argentina. Year: 1990 Location: Buenos Aires, Argentina Company: Infrastructure division, Civil Aviation Airport Authority, belongs to the Air

Force Main project features: Project of modernization of the passenger terminal building and increase

of the airfield capacity. Construction Amount: US$ 5.6 million Positions held: Head of the Department of Architecture of Infrastructure Management

Activities performed: Leader the design group for the widening and improvement of the airport

capacity.

Name of assignment or project: N/A Year: 1987-1993 Location: Patagonia Argentina Company: Infrastructure division of the Argentinean Air Force Main project features:

He participated on the following works:

Page 11: Actual Position OPERATIONS MANAGER LATAM & CARIBBEAN ...alacpa.org/CV-Eng-FERNANDO RATTO-Feb-2020.pdf · CV Fernando Ratto Actual Position: OPERATIONS MANAGER LATAM & CARIBBEAN CONSTRUCTIONS

CV Fernando Ratto

• EZQUEL: HVAC of Operative Group.

• BARILOCHE: Signage of the International Airport runway. Extension of the movement area and passenger terminal building.

• MENDOZA: Soil movement and move the Gendarmerie Building.

• RIO GALLEGOS: Building. Firefight Service, Construction of Maintenance, Electrification of high, medium and low tension. Shoulder and taxiway. Taxiway construction Runway 07-25, International Airport.

• RIO GRANDE: Construction for Radom of Radar and Electrification of the Solar System, Cabo Domingo. Argentina

• TANDIL: Flight Simulator extension in the VI Air Brigade, surface 200 m2.

Positions held: Head of South Zone of the Direction of Infrastructure - Argentine Air Force

Activities performed: Supervision of the inspections of all south area works.

Name of assignment or project: Construction Management of Infrastructure division, Argentine Air Force Year: 1984-1986 Location: Argentina Company: Argentine Air Force. Construction & Control Department. Main project features: Collaboration with the Head of the area in the verification of

certifications, works progress, technical reports, etc. Positions held: Assistant of Head of zone Activities performed: Verification of the Argentine North East construction.

Name of assignment or project: Construction inspection Year: 1982- 1983 Location: Tandil, Province of Buenos Aires, Argentina Company: Argentine Air Force - VI Air Brigade, Tandil Main project features: Supervision: technical, administrative and economical:

• Four single-family homes, total surface 1000 m2.

• Home building, total surface 10000 m2, corner Santamarina Ave and San Martín, Tandil.

• Flight simulator building, surface 350 m2.

• Passenger Terminal Airport, Tandil, surface 900 m2.

• Technical Group Hangar, total refurbishment, surface 8000 m2.

• Concrete APRON and parking area.

• Tandil terminal passenger, surface 12000 m2 Positions held: Head of Construction Inspection of the Infrastructure division in the VI

Air Brigade, Tandil Activities performed: Lead the construction supervision activities.