ad hoc building committee - 15 mar 2018 - civicweb
TRANSCRIPT
Agenda
Ad Hoc Building Committee Meeting
Thursday, March 15, 2018 @ 2:00 PM
Shawano County Courthouse, Room 7
Members: Mark Bolin, Kevin Conradt, Jerry Erdmann
Richard Ferfecki, Tom Kautza, Arlyn Tober
Page
1. Call meeting to order. 2. Public comment - limited to 10 minutes. 3. Approval of minutes from previous meeting. 3.1.
Ad Hoc Building Committee - 15 Feb 2018 - Minutes - Pdf 2 - 3
4. Motion to deviate from the order of the agenda, if necessary . 5. Discussion and possible action on building site at W7327
Anderson AV, Shawano, to include: driveway permitting,
meetings with the Town of Wescott Planning Commission,
certified survey map and related issues.
5.1.
Property swap
HR Survey Signed (003)
4 - 6
6. New business that is requested for future committee
consideration.
7. Set next meeting date. 8. Adjournment.
Accommodations due to disability can be made by calling: 715-526-6685
Page 1 of 6
Minutes
Ad Hoc Building Committee Meeting
Thursday, February 15, 2018, 2:00 PM
Shawano County Courthouse, Room 7
Members Present: Conradt, Bolin, Erdmann, Ferfecki, Kautza, and Tober
Members Absent:
Others Present: Steve Dreher, Brent Miller, Bill Devine, Tony Kordus, Nitta Charnon,
and Rick Kane 1 Call meeting to order. Meeting called to order by Chairman Bolin at 2:00 pm. 2 Public comment - limited to 10 minutes. None 3 Approval of minutes from previous meeting. Motion by Kautza, seconded by Conradt to approve the minutes of the previous meeting. All
yes. Motion carried. 4 Motion to deviate from the order of the agenda, if necessary . Motion by Ferfecki, seconded by Erdmann to deviate from the posted agenda if necessary. All
yes. Motion carried. 5 Discussion and possible action on revised floor plans. Bill Devine presented a quick video of another project by Devine Inc. so the committee could get an idea of how the project progresses. The committee reviewed the conceptual floor plan for the
showroom building. Motion by Conradt, seconded by Ferfecki to approve the conceptual plan for
the showroom building. All yes. Motion carried.
Committee reviewed a conceptual design for the can crusher area. Motion by Kautza, seconded
by Tober to approve the conceptual floor plan of the can crusher area. All yes. Motion carried.
Committee reviewed a conceptual design for the woodworking building. Motion by Erdmann, seconded by Ferfecki to approve the conceptual design of the woodworking building. All yes.
Motion carried.
The committee reviewed a conceptual site plan. Consensus of the committee to move forward
with the site planning. 6 New business that is requested for future committee consideration. New building concepts. Bidding process, no bids will be let for the project until plans receive
state approval. Site approval from the Town of Wescott.
Page 1 of 2
Page 2 of 6
7 Set next meeting date. Next meeting of the Ad Hoc Building Committee will be held March 15th at 2 p.m. in room 7 of
the Courthouse. 8 Adjournment. Motion by Ferfecki, seconded by Conradt to adjourn. All yes. Motion carried. Meeting
adjourned at 3:19 p.m.
Submitted by: Steve Dreher, Maintenance Supervisor
Page 2 of 2
Page 3 of 6
NORTHEAST CORNER OF SECTION25, T.27N.. R.15E.. P.K. NAILRECOVERED.
1768.53'2661.42'
N O1'18'55" W25.01 ’
S 89’57'55" ES 89'57'55" E
‘J
‘ N 89'57’55" WPARCEL ‘A’6,767 30. FEET
0.747 ACRE2 E n
PARCEL '13’LIJ L) WW
*5 6,761 50. F5270.747 ACRE
‘§%§%"Lu :2§E 2
‘N, g1'1§'55" ‘II.S O1'18'55" E
LEGEND AND NOTES.DENOTES1" IRON PIPE RECOVERED.
O DENOTES1"( O.D. ) x 18' IRON PIPE SET, $3MIN. WEIGHT= 1.13 LBS./LINEALFOOT. ”T"’\)
RECORDEDAS BEARINGSOR DISTANCESARE EV5”°‘”" ‘N ( ) WHEN °""*'ERENT- EAST 1/4 CORNER or SECTION E:
PRIORTO consmucnou, PLEASEvzmnr 25, T.27 N., R.15 E.. SHAWANO °
CURRENTSETBACKRESTRICTIONS. COUNTYMONUMENT( STAINLESS ZSTEEL BERNTSEN ) RECOVERED.
I. WAYNER. REUTER,LANDSURVEYOR,WISCONSINREGISTRATIONNO. S-2263. D0HEREBYCERTIFYTHATI HAVE SURVEYEDTHE LANDSSHOWNHEREON, AND THATTHESAID SURVEYIS ACCURATEAND TRUE TO THE BEST OF MY KNOWLEDGEAND BELIEF;THATTHE MAPAS SHOWNHEREONIS A TRUEAND CORRECTREPRESENTATIONOF THE\\\\\xx\\\\\\““""""II///////.,,,,2eJa.:.“R.vEz-aw. ezzem °F
DATEDrHIs;—__I__nAYF .201$
WAYNER. m?, isunvzvonSURVILYEDTHIS 2131 DAY OF JUNE.2010. BY NORDIN& ASSOCIATES.INC.
NORDIN 8: ASS'0C'., INC.PROFESSIONALLAND SURVEYORS
N584-1 STATE HWY. "47-55" SHAWANO, WI 54166(715) 526-3638 FAX (715) 524-9922
MAP OF PART OF THE SE I/4 OF THE NE7/4,SECTION25. 7227M.R. 75 5. TOWNOFWE$O077l SI-IAWANOCOUNT)’, MSCONS/N.
JUL2 9 yuan
nevEt3§»'IIE‘»?r%:pw"“"'" °” CUFF T °""“ M- LUEDTKE°‘"‘ °6/2‘/201° "°“”°‘ 14225
Page 4 of 6
R. W. Nordin & Associates, Inc.ProfessionalLand Surveyors
'
N584-1State Hwy47-55 .5lIa/Iano,Wisconsin54166Phone 715-526-3638 '
Fax 715-524-9922Saw Wiswndn5/nu IE5
June 23, 2010
Dennison to Luedtke
Parcel A
That part of the SE1/4 of the NE1/4, Section 25, Township 27 North, ofRange 15 East, Town of Wescott, ShawanoCounty, Wisconsin, bounded anddescribed as follows: Commencing at the East 1/4 corner of the said Section 25;thence N01°12'37’W along the section line 892.89 feet; thence N89°57'55”\N33.78 feet to the west line of S.T.H. "47—55"and the place of beginning; thenceN89°57'55"W continuing on the same line 246.52 feet; thence N01°18'55”\N25.01 feet; thence S89°57’55"E 246.54 feet to the west lineof S.T.H. "47-55";thence SO1°15’55"E along thesaid west line 25.01 feet to the place of beginning.Subject to all easements and restrictions of record. Parcel contains 0.141 Acre.
Luedtketo Dennison
Parcel B
That part of the SE1/4 of the NE1/4, Section 25, Township 27 North,ofRange 15 East, Town of Wescott, Shawano County, Wisconsin, bounded anddescribed as follows: Commencing at the East 1/4 corner of the said Section 25;thence NO1°12’37’W'along the section line 892.89 feet; thence N89°57’55"W280.30 feet to the place of beginning; thence S01°18’55”E 184.04 feet; thenceN89°16’36’W 33.52 feet; thence NO1°18'55"W 183.64 feet; thence S89°57’55”E33.51 feet to the place of beginning. Subject _toall easements and restrictions ofrecord. Parcel contains 0.141 Acre:
b©a.,.,Q.{§;5,\Wayne R. Reuter, PSm14226
Page 5 of 6
File Name: F:\SURVEY\S3317A13\CiviI3D 2014\BaseData\Ex-topo.dwgPlotted By: YURKDon 03/06/2018 at 04:15 PM
LEGAL DESCRIPTION:A PARCEL OF LANDLOCATEDIN PART OF THE SOUTHEASTQUARTER OF THE NORTHEASTOF SECTION25. T27N.
R15E.TOWN OF WESCOTT, SHAWANOCOUNTY.WISCONSINMORE FULLY DESCRIBEDASFOLLOWS:
COMMENCINGAT THE EAST OUARTERCORNEROF SECTION25. TZTN.RISEITHENCENO1°12'37"W COINCIDENTWITHTHE EAST LINE OF THE NORTHEASTOUARTEROF SECTION25 A DISTANCE
OF 1289.53 FEET:THENCE N8S°56'O5”W A DISTANCE OF 34.16 FEET TO THE WESTERLYRIGHT-OF-WAYLINEOF STH 47-55 ALSO
BEINGTHE POINTOF BEGINNING?
THENCESO1"14'33"ECOINCIDENTWITHSAID WESTERLYRIGHT-OF'WAYLINEA DISTANCEOF 397.07 FEET:O‘ 100' 200'
THENCEN89°57'13"W A DISTANCEOF 280.03 FEET;THENCE SO1'19‘42"EA DISTANCEOF 183.64 FEET TO THE NORTHERLYRIGHT-OF-WAYLINE OF THE WISCONSIN
CENTRALLIMITEDRAILROAD:THENCEN89°15'54"W COINCIDENTWITHSAID NORTHERLYRIGHT-OF-WAYLINEA DISTANCEOF 771.33 FEET TO THE
EAST LINEOF LOT 4. SHAWANOCOUNTYCERTIFIEDSURVEYMAPNO. 27203THENCENO1°12'31"W COINCIDENTWITHSAID EAST LINE A DISTANCEOF 571.77 FEET TO THE SOUTHERLY
RIGHT-OF-WAYLINEor ANDERSONAVENUE:RORTREASTCORNER
THENCE S89'56‘05"E COINCIDENTWITHSAIDSOUTHERLYRIGHT-OF-WAYLINE A DISTANCEOF 1050.49 FEET TO SECTION 25
THE POINT OF BEGINNINGT27N, R155COMPUTED FROM
PARCEL TOTAL CONTAINS12.745 ACRES (‘$55,188 SQUARE FEET) MORE OR LESS.TIES
SUBJECT TO ALL EASEMENTSANDRESTRICTIONSOF RECORD
ANDERSON'S I IE
E-
AW E ” I3 2 T
A \
-1
I I‘ N
so
I I IswCORNER
‘ V l ‘BLOCK5 _ LOT 5 LOT 8 LOT 7 LOT 6 LOT 5 LOT 8 LOT 7 LOT 6 LOT 5 LOT 8 LOT 7 LOT 6 LOT 5ANDERSONS PLAT
IOFWESCOIT 2 2 z 1 z
ANDERSON AVENUE mww 5.9.‘::§*.§.°“"°———-“NETABLE
FROMCORNER\ LINE BEARING DISTANCE
S89°56‘05"E
"K"
/ _,(__,x__._x———x»—-x»——><-—?\I
10‘ UTILITY X
EASEMENTDOC ‘$99411
, —— —— :2 ——.—— — L1 NE3°SE‘O5"W 34.16‘
229.10‘ (229.00')4x—— xx——— —x———x——x
OI wIII1DLIIwr
I I24‘X30' EASEMENT
"\ SHAWANOLAKE SAN.LEGEND
O 1/4" OD IRON PIPE SETWEIGHING1.13 LBS PER LIN. FT.
0 1" IRON PIPE FOUND
O. 3/4" IRON REBAR FOUND
I ) RECORDEDAS
--X— EXISTINGFENCE
%I 4:1‘ LIGHT POLE
l ?g POWER POLE
—-OH— OVERHEAD UTILITY LINES
xDISTRICT'1
DOC’ 651190
571.77‘
/* /
«K» /*
\/(IVERHANG
/\ _ _
E_ _ .__// I
/GRAVELDRIVE I7"“"7_
( CONCRETE CONCRETE J,_____ _ _ _ _ _ __ _ _ __ _ _ _ _ _ _ _l
III
IPARCEL POLE
I POLE
12.745 ACRES t SHED I SHED
: 10‘ UTILITY
IIL
397.07‘duced IFI any m
IEI
‘I MES
lI) HORIZONTALCONTROL BASED UPON555.188 SOUARE FEET 1 EASEMENT
Doc ‘T599411 WISCONSINCOORDINATESSHED
I
E REFERENCESYSTEM COORDINATES
%‘(WISCRS) SHAWANOCOUNTY,
be wpIeLI,
NAD 83 (1991). NORTH IS REFERENCED
I TO THE EAST LINE or THENORTHEASTOUARTER BEING
I N01°I2’37"W.CONCRETE
(NO1"I3‘13"W)NO1°12'31"WNo I;(‘II I
2) PLAT or SURVEY BY NORDIN ANDASSOCIATES INC. DATED JUNE 21,
NDRDIISLANDOISSDEIIAPTESINC2°” WAS PREPAREDToDESCRIBE2 PARCELS FOR LAND TO
JUNE 21' 2010 BE SwAPPED BETWEENLUEDTKEANDDENNISON.No EVIDENCEON
Docge 673275 RECORDEDDOCUMENTOF LAND— -— -— TRANSFERS WAS FOUND.
PLAT OF SURVEYSHAWANO COUNTY311 N. MAIN STREETSHAWANO, WISCONSIN 54166
NO EASEMENTOF RECORD O1VN
\IIASSOCIATES
ONE SYSTEMS DRIVEAPPLETON, WI 54914(920) 735-6900
REV DATE DESCRIPTION”
SHEET DESCRIPTION
OH 95News-54--w (N8916' . '
771.33‘
WISCONSHVCHIN IMTED RAEOAD 100’ MW
_3,:
‘.7. :2
E '-" Ez 5:!‘ ?
2 SURVEYOR'SCERTIFICATE: §
I. DAVID A. YURK.STATE OF WISCONSINREGISTEREDLAND SURVEYOR NO. S~2648 DO
HEREBYCERTIFY THAT I HAVE MADE A SURVEYOF THE LANDS SHOWN HEREON ACCORDINGTO
THE OFFICIALRECORDS AND THAT THIS MAP IS A
TRUE AND ACCURATE REPRESENTATIONTHEREOFTO THE BEST OF MY KNOWLEDGEAND BELIEF.
E 1/4 CORNER ?id O. _ (4,./eSECTIoN 25 _ R
TERM REE DAVID A. YURK P.L.S. No. S 2648 PROJECT MANAGER:DAY A
MAG SPIKE —5_6_Zo'aFOUND ——-———?
PROJ NO: S3317A18DATE DATE: 2/26/18
DRAWINGNO.
©”1OI/I OMNNI
Page 6 of 6