add btss- new cells

Upload: dao-tran-minh-quan

Post on 03-Apr-2018

226 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/28/2019 Add BTSs- New Cells

    1/30

    Alcatel BSS

    Add BTS(s), newcell(s)

    O&MDocumentation

    Scenario

    3BK 17416 0841 RJZZA Ed.03

  • 7/28/2019 Add BTSs- New Cells

    2/30

    Status RELEASED

    Short title MPI 84 / 1 7

    All rights reserved. Passing on and copying of this document, useand communication of its contents not permitted without writtenauthorization from Alcatel.

    BLANK PAGE BREAK

    2 / 30 3BK 17416 0841 RJZZA Ed.03

  • 7/28/2019 Add BTSs- New Cells

    3/30

    Contents

    Contents

    Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

    1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

    1.1 Presentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101.1.1 Cases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101.1.2 Options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101.1.3 Restrictions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101.1.4 Grouped Task Sequence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

    1.2 Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 121.2.1 Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 121.2.2 Site Specific Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 131.2.3 External Tasks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

    1.3 Scheduling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 131.4 Telecom / Supervision Outage and Operating Impact . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 151.5 Resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16

    1.5.1 Tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16

    1.5.2 Supplies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 161.5.3 Applicable Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17

    2 Scenario . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19

    2.1 Before Going On-site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 202.2 Before you start . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 202.3 Scenario Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21

    2.3.1 Perform initial checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 212.3.2 Create Abis (Case 1) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 212.3.3 Create BTS(s) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 212.3.4 Create Cell(s) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 222.3.5 Insert BTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 252.3.6 Call Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26

    2.3.7 Create Adjacencies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 262.3.8 Final Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27

    2.4 Reverse procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 282.4.1 Lock Cells . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 282.4.2 Disconnect BTS(s) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 282.4.3 Unlock Cells . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 282.4.4 Delete Cell . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 292.4.5 Delete BTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 292.4.6 Delete Abis (Case 1) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 292.4.7 Final Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30

    3BK 17416 0841 RJZZA Ed.03 3 / 30

  • 7/28/2019 Add BTSs- New Cells

    4/30

    Figures

    Figures

    Figure 1: Grouped Task Sequence for Add BTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

    4 / 30 3BK 17416 0841 RJZZA Ed.03

  • 7/28/2019 Add BTSs- New Cells

    5/30

    Tables

    Tables

    Table 1: Sites/Personnel/Duration in Minutes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14

    Table 2: Traffic Outage, Loss of Supervision . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

    Table 3: Software tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16

    Table 4: Forms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16

    3BK 17416 0841 RJZZA Ed.03 5 / 30

  • 7/28/2019 Add BTSs- New Cells

    6/30

    Tables

    6 / 30 3BK 17416 0841 RJZZA Ed.03

  • 7/28/2019 Add BTSs- New Cells

    7/30

    Preface

    Preface

    Purpose To add a BTS.

    Audience This document is intented for:

    Field service technicians

    Specialists

    Project managers

    Foremen.

    AssumedKnowledge You must have a basic understanding of the following:For planification purpose

    Network architecture and reshuffling principles

    Basic knowledge for scheduling.

    For realization purpose

    Alcatel operations and maintenance concepts for BSS

    Alcatel 1353RA OMC-R

    Equipment (BSC, BTS, MFS) hardware configurations

    Windows environment.

    3BK 17416 0841 RJZZA Ed.03 7 / 30

  • 7/28/2019 Add BTSs- New Cells

    8/30

    Preface

    8 / 30 3BK 17416 0841 RJZZA Ed.03

  • 7/28/2019 Add BTSs- New Cells

    9/30

    1 Overview

    1 Overview

    This chapter gives information needed for project managers and foremen, forpresentation to the customer and site planning.

    3BK 17416 0841 RJZZA Ed.03 9 / 30

  • 7/28/2019 Add BTSs- New Cells

    10/30

    1 Overview

    1.1 Presentation

    Note: The logical configuration can be activated completely independently from thephysical connection of the BTS. Creating adjacencies and call tests must beconducted after the BTS is functional and connected to the network.

    Coordination is needed between BTS and OMC-R sites to define the initialsettings. The Qmux address must always be set. For A9100/A910 BTSs, thetransmission mode is configured via OML.

    The GPRS option is not applicable when the Abis chain to the BTS is passingthrough a satellite connection.

    G1 MKII BTSs can only be used if they have a BIUMD card (Chain) and if theyare equipped with DRFU. They cannot be used if they have a BIU2M card (Star).If they have the BIU2M card, either the BTS or the card must be replaced.

    G2 BTSs can only be used if they have a FUMO or DRFU card. They cannotbe used if they have a FUCO card, in this case either the BTS or the cardmust be replaced.

    In order to create a required configuration it is also possible to add more thanone new BTS and more than one cell. In this case it is better to perform all thelogical parameters modification into a single PRC.

    1.1.1 Cases

    The following cases apply:

    C1: BTS is installed on a new Abis. There is no traffic outage.

    C2: BTS is installed on an existing Abis with downstream BTSs. This case

    causes a traffic outage on the downstream BTSs.

    C3: BTS is installed at the end of an Abis chain (no downstream BTSs).There is no traffic outage.

    1.1.2 Options

    The method takes into account one option:

    O1 : Configuring the GPRS for the cells

    O2 : Abis connection via satellite.

    O3: Create cell(s) shared (applicable only for A9100 BTSs ).

    1.1.3 Restrictions

    None.

    10 / 30 3BK 17416 0841 RJZZA Ed.03

  • 7/28/2019 Add BTSs- New Cells

    11/30

    1 Overview

    1.1.4 Grouped Task Sequence

    Figure 1 shows the grouped task sequence for the Add BTS scenario.

    MSC OMCR

    Initial checks

    BTS

    Create Abis (Case 1)

    Create cell

    Create BTS

    Final checks

    Insert BTS

    Figure 1: Grouped Task Sequence for Add BTS

    3BK 17416 0841 RJZZA Ed.03 11 / 30

  • 7/28/2019 Add BTSs- New Cells

    12/30

    1 Overview

    1.2 Preparation

    1.2.1 Prerequisites

    The following prerequisites apply:

    BTS sites are clean, tidy and easily reachable.

    The Abis is installed and tested.

    For Case 2, the jumper linking the upstream and downstream BTSs has

    been installed. This jumper is removed during this scenario.

    BTS(s) is installed and commissioned.

    For option O3: Clock synchronization cable(s) must be already installed

    between BTSs involved into cell shared .

    BTS(s) must be configured with the correct initial settings.

    There are adequate resources to handle the new traffic channels and LapD.

    All BTS SW packages and OMU-CPF are loaded in BSC memory.

    12 / 30 3BK 17416 0841 RJZZA Ed.03

  • 7/28/2019 Add BTSs- New Cells

    13/30

    1 Overview

    1.2.2 Site Specific Information

    You need the following site specific information:

    Identification of cases and options to perform

    BTS site topology

    Case 1: Characteristics of the Abis (name, Qmux TS if BTS(s) to insert is

    G1/G2 BTS).

    Characteristics of the BTS(s) (family, HW generation, name, Qmux address,

    number of sectors, mode of transmission, antenna diversity, master or

    slave, Qmux TS for G1/G2 BTS).

    List of cells to create with parameters value ( LAC, CI, frequency, TS

    definition). The list has to be exhaustive.

    List of cells supporting GPRS and parameters value ( RA code, RA color,

    Min_Pdch, Max_Pdch_High_Load, Max_Pdch )List of adjacencies with parameters (list of impacted cells, direction of

    the HO)

    1.2.3 External Tasks

    The following external task is to be taken into account:

    1. All cells are declared at MSC site

    2. Ask the personnel at MSC to perform a MSC database update for takinginto account the parameters for the new BTS.

    3. In case of Option 2, check and update if needed the CRC4 for the Abis atthe BSC site.

    4. Update adjacencies on neighbours OMCs if necessary

    1.3 Scheduling

    Table 1 describes the sites, personnel and duration of each Grouped task andthe total time to perform the scenario.

    Time based on technical constraintsThe times in the following table do not take into account individual customer or

    safety requirements.

    GroupedTask

    MSC TSC BSC BTS Imp.BTS

    OMC -R Time/ Task

    Perform InitialChecks

    - - - - - 1 op

    15

    15

    Create Abis(C1)

    - - - - - 1 op

    C1:6

    6, only for case C1

    3BK 17416 0841 RJZZA Ed.03 13 / 30

  • 7/28/2019 Add BTSs- New Cells

    14/30

    1 Overview

    GroupedTask

    MSC TSC BSC BTS Imp.BTS

    OMC -R Time/ Task

    Create BTS(s) - - - - - 1 op

    8/ BTS+1

    C2,C3:+2/BTS

    O2: +3

    8/ BTS+1

    C2,C3:+2/BTS

    O2: +3

    Create Cell(s) 1 op

    (3)

    - - - - 1 op

    17/cell+2/BTS+6

    O1: +7/cell

    O3: +3/cell

    17/cell+2/BTS+6

    O1: +7/cell

    O3: +3/cell

    Insert BTS(s) - - 1 com

    C1:5

    C2:10

    C3:5

    - 1 op

    7/BTS+1/cell+1

    C2:+1+5/cell+2/BTS*

    7/BTS+1/cell+1

    C1:+5

    C2:+10+5/cell+2/BTS*

    C3:+5/BTS

    Call Tests - - - 1 com

    5/cell

    - 1 op

    5

    5+5/cell

    CreateAdjancencies

    - - - - - 1 op

    9/cell

    9/cell

    Final Checks - - - 1 com - 1 op

    15

    15

    TOTAL TIME 49+17/BTS+32/cellC1:+11

    C2: +2/BTS*+13+5/cell

    C3: +7

    O1: +7/cell

    O2: +3

    O3: +3/ cell(shared)

    Table 1: Sites/Personnel/Duration in Minutes

    Note :

    BTS for added BTS

    BTS* for downstream BTS.

    14 / 30 3BK 17416 0841 RJZZA Ed.03

  • 7/28/2019 Add BTSs- New Cells

    15/30

    1 Overview

    1.4 Telecom / Supervision Outage and Operating Impact

    The following table describes the traffic outage and loss of supervision causedby each Grouped task.

    Out.ReF.

    GroupedTask

    Tel Out/ GPRSOut.

    TelRed Sup Out OM Out Impacts...

    - Perform InitialChecks

    - - - - None

    - Create Abis(Case C1)

    - - - - None

    - Create BTS(s) - - - - None

    - Create Cell(s) - - 1/30 - Sup.out. 130 duringthe PRC activation

    1 Insert BTS 2/BTS*+2/cell+10- 10+2/BTS* - For C2, outage ondownstream BTSs

    For O2+C2 telcomand GPRS outagefor downstream BTSs(same value)

    - Call Tests - - - - None

    - CreateAdjacencies

    - - - - None

    - Final Checks - - - - None

    - Total C2:2/BTS*+2/cell+10

    - C2: 10+2/BTS*

    for all cases:+1/30

    - C2:2/BTS*+2/cell+10

    O2+C2:2/BTS*+2/cell+10GPRS +telecomoutage

    During the activationsupervisionoutage:130.

    Table 2: Traffic Outage, Loss of Supervision

    Note :

    BTS for added BTS

    BTS* for downstream BTS.

    3BK 17416 0841 RJZZA Ed.03 15 / 30

  • 7/28/2019 Add BTSs- New Cells

    16/30

    1 Overview

    1.5 Resources

    1.5.1 Tools

    The following tables describe the tools that are needed.

    HardwareTools

    Item Part Number Use at ...

    Wiring tools for disconnection and reconnectionof PCM

    - BTS

    Mobiles for call testing - BTS

    PC with associated cables - BTS

    Item Part Number Use at ...

    BTS Terminal for B7.2 - BTS

    LMT-CT (Craft Terminal) for B7.2 - BSC

    Table 3: Software tools

    Item Part Number Use at ...

    None

    Table 4: Forms

    1.5.2 Supplies

    The following table describes the supplies needed for this operation.

    Item Part Number Use at ...

    Topology regarding operation - BTS

    16 / 30 3BK 17416 0841 RJZZA Ed.03

  • 7/28/2019 Add BTSs- New Cells

    17/30

    1 Overview

    1.5.3 Applicable Documents

    The following documents are needed:

    A1353-RA Configuration Handbook

    A1353-RA Surveillance Handbook

    B7 BSS Methods Handbook .

    Network Configuration Recommendations

    BTS Terminal User Guide

    Transmission Terminal User Guide

    BTS Site Master/ Slave Synchronization

    3BK 17416 0841 RJZZA Ed.03 17 / 30

  • 7/28/2019 Add BTSs- New Cells

    18/30

    1 Overview

    18 / 30 3BK 17416 0841 RJZZA Ed.03

  • 7/28/2019 Add BTSs- New Cells

    19/30

    2 Scenario

    2 Scenario

    This chapter presents all checks needed before beginning the scenario, and alldetailed tasks to be performed on each site.

    3BK 17416 0841 RJZZA Ed.03 19 / 30

  • 7/28/2019 Add BTSs- New Cells

    20/30

    2 Scenario

    2.1 Before Going On-site

    Before going on-site, you must check the following information are available.

    All Prerequisites (Section 1.2.1) are fulfilled.

    The customer has been informed about the:

    Date

    Time

    Site name

    Site address

    Purpose of the operation.

    Personnel are available and ready for the operation (see Scheduling

    (Section 1.3)).

    Site Specific Information (Section 1.2.2) is available and ready for operation.

    Tools (Section 1.5.1) are available and ready for operation.

    Supplies (Section 1.5.2) are available and ready for operation.

    Documentation is available and ready for operation.

    2.2 Before you start

    Check that all Prerequisites (Section 1.2.1) in the overview are fulfilled.

    Well check the availability of all necessary tools and material

    Inform the operator.

    Among the cases (C1, C2, C3) described within Overview chapter 1.1.1,identify which are your cases. Identify as well the option you have choosen.

    RequiredKnowledge You must be familiar with the following:

    Safety Rules and Precautions

    Telecom / Supervision Outage and Operating Impact (Section 1.4)

    Instruction for reverse procedure decision

    Grouped Task Sequence (Section 1.1.4)

    Operating Hints

    How to document Faults and Anomalies.

    20 / 30 3BK 17416 0841 RJZZA Ed.03

  • 7/28/2019 Add BTSs- New Cells

    21/30

    2 Scenario

    2.3 Scenario Description

    The detailed tasks for adding a BTS are described below.

    Note: Case specific tasks are marked with a C1, C2 or C3 in the Note column.Detailed Tasks that do not have C1, C2 and C3 in the note column are common

    to all three cases and must be performed.To add a BTS to:

    A new Abis, use Case 1 (C1)

    An existing Abis with downstream BTSs, use Case 2 (C2)

    A BTS to the end of an existing Abis (no downstream BTSs), use Case 3

    (C3).

    Options are marked with O1, O2, O3 in the Note column. Detailed tasks thathave O1, O2, O3 are applied only if that option is choosen.

    2.3.1 Perform initial checks

    Note Task Description Site To Do Outage

    Perform an Audit Alarm State on BSS. OMC-R 10 None

    View Status of Managed Objects and Alarmsonall the BTSs of the TSU and for the Abis, print it.

    OMC-R 5 None

    2.3.2 Create Abis (Case 1)

    Note Task Description Site To Do Outage

    C1 Create Abis Chain/Ring . Wait for thetransmission programming flag to change fromAbis to idle.

    OMC-R 6 None

    2.3.3 Create BTS(s)

    In order to create a required configuration it is also possible to add morethan one new BTS .

    Note Task Description Site To Do Outage

    C2, C3 If the BTS(s) to add is G1 or G2, check if theAbis is set with a TS for Qmux. If not, reserveone Qmux TS by Modify Abis Chain/RingCharacteristics

    OMC-R 2 None

    3BK 17416 0841 RJZZA Ed.03 21 / 30

  • 7/28/2019 Add BTSs- New Cells

    22/30

    2 Scenario

    Note Task Description Site To Do Outage

    Create BTS . Always set the Qmux address.

    For option O3 : Declare the new BTS in slaveand select the concerned Master BTS name, if

    is necessary.

    If you receive any error messages, see Checkingfor Sufficient Resources on Abis.

    Wait for the Information window confirming thecreation of the new BTS, click on &ok.

    Wait for the transmission programming flag tochange from Abis to idle

    OMC-R 7/ BTS None

    Verify with the BTS site that the initial settingsare correct. If it is not correct, change the Qmuxaddress (see Modify Initial Settings ) at the BTS

    site for each new BTS.

    OMC-R/BTS 1 / BTS None

    O2 If the Abis is connected via satellite Check CyclicRedundancy at the BSC side using LMT-CTtool, and, if needed, Modify CRC4

    OMC-R /BSC

    3 None

    Check that the newly created BTSs appear inthe hierarchy view of the Radio ConfigurationBrowser (SC).

    OMC-R 1 None

    2.3.4 Create Cell(s)

    In order to create a required configuration it is also possible to create morethan one cell. In this case it is better to perform all the logical parametersmodification into a single PRC

    Note Task Description Site To Do Outage

    Create PRC(PRC1). Enable the buttonAutomatic opening in the Create PRC window.The PRC is opened once created.

    OMC-R 1 None

    O3 Copy OMC cells to PRC

    , the cell(s) which becoming shared with the newBTS, if is necessary.

    OMC-R 2/ cell None

    Use Copy BTS to PRC , to copy the new BTSsfrom the SC to the PRC1.

    OMC-R 2/ BTS None

    OMC-R 1/ cell NoneO3 Link Cell to a secondary BTS Sector

    Note: for each cell which becoming shared

    22 / 30 3BK 17416 0841 RJZZA Ed.03

  • 7/28/2019 Add BTSs- New Cells

    23/30

    2 Scenario

    Note Task Description Site To Do Outage

    Create Provisioning Cell or Duplicate Cell . Thecell is created/duplicated in the PRC1 and is ina locked state. Create one cell for each sector

    is necessary.

    OMC-R 2/ cell None

    Use Set Cell Telecom Parameters. OMC-R 2/ cell None

    Create Radio Frequency. OMC-R 30/ cell None

    Create Frequency Hopping System , if you useFrequency Hopping.

    OMC-R 1 30/ cell None

    OMC-R 30/ TRX NoneCreate TRX.

    Note : For O3 select the TRX in[Secondary] TRX on a shared BTS sector,

    if is necessary.

    Configure TRX Channel Hopping Law , tohopping or no hopping.

    OMC-R 1 30/ cell None

    Specify TRX Preference. OMC-R 30/ TRX None

    Configure Logical Channels. OMC-R 1/ cell None

    OMC-R 5/ cell NoneO1 Set BSS/BSC Telecom Parameters in PRC1 toupdate GPRS parameters if needed. This taskincludes the modification of CAE data specificto the MFS.

    Notice: the duration depends of thenumber of parameters to modify. Hereis considered 10 parameters in differentwindows

    OMC-R 2/ cell NoneO1 If GPRS parameters have to be modifiedon cell(s) then, Edit n Cells in PRC.Modify parameters such as Min_Pdch andMax_Pdch_High_Load, Max_Pdch, RoutingArea Code or Routing Area Color

    Notice1: To have GPRS on the cell GPRSPref.mark must be different from 0. Tomodify it, use the java script Set/UpdateGPRS pref. Mark using script

    Notice2: to modify only one cell, theoperator can use the edit cell command(see Set Cell Telecom Parameters )

    Notice3:For O3 : GPRS Pref. mark =0, forsecondary sector.

    Click on in the Edit Cellwindow to save cell modifications in the PRC1.Wait for the message No error or warningand click on &ok. If the check produces errormessages, correct the configuration as requiredand re-attempt the check. Continue correctionsand checks until no errors occur.

    OMC-R 30/ cell None

    Click on to exit from the Edit Cellwindow.

    OMC-R 30/ cell None

    3BK 17416 0841 RJZZA Ed.03 23 / 30

  • 7/28/2019 Add BTSs- New Cells

    24/30

    2 Scenario

    Note Task Description Site To Do Outage

    OMC-R 1/ cell NoneMap Cell to a BTS Sector.

    Note:map each new cell

    Use the Check All option ( without forcing celladministrative state) in Check PRC to check theparameters, hardware and telecom impact ofyour PRC1.

    If the check produces error messages, correctthe configuration as required and re-attempt thecheck. Continue corrections and checks until noerrors occur.

    OMC-R 1 None

    Ask the MSC personnel to update the parametersin the MSC DB.

    OMC-R/MSC 3 None

    24 / 30 3BK 17416 0841 RJZZA Ed.03

  • 7/28/2019 Add BTSs- New Cells

    25/30

    2 Scenario

    2.3.5 Insert BTS

    To minimize traffic outage, you must keep the time between the lock andunlock cells to a minimum.

    For option O 3: Clock synchronization cable(s) must be already installed

    between BTSs involved into cell shared . If the cables are not installed performthis installation using chapter Install Synchronization Cables form BTS SiteMaster/ Slave Synchronization scenario.

    Note Task Description Site To Do Outage

    C1, C3 If not done previously, the BTS must bephysically connected to the new Abis link(use BTS Connection ).

    BTS 5 None

    C2 Inform the OMC-R you are ready to insert the

    BTS into the Abis link.

    BTS/

    OMC-R

    1 None

    C2 In the Abis Interface View Window, selectthe Abis chain/ring where you insert thenew BTS. Write down the BTSs that aredownstream from the new BTS. Go to theSC and lock the cells, use Shut Down Cellof these downstream BTSs (WTC=3 min ).Inform the BTS site when the cells are locked.

    OMC-R 4/cell START 1, starttelecom+ GPRSoutage fordownstreamBTSs.

    C2 Lock BTS O&M Capability of the downstreamBTSs.

    OMC-R 1/ BTS* OUTAGE 1

    C2 Inhibit Alarm Reporting on Abis TP, ( selectInhibit Alarm Reporting on TP Down)

    OMC-R 1 OUTAGE 1

    C2 Jumper Disconnection. BTS 5 OUTAGE 1

    C2 BTS Connection. BTS 5 OUTAGE 1

    C2 Unlock BTS O&M Capability of thedownstream BTSs.

    OMC-R 1/ BTS* OUTAGE 1

    C2 Use Unlock Cell, to unlock the cells of thedownstream BTSs.

    OMC-R 1/cell END1

    After connection the new BTS will enable itsOML link. Unlock BTS O&M Capabilityof theadded BTSs.

    OMC-R 1/ BTS None

    It starts the download for each new BTS. Aftera time the OMC-R will automatically trigger aHW and alarm audit for the each new BTS.All the boards of the BTS must appear onOMC-R BSS equipment view. Wait until theend of BTS(s) audit.

    OMC-R 6/ BTS None

    3BK 17416 0841 RJZZA Ed.03 25 / 30

  • 7/28/2019 Add BTSs- New Cells

    26/30

    2 Scenario

    Note Task Description Site To Do Outage

    OMC-R 5 / cell NoneActivate PRC (PRC1). Choose to activateusing the option Without forcing celladministrative state. This option keeps the

    cells locked.

    The activation time depends on the number of

    cells activated.During the activation supervision outage(130).

    Close PRC(PRC1). OMC-R 1 None

    C1, C2 Allow Alarm Reporting on Abis TP, ( selectAllow Alarm Reporting on TP Down)

    OMC-R 1 None

    Use Unlock Cell , to unlock the cells of thenew BTS(s).

    OMC-R 1/ cell None

    2.3.6 Call Tests

    Note Task Description Site To Do Outage

    BTS 5/cell NonePerform Call Test for the each new cell.

    Task must be done in parallel with thenext task. .

    Unlock cell from Call Test detailed tasknot necessary here.

    CHECK Display USD Detailed Cell Information . Checkthat the new cells are in traffic. If not, go totheReverse procedure (Section 2.4) .

    OMC-R 5 None

    2.3.7 Create Adjacencies

    Note Task Description Site To Do Outage

    Create Adjacency for the new cell withnotes taken at preparation step assumingboth adjacencies towards new internalcells and adjacencies towards newexternal cells.

    OMC-R 5 /new cell(s) None

    For each cell on the same OMC thatmust be adjacent to the new added ones,Modify Adjacency to include the newadded cells.

    OMC-R 2 /cell None

    For each cell on the neighbour OMCsthat must be adjacent to the new addedcells, Modify Adjacency on neighbour

    OMCs to include the new added cells.

    neighbourOMC-R

    2 /cell None

    26 / 30 3BK 17416 0841 RJZZA Ed.03

  • 7/28/2019 Add BTSs- New Cells

    27/30

    2 Scenario

    2.3.8 Final Checks

    Note Task Description Site To Do Outage

    Perform an Audit Alarm State on BSS. OMC-R 10 None

    View Status of Managed Objects and Alarmsonall the BTSs of the TSU. Compare this check tothe initial check.

    OMC-R 5 None

    3BK 17416 0841 RJZZA Ed.03 27 / 30

  • 7/28/2019 Add BTSs- New Cells

    28/30

    2 Scenario

    2.4 Reverse procedure

    2.4.1 Lock Cells

    Note Task Description Site To Do Outage

    In the SC, use Lock Cell to lock all the cellsthat correspond to the added BTSs.

    OMC-R 1/cell -

    C2 In the SC, use Shut Down Cell for each cellof the downstream BTSs (WTC=3).

    OMC-R 4/ cell -

    C2 Lock BTS O&M Capability of thedownstream BTSs.

    OMC-R 1/BTS* -

    Lock BTS O&M Capability of the addedBTSs.

    OMC-R 1 -

    2.4.2 Disconnect BTS(s)

    Note Task Description Site To Do Outage

    BTS Disconnection ( for each added BTS). BTS 5 -

    C2 Inhibit Alarm Reporting on Abis TP, ( selectAllow Alarm Reporting on TP Down)

    OMC-R 1 -

    C2 Jumper Connection. BTS 5 -

    2.4.3 Unlock Cells

    Note Task Description Site To Do Outage

    C2 Unlock BTS O&M Capability of thedownstream BTSs.

    OMC-R 1/BTS* -

    C2 Allow Alarm Reporting on Abis TP, ( select

    Allow Alarm Reporting on TP Down)

    OMC-R 1 -

    C2 In the SC, use Unlock Cell to unlock allcells of the downstream BTSs. Traffic isrestarted on the cells of the downstreamBTSs.

    OMC-R 1 Traffic Restarts

    28 / 30 3BK 17416 0841 RJZZA Ed.03

  • 7/28/2019 Add BTSs- New Cells

    29/30

    2 Scenario

    2.4.4 Delete Cell

    Note Task Description Site To Do Outage

    Use Open PRC to open the PRC1 OMC-R 1 -

    O3 Unlink Cell from a secondary BTS Sector ,unlink the cell(s) which is shared with theadded BTS(s)

    OMC-R 1/ cell -

    O3 Delete TRX, to delete all TRXs for thesecondary sector

    OMC-R 1/cell -

    O3 Delete Radio Fraquency, to delete allfrequency for the secondary sector

    OMC-R 1/cell -

    Delete OMC Cell from PRC, delete all thecell(s) from the added BTS(s).

    OMC-R 1/ cell -

    Activate PRC(PRC1).

    The activation time depends on the numberof cells activated.

    OMC-R 5 / cell -

    Close PRC(PRC1). OMC-R 1 -

    Delete PRC(PRC1). OMC-R 2 -

    Ask the MSC personnel to update theparameters in the MSC DB.

    MSC 3 -

    2.4.5 Delete BTS

    Note Task Description Site To Do Outage

    Delete BTS(s) from OMC-R . Wait for thetransmission programming flag to changefrom Abis to idle.

    OMC-R 6/ BTS -

    2.4.6 Delete Abis (Case 1)

    Note Task Description Site To Do Outage

    C1 Delete Abis Chain / Ringyou created. Waitfor the transmission programming flag tochange from Abis to idle.

    OMC-R 6 -

    3BK 17416 0841 RJZZA Ed.03 29 / 30

  • 7/28/2019 Add BTSs- New Cells

    30/30

    2 Scenario

    2.4.7 Final Checks

    Note Task Description Site To Do Outage

    Display USD detailed Cell Information .

    Check that the downstream BTSs are intraffic.

    BTS 5 -

    Perform an Audit Alarm State on BSS. OMC-R 10 -

    View Status of Managed Objects and Alarmson all the BTSs of the TSU. Compare thischeck to the initial check.

    OMC-R 5 -